Loading...
HomeMy WebLinkAboutMFP20005881.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20005881 IVR Number: 20005881 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:12/20/2020Application Date:7227801075Parcel Number: 2715 SUNSET LN NE, APT Permit Type:02/04/2021Issue Date:Franchise Permit Work Class:02/04/2022Expiration Date:Minor Utility Job Number: 105095874Franchise Type:Electric Description: Puget Sound Energy Electric Potelco crew to install 1 4" SCHL80 conduit and UG primary cable from J02 to V01 in customer provided trench. Install new UG primary cable from J01 to J02 in existing conduit. Install new PM Transformer and connect temp service. Restoration per City of Renton standards PRE CONSTRUCTION MEETING REQUIRED. PLEASE CALL IN FOR LOCATES BEFORE SCHEDULING THE PRE CON. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contact COLPITTS SUNSET LLC 2256 38TH PL E SEATTLE , WA 98112 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20005881 Scott Warlick CED 1/13/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date 2020NE SUNSET BLVDN E S U N S E T B L V D 101112111016 16 1011121110islandBUSSTOPNE 10TH ST1011121110BUSSTOPSHELL STATIONBU S ST O P1111SUNSET LN NEHARRINGTON AVE NEM01STOPFLAGGERSTOPFLAGGER STOPFLAGGER W20-7AROADWORKAHEAD W20-1 BEPREPAREDTOSTOPW3-4100'100'100'W20-1ROADWORK AHEA DW20-1ROADWORKAHEADW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD10 0 ' 100' 10 0 'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'THE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREANPSEPUGETSOUNDENERGY-OBNovember 19, 20201050958742715 Sunset Ln NE, Renton, Washingtoneduard.volianskyi@pse.comSHEET 1 of 1TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425SIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840L=W S602WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 30" x 30" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP20005881 FOREMAN (CHECK BOX WHEN COMPLETED) #1 Print Name ___________________________________ Date ______________ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Material VERIFIED and CHANGES noted on Paperwork. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures #1 Foreman's Signature _______________________________________________ and that all quality requirements are met. Field Changes RED-LINED on As-built. Total PRIMARY Cable noted on As-built. Correct QC Checklist(s) reviewed. OVERHEAD APPARATUS "When performing planned work on a pole with an existing transformer or device, the Service Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge time. If you are working on a pole with the pole ground connected with a hot tap, replace it. If the transformer has split bolts on the secondary neutral or services, replace them. If the primary neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on the neutral bus, replace it. #1 #2 #2 Print Name ___________________________________ Date ______________ #2 Foreman's Signature _______________________________________________ PSE GENERAL SPECIFICATIONS General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept clear of debris and all construction materials, equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. - Return all Street lights, area lights and floodlights. - All fault indicators will be maintained in their current location on the 1/0 cables upon completion of the job. If it is noted to remove any of the indicators they shall be returned to local PSE first response department for re-issue. