HomeMy WebLinkAboutMFP20005123.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20005123 IVR Number: 20005123 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:11/04/2020Application Date:0323059096Parcel Number: 2741 WHITMAN PL NE, LOT Permit Type:01/25/2021Issue Date:Franchise Permit Work Class:01/25/2022Expiration Date:Minor Utility Job Number: 107057815Franchise Type:Natural Gas Description: PSE Gas PER CITY OF RENTON'S BRAD STOCCO'S REQUEST. 2" MPE GAS MAIN EXTENSION SERVING 19 NEW SINGLE FAMILY HOMES. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 SOUND BUILDING & DEVELOPMNT 23837 43RD AVE S KENT , WA 98032 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20005123 Scott Warlick CED 1/25/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date W H I T M A N PL NE WHITMAN PL NE WHITMAN PL NE SE 95 T H W A Y SE 95 T H W A Y UTILITYWORKAHEAD W21-7 ONE LANEROAD AHEAD CW20-4 W20-7A UTILITY WORK AHEAD W21-7 ONE LANEROAD AHEAD CW20-4 W20-7A 100' 100' 100' 100' W20-7A BE PREPAREDTO STOP W20-7b UTILITYWORKAHEAD W21-7 K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 10' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE ACOPY OF THE APPROVED TRAFFIC CONTROL PLAN Legend Cone CONEONE LANEROADAHEAD CW20-4 one lane road ahead Flagger W20-7A Flagger AheadBE PREPAREDTO STOP W20-7b be prepared to stopUTILITYWORKAHEADW21-7 utility work ahead Work Area Work Truck INVENTORY: 3-UITILITY WORK AHEAD 3-FLAGGER AHEAD 2-ONE LANE ROAD AHEAD 1-BE PREPARED TO STOP 3-FLAGGER(S) 30-CONE(S) NOT TO SCALE N S EW NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE NOTIFY EMS,FIRE AND POLICE72 HOURS IN ADVANCE CUSTOMER: CONTACT: LOCATION: DATE:W/O # Designed By: Garrett Hooper Off:800-343-4049 Ext 5860 Cell # 425-551-8297 WATCP@KNDSERVICES.NET WSTCS#010855 PUGET SOUND ENERGY MITCH PETERSON 425-398-6071 13429 SE 95TH WAY RENTON, WA 4-24-19 107057815 ADJUST CONTROLS AS NEEDED AS TRENCHING CONTINUES INTO OPPOSITE LANE BEGIN OF JOINT MAIN POLYVALVE 2" MPE-7(OPEN) WITH VALVE BOX & SUPPORT SHEET 4 OF 4 www.invarion.com MFP20005123 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS SE 95 T H W A YSE 95TH WAYSE 95TH WAY UTILITYWORK AHEAD W21-7 ONE LANEROADAHEAD CW20-4 W20-7A UTILITY WORK AHEAD W21-7 ONE LANE ROAD AHEAD CW20-4 W20-7A 100' 100' 100'100' K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 10' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions PLEASE SCHEDULE WITH DISPATCH@ 800-343-4049 OPT.1AND PROVIDE ACOPY OF THE APPROVEDTRAFFIC CONTROL PLAN Legend Cone CONEONE LANEROADAHEAD CW20-4 one lane road ahead Flagger W20-7A Flagger AheadBE PREPAREDTO STOP W20-7b be prepared to stopUTILITYWORKAHEADW21-7 utility work ahead Work Area Work Truck NOT TO SCALE N S EW NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE NOTIFY EMS,FIRE AND POLICE 72 HOURS IN ADVANCE INVENTORY: 2-UTILITY WORK AHEAD 2-ONE LANE ROAD AHEAD 