Implementation Procedures for Compliance with Planned Action EIS Mitigation
Ordinance No. 5813– Sunset Area Planned Action Mitigation Measures
1. EARTH
Earth Mitigation Measures:
The following mitigation measures shall apply:
· Apply erosion-control best management practices (BMPs), as described in Appendix D
of the City of Renton Amendments to the King County Surface Water Design Manual.
Planned Action applicants shall identify in their applications the source of earth material to be
used in construction and shall consider earth material reuse and provide information to the
City regarding why earth material reuse is not feasible if it is not proposed.
2. AIR QUALITY
Air Quality Mitigation Measures:
Construction Emission Control
Air quality control plans shall include BMPs to control fugitive dust and odors emitted by diesel
construction equipment. The following BMPs shall be used to control fugitive dust:
· Use water sprays or other non-toxic dust control methods on unpaved roadways.
· Minimize vehicle speed while traveling on unpaved surfaces.
· Prevent trackout of mud onto public streets.
· Cover soil piles when practical.
· Minimize work during periods of high winds when practical.
The following mitigation measures shall be used to minimize air quality and odor issues caused
by tailpipe emissions.
· Maintain the engines of construction equipment according to manufacturers'
specifications.
· Minimize idling of equipment while the equipment is not in use.
Where feasible, Applicants shall schedule haul traffic during off-peak times (e.g., between 9:00
a.m. and 4:00 p.m.) to have the least effect on traffic and to minimize indirect increases in
traffic-related emissions. This shall be determined as part of traffic control plans required in
Section 14 of this mitigation document.
SOLERA RENTON
Prepared by
12/16/2020 2
Burning of slash or demolition debris shall not be permitted without express approval from
Puget Sound Clean Air Agency (PSCAA). No slash burning is anticipated for any construction
projects in the Planned Action Study Area.
In addition to the mitigation measures above, the following mitigation measures apply:
· Should the phases of the Potential Sunset Terrace Redevelopment Subarea occur
concurrently rather than in a phased and sequential manner, the City and RHA will
consider adding the Northeast Diesel Collaborative Diesel Emission Controls in
Construction Projects- Model Contract Specifications or an equivalent approaches as
additional mitigation measures.
· The City and RHA and other public or private applicants within the subarea should
explore measures to improve indoor air quality beyond what is normally achieved by
simply complying with building codes. For example, grant programs such as the Breath
Easy Homes program could provide funding to foster construction methods that reduce
dust, mold, and air toxics concentrations in the homes, such as the following:
o Use of low-VOC (volatile organic compounds) building materials and coatings,
o Enhanced building ventilation and room air filtration, and
o Installation of dust-free floor materials and low-pile carpeting to reduce dust
buildup.
· Planned Action applicants for residential developments shall provide information
regarding the feasibility and applicability of indoor air quality measures. The City may
condition Planned Action applications to incorporate feasible indoor air quality
measures.
Greenhouse Gas Reduction Measures:
Reduction Measure from Table 6 Applicant Consideration
Site Design
Plant trees and vegetation near structures
to shade buildings.
Trees will be planted throughout the
redevelopment area including in proximity
to proposed structures as depicted on the
preliminary landscape plan.
Minimize Building Footprint Zoning code allows for a max 75% lot
coverage, the building footprints are
compliant with this requirement.
Design water efficient landscaping Water efficient landscaping does not affect
greenhouse gases. Landscaping will be as
required by COR code.
Minimize energy use through building
orientation.
Mixed-Use buildings are oriented North-to-
South to take advantage of natural light
but in general are oriented to the site
SOLERA RENTON
Prepared by
12/16/2020 3
dimensions and in coordination with city
planning staff.
Building Design and Operations
Construct buildings according to City of
Seattle energy code.
The applicant feels that the City of Renton
standards with the anticipated 2021
update are the appropriate standard for
the proposed development.
Apply Leadership in Energy and
Environmental Design (LEED) standards (or
equivalent) for design and operations.
