HomeMy WebLinkAboutD_Shoreline Exemption_Heily_210120DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
D_Heily Residence Dock Repair_210120
PLANNING DIVISION
CERTIFICATE OF EXEMPTION
FROM SHORELINE SUBSTANTIAL DEVELOPMENT
EVALUATION FORM & DECISION
DATE: January 20, 2021
PROJECT NAME: Heily Residence Dock Repair
PROJECT NUMBER: LUA21-000006, SME
PROJECT MANAGER: Jill Ding, Senior Planner
OWNER:
Sunday Heily
2727 Mountain View Ave N
Renton, WA 98056
APPLICANT/CONTACT: Dustin Howe
Seaborn Pile Driving Co.
1080 W Ewing Pl, Suite 300
Seattle, WA 98119
PROJECT LOCATION: 2727 Mountain View Ave N, Renton, WA 98056
PROJECT DESCRIPTION: The applicant is requesting a Shoreline Exemption for the repair of an
Existing Dock within Lake Washington. The proposed work includes
the repair of 7 support piles using steel sleeves, the removal of 3 10 to
12 inch existing wood mooring piles, the driving of 3 new 10 to 12 inch
steel mooring piles and the installation of a new ThruFlow grated deck
surface to allow light penetration. The project site is located within the
R-8 zone, the Shoreline Residential Jurisdiction, and Lake Washington
Reach E. The proposal would be exempt from SEPA in accordance with
WAC 197-11-800(3) Repair, remodeling, maintenance activities.
LEGAL DESCRIPTION: HILLMANS LK WN GARDEN OF EDEN #1 LOT 88 TGW SELY 1/2 LOT 87
MEAS MIDWAY BTWN NWLY & SELY LNS SD LOT 87 & SH LDS ADJ
SEC-TWN-R: NE 06-23-05
WATER BODY: Lake Washington Reach E
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
City of Renton Department of Community & Economic Development Certificate of Exemption from Shoreline Substantial Development
Heily Residence Dock Repair LUA21-000006, SME
DATE OF PERMIT: January 20, 2021 Page 2 of 3
D_Heily Residence Dock Repair_210120
An exemption from a Shoreline Management Substantial Development Permit is hereby Approved
on the proposed project in accordance with RMC 4.9.190C 'Exemption from Permit System' and for
the following reasons:
Maintenance and Repair of Docks: Existing docks or piers that do not comply with these regulations
may be repaired in accordance with the criteria below.
i. When the repair and/or replacement of the surface area exceeds thirty percent (30%) of the
surface area of the dock/pier, light penetrating mat erials must be used for all replacement decking.
For floating docks, light penetrating materials shall be used where feasible, and as long as the
structural integrity of the dock is maintained.
Staff Comment: The decking material is proposed to be replaced with light penetrating material.
ii. When the repair involves replacement of the surfacing materials only, there is no requirement to
bring the dock/pier into conformance with dimensional standards of this Section.
Staff Comment: The proposed work includes the repair of 7 support piles using steel sleeves, the
removal of 3 10 to 12 inch existing wood mooring piles, the driving of 3 new 10 to 12 inch steel
mooring piles and the installation of a new ThruFlow grated deck surface to allow light penetration.
iii. When the repair/replacement involves the replacement of more than fifty percent (50%) of the
pilings, or more, the entire structure shall be replaced in compliance with these regulations. For
floating docks, when the repair/replacement involves replacement of more than fifty percent (50%)
of the total supporting structure (including floats, pilings, or cross-bars), the entire structure shall
be replaced in compliance with these regulations.
Staff Comment: The proposed work includes the repair to 7 support piles, no replacement of dock
piles is proposed. The only pile replacement proposed are 3 separate mooring piles, which are not
connected to the dock.
iv. When the existing dock/pier is moved or expanded or the shape reconfigured, the entire
structure shall be replaced in compliance with these regulations
Staff Comment: No expansion or reconfiguration is proposed.