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of work sketch. - Return one Foreman's copy of work sketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. Traffic /Pedestrian control notes - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. -The uniform code of traffic control shall be adhered to at all times.. -Provide signs, barricades, and traffic control in conformance with local permit regulations. -Provide route for pedestrians when working on or near sidewalks. -Maintain traffic flow as required by permitting agency. NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT. REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0 JACKETED CABLE. UNDERGROUND CONSTRUCTION Additional notes to standards. -Erosion control must be placed before construction starts. Silt bags must be installed in downstream catch basins. Existing Utilities: Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage to existing utilities. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. Excavation - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors or as required by the permitting Agency. - No rocks larger than 8" shall be included in backfill. - Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. Vaults & Hand holes - Refer to PSE standard 6775.0040 "Vault and Hand hole Installation" - Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - Civil crew to install Conduit plug on each end until new cable to be installed. - All "spare" conduits shall be capped at each end. Surface Restoration Restore ground surface to original contour and original condition or better. Restore asphalt and concrete in accordance with requirements of local permitting agency. Cold patch or plate trench when necessary. Leave area in its original state or better at the end of construction. Existing System: Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by PSE System Operator. SCOPE OF WORK Install approx. 100' of 3Ø UG Pri. line extention. Install (3) J-Boxes in vault 318527-166698. Install 3Ø 500KVA Padmount and vault. Install UG Temp approx. 40' Project type : Planned Project location : There will be an advance notice provided by the contractor 24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to manage access. Traffic Revisions Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work hours. For more information on the project 24-hour project information (888) 471-7339, (360) 825-5236 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POTELCO DESIGN AND Signature _________________________________________ Print Name _________________________________________ This design complies with PSE Any/all variations have been Design/Engineering Standards. QUALITY ASSURANCE pre-approved/documented by the appropriate PSE Representative. Date _________________ JOB SITE JOB SITE MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages Trench Method: CABLE REPLACEMENT Approximate Trench Footage: Abandon Cable Segments: Approximate New 3Ø pri. Cable Footage: Approximate 4" SCH80 Conduit Footage: Install New Cable Segments: Vaults: Approximate Trench PVT/ROW: TRENCH 35 0'/35' 0 6 100' 20' 1 ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR TEMP SERVICE METER EXPENSE VICINITY MAP OVERHEAD CIRCUIT: MAP # . SCALE 6" = 1 MILE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP T. NGUYEN 253-437-6703 10/27/20 C. TOBIN 253-548-4516 10/27/20 N/A N/A N/A C. CHAVEZ 253-234-6307 10/27/20 N/A CITY OF RENTON SUNSET TERRACE TEMP (1) INSTALL NEW XFMR & J-BOX (CSP) 2715 SUNSET LN NE #TEMP, RENTON, WA 98056 N/A N/A N/A 105095874 AS NOTED 1 OF 2 KING N/A N/A CSPSKEPM T23N, R05E, 9-NW N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY 1050958742801 NE 10TH ST, RENTON, WA 98056 INDEX PAGE 1 - GENERAL NOTES PAGE 2 - SITE PLAN, CABLE & CONDUIT DIAGRAM