The project will comply with Evergreen
Sustainable Development Standards.
Purchase Energy Star equipment and
appliances for public agency use.
There are no public agency uses proposed
in this development. Energy Star
appliances will be a part of all residential
units.
Incorporate on-site renewable energy
production, including installation of
photovoltaic cells or other solar options.
Photovoltaic panels will be proposed for
the roofs of mixed-use buildings on Blocks
A and B.
Design street lights to use energy-efficient
bulbs and fixtures.
The street lighting will incorporate full cut
off fixtures to reduce light pollution and
LED bulbs for energy efficiency.
Construct "green roofs" and use high-
albedo roofing materials.
The project will provide PV panels and
high-albedo roof materials. No green roofs
are proposed at this time.
Install high-efficiency heating, ventilation,
and air-conditioning (HVAC) systems.
Residential units will use high-efficiency
heating systems and ventilation in
accordance with WA State VIAQ code
Eliminate or reduce use of refrigerants in
HVAC systems.
Not proposed at this time.
Maximize interior day lighting through floor
plates, increased building perimeter and
use of skylights, clerestories, and light wells.
The project will seek to maximize day
lighting through access to natural light
from habitable spaces in all units and
community spaces. Clerestory windows
and courtyard spaces will increase daylight
access.
Incorporate energy efficiency technology
such as super insulation motion sensors for
lighting and climate-control-efficient,
directed exterior lighting.
7 day programmable thermostats will be
provided for all units to allow for
individualized programming to limit the
loads to just those necessary for each
occupant. Motion sensors for lighting will
be used in community amenity spaces
within the mixed-use buildings.
SOLERA RENTON
Prepared by
12/16/2020 4
Use water-conserving fixtures that surpass
building code requirements.
Greenhouse gases are not affected by
water-conservation features. The applicant
feels that the current code requirements
are appropriate for the proposed
development.
Reuse gray water and/or collect and reuse
rainwater.
Greenhouse gases are not affected by
water-conservation features. The applicant
has chosen not to propose any such
systems at this time.
Reduction Measures
Use recycled building materials and
products.
The existing buildings’ materials will not be
reused for this project.
Asphalt grindings from site demolition will
be used for road subgrade to the extent
allowed by the City.
Use building materials that are extracted
and/or manufactured within the region.
This measure is not proposed at this time
but will be considered.
Use rapidly renewable building materials. This measure is not proposed at this time
but will be considered.
Conduct third-party building commissioning
to ensure energy performance.
Third party building commissioning will be
provided for the mixed use buildings to
ensure accurate and efficient set-up of
MEP building operation systems.
Track energy performance of building and
develop strategy to maintain efficiency.
Due to the anticipated individualized
nature of building utilities, aggregate
understanding of efficiency and
maintenance is not practicable.
Transportation
Size parking capacity to not exceed local
parking requirements and, where possible,
seek reductions in parking supply through
special permits or waivers.
City and owner recognize the need for
parking in this area. The project does not
exceed the zoned maximum required
parking.
Develop and implement a
marketing/information program that
includes posting and distribution of
ridesharing/transit information.
Marketing material will be made available
both digitally on the builder’s website and
at the point of sale or rent to new
residents that highlights ridesharing and
transit information relevant to the project
Subsidize transit passes. Reduce employee
trips during peak periods through
alternative work schedules, telecommuting,
and/or flex time.
No subsidized transit pass programs are
currently planned for this project. Project
has no control over resident work
schedules.
SOLERA RENTON
Prepared by
12/16/2020 5
Provide a guaranteed-ride-home program.
No guaranteed ride home programs are
currently planned for this project.
Provide bicycle storage and showers/
changing rooms.
Bicycle storage will be provided, but
changing and showering will likely occur
within residential units.
Use traffic signalization and coordination to
improve traffic flow and support pedestrian
and bicycle safety.
Not Applicable, no changes are proposed
to signal controls.
Apply advanced technology systems and
management strategies to improve
operational efficiency of local streets.
Not Applicable, no new transportation
technologies are proposed by this project.
