Loading...
HomeMy WebLinkAboutSummary of Bidder Inquiries No. 1Page 1 of 1 Summary of Bidders Inquiries No. 1 Lake Washington Loop Trail Project Federal Aid Number: TAP-HLP-1070-008 Date: December 23,2020 The responses to bidder inquiries, unless incorporated into a formal addendum to the contract, are not part of the contract and are provided for the bidders’ convenience only. The responses may be considered along with all other information furnished to pr ospective bidders for the purpose of bidding on the project. The use of information provided in the responses to bidder inquiries is not to be construed in any way as a waiver of the provisions nor excuse the contractor from full compliance with the contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given and any such subsequent response or addenda should be taken into consideration when submitting a bid for the project. Bidder Inquiry No. 1 What is the Engineer’s Estimate for the project? City of Renton Response to Bidder Inquiry No. 1 The Engineer’s Estimate for the project is $1,400,000. This information is currently posted on the project summary page. Bidder Inquiry No. 2 In regards to the Special provisions 1.05.4 does the Owner provide survey or does the Contractor provide survey. Please clarify. City of Renton Response to Bidder Inquiry No. 2 The intent is for the Contractor to provide the construction surveying . Section 1.05.4 will be revised in Addendum 1. Please refer to Addendum No. 1 for clarification. End of Summary of Bidder Inquiries No. 1