Overflow Filter fabric walls for Catch Basin Grate dewatering sedimentCollected Sediment Catch Basin Insert MID 9995728 Filter fabric skirt Secured with grate. EROSION CONTROL NOT TO SCALE 2305E040 LEGEND SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV THREE PHASE WIRE/CABLE - 12.5 KV CABLE TERMINATION BUS (J-BOX) NEW OVERHEAD TO UNDERGROUND CABLE OVERHEAD TO UNDERGROUND CABLE TERM. 10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE TOTAL UNDERGROUND XFMR (T.U.T.) NEW COMBINATION J-BOX/PADMOUNT XFMR UNDERGROUND COMBINATION J-BOX/XFMR N.T.S. = NOT TO SCALE X.F.M.R. = TRANSFORMER P.E. = POLYETHYLENE ABBREVIATIONS PRIMARY METERING CABLE SPLICE FAULT INDICATOR WILL NOT PHASE (WNØ) NORMAL OPEN (N.O.) FUSED DISCONNECT: SOLID BLADE DISCONNECT HANDHOLE PULL VAULT UNDERGROUND SWITCH UNDERGROUND J-BOX NEW PADMOUNT XFMR NEW UNDERGROUND XFMR PAD MOUNT XFMR ELECTRONIC MARKER COMBINATION J-BOX/PADMOUNT XFMR NEW UNDERGROUND COMBINATION J-BOX/XFMR TERMINATION CABLE TO REPLACE PROPERTY LINE RIGHT OF WAY CENTERLINE EASEMENT CL Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min (ROW) 36" MIN Cover (PVT PROP) 36" MIN 48" Max Backfill (No rocks over 8" diameter) 3" Bedding Clean Native Soil, Sand or 5/8" Minus 12" Typical TRENCH DETAIL NOT TO SCALE 12" Min Shading Clean Native Soil, Sand or 5/8" Minus - A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches - A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 8" in diameter. FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN 12" MIN 48" MAX 36" MIN EXISTING PAVEMENT / SIDEWALK VERTICAL SAW CUT LINE CRUSHED SURFACING MATERIAL COMPACT TO 95% MAX DENSITY. EXCAVATION AND HARD RESTORATION DETAIL NOT TO SCALE 12" MIN 3" Sand Bedding or 5/8" Minus 12" Min Sand Shading or 5/8" Minus 12" MIN ASPHALT PATCH, 2" MIN MATCH EXISTING Conduit (ROW) 36" MIN (PVT PROP) 36" MIN For contacts below dial 1-888-CALL PSE (225-5773) OWNER/DEVELOPER OAK HILLS CONSTRUCTION 901 ALGONA BLVD N ALGONA, WA 98001 RYAN COVINGTON 417-283-1076 UNDERGROUND CIRCUIT: MAP # . SCALE 1" = 100' 2305E040 JOB SITE 503383771 105095874 587032377 3001059186 510093412 510349424 FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' GUARD POST INSTALLATION GUARD POST LOCATIONS 10' MIN. REQUIRED ROAD OR PARKING AREA GUARD POSTS 5' MIN MIN WORK SPACE 5' MAX 5' MAX 6" CONCRETE 5' MAX 5' MIN 5' MIN PAINTED YELLOW MIN 2'-6" 6" 3'-6" 6'-0" CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. PAD & FRONT GUARD XFMR 3' MIN TYPICAL MIN 18"18" MIN MIN 3' LENGTH GUARD POST INSTALLATION Not to scale 0700.1600-02 PRE-CONSTRUCTION MEETING REQUIRED. PLEASE CALL IN FOR LOCATES BEFORE SCHEDULING THE PRE-CON. 2801 SUNSE T L N N E 2680 NE SUNSET BLVD (SR-900)N E 1 0 T H S T 2725 2705 NEW 7' X 7' X 4' 500KVA XFMR HARRINGTON AVE NE CUSTOMER TO PROVIDE TRENCH 50KVA 120/240v PRE 11 PRE 11 ROW 100' ROW 50' ROW 63' 2715 2715 EHC880 - AØ EHC881 - BØ EHC882 - CØ EXISTING TO REMAIN EHC850 - AØ EHC851 - BØ EHC852 - CØ EXISTING TO REMAIN NEW 7' X 7' X 4' 500KVA XFMR + 45' EXISTING SCH80 CONDUIT + 20' EXISTING 5' x 7' x5' J-BOX EXISTING 5' x 7' x5' VAULT, PSE WILL INSTALL 3-4 POS J-BUS CUSTOMER TO TRENCH FROM J02 TO V01 + 20'. CUSTOMER TO INSTALL PSE PROVIDED 1-4" SCH80 CONDUIT FROM J02 TO V01 + 20'. CUSTOMER WILL PROVIDE 11' X 11' WORK PIT & INSTALL PSE PROVIDED VAULT CUSTOMER TO PROVIDE 4' X 4' WORK PIT 221.2 lbs 221.2 lbs 311.5 lbs 313.9 lbs NEW EHH765 - AØ EHH766 - BØ EHH767 - CØ NEW EHH768 - AØ EHH769 - BØ EHH770 - CØ EHC880 - AØ EHC881 - BØ EHC882 - CØ EXISTING TO REMAIN EHC850 - AØ EHC851 - BØ EHC852 - CØ EXISTING TO REMAIN NEW 7' X 7' X 4' 500KVA XFMR PSE TO INSTALL 3 RUN OF 