Develop shuttle systems around business
district parking garages to reduce
congestion and create shorter commutes.
Not Applicable.
3. WATER RESOURCES
Water Resource Mitigation Measures:
Consistent with the Planned Action Study Area EIS Mitigation Measures as listed in Attachment
B, Mitigation Document Section 5, the proposed development proposes a net reduction to
the existing pollution-generating surface. In addition, infiltrating bioretention facilities
providing water quality treatment in accordance with Renton Stormwater Manual BMPs are
proposed for all remaining pollution-generating impervious surfaces.
Consistent with the Sunset Area Surface Water Master Plan, and associated street frontage
improvements, the project proposes infiltrating bioretention facilities providing water
quality treatment in accordance with Renton Stormwater Manual BMPs for all street
frontages adjacent to the property.
4. PLANTS & ANIMALS
Plant and Animal Mitigation Measures:
With implementation of proposed stormwater features or standards, no mitigation is required.
5. ENERGY
Energy Mitigation Measures:
Although the growth and development would result in increased energy demand in the Planned
Action Study Area under all of the alternatives, expanding the beneficial transit-oriented
development and high-density housing development within the study area would reduce
regional energy usage. Therefore, all alternatives would provide a net benefit rather than
adverse impact with regards to energy usage. However, to further reduce energy
consumption, the City shall encourage future developers to implement additional trip-
SOLERA RENTON
Prepared by
12/16/2020 6
reduction measures and energy conservation measures. For example, energy and GHG
reductions can be achieved through implementation of the following energy conservation
techniques or equivalent approaches.
Reduction Measure from Table 10 Applicant Consideration
Site Design
An energy reduction of 12% can be
achieved by implementing sufficient
strategies established by the Northwest
Energy Star Homes program for multifamily
residential buildings.
Project will comply with Northwest Energy
Start Homes program.
An energy reduction of 10% would comply
with Seattle Energy Code for non-
residential buildings.
The applicant feels that the City of Renton
standards with the anticipated 2021 update
are the appropriate standard for the
proposed development.
See also Air Quality mitigation measures.
The City shall require development applicants to consider trip-reduction measures and energy
conservation, and as part of their application explain what reduction measures are included
and which ones are not included (based on that are part of Table 6 or Table 10). The City
may condition Planned Action applications to incorporate feasible trip reduction and energy
conservation measures.
In addition to the mitigation measures described for the Planned Action Study Area, according
to the King County proposed GHG reduction regulation, energy reductions can be provided
with the implementation of the following basic requirements of the American Society of
Heating, Refrigerating and Air-Conditioning Engineers Advanced Buildings Core Performance
Guide for residential and non-residential building in the subarea:
· 30% energy reduction for residential dwelling that are 50% of average size; and 15%
energy reduction for residential dwelling that are 75% of average size; and
· 12% energy reduction for office, school, retail, and public assembly buildings that are
smaller than 100,000 square feet in floor area.
6. NOISE
Noise Mitigation Measures:
Construction Noise
To reduce construction noise at nearby receivers, the following mitigation measures shall be
incorporated by Planned Action applicants into construction plans and contractor
specifications.
· Locate stationary equipment away from receiving properties.
· Erect portable noise barriers around loud stationary equipment located near sensitive
receivers.
SOLERA RENTON
Prepared by
12/16/2020 7
· Limit construction activities to between 7:00 a.m. and 10: 00 p.m. to avoid sensitive
nighttime hours.
· Turn off idling construction equipment.
· Require contractors to rigorously maintain all equipment.
· Train construction crews to avoid unnecessarily loud actions (e.g., dropping bundles of
rebar onto the ground or dragging steel plates across pavement) near noise-sensitive
areas.
New Commercial Operation Noise
The City shall require all prospective future developers to use low-noise mechanical equipment
adequate to ensure compliance with that the City' s daytime and nighttime noise ordinance
limits where commercial uses are abutting residential uses and where there is a potential to
exceed noise ordinance limits. Depending on the nature of the proposed development, the
City may require the developer to conduct a noise impact study to forecast future noise
levels and to specify appropriate noise control measures. Compliance with the noise
ordinance would ensure this potential impact would not be significant.
