Loading...
HomeMy WebLinkAboutMFP20005651.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20005651 IVR Number: 20005651 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:12/03/2020Application Date:0823059001Parcel Number: 1164 ABERDEEN AVE NE Permit Type:01/15/2021Issue Date:Franchise Permit Work Class:01/15/2022Expiration Date:Minor Utility Job Number: 349780-1Franchise Type:Cable Description: Comcast to overlash fiber, replace hardline coax, and fiber splicing. Restoration per City of Renton standards Contacts Name Address PhoneTypeBilling Rhonda Resnik Comcast 410 Valley Ave NW, Suite 12, Bldg C Puyallup, WA 98371 B: (253) 864-4246Applicant Shannon Heaton Cannon Construction Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Michael Cannon Cannon Construction Inc 406 Porter Way Milton, WA 98354-9638 B: (253) 922-2787 C: (253) 588-4034 Contractor Business License Number: 20838Electrical Contractor: CANNOCI873CL Construction Contractor: CANNOCI055CS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP20005651 Scott Warlick 1/15/2021 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20005651 Scott Warlick CED 1/15/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPR2-1 ABERDEEN AVE NEWTW20-1 W21-5 W20-1 N COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000349780WARNTNH07500 NE 12TH ST & ABERDEEN AVE NE RENTON, WA 98056 TCP 1 4 12/2/2020 AH CK ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION SITE SPECIFIC TRAFFIC CONTROL PLAN [UNDERGROUND WORK] CONTROL TYPE: SHOULDER CLOSURE 2-LANE ROAD SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. PLACE TEMP "NO PARKING" SIGNS AT LEAST 72 HOURS PRIOR TO WORK 3. SIDE WALKS TO REMAIN OPEN DURING ROAD WORK, UNLESS NOTED OTHERWISE SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 ***TRAFFIC CONTROL ADDITIONAL NOTES *** - At aerial work, will be a moving traffic control setup -Will coordinate with business that will be affected by construction. -Will have Spotter on site to escort pedestrian through work zone. - All work will stop while pedestrians are escorted through work zones. -Will have no more than two work areas active at a time. -Work Areas will have 2-3 Man Work Crews with line truck. MFP20005651 FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R2-1 NE 12TH ST WT W20-1W21-5 W20-1 FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPR2-1 ABERDEEN AVE NEWTW20-1 W21-5 W20-1 WTABERDEEN AVE NEN COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000349780WARNTNH07500 NE 12TH ST & ABERDEEN AVE NE RENTON, WA 98056 TCP 2 4 12/2/2020 AH CK ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION SITE SPECIFIC TRAFFIC CONTROL PLAN [UNDERGROUND WORK] CONTROL TYPE: SHOULDER CLOSURE 2-LANE ROAD SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. PLACE TEMP "NO PARKING" SIGNS AT LEAST 72 HOURS PRIOR TO WORK 3. SIDE WALKS TO REMAIN OPEN DURING ROAD WORK, UNLESS NOTED OTHERWISE SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 ***TRAFFIC CONTROL ADDITIONAL NOTES *** - At aerial work, will be a moving traffic control setup -Will coordinate with business that will be affected by construction. -Will have Spotter on site to escort pedestrian through work zone. - All work will stop while pedestrians are escorted through work zones. -Will have no more than two work areas active at a time. -Work Areas will have 2-3 Man Work Crews with line truck. MFP20005651 EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPR2-1 MONTEREY AVE NEWTW20-1 W3-4 W20-7aFLAGGERW20-1 W3-4 W20-7a FLAGGERN COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000349780WARNTNH07500 NE 12TH ST & ABERDEEN AVE NE RENTON, WA 98056 TCP 3 4 12/2/2020 AH CK ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION SITE SPECIFIC TRAFFIC CONTROL PLAN [UNDERGROUND WORK] CONTROL TYPE: FLAGGING SETUP 2-LANE ROAD SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. PLACE TEMP "NO PARKING" SIGNS AT LEAST 72 HOURS PRIOR TO WORK 3. SIDE WALKS TO REMAIN OPEN DURING ROAD WORK, UNLESS NOTED OTHERWISE SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 ***TRAFFIC CONTROL ADDITIONAL NOTES *** - At aerial work, will be a moving traffic control setup -Will coordinate with business that will be affected by construction. -Will have Spotter on site to escort pedestrian through work zone. - All work will stop while pedestrians are escorted through work zones. -Will have no more