The proposed development is:
Consistent with the policies of the Shoreline Management Act.
Not Applicable to the guidelines of the Department of Ecology where no Master Program has been
finally approved or adopted by the Department.
Consistent with the City of Renton Shoreline Master Program.
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
City of Renton Department of Community & Economic Development Certificate of Exemption from Shoreline Substantial Development
Heily Residence Dock Repair LUA21-000006, SME
DATE OF PERMIT: January 20, 2021 Page 3 of 3
D_Heily Residence Dock Repair_210120
CONDITIONS: None Recommended
DATE OF DECISION ON LAND USE ACTION:
SIGNATURE:
__________________
Vanessa Dolbee, Planning Director
Department of Community & Economic Development
Date
Attachments: Plan Set
cc: Sunday Heily - Owner
APPEALS: The administrative land use decision will become final if not appealed in writing to the
Hearinge Examiner on or before 5:00 p.m. on February 3, 2021. An appeal of the decision(s) must
be filed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Due to Governor
Jay Inslee’s Proclamation 20-25 (“Stay Home, Stay Healthy”), the City Clerk’s Office is working
remotely. For that reason, appeals must be submitted electronically to the City Clerk at
cityclerk@rentonwa.gov. The appeal fee, normally due at the time an appeal is submitted, will be
collected at a future date. Appeals to the Hearing Examiner are governed by RMC 4 -8-110 and
additional information regarding the appeal process may be obtained from the City Clerk’s Office,
cityclerk@rentonwa.gov. If the situation changes such that the City Clerk’s Office is open when you
file your appeal, you have the option of filing the appeal in person.
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
1/20/2021 | 11:09 AM PST
VICINITY MAP (ZOOMED)
SITE PLAN
SUBJECT
PROPERTY
SHEETA1.0 NWS-2020-XXX
10PAGE 1 OF
Pin: 334210-4050
Legal Description:HILLMANS LK WN GARDEN OF EDEN #1 LOT 88 TGW SELY 1/2 LOT 87 MEAS MIDWAY
BTWN NWLY & SELY LNS SD LOT 87 & SH LDS ADJ
Plat Block: A
Plat Lot: 87 & 88
LAT: 47.51639 LONG: -122.20925
Prepared By:
Seaborn Pile Driving
1080 W Ewing St
Seattle, WA 98119
Office: 206-236-1700
permits@seabornpiledriving.com
www.seabornpiledriving.com
Scope of Work: We propose to repair (7) supporting piles using steel sleeves, replace (3) existing mooring piles with steel mooring piles and re-deck
the existing dock with thruflow decking.Created: 7/29/2020Purpose: The proposed dock is to provide for safe boat moorage and safe water recreational activities for a single family residence.Adjacent Owners:WINTER MARLENE R2731 MOUNTAIN VIEW AVE N 98056RENTON CITY OF2550 LAKE WASHINGTON BLVD 98056Datum: CORPS OF ENGINEERS 1919NE Quarter Of Section 6, Township 23, Range 05Applicant: Sunday Heilly2727 Mountain View Ave N.Renton, WA 98056County: King CountyLocation: Lake WashingtonLast Updated: 7/29/2020 12:05 PM KelseConctractor: Seaborn Pile Driving Company1080 W Ewing StSeattle, WA 98119S E A B O R N
PILE DRIVING COMPANY
N
RECEIVED
01/04/2021 jding