Traffic Noise Mitigation
Although traffic noise is exempt from City noise ordinance, based on site-specific
considerations, the City may at its discretion require the new development to install double-
pane glass windows or other building insulation measures using its authority under the
Washington State Energy Code (RMC 4-5-040).
Site design approaches shall be incorporated to reduce potential noise impacts including the
following.
· Concentrating open space uses away from NE Sunset Boulevard.
· Where open space uses must be located near NE Sunset Boulevard, avoiding activities
that require easily understood conversation (e. g., instructional classes), or Other uses
where quiet conditions are required for the primary function of the activities.
· Allowing for balconies on exterior facing units only if they do not open to a bedroom.
7. ENVIRONMENTAL HEALTH
Environmental Health Mitigation Measures:
· Since encountering unreported spills or unreported underground fuel tanks is a risk
when performing construction, contractors shall be required to provide hazardous
materials awareness training to all grading and excavation crews on how to identify any
suspected contaminated soil or groundwater, and how to alert supervisors in the event
of suspected contaminated material. Signs of potential contaminated soil include
stained soil, odors, oily sheen, or the presence of debris.
· Contractors shall be required to implement a contingency plan to identify, segregate,
and dispose of hazardous waste in full accordance with the Model Toxics Control Act
(MTCA)(WAC 173-340) and the Dangerous Waste (WAC 173-303) regulations.
· Contractors shall be required to develop and implement the Stormwater Pollution
Prevention Plan, BMPs, and other permit conditions to minimize the potential for a
SOLERA RENTON
Prepared by
12/16/2020 8
release of hazardous materials to soil, groundwater, or surface water during
construction.
· Contractors shall be required to follow careful construction practices to protect against
hazardous materials spills from routine equipment operation during construction;
prepare and maintain a current spill prevention, control, and countermeasure plan, and
have an individual on site designated as an emergency coordinator; and understand and
use proper hazardous materials storage and handling procedures and emergency
procedures, including proper spill notification and response requirements.
· All asbestos-containing materials (ACM) and lead-based paint will be identified in
structures prior to demolition activities in accordance with 24 CFR Part 35. If ACM or
lead-based paint is identified, appropriately trained and licensed personnel will contain,
remove, and properly dispose of the ACM and/ or lead-based paint material according
to federal and state regulations prior to demolition of the affected area.
· If warranted, contractors shall conduct additional studies to locate undocumented
underground storage tank (USTs) and fuel lines before construction of specific
development projects (areas of concern include current and former commercial and
residential structures) and will permanently decommission and properly remove USTs
from project sites before commencing general construction activities.
· Prior to acquisition of known or potentially contaminated property, the City shalt
require appropriate due diligence be performed to identify the presence and extent of
soil or groundwater contamination. This can help to prevent or manage liabilities for any
long-term clean-up activities that might be ongoing during project operations. If
contamination is discovered, the project proponent will comply with all state and
federal regulations for contaminated sites.
8. LAND USE
Land Use Mitigation Measures:
Under all alternatives, the City shall require planned action applicants to implement
appropriate construction mitigation measures, including but not limited to dust control and
construction traffic management. The City should make efforts to minimize property
acquisition that affects buildings as part of its refinement of study area streetscape designs
while balancing Complete Streets principles.
As part of the Planned Action Ordinance adoption process, the City should amend its
Comprehensive Plan’s Transportation and Capital Facilities elements to ensure that planned
public investments and their funding sources are accounted for and programmed.
The City and RHA should coordinate on future Sunset Terrace redevelopment and Planned
Action Study Area streetscape improvements to ensure that property acquisition that
affects buildings is minimized.
The City shall require construction plans to:
SOLERA RENTON
Prepared by
12/16/2020 9
· Locate the majority of the most intensive non-residential development along or near NE
Sunset Boulevard, where possible.