than two work areas active at a time. -Work Areas will have 2-3 Man Work Crews with line truck. MFP20005651 FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOPEOPEOPEOP EOP EOP EOP FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOP EOP EOP EOP EOP FLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPR2-1 MONTEREY AVE NEWTW20-1 W21-5 W20-1MONTEREY AVE NEW20-1 W20-1 NE 12TH STNE 12TH ST R2-1R2-1 N COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000349780WARNTNH07500 NE 12TH ST & ABERDEEN AVE NE RENTON, WA 98056 TCP 4 4 12/2/2020 AH CK ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION SITE SPECIFIC TRAFFIC CONTROL PLAN [UNDERGROUND WORK] CONTROL TYPE: SHOULDER CLOSURE 2-LANE ROAD SITE NOTES: 1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 2. PLACE TEMP "NO PARKING" SIGNS AT LEAST 72 HOURS PRIOR TO WORK 3. SIDE WALKS TO REMAIN OPEN DURING ROAD WORK, UNLESS NOTED OTHERWISE SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 ***TRAFFIC CONTROL ADDITIONAL NOTES *** - At aerial work, will be a moving traffic control setup -Will coordinate with business that will be affected by construction. -Will have Spotter on site to escort pedestrian through work zone. - All work will stop while pedestrians are escorted through work zones. -Will have no more than two work areas active at a time. -Work Areas will have 2-3 Man Work Crews with line truck. MFP20005651 1 - COVER SHEET 2 -OVERVIEW 3 -DESIGN THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES 24 CT FIBER: 514 FT + 20% STORAGE = 617 FT HARDLINE COAX: 170 FT. CONTACTS: PROJECT MAP: *ALL FOOTAGES AND MATERIALS ARE ESTIMATED N SCOPE OF WORK: SHEET INDEX: BILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER (0)= TOTAL FOOTAGE = 0 FT. 684 FT. 0 FT. 0 FT. 0 FT. 684 FT. PROJECT DESCRIPTION - ROW* NEW BUILDING PATH WAY = EXISTING BUILDING PATH WAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL FOOTAGE = 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. PROJECT DESCRIPTION -SITE* TOTAL PROJECT FOOTAGE =684 FT. -SPLICING AT (4) LOCATIONS -TIE IN TO SPLICE CASE SP.WAKV.0618 (CONTINGENT ON JB0000344182) AND PLACE NEW MID SHEATH SPLICE CASE -OVERLASH (1) 24CT FIBER ON EXISTING AERIAL STRAND (TYPICAL) -NEW SPLICE CASE, PLACE 6 CT PIGTAIL AND PLACE NEW NODE -REPLACE HARDLINE COAX CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 COMCAST NE 12TH ST & ABERDEEN AVE NE RENTON, WA 98056 WARNTNH07500 2X2 OFF RN11D JB0000349780 NODE SPLIT CANNON COMPANIES Cody Kainoa - (253)-753-7943 - ckainoa@cannonconstructioninc.com MFP20005651 DHN OF DATE REVISION BY QC CANNON COMPANIES 0000349780WARNTNH07500 NE 12TH ST & ABERDEEN AVE NE RENTON, WA 98056 OVERVIEW 2 3 12/2/2020 AH CK COMCAST SPLICING LOCATIONS WORK AREA: SEE DESIGN ON SHEET 5 SPLICING LOCATION MFP20005651 2010 2022 2028 2131 2019 22081209 2151 2103 2207 2013 0 00 NE 12TH ST NE 12TH ST 0 0 2120 1152 2139 1156 2216 2116 1167 1161 1160 2135 2143 2110 1155 2200 2108 2211 2007 2147 1165 1151 2018 1158 1164 ABERDEEN AVE NE150' 212'152'170' EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLREPLACE HARDLINE COAX TIE IN TO SPLICE CASE SP.WAKV.0618 (CONTINGENT ON JB0000344182) AND PLACE NEW MID SHEATH SPLICE CASE OVERLASH (1) 24CT FIBER ON EXISTING AERIAL STRAND (TYPICAL) TREE TRIMMING REQUIRED NEW SPLICE CASE, PLACE 6CT PIGTAIL AND PLACE NEW NODE CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 1 PSE 318650-166510 NEUTRAL 28 10 N/A SECONDARY 28 2 N/A STREET LIGHT 25 4 N/A CATV 24 7 N/A CTL 23 9 N/A T N N N N N CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 2 PSE 318650-166502 NEUTRAL 25 5 N/A STREET LIGHT 21 6 N/A CATV 20 7 N/A CTL 19 9 N/A N N N N CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 3 PSE 318645-166478 NEUTRAL 27 5 N/A STREET LIGHT 25 9 N/A SECONDARY 23 11 N/A CATV 23 3 N/A COMM 1 22 3 N/A CTL 21 3 N/A N N N N N N CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 4 PSE 318630-166478 NEUTRAL 26 7 N/A STREET LIGHT 24 6 N/A SECONDARY 23 6 N/A CATV 20 0 N/A COMM1 18 7 N/A CTL 17 9 N/A N N N N N N CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 5 PSE 318616-166476 NEUTRAL 26 4 N/A SECONDARY 25 5 N/A STREET LIGHT 22 5 N/A CATV 21 7 N/A COMM 1 20 3 N/A COMM 2 19 0 N/A N N N N N N CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 6 PSE 318615-166458 SECONDARY 22 9 N/A CATV 18 9 N/A COMM 1 16 9 N/A N N N MAKE READY: LOWER CATV TO 20-7 LOWER COMM 1 TO 20-1 LOWER COMM 2 TO 19-7 N OF DATE REVISION BY QC CANNON COMPANIES 0000349780WARNTNH07500 NE 12TH ST & ABERDEEN AVE NE RENTON, WA 98056 DESIGN 3 3 12/2/2020 AH CK COMCAST MFP20005651 Comcast Cable Communications Management 410 Valley Ave NW Suite 12 Bldg C Puyallup, WA 98371 12/8/2020 City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for 0000349780_1 To whom it may concern: Cannon Construction has been contracted to design and engineer this project on behalf of Comcast Cable Communications Management. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposes: - SPLICING AT (4) LOCATIONS - TIE IN TO SPLICE CASE SP.WAKV.0618 (CONTINGENT ON JB0000344182) AND PLACE NEW MID SHEATH SPLICE CASE - OVERLASH (1) 24CT FIBER ON EXISTING AERIAL STRAND (TYPICAL) - NEW SPLICE CASE, PLACE 6 CT PIGTAIL AND PLACE NEW NODE - REPLACE HARDLINE COAX Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over-lash on existing plant will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand. 2. Risk of potential damage to underground facilities will be increased. 3. Over-lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over-lashing the cable will be accomplished in a few days, and the MFP20005651 residents will not notice any impact. Comcast will clean up the over-lashed spans as necessary and identify and remove any existing dead cables along this route. 4. The variance is necessary to prevent any undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare. Comcast does agree to participate in future underground improvements for its proportionate share of the undergrounding costs, waiving the obligation into the future when all other utilities are undergrounded to prevent an undue hardship against Comcast currently. Upon the granting of the variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project, please contact Rhonda Resnik. Thank you for your consideration in this matter. Rhonda Resnik Permit Coordinator Comcast Cable Communications Management o 253-864-4246 | e Rhonda_Resnik@comcast.com January 15, 2021 Rhonda Resnik Comcast Cable Communications Management 410 Valley Ave NW Puyallup, WA 98371 Via Email: Rhonda_Resnik@comcast.com SUBJECT: Request for Undergrounding Exemption (JB#349780_1, MFP20005651, 1164 Aberdeen Ave NE) Dear Ms. Resnik: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have Cannon Construction, Inc. overlash 24ct fiber and Coax cable to existing Puget Sound Energy (PSE) poles within the City: 1. Overlash approximately 514 lineal feet of 24ct fiber beginning at the pole on the southwest corner of 1164 Aberdeen Avenue NE property, continuing north 152 lineal feet along the east side of Aberdeen Avenue NE to southeast corner of Aberdeen Avenue NE and NE 12th Street, then northeast 212 lineal feet crossing to the north side of NE 12th Street, then along east along the north side of NE 12th Street for approximately 150 lineal feet, and ending at the pole to the southwest corner of 2208 NE 12th Street property. 2. Overlash approximately 170 lineal feet of Coax cable beginning at the pole on the northwest corner of 1152 Aberdeen Avenue NE property and ending at a pole 170 lineal feet west at the pole located on 1155 Aberdeen Avenue NE property. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast Comcast Job JB#349780_1 Page 2 of 2 January 15, 2021 franchise agreement which allows new overhead facilities to be placed overhead provided there are other similar providers overhead as well. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with the Comcast Franchise Agreement. Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, January 29, 2021. Due to Governor Jay Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If the situation changes such that the City Clerk’s Office is open when you file your appeal, you have the option of filing the appeal in person. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Vanessa Dolbee, Planning Director Justin Johnson, Assistant Development Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Permit Technician Franchise Permits Shannon Heaton, Cannon Construction sheaton@cannonconstructioninc.com DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP20005651 Engineering 1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 3 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. 4 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. Page 1 of 1