Loading...
HomeMy WebLinkAboutMFP20004615.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20004615 IVR Number: 20004615 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:10/08/2020Application Date:7227801315Parcel Number: 2650 NE 10TH ST Permit Type:01/25/2021Issue Date:Franchise Permit Work Class:01/25/2022Expiration Date:Minor Utility Job Number: 109132572Franchise Type:Natural Gas Description: PSE gas Install 2" HVTT tie in on existing main 109101204 48'N of Sunset LN NE & 11'E of Glennwood AVE NE. Install 2" MPE 7 main via open trench approx. 19'N and 21'W to existing main 109046484 and install 2"HVTT tie in on existing main 109046484. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 RENTON HOUSING AUTHORITY PO BOX 2316 RENTON , WA 98056 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date H H T01 Flaggers Assist Peds. Around Work Zone Adjust Controls to Accommodate Trenching UTILITY WORKAHEAD W21-7 BE PREPARED TO STOP W20-7b W20-7A W20-7A BE PREPARED TO STOP W20-7b UTILITY WORK AHEAD W21-7 UTILITYWORK AHEAD W21-7 W20-7A BE PREPAREDTO STOP W20-7b UTILITY WORK AHEAD W21-7 100' 100' 100' 100' 100' 100' 100' Install 2" HVTT tie-in on existing main 109101204 48'N of Sunset LN NE & 11'E of Glennwood AVE NE. Install 2" MPE-7 main via open trench approx. 19'N and 21'W to existing main 109046484 and install 2"HVTT tie-in on existing main 109046484 K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) CUSTOMER: CONTACT: LOCATION: DATE:W/O # PSE R. Blackie 253.395.6850 2650 NE 10th St Renton WA 10/05/20 OFFICE: 800-343-4049 CELL: 425-765-1153 WATCP@KNDSERVICES.NET WSTCS#011563 109132572 DESIGNED BY: CHRIS SCHALEGER Legend Cones Flagger W20-7A Flagger Ahead BE PREPAREDTO STOP W20-7b be prepared to stop UTILITYWORKAHEAD W21-7 utility work ahead Inventory: 3 Utility Work Ahead 3 Be Prepared to Stop 3 Flagger Ahead 30 Cones 3 Flaggers Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 11' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions NOT TO SCALE NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE N PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLANSunset Ln NESunset Ln NE Harrington Ave NEGlenneood Ave NEwww.invarion.com BLDG A 10 UNITS ~400 SQ.FT. 51' PROPOSED STORM UTILITY IN CONFLICT WITH EXISTING GAS MAIN 4" MPE IP 30'N 109101204-2017 JT 2" MP E I P 6 0' N 1091 0 1 2 0 4 - 2 0 1 7 J T2" MPE IP 7 'W109046484-20091063 5/8" MPEI 1997 91'N 63'N, 1 1' W 2" MPE 11'E 30 'N , 11E SEE CONST. DETAILFLOW FLOWFLOW N Vicinity Map 47.5006, -122.1835 Owner / Developer Contact Info officeATTN: CHARTER CONSTRUCTION 980 S HARNEY ST SEATTLE, WA 98108 JEFF SNOWDEN 206.518.4684 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 1" = 20'N/A 109132572 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL R. BLACKIE 253.395.6850 . K.COSTLEY 425.272.7075 9.1.20 E. PASAYE . 8.27.20 N/A RENTON SUNSET OAKS MAIN RELOCATE 2" MPE IP GAS MAIN RELOCATION 2650 NE 10TH ST, RENTON, WA 98056 PUGET SOUND ENERGY 109132572 N/A 1" = 20' 1 OF 1 KING 30 CIKNC 09NW-T23N-R05E 204.080 206.084 . . . . . . . . . . . . N/A N/A N/A ... Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 509763074 109132572 N/A 108623658 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 INSTALL 2" MPE-___ 43 FT RETIRE 2" MPE-___ 35 FT .. .. .. .. .. .. .. .. Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:RANDY BLACKIE 253.395.6850 randy.blackie@pse.com 60 IP 088-60 SITE PLAN xx INSTALL 2" = 43 FT RETIRE 2" = 35 FT ... ... ... JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 SITE STANDARD GAS CONSTRUCTION NOTES: 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 2. NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 3. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 4. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 5. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 6. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 7. COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. 10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 11. SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG 12. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 13. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 14. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. 15. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. --------- ___________________________, PHONE______________. 17. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES FOOTAGE BETWEEN FITTINGS. 18. EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD) 60 N/A N/A JSNOWDEN@CHARTERCON.COM IP 088-60 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 T01 CONSTRUCTION DETAIL N.T.S. DEACTIVATE IN PLACE EXISTING 2" MPE IP MAIN EX 2 "EX 2 " CUT & CAP CAP 2" MPE IP MAIN 50'N C/L & 11'E C/L _____'S C/L & _____'E C/L CUT & CAP CAP 2" MPE IP MAIN 65'N C/L & 7'W C/L _____'N C/L & _____'W C/L 2" HVTT TIE-IN 67'N C/L & 7'W C/L ______'N C/L & _____'W C/L 2" POLYVALVE/OPEN W/ BOX & SUPPORT 67'N C/L & 6'W C/L ______'N C/L & _____'W C/L INSTALL 2" MPE-___ 20' @ 67'N C/L (______)' @ _____'N C/L NOT TO SCALE CROSS SECTION - GLENNWOOD AVE NE LOOKING NORTH E 51.5' ROW W PROP. 2" MPE IP - 14'ECL G EX 2" MPE IP - 11'E 109101204 G INSTALL 2" MPE-___ 19' @ 14'E C/L (______)' @ _____'E C/L 2" 90° ELBOW 67'N C/L & 14'E C/L ______'N C/L & _____'E C/L 2" 90° ELBOW 48'N C/L & 14'E C/L ______'N C/L & _____'E C/L G EX 2" MPE IP - 7'W 109046484 INSTALL 2" MPE-___ 3' @ 48'N C/L (______)' @ _____'N C/L INSTALL 2" MPE-___ 1' @ 67'N C/L (______)' @ _____'N C/L 2" HVTT TIE-IN 48'N C/L & 11'E C/L ______'N C/L & _____'E C/L TYPICAL GAS MAINLINE TRENCH DETAIL NOT TO SCALE Excavated Dirt Pile 24" Min NOTE: Install 12" shading if the backfill contains rocks greater than 6" dia. 24"Min Cover TO 36" Max Cover Gas Main Line SIDE ACCESS VEHICLE Final Grade 4" Sand Bedding 12" Min. of Acceptable Backfill (See Definition Above) 6" Sand Shading 12"-18" Min Backfill for Direct Bury - The final backfill may be soil-based select material or native soil, but free of construction debris and shall not contain rocks larger than 10"-in. diameter to prevent impedence of gas system maintenance. STANDARD IP & LP GAS REPLACEMENT CONSTRUCTION NOTES 1. NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED OUTAGE. 2. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARD 2525.2300. 3. MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. 4. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS 5. INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES PER PSE GAS OPERATING STANDARD 2550.1600. 6. REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. 7. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500. 8. PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. 9. INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR ABANDONMENT OR DEACTIVATION 10. PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING STANDARDS 2525.2100 AND 2525.3600. 11. REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED. 12. INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. 13. REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. 14. REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. 15. ACTIVE SERVICES TO BE REPLACED DENOTED BY: #### R1 R1