· Implement proposed open space and landscape features to offset the proposed
intensification of land uses on the site.
· Provide new opportunities for public open space area.
· As part of site design, emphasize transitions in density, with less intense densities where
abutting lower-intensity zones.
9. SOCIOECONOMICS
Socioeconomic Mitigation Measures:
Mitigation measures to minimize dust, noise, aesthetics, and transportation impacts during
construction are identified in Sections 2, 6, 12, and 14, respectively, of this Mitigation
Document.
These measures would address many of the construction-related impacts that could negatively
affect the study area businesses.
In addition, with the reconstruction of NE Sunset Boulevard, or with any new development, if
access to businesses is affected, the following measures should be addressed by the City or
WSDOT:
· Provide detour, open for business, and other signage, as appropriate.
· Provide business cleaning services on a case-by-case basis, as needed.
· Establish promotions or marketing measures to help affected businesses maintain their
customer base during construction.
· Maintain access, as much as possible, to each business and, if access needs to be
limited, coordinate with the affected businesses.
10. HOUSING
Housing Mitigation Measures:
Not applicable
11. ENVIRONMENTAL JUSTICE
Environmental Justice Mitigation Measures:
There are no specific mitigation measures related to environmental justice during construction
or operation. During construction, mitigation measures related to noise, dust, traffic
congestion, and visual quality shall be applicable to all populations. These measures are
described in Sections 2, 6, 12, and 14, respectively, of this Mitigation Document.
SOLERA RENTON
Prepared by
12/16/2020 10
12. AESTHETICS
Aesthetic Mitigation Measures:
In both the Planned Action Study Area and Potential Sunset Terrace Redevelopment Subarea,
mitigation measures will be necessary to minimize impacts associated with increased
height, bulk, and shading.
Future development occurring under any of the alternatives shall conform to the Renton
Municipal Code design standards, including but not limited to the following:
· Urban design standards contained in RMC 4-3-100,
· Residential Design and Open Space Standards contained in RMC 4-2-115, and
· Lighting Standards contained in RMC 4-4-075.
· Applicant site will comply with appropriate standards as applied to Design District D in
RMC 4-3-100.
Current city design standards address building modulation and roofline variation and are
recommended for application in the Reevaluation/Addendum.
13. HISTORICAL/CULTURAL
Historic/Cultural Mitigation Measures:
· In the event that a proposed development site within the study area contains a building
at least 50-years of age that is not listed in or determined eligible for listing in the
National Register of Historic Places (NRHP) or Washington Heritage Register (WHR), the
project shall be required to undergo review to determine if the property is considered
eligible for listing.
· It is recommended that the City adopt a historic preservation ordinance that considers
the identification and treatment of historic resources listed in or determined eligible for
listing in the NRHP or WHR, or locally designated. Until such time an ordinance is
adopted, the City must enter into consultation with DAHP regarding potential impacts
on historic resources in the study area that are listed in or determined eligible for listing
in the NRHP or WHR.
· For future projects that involve significant excavation in the study area the City must
enter into consultation with Washington State Department of Archaeology and Historic
Preservation (DAHP) to determine the likelihood of and recommendations for
addressing potential archaeological resources. It may be necessary to complete
archaeological testing prior to significant excavation in the study area, such as digging
for footings or utilities. Archaeological project monitoring may be recommended for
subsurface excavation and construction in high probability areas.
· In the event that a future development project in the study area is proposed on or
immediately surrounding a site containing an archaeological resource, the potential
impacts on the archaeological resource must be considered and, if needed, a study
conducted by a qualified archaeologist to determine whether the project would
materially impact the archaeological resource. If the project would disturb an
archaeological resource, the City shall impose any and all measures to avoid or
SOLERA RENTON
Prepared by
12/16/2020 11
substantially lessen the impact. If avoidance of the archaeological resource is not
possible, an appropriate research design must be developed and implemented with full
data recovery of the archaeological resource prior to the development project. The
avoidance of archaeological resources through selection of project alternatives and
changes in design of project features in the specific area of the affected resource(s)
would eliminate the need for measuring or mitigating impacts.