PLANNING DIVISION
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
3'-7"
51'-10"
8'
58'-8"
6'-10"
EXISTING CONDITIONS
SHEETA2.0 NWS-2020-XXX
10PAGE 2 OF
N
Prepared By:
Seaborn Pile Driving
1080 W Ewing St
Seattle, WA 98119
Office: 206-236-1700
permits@seabornpiledriving.com
www.seabornpiledriving.com
Scope of Work: We propose to repair (7) supporting piles using steel sleeves, replace (3) existing mooring piles with steel mooring piles and re-deck
the existing dock with thruflow decking.Created: 7/29/2020Purpose: The proposed dock is to provide for safe boat moorage and safe water recreational activities for a single family residence.Adjacent Owners:WINTER MARLENE R2731 MOUNTAIN VIEW AVE N 98056RENTON CITY OF2550 LAKE WASHINGTON BLVD 98056Datum: CORPS OF ENGINEERS 1919NE Quarter Of Section 6, Township 23, Range 05Applicant: Sunday Heilly2727 Mountain View Ave N.Renton, WA 98056County: King CountyLocation: Lake WashingtonLast Updated: 7/29/2020 12:05 PM KelseConctractor: Seaborn Pile Driving Company1080 W Ewing StSeattle, WA 98119S E A B O R N
PILE DRIVING COMPANY
HEILY JOHN PATRICK+SUNDAY G
2727 MOUNTAIN VIEW AVE N 98056
Parcel #: 334210-4050
WINTER MARLENE R
2731 MOUNTAIN VIEW AVE N 98056
RENTON CITY OF
2550 LAKE WASHINGTON
BLVD 98056
LAKE WASHINGTON
LAT
E
R
A
L
LI
N
E
LAT
E
R
A
L
LI
N
E
EXIS
TI
N
G
PI
E
R:
N
O
W
O
R
K
P
R
O
P
O
S
E
D
10' S
E
T
B
A
C
K
10' S
E
T
B
A
C
K
**CLEAN UP LAKE AROUND PROJECT**
OHWM -21.8'
15' DEPTH
OHWM 30' OFFSET
EXISTING PIER TO BE REPAIRED
5'10'0'20'
SCALE: 1" = 20'-0"
EXISTING BOAT LIFT
TO REMAIN
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
3'-7"
8'
6'-10"
51'-10"
58'-8"SHEETA3.0 NWS-2020-XXX
10PAGE 3 OF
PROPOSED CONDITIONS
N 5'10'0'20'
SCALE: 1" = 20'-0"
Prepared By:
Seaborn Pile Driving
1080 W Ewing St
Seattle, WA 98119
Office: 206-236-1700
permits@seabornpiledriving.com
www.seabornpiledriving.com
Scope of Work: We propose to repair (7) supporting piles using steel sleeves, replace (3) existing mooring piles with steel mooring piles and re-deck
the existing dock with thruflow decking.Created: 7/29/2020Purpose: The proposed dock is to provide for safe boat moorage and safe water recreational activities for a single family residence.Adjacent Owners:WINTER MARLENE R2731 MOUNTAIN VIEW AVE N 98056RENTON CITY OF2550 LAKE WASHINGTON BLVD 98056Datum: CORPS OF ENGINEERS 1919NE Quarter Of Section 6, Township 23, Range 05Applicant: Sunday Heilly2727 Mountain View Ave N.Renton, WA 98056County: King CountyLocation: Lake WashingtonLast Updated: 7/29/2020 12:05 PM KelseConctractor: Seaborn Pile Driving Company1080 W Ewing StSeattle, WA 98119S E A B O R N
PILE DRIVING COMPANY
GRATED THRUFLOW DECKING TO REPLACE
SOLID SURFACE DECKING THROUGHOUT
HEILY JOHN PATRICK+SUNDAY G
2727 MOUNTAIN VIEW AVE N 98056
Parcel #: 334210-4050
WINTER MARLENE R
2731 MOUNTAIN VIEW AVE N 98056
RENTON CITY OF
2550 LAKE WASHINGTON
BLVD 98056
LAKE WASHINGTON
LAT
E
R
A
L
LI
N
E
LAT
E
R
A
L
LI
N
E
EXIS
TI
N
G
PI
E
R:
N
O
W
O
R
K
P
R
O
P
O
S
E
D
10' S
E
T
B
A
C
K
10' S
E
T
B
A
C
K
**CLEAN UP LAKE AROUND PROJECT**
OHWM -21.8'