2-FLAGGER AHEAD 30-CONE(S) 2-FLAGGER(S) CUSTOMER: CONTACT: LOCATION: DATE:W/O # Designed By: Garrett Hooper Off:800-343-4049 Ext 5860 Cell # 425-551-8297 WATCP@KNDSERVICES.NET WSTCS#010855 PUGET SOUND ENERGY MITCH PETERSON 425-398-6071 13241 SE 195 WAY RENTON, WA 4-24-19 107057815 ADJUST CONTROLS AS NEEDED AS TRENCHING CONTINUES INTO OPPOSITE LANE SHEET 3 OF 4 www.invarion.com MFP20005123 132ND AVE SESE 95TH WAY STOP SE 95TH WAY SE 95TH WAY SE 95TH WAY 132ND AVE SEUTILITY WORK AHEAD W21-7 ONE LANEROAD AHEAD CW20-4 W20-7A UTILITY WORK AHEAD W21-7 ONE LANE ROAD AHEAD CW20-4W20-7A MatchLine MatchLine UTILITY WORK AHEAD W21-7 ONE LANE ROAD AHEAD CW20-4 W20-7A K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 10' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVEDTRAFFIC CONTROL PLAN Legend Cone CONEONE LANEROADAHEAD CW20-4 one lane road ahead Flagger W20-7A Flagger AheadBE PREPAREDTO STOP W20-7b be prepared to stopUTILITYWORKAHEADW21-7 utility work ahead Work Area Work Truck INVENTORY: 3-UITLITY WORK AHEAD 3-ONE LANE ROAD AHEAD 3-FLAGGER AHEAD 30-CONE(S) 2-FLAGGER(S) NOT TO SCALE N S EW NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE NOTIFY EMS,FIRE AND POLICE72 HOURS IN ADVANCE CUSTOMER: CONTACT: LOCATION: DATE:W/O # Designed By: Garrett Hooper Off:800-343-4049 Ext 5860 Cell # 425-551-8297 WATCP@KNDSERVICES.NET WSTCS#010855 PUGET SOUND ENERGY MITCH PETERSON 425-398-6071 13241 SE 95TH WAY RENTON, WA 4-24-19 107057815 100'100' 100' 100' 100' 100' 2" GAS MAIN EXTENSION TURN EAST CONTINUE TRENCHING DOWN SE 95TH WAY ADJUST CONTROLS AS NEEDED AS TRENCHING CONTINUES EAST SHEET 2 OF 4 www.invarion.com MFP20005123 132ND AVE SE132ND AVE SE132ND AVE SEUTILITY WORK AHEAD W21-7 ONE LANE ROADAHEAD CW20-4 W20-7A UTILITY WORK AHEAD W21-7 ONE LANE ROAD AHEAD CW20-4 W20-7A 100' 100' 100' 100' 9536 2" GAS MAIN EXTENSION PAVEMENT CUT 3'X20' W SPLICE 90 BEND ONTO EXISTING 2" TRENCH NORTH TO SE 95TH WAY RESIDENT(S) WILL BE NOTIFIED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE ADJUST CONTROLS AS NEEDED AS TRENCHING CONTINUES NORTH K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 10' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN Legend Cone CONEONE LANEROADAHEAD CW20-4 one lane road ahead Flagger W20-7A Flagger AheadBE PREPAREDTO STOP W20-7b be prepared to stopUTILITYWORKAHEADW21-7 utility work ahead Work Area Work Truck INVENTORY: 2-UTILITY WORK AHEAD 2-ONE LANE ROAD AHEAD 2-FLAGGER AHEAD 30-CONE(S) 2-FLAGGER(S) NOT TO SCALE N S EW NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE NOTIFY EMS,FIRE AND POLICE72 HOURS IN ADVANCE CUSTOMER: CONTACT: LOCATION: DATE:W/O # Designed By: Garrett Hooper Off:800-343-4049 Ext 5860 Cell # 425-551-8297 WATCP@KNDSERVICES.NET WSTCS#010855 PUGET SOUND ENERGY MITCH PETERSON 425-398-6071 9536 132ND AVE SE RENTON, WA 4-24-19 107057815 SHEET 1 OF 4 www.invarion.com MFP20005123