· Non-site-specific mitigation could include developing an educational program,
interpretive displays, and design guidelines that focus on compatible materials, and
professional publications.
Since no native "A" horizon was identified at the Edmonds-Glenwood site and throughout the
Sunset Terrace public housing complex, no further archaeological investigations are
recommended for these areas. Although a buried, native "A" horizon was identified on
RHA's Piha site (SE corner of Solera site on Harrington Avenue NE), the potential for an
archaeological discovery is very low. The project should proceed with no further
archaeological investigations. If archaeological materials are discovered during ground
disturbing excavations, the contractor shall halt excavations in the vicinity of the find and
contact DAHP.
If human skeletal remains are discovered, or if during excavation archaeological materials are
uncovered, the proponent will immediately stop work and notify agencies as outlined in the
Unanticipated Discovery Plan provided in Draft EIS Appendix J and as amended by Final EIS
Chapter 4 (and provided as Attachment 1 of this Exhibit B). If the project would disturb an
archaeological resource, the City shall impose any and all measures to avoid or substantially
lessen the impact. If avoidance of the archaeological resource is not possible, an
appropriate research design must be developed and implemented with full data recovery of
the archaeological resource prior to the development project. The avoidance of
archaeological resources through selection of project alternatives and changes in design of
project features in the specific area of the affected resource(s) would eliminate the need for
measuring or mitigating impacts.
14. TRANSPORTATION
Transportation Mitigation Measures:
Operational Mitigation
Planned Action applicants shall pay a Transportation Impact Fee as determined by the Renton
Municipal Code at the time of payment, payable to the City as specified in the Renton
Municipal Code.
Planned Action applicants shall provide a traffic analysis estimating trips generated by their
proposed development and demonstrate conformance with the Planned Action Ordinance
trip ranges and thresholds in Section 3(d)(4) as well as demonstrate conformance with the
City' s concurrency requirements in RMC 4-6-070. When demonstrated by an applicant’s
analysis that operational LOS standards reviewed in the EIS are exceeded at the following
locations, intersection improvements shall be made by planned action applicants as
SOLERA RENTON
Prepared by
12/16/2020 12
appropriate to meet LOS D and in conformance with the City’s street standards in RMC 4-6-
060:
Edmonds Avenue NE and NE 12th Street: an additional southbound left-turn pocket and
westbound right-turn pocket would improve operations to LOS E, while added pedestrian-
and bicycle-oriented paths or multi-use trails to encourage mode shifts would likely improve
operations to LOS D.
At the Harrington Avenue NE and NE 12th Street intersection: the eastbound and westbound
approaches could be restriped to increase the number of lanes and, therefore, the capacity
of the intersection. With implementation, this intersection would improve to LOS D.
Construction Mitigation
Temporary mitigation during construction may be necessary to ensure safe travel and manage
traffic delays. The following mitigation measures shall be implemented prior to or during
construction within the Planned Action Study Area.
· Prior to construction:
o Assess pavement and subsurface condition of roadways being proposed for
transport of construction materials and equipment. Ensure pavement can
support loads. Adequate pavement quality would likely reduce the occurrence of
potholes and would help maintain travel speeds.
o Alert landowners and residents of potential construction. Motorists may be able
to adjust schedules and routes to avoid construction areas and minimize
disruptions.
o Develop traffic control plans for a11 affected roadways. Outline procedures for
maintenance of traffic, develop detour plans, and identify potential reroutes.
o Place advance warning signage on roadways surrounding construction locations
to minimize traffic disturbances.