15' DEPTH
OHWM 30' OFFSET
EXISTING PIER TO BE REPAIRED
EXISTING BOAT LIFT
TO REMAIN
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
LEGEND
(7) EXISTING PILES - TO BE REPAIRED
(3) EXISTING PILES - TO BE REPLACED
(6) EXISTING PILES - NO WORK TO BE DONE
Area: 439 sqft (total)
Area: 415 sqft (over water)
Area: 439 sqft (new thruflow grated decking)
A'A'
10"
10"
12"
12"
12"
10"
12"
10"
12"
12"
12"
10"8"
10"12"12"
58'-8"
8'
3'-7"
6'-10"SHEETA4.0 NWS-2020-XXX
10PAGE 4 OF
PIER DETAILS
PLAN VIEW
Prepared By:
Seaborn Pile Driving
1080 W Ewing St
Seattle, WA 98119
Office: 206-236-1700
permits@seabornpiledriving.com
www.seabornpiledriving.com
Scope of Work: We propose to repair (7) supporting piles using steel sleeves, replace (3) existing mooring piles with steel mooring piles and re-deck
the existing dock with thruflow decking.Created: 7/29/2020Purpose: The proposed dock is to provide for safe boat moorage and safe water recreational activities for a single family residence.Adjacent Owners:WINTER MARLENE R2731 MOUNTAIN VIEW AVE N 98056RENTON CITY OF2550 LAKE WASHINGTON BLVD 98056Datum: CORPS OF ENGINEERS 1919NE Quarter Of Section 6, Township 23, Range 05Applicant: Sunday Heilly2727 Mountain View Ave N.Renton, WA 98056County: King CountyLocation: Lake WashingtonLast Updated: 7/29/2020 12:05 PM KelseConctractor: Seaborn Pile Driving Company1080 W Ewing StSeattle, WA 98119S E A B O R N
PILE DRIVING COMPANY
EXISTING BOAT LIFT
TO REMAIN
EXISTING MOORING PILES
TO BE REPLACED
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
EXISTING MUD SUBSTRATE
LAKE
WASHINGTON
58'-8"
6"
25'
5'-6"
OHWL
SHEETA5.0 NWS-2020-XXX
10PAGE 5 OF
PIER DETAILS
SECTION VIEW
Prepared By:
Seaborn Pile Driving
1080 W Ewing St
Seattle, WA 98119
Office: 206-236-1700
permits@seabornpiledriving.com
www.seabornpiledriving.com
Scope of Work: We propose to repair (7) supporting piles using steel sleeves, replace (3) existing mooring piles with steel mooring piles and re-deck
the existing dock with thruflow decking.Created: 7/29/2020Purpose: The proposed dock is to provide for safe boat moorage and safe water recreational activities for a single family residence.Adjacent Owners:WINTER MARLENE R2731 MOUNTAIN VIEW AVE N 98056RENTON CITY OF2550 LAKE WASHINGTON BLVD 98056Datum: CORPS OF ENGINEERS 1919NE Quarter Of Section 6, Township 23, Range 05Applicant: Sunday Heilly2727 Mountain View Ave N.Renton, WA 98056County: King CountyLocation: Lake WashingtonLast Updated: 7/29/2020 12:05 PM KelseConctractor: Seaborn Pile Driving Company1080 W Ewing StSeattle, WA 98119S E A B O R N
PILE DRIVING COMPANY
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
OHWL
Floatation
Sediment
Containment
Curtain
Weighted Chain
EXISTING
LAKEBED/SOIL
DETAIL 1.1 DETAIL 1.2
SHEETA7.0 NWS-2020-XXX
10PAGE 7 OF
BMP INFORMATION
A.Constant vigilance shall be kept for the presence of protected fish species during all aspects of the
proposed action, particularly during in-water activities such as vessel movement, deployment of anchors &
spuds, pile driving, dredging, and placement of gravels and other fill.
