Loading...
HomeMy WebLinkAbout21-102 Wang Renton TESC 1-26-21 Inspection Report.pdf Construction Stormwater SITE INSPECTION CHECKLIST Project: Wang TESC Project Number: 21-102 Permit #:WAR308666 Date/Time: 1/26/21 9am Inspector: Phil Becker 1. Current weather: Cloudy and Cold 32 Degrees 2. Precipitation since last inspection/24 hours: 0” in 24 hours 3. Describe discharging stormwater, if any: - Visual change in turbidity: YES / NO (%</>) - Discoloration: YES / NO - Oil sheen: YES / NO - Water quality testing, if applicable: Test Point Parameter Method Result Flow, Stage, Etc. 4. Other water sources: Test Point Parameter Method Result Flow, Stage, Etc. Outlet Swale Turbidity Meter 7 Nu SITE BMPs Condition Repair? Comments Photo Clearing Limits:  Buffer zones around sensitive areas  Clearing limit fences G F P N/A G F P N/A Y N Y N Clearing Limits in good repair 1-28 Construction Access/Roads  Stabilized site entrance  Stabilized roads/parking  Wheel wash G F P N/A G F P N/A G F P N/A Y N Y N Y N Construction Entrance needs to be cleaned up. Steal Plates have been used to track around area beyond Entrance, but no vehicles tracked out any debris 1-2 Control Flow Rates  Swale  Check Dams  Sediment pond (vault)  Sediment trap G F P N/A G F P N/A G F P N/A G F P N/A Y N Y N Y N Y N Sediment trap is functioning a great deal better than last week continue to pump water to the highest part of the lot to clean turbid water 22-24 Install Sediment Controls  Sediment pond  Sediment trap  Silt fence  Wattles G F P N/A G F P N/A G F P N/A G F P N/A Y N Y N Y N Y N -Silt fence needs to be repair along the north side of the soils stockpiles. -Sediment trap is functioning a great deal better than last week continue to pump water to the highest part of the lot to clean turbid water 25-28 Preserve Vegetation/Stabilize Soils  Nets/blankets  Mulch  Seeding  Cover measures G F P N/A G F P N/A G F P N/A G F P N/A Y N Y N Y N Y N Maintain plastic cover over stock piles recommend collecting clean runoff from plastic cover and disposing of it directly to storm system. Maintain mulch layers for filtration. The newly graded vault area will need to be covered via hydroseed or mulch within 24 hours 16-21 12-15 Protect Slopes  Terrace  Pipe slope drains  Surface Roughening G F P N/A G F P N/A G F P N/A Y N Y N Y N Recommend installing pipe slope drains for plastic covered areas Protect Drain Inlets  Inserts/Socks G F P N/A Y N Need to continue to check filter socks for additional debris and clean when full Stabilize Channels & Outlets Qty Materials for next 7 days  Will existing BMPs need to be modified or removed? Will others need to be installed? YES / NO o If yes, list and describe actions to be completed: Action Notes Date Complete/Initials 1.Repair the north side silt fence Talked with contractor to complete on 1/19/2021 - Some Repairs have been made but additional repairs are required 1/26/21 2.Continue to monitor Construction Entrance Will check condition next week to see if it has deteriorated. - Construction entrance is still functional not track out has been observed at this time. 1-26-2021 3.  Conveyance channels  Energy dissipaters G F P N/A G F P N/A Y N Y N New swales are in good repair and filtering well Control Pollutants  Chem. storage area covered  Concrete handling G F P N/A G F P N/A Y N Y N Reminder all Fuel cans shall be in secondary containment Control De-Watering G F P N/A Y N Dewatering measures have made a great difference in the site conditions. Continue to monitor and maintain all BMP’s 25-28 4. 5. 6. Site activity: Earthworks small site grading, loading of equipment Personnel: Earthworks Crew of 3 Personal Conclusion:  Is site in compliance with SWPPP and permit req’s? YES / NO o If “NO”: indicate tasks to achieve compliance in above table w/projected completion date. o If “NO”: Has non-compliance been reported to Dept. of Ecology? YES / NO o If “NO”: should the SWPPP be modified? YES / NO Indicate all pending issues/corrective actions to be taken: Silt Fence on north side of site Attach any pictures to end of document. “I certify that this report is true, accurate, and complete to the best of my knowledge and belief.” Inspection completed: ___1/26/2021_____________ File date:________________ By (print/sign):__Phil Becker ______________________________ Title/Qualification of Inspector:___Director of Company Land Development Services and Construction Services – Certified CESCL _____________ 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28.