· During construction:
o Place advance warning signage on NE Sunset Boulevard and adjacent arterials to
warn motorists of potential vehicles entering and exiting the roadway. Signage
could include" Equipment on Road,"" Truck Access," or" Slow Vehicles Crossing."
o Use pilot cars as dictated by the Washington State Department of Transportation
(WSDOT).
o Encourage carpooling among construction workers to reduce traffic volume to
and fi-om the construction site.
o Employ flaggers, as necessary, to direct traffic when vehicles or large equipment
are entering or exiting the public road system to minimize risk of conflicts
between trucks and passenger vehicles.
o Maintain at least one travel lane at all times, if possible. Use flaggers to manage
alternating directions of traffic. If lane closures must occur, adequate signage for
potential detours or possible delays should be posted.
o Revisit traffic control plans as construction occurs. Revise traffic control plans to
improve mobility or address safety issues if necessary.
SOLERA RENTON
Prepared by
12/16/2020 13
No permanent mitigation measures are recommended within Potential Sunset Terrace
Redevelopment Subarea. The intersection operations under action alternatives are
expected to be within the LOS D threshold.
During construction, mitigation measures are those described for the Planned Action Study
Area. Flaggers, advance warning signage to alert motorists of detours or closures, and
reduced speed ones would likely benefit traffic operations.
15. PARKS AND RECREATION
Parks and Recreation Mitigation Measures:
During construction, impacts adjacent to or in parks within the Planned Action Study Area, such
as an increase in noise, dust, and access limitations, shall be mitigated as per a construction
mitigation plan developed by Planned Action applicants and approved by the City,
Planned Action Applicants shall pay a Parks and Recreation Impact fee as determined by the
Renton Municipal Code at the time of payment payable to the City as specified by the
Renton Municipal Code.
The following mitigation measures would help improve the availability or access to parks and
recreation facilities in the Planned Action Study Area:
· The City is considering amendments to its development codes that would provide for
payment of a fee-in-lieu for required common open space. As proposed, the fee-in-lieu
option could be executed when development sites are located within 0. 25 mile of a
public park and when that park can be safely accessed by pedestrians. The City’s
package of amendments also includes park impact fees.
16. PUBLIC SERVICES
Public Services Mitigation Measures:
Police
During construction, security measures shall be implemented by developers to reduce
potential criminal activity, including on-site security surveillance, lighting, and fencing
to prevent public access. Such measures shall be detailed in a construction mitigation
plan prepared by Planned Action Applicants and approved by the City.
Planned Action applicants shall design street layouts, open space, and recreation areas to
promote visibility for residents and police. Street and sidewalk lighting would
discourage theft and vandalism, and enhance security.
Fire and Emergency Medical Services
Developers will construct all new buildings in compliance with the International Fire Code
and Renton Development Regulations(RMC Title 4), including provision of emergency
egress routes and installation of fire extinguishing and smoke detection systems. All
new buildings will comply with accessibility standard for people with disabilities, per
the requirements of the Americans with Disabilities Act.
SOLERA RENTON
Prepared by
12/16/2020 14
Planned Action applicants shall pay a Fire Impact Fee as determined by the Renton
Municipal Code at the time of payment, payable to the City as specified in the Renton
Municipal Code.
Education
No mitigation measures are necessary or proposed.
Health Care
There are no mitigation measures needed or proposed for health care due to the
negligible change in the number of beds.
Social Services
The City's planned improvements to the streetscape and transit facilities that make
walking, bicycling, and taking transit more viable modes of transportation would
improve accessibility of social services located outside the Planned Action Study Area
to area residents.
RHA and the City should consider developing a community center facility as part of Sunset
Terrace redevelopment or the family village development or at another location in
the Planned Action Study Area. The center would provide an accessible on-site space
for a comprehensive range of social services for residents in the Planned Action Study
Area, focused on alleviating poverty, and addressing the needs of some of the more
predominant demographic groups found within the Planned Action Study Area—
seniors, individuals living with disabilities, those speaking English as a Second
Language, and youth.
RHA’s provision of community space that could be used for social services or community
meeting space for community organizations would serve as mitigation. See the
discussion under the Planned Action Study Area.
RHA should maintain a community meeting space within or near the subarea during
construction phase of Sunset Terrace redevelopment that allows for on-site social
service programs to continue to meet within the subarea.