1.The project manager shall designate an appropriate number of competent observers to survey the project
site and adjacent areas for protected species, including the presence of fish as conditions allow.
2.Visual surveys shall be made prior to the start of work each day, and prior to resumption of work following
any break of more than an hour. Periodic additional visual surveys throughout the work day are strongly
recommended.
3.All in-water work shall be done during the in-water work window for the waterbody. Where there is a
difference between the USCOE and WDFW work windows, the overlap of the two shall apply.
4.All pile driving and extraction shall be postponed or halted when obvious aggregations or schooling of fish
are observed within 50 yards of that work, and shall only begin/resume after the animals have voluntarily
departed the area.
5.When piloting vessels, vessel operators shall operate at speeds and power settings to avoid grounding
vessels, and minimize substrate scour and mobilization of bottom sediments.
B.No contamination of the marine environment shall result from project-related activities.
1.Appropriate materials to contain and clean potential spills shall be stored and readily available at the work
site and/or aboard project-related vessels.
2.The project manager and heavy equipment operators shall perform daily pre-work equipment inspections
for cleanliness and leaks. All heavy equipment operations shall be postponed or halted should a leak be
detected, and shall not proceed until the leak is repaired and the equipment is cleaned.
3.To the greatest extent practicable, utilize biodegradable oils for equipment that would be operated in or
near water.
4.Fueling of land-based vehicles and equipment shall take place at least 50 feet away from the water,
preferably over an impervious surface. Fueling of vessels shall be done at approved fueling facilities.
5.Turbidity and siltation from project-related work shall be minimized and contained through the appropriate
use of erosion control practices, effective silt containment devices, and the curtailment of work during
adverse weather and tidal/flow conditions.
6.All wastes shall be collected and contained for proper disposal at approved upland disposal sites
appropriate for the material(s).
7.When removing piles and other similarly treated wood, containment booms must fully enclose the work
area. Wood debris, oils, and any other materials released into lake waters must be collected, removed,
and properly disposed of at approved disposal sites.
8.All in- and over-water wood cutting would be limited to the minimum required to remove the subject wood
component, and all cutting work should be enclosed within floating containment booms.
9.When removing piles, no actions shall be taken that would cause adhering sediments to return to lake
waters.
10.Above-water containment shall be installed around removed piles to prevent sediment laden waters from
returning to lake waters.
11.Construction staging (including stocking of materials, etc.) will occur on the supply barge.
BMP NOTES:
DETAIL 1.1 & 1.2
Prepared By:
Seaborn Pile Driving
1080 W Ewing St
Seattle, WA 98119
Office: 206-236-1700
permits@seabornpiledriving.com
www.seabornpiledriving.com
Scope of Work: We propose to repair (7) supporting piles using steel sleeves, replace (3) existing mooring piles with steel mooring piles and re-deck
the existing dock with thruflow decking.Created: 7/29/2020Purpose: The proposed dock is to provide for safe boat moorage and safe water recreational activities for a single family residence.Adjacent Owners:WINTER MARLENE R2731 MOUNTAIN VIEW AVE N 98056RENTON CITY OF2550 LAKE WASHINGTON BLVD 98056Datum: CORPS OF ENGINEERS 1919NE Quarter Of Section 6, Township 23, Range 05Applicant: Sunday Heilly2727 Mountain View Ave N.Renton, WA 98056County: King CountyLocation: Lake WashingtonLast Updated: 7/29/2020 12:05 PM KelseConctractor: Seaborn Pile Driving Company1080 W Ewing StSeattle, WA 98119S E A B O R N
PILE DRIVING COMPANY
LAKE WASHINGTON
LAT
E
R
A
L
LI
N
E
HEILY JOHN PATRICK+SUNDAY G
2727 MOUNTAIN VIEW AVE N 98056
Parcel #: 334210-4050
WINTER MARLENE R
2731 MOUNTAIN VIEW AVE N
98056
RENTON CITY OF
2550 LAKE WASHINGTON
BLVD 98056
LAT
E
R
A
L
LI
N
E TEMP.