1/0 AL SOL JCKT UG PRI CABLE FROM J01 TO J02 + 65 (L=________' ) PSE TO INSTALL 3 RUN OF 1/0 AL SOL JCKT UG PRI CABLE FROM J02 TO V01 + 35 (L=________' ) + 65' + 35' SITE PLAN SCALE: 1:50 CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY. CIRCUIT FEET REMOVED: 0' CIRCUIT FEET ADDED: 70' WIRE CREW FOREMAN NOTE: ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING. CIVIL CREW FOREMAN NOTE: MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE. CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS (FOREMAN'S COPIES) AT THE END OF THE JOB. EXISTING UNDERGROUND MAP: # . SCALE: 1:100 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP T. NGUYEN 253-437-6703 10/27/20 C. TOBIN 253-548-4516 10/27/20 N/A N/A N/A C. CHAVEZ 253-234-6307 10/27/20 N/A CITY OF RENTON SUNSET TERRACE TEMP (1) INSTALL NEW XFMR & J-BOX (CSP) 2715 SUNSET LN NE #TEMP, RENTON, WA 98056 N/A N/A N/A 105095874 AS NOTED 2 OF 2 KING N/A N/A CSPSKEPM T23N, R05E, 9-NW N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A 2305E034 105095874FOREMAN NOTE: CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS & BODILY INJURY. Potelco, Inc.DESIGNED BY VAULT & EQUIPMENT TABLE SITE GRID NUMBER VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) REMARKS LB DC J01 318512 166685 EXISTING JUNCTION BOX J-BOX BELOW GRADE W/ 3-4 POS. J-BUS EXISTING 3 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS J02 318527 166698 EXISTING JUNCTION BOX 6 6 INSTALL NEW 3-4 POS. J-BUS V01 318511 130703 HH 7' X 7' X 4' W/60" X 24" ACCES W/8' SQ COVER MAT ID: 7917901 NEW 500kVA PM XFMR 277/480v 3 - INSTALL NEW 7' X 7' X 4' 3-PH PM 500KVA XFMR. INSTALL NEW ELBOWS & CONDUCTORS. WIRE CREW TO INSTALL GRID NUMBERS TOTALS :12 6 CIVIL CREW NOTE: ALL 4" - 90° BENDS MIN 60" RADIUS SCH-80 PVC ALL 4" - 45° BENDS SCH-80 PVC - ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL CABLE IS INTALLED PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)REMARKS FROM TO SIZE (in)QTY DESIGN LENGTH (ft) ACTUAL LENGTH (ft) TYPE BENDS PULL (lbs) PULL REV (lbs) SIZE DESIGN LENGTH (ft) ACTUAL LENGTH (ft) CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only Check applicable box DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS BUILT J01 J02 4 -45 (EXISTING)X 221.2 221.2 1/0 AL JKT 65 EHH765 EHH766 EHH767 # J02 V01 4 -20 X X 313.9 311.5 1/0 AL JKT 35 EHH768 EHH769 EHH770 0.1 TOTAL 4"20'TOTAL 3Ø 100'TOTAL LUBE 0.1 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Svc Size: Svc Length:20' #250 AL 3.6% 0.5% 450 AMPS 59 KW N/A 400 AMPS >3,500' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 318511-130703 500 KVA 6259250 SITE SPECIFIC NOTES J01 (EXISTING) 318512-166685 -INST (3) L/B ELBOW (ELB10J) J02 (EXISTING) 318527-166698 -INST (3) J-BOX 200A 15KV 4-BSH -INST (6) L/B ELBOW (ELB10J) -INST (6) DUST CAPS (7630600) V01 (NEW) 318511-130703 -INST HH AND GNDS 7' X 7' X 4' (6045.5000 PM3P15M) (3-19B) -INST COVER HH 8' SQ W/60" X 24" ACCESS (MID:9996109) -INST 500KVA, 277/480V PM XFMR (MID: 6259250) -INST (4) #2 TO 500KCMIL CONNECTOR LUGS (MID: 7651002) -INST (9) MOUNTING BOLT KITS (MID: 7651008) -CONNECT 2-RUNS CUSTOMER OWNED #250 AL -INSTALL GRID # 318511-130703 SPAN SPECIFIC NOTES J01 - J02 -INST (3) 1/0 AL SOL JCKT PRI CABLE, + 65' (L=______' ) IN EXISTING (2-55) PSE INSTALLED 4" SCH80 CONDUIT -INST CABLE TAGS AS SHOWN IN ONE LINE J02 - V01 -INST (3) 1/0 AL SOL JCKT PRI CABLE + 35' (L+______' ) IN (2-55) CUSTOMER PROVIDED TRENCH AND 4" SCH80 CONDUIT (2-36) W/ 3/8" POLLY PULL ROPE -INST CABLE TAGS AS SHOWN IN ONE LINE V01 - M01 -CONNECT AND TAG CUSTOMER OWNED WIRE SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE Assumed