Solid Waste
The City shall require development applicants to consider recycling and reuse of building
materials when redeveloping sites, and as part of their application explain what
measures are included.
The City may condition Planned Action applications to incorporate feasible recycling and
reuse measures.
17. UTILITIES
Utilities Mitigation Measures:
Water
To mitigate the current and projected water storage deficit in the pressure zones that
serve the study area, the City completed the construction of the 4.2-million-gallon
Hazen Reservoir in the Highlands 565 pressure zone in March 2009. The City also
SOLERA RENTON
Prepared by
12/16/2020 15
completed a water distribution storage feasibility study to develop conceptual options
and planning level cost estimates for expanding the storage capacity at two existing
City-owned sites: the Highlands Reservoirs site and the Mt. Olivet Tank site HDR, Inc.
2009). Financial strategies for the planning, design, and construction of the storage-
capacity expansion have not been determined at this time.
The project is located within the Highlands 435 pressure zone, and proposes to connect
to existing 8" and 12" water mains in street frontage. An 8" diameter water main,
looped system is proposed through the development and it is not anticipated that
pressure zone capacity will be affected as a result of the looping. The looping provides
a grid-like water system connecting to the following existing water mains: 8" WM
Harrington Place NE; 8" WM NE 12th Street; 8" WM NE Sunset Blvd; 12" WM NE 10th
Street. Fire flow requirements can be met through the 8" water main system
proposed.
Mains within the development site provide water meters, and fire prevention
connections in accordance with Renton Municipal Code.
Wastewater Collection
The project proposes to construct new, on-site, 8" sanitary sewer mains to serve the
development. On-site sewer mains are gravity sewer mains and will connect to
existing sanitary sewer manholes located in NE 10th Street and NE 12th Street
Consistent with the Planned Action Study Area, it is not anticipated that the proposed
development will create capacity constraints within the existing area.
Water
To mitigate the current and projected water storage deficit in the pressure zones that serve the
study area, the City completed the construction of the 4.2-million-gallon Hazen Reservoir in
the Highlands 565 pressure zone in March 2009. The City also completed a water
distribution storage feasibility study to develop conceptual options and planning level cost
estimates for expanding the storage capacity at two existing City-owned sites: the Highlands
Reservoirs site and the Mt. Olivet Tank site HDR, Inc. 2009). Financial strategies for the
planning, design, and construction of the storage-capacity expansion have not been
determined at this time.
The project is located within the Highlands 435 pressure zone, and proposes to connect to
existing 8" and 12" water mains in street frontage. An 8" diameter water main, looped
system is proposed through the development and it is not anticipated that pressure zone
capacity will be affected as a result of the looping. The looping provides a grid-like water
system connecting to the following existing water mains: 8" WM Harrington Place NE; 8"
WM NE 12th Street; 8" WM NE Sunset Blvd; 12" WM NE 10th Street. Fire flow requirements
can be met through the 8" water main system proposed.
The project is located within the Highlands 435 pressure zone, and proposes to connect to
existing 8" and 12" water mains in street frontage. An 8" diameter water main, looped
SOLERA RENTON
Prepared by
12/16/2020 16
system is proposed through the development and it is not anticipated that pressure zone
capacity will be affected as a result of the looping. The looping provides a grid-like water
system connecting to the following existing water mains: 8" WM Harrington Place NE; 8"
WM NE 12th Street; 8" WM NE Sunset Blvd; 12" WM NE 10th Street. Fire flow requirements
can be met through the 8" water main system proposed.
Mains within the development site provide water meters, and fire prevention connections in
accordance with Renton Municipal Code.
Wastewater Collection
The project proposes to construct new, on-site, 8" sanitary sewer mains to serve the
development. On-site sewer mains are gravity sewer mains and will connect to existing
sanitary sewer manholes located in NE 10th Street and NE 12th Street
Consistent with the Planned Action Study Area, it is not anticipated that the proposed
development will create capacity constraints within the existing area.