S
E
DI
M
E
NT
C
U
RT
AI
N
1.1
SHE
E
T
A6.0
1.2
SHE
E
T
A6.0
OHWM -21.8'
EXIS
TI
N
G
PI
E
R:
N
O
W
O
R
K
P
R
O
P
O
S
E
D
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B
CONSTRUCT MOUND OF EXCAVATED SOIL
TO SET ROOTBALL AT PROPER ELEVATION
FINISHED GRADE
SETTLE BACKFILL WITH
WATER IMMEDIATELY
AFTER PLANTING. ADD
BACKFILL AS NECESSARY
TO ACHIEVE LEVEL
SURFACE
DEPTH AS NECESSARY
TO ACHIEVE PROPER
HEIGHT OF TRUNK
FLARE
5' DIAMETER PLANTING PIT
REMOVE ALL WIRE, TWINE, AND BURLAP
FROM ROOTBALL. SCARIFY AND CUT
GIRDLING ROOTS.
SET CROWN OF ROOTBALL AT TOP OF
BACKFILL/FINISH GRADE. REMOVE EXCESS SOIL
FROM TOP OF ROOTBALL TO EXPOSE CROWN.
2" DIAMETER X 6' TALL WITH TAPERED
BOTTOM, PRESSURE TREATED
LODGEPOLE TREE STAKE
CENTER TREE IN PIT AND SET PLUMB AND
STRAIGHT, ADJUST TREE BY MOVING
ROOTBALL WHILE PROTECTING THE CROWN
FROM BREAKING. DO NOT ADJUST TREE BY
MOVING ONLY THE TRUNK
1/3 THE TREE HEIGHT
30"
NOTES:
1.LOWEST BRANCH HEIGHT SHALL BE 6 FEET ABOVE
ROOT CROWN.
2.AVOID DAMAGE TO ROOTBALL - STAKES SHALL NOT
PENETRATE ROOTBALL.
3.GUY WIRES WILL NOT BE ACCEPTED
4.PROVIDE STAKING FOR WINDY LOCATION. FORWARD
STAKE SHALL BE WINDWARD OF TREE.
5.TREES SHALL BE PLANTED A MINIMUM OF 10 FEET ON
CENTER
1 INCH WIDTH BLACK WEBBING FOR
TENSIONING TREE. SECURE TO POST USING 1
INCH, 8 GAUGE, GALVANIZED DOUBLE WIRE
STAPLES, TWO PER WEB STRAP
SHREDDED WOOD MULCH, 3" MIN. COMPACTED
DEPTH. PULL MULCH 3" AWAY FROM TRUNK
3" HIGH X 10' WIDE MULCH BERM, COMPACTED
FIRMLY
PLANTING PIT BACKFILL WITH A MIX OF 3:1
TOPSOIL TO COMPOSTPREVAILINGWINDROOTBALL
3" BERM
CENTER OF TREE STEM OR
CLUSTER OF TREE STEMS
2" DIAMETER POLE
3"
MULCH LAYER, PULL MULCH
AWAY FROM STEMS
PLANTING PIT BACKFILL WITH A MIX OF 3:1
TOPSOIL TO COMPOST
TREE PLANTING DETAILS (NTS)
SHRUB AND GROUNDCOVER
PLANTING DETAILS (NTS)
3"
SEE PLANTING PLAN
FOR SPACING
NOTES:
1.INSTALLATION SHALL INCLUDE LOOSENING SIDES AND
BOTTOM OF PLANTING PIT AND REMOVE DEBRIS
3.THE PIT SHALL BE SOAKED WITH WATER PRIOR TO,
AND SUBSEQUENT TO, INSTALLATION
4.PRIOR TO INSTALLATION, LOOSENING OF PLAT
ROOTBALLS SHALL OCCUR
5.SHRUBS SHALL BE PLANTED A MINIMUM OF 5 FEET ON
CENTER.SHEETA7.0 NWS-2020-XXX
10PAGE 7 OF
MITIGATION PLAN
Notes:
1.Shrubs are show, and shall be planted, at least five feet on center. Trees are show, and shall be planted, at least ten feet to
center.