Lot Corner CONDUIT VOLTAGE DROP VOLTAGE FLICKER ASBUILT INFORMATION SIZE LENGTH Design (ft) SIZE LENGTH Design (ft) BENDS Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) V01 M01 250 30 20 3 20 0.5%3.6% CONDUIT DIAGRAM NOT TO SCALE PRIMARY CABLE DIAGRAM NOT TO SCALE 3Ø PM TRANSFORMERS (480Y/277V) 277V WINDINGS 480V WINDINGS LOCATION SIZE R/X MIN %Z FAULT CURRENT MIN %Z FAULT CURRENT V01 500KVA 0.2 --2.30 24,918 A 6054.5000Not to scale VAULT & EXCAVATION DETAIL COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL NOT TO SCALE 12kV CABLE ROUTING 11'-0" TOP VIEW 11'-0" No Secondary 2" Excavation - 29.1 cubic yards SIDE VIEW 6'-6"6" Crushed Rock 8'-0" 7'-0" 8'-0"8" 7'-0" 6'-2" 5'-6" PRE-CONSTRUCTION MEETING REQUIRED. PLEASE CALL IN FOR LOCATES BEFORE SCHEDULING THE PRE-CON. FOREMAN (CHECK BOX WHEN COMPLETED) #1 Print Name ___________________________________ Date ______________ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Material VERIFIED and CHANGES noted on Paperwork. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures #1 Foreman's Signature _______________________________________________ and that all quality requirements are met. Field Changes RED-LINED on As-built. Total PRIMARY Cable noted on As-built. Correct QC Checklist(s) reviewed. OVERHEAD APPARATUS "When performing planned work on a pole with an existing transformer or device, the Service Provider will change out bolted connectors to pressed connectors". Use unit 1-3A to charge time. If you are working on a pole with the pole ground connected with a hot tap, replace it. If the transformer has split bolts on the secondary neutral or services, replace them. If the primary neutral is connected with a hot tap, replace it. If the transformer bank has a 2-bolt connector on the neutral bus, replace it. #1 #2 #2 Print Name ___________________________________ Date ______________ #2 Foreman's Signature _______________________________________________ PSE GENERAL SPECIFICATIONS General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept clear of debris and all construction materials, equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. - Return all Street lights, area lights and floodlights. - All fault indicators will be maintained in their current location on the 1/0 cables upon completion of the job. If it is noted to remove any of the indicators they shall be returned to local PSE first response department for re-issue. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of work sketch. - Return one Foreman's copy of work sketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. Traffic /Pedestrian control notes - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. -The uniform code of traffic control shall be adhered to at all times.. -Provide signs, barricades, and traffic control in conformance with local permit regulations. -Provide route for pedestrians when working on or near sidewalks. -Maintain traffic flow as required by permitting agency. NOTE: Completely rebuild terminations. EXCEPTION: DO NOT REPLACE CUTOUTS UNLESS THEY ARE THE OLDER "BOX TYPE" OR 50 AMP "TRIP LINK" TYPE CUTOUT. REPLACE J-BOXES IF REQUIRED. UTILIZE FEED-THRU T.U.T.s AND REMOVE J-BOXES IF POSSIBLE. REPLACE ALL TRANSFORMER JUMPERS WITH NEW 1/0 JACKETED CABLE. UNDERGROUND CONSTRUCTION Additional notes to standards. -Erosion control must be placed before construction starts. Silt bags must be installed in downstream catch basins. Existing Utilities: Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage to existing utilities. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. Excavation - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors or as required by the permitting Agency. - No rocks larger than 8" shall be included in backfill. - Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. Vaults & Hand holes - Refer to PSE standard 6775.0040 "Vault and Hand hole Installation" - Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - Civil crew to install Conduit plug on each end until new cable to be installed. - All "spare" conduits shall be capped at each end. Surface Restoration Restore ground surface to original contour and original condition or better. Restore asphalt and concrete in accordance with requirements of local permitting agency. Cold patch or plate trench when necessary. Leave area in its original state or better at the end of construction. Existing System: Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by PSE System Operator. SCOPE OF WORK Install approx. 100' of 3Ø UG Pri. line extention. Install (3) J-Boxes in vault 318527-166698. Install 3Ø 500KVA Padmount and vault. Install UG Temp approx. 40' Project type : Planned Project location : There will be an advance notice provided by the contractor 24-hour advance notice of no parking in work areas. Access will be maintained to all residences and their driveways. When work is occurring directly in front of driveways, the contractor will work with the residence to manage access. Traffic Revisions Flagging crews will maintain one lane; flaggers will assist vehicles alternating through the roadway during work hours. For more information on the project 24-hour project information (888) 471-7339, (360) 825-5236 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POTELCO DESIGN AND Signature _________________________________________ Print Name _________________________________________ This design complies with PSE Any/all variations have been Design/Engineering Standards. QUALITY ASSURANCE pre-approved/documented by the appropriate PSE Representative. Date _________________ JOB SITE JOB SITE MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages Trench Method: CABLE REPLACEMENT Approximate Trench Footage: Abandon Cable Segments: Approximate New 3Ø pri. Cable Footage: Approximate 4" SCH80 Conduit Footage: Install New Cable Segments: Vaults: Approximate Trench PVT/ROW: TRENCH 35 0'/35' 0 6 100' 20' 1 ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR TEMP SERVICE METER EXPENSE VICINITY MAP OVERHEAD CIRCUIT: MAP # . SCALE 6" = 1 MILE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP T. NGUYEN 253-437-6703 10/27/20 C. TOBIN 253-548-4516 10/27/20 N/A N/A N/A C. CHAVEZ 253-234-6307 10/27/20 REQ-CITY OF RENTON SUNSET TERRACE TEMP (1) INSTALL NEW XFMR & J-BOX (CSP) 2715 NE 10TH ST #TEMP, RENTON, WA 98056 N/A N/A N/A 105095874 AS NOTED 1 OF 2 KING N/A N/A QCNOKE T23N, R05E, 9-NW N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY 1050958742801 NE 10TH ST, RENTON, WA 98056 INDEX PAGE 1 - GENERAL NOTES PAGE 2 - SITE PLAN, CABLE & CONDUIT DIAGRAM PAGE 3 - 774 VAULT, 500KVA PM XFMR & 3Ø J-BOX DETAILS Overflow Filter fabric walls for Catch Basin Grate dewatering sedimentCollected Sediment Catch Basin Insert MID 9995728 Filter fabric skirt Secured with grate. EROSION CONTROL NOT TO SCALE 2305E040 LEGEND SINGLE PHASE, ONE WIRE/CABLE - 7.2 KV THREE PHASE WIRE/CABLE - 12.5 KV CABLE TERMINATION BUS (J-BOX) NEW OVERHEAD TO UNDERGROUND CABLE OVERHEAD TO UNDERGROUND CABLE TERM. 10T, 15T, 25T, 40T, 100T - INDICATES FUSE SIZE TOTAL UNDERGROUND XFMR (T.U.T.) NEW COMBINATION J-BOX/PADMOUNT XFMR UNDERGROUND COMBINATION J-BOX/XFMR N.T.S. = NOT TO SCALE X.F.M.R. = TRANSFORMER P.E. = POLYETHYLENE ABBREVIATIONS PRIMARY METERING