2.The property owner will implement and abide by the shoreline planting plan. The plants shall be installed before or
concurrent with the work authorized by this permit. A report, as-built drawing and photographs demonstrating the plants
have been installed or a report on the status of project construction will be submitted to the U.S. Army Corps of Engineers,
Seattle District, Regulatory Branch, within 12 months from the date of permit issuance. This reporting requirement may be
met by completing and submitting a U.S. Army Corps of Engineers approved Report for Mitigation Work Completion form.
3.The property owner will maintain and monitor the survival of installed shoreline plantings for five years after the U.S. Army
Corps of Engineers accepts the as-built report. Installed plants shall achieve 100% survival during monitoring Years 1 and 2.
Installed plants shall achieve at least 80% survival during monitoring Years 3, 4 and 5. Percent survival is based on the total
number of plants installed in accordance with the approved riparian planting plan. Individual plants that die will be replaced
with native riparian species in order to meet the survival performance standards.
4.The property owner will provide annual monitoring reports for five years (Monitoring Years 1-5). Each annual monitoring
report will include written and photographic documentation on plant mortality and replanting efforts and will document
whether the performance standards are being met. Photos will be taken from established points and used repeatedly for each
monitoring year. In addition to photos at designated points, photo documentation will include a panoramic view of the entire
planting area. Submitted photos will be formatted on standard 8 1/2 x 11" paper, dated with the date the photo was taken,
and clearly labeled with the direction from which the photo was taken. The photo location points will be identified on an
appropriate drawing. Annual shoreline planting monitoring reports will be submitted to the U.S. Army Corps of Engineers,
Seattle District, Regulatory Branch, by November 31 of each monitoring year. This reporting requirement may be met by
completing and submitting a U.S. Army Corps of Engineers approved Mitigation Planting Monitoring Report form.
Prepared By:
Seaborn Pile Driving
1080 W Ewing St
Seattle, WA 98119
Office: 206-236-1700
permits@seabornpiledriving.com
www.seabornpiledriving.com
Scope of Work: We propose to repair (7) supporting piles using steel sleeves, replace (3) existing mooring piles with steel mooring piles and re-deck
the existing dock with thruflow decking.Created: 7/29/2020Purpose: The proposed dock is to provide for safe boat moorage and safe water recreational activities for a single family residence.Adjacent Owners:WINTER MARLENE R2731 MOUNTAIN VIEW AVE N 98056RENTON CITY OF2550 LAKE WASHINGTON BLVD 98056Datum: CORPS OF ENGINEERS 1919NE Quarter Of Section 6, Township 23, Range 05Applicant: Sunday Heilly2727 Mountain View Ave N.Renton, WA 98056County: King CountyLocation: Lake WashingtonLast Updated: 7/29/2020 12:05 PM KelseConctractor: Seaborn Pile Driving Company1080 W Ewing StSeattle, WA 98119S E A B O R N
PILE DRIVING COMPANY
PLANTS: Shrubs to be installed 5ft on center and trees to be installed 10ft on center.
PROPOSED PLANTING SPECIES/QUANTITIES
SYMBOL LATIN NAME COMMON NAME QTY SIZE
Thuja picatta Western Redcedar 2 3 ft
Rosa nutkana Nootka Rose 1 1 Gallon
Philadelphus lewisii Mock Orange 2 1 Gallon
10' MITIGATION OFFSET
OHWM -21.8'
DocuSign Envelope ID: EC86462D-B921-498A-902F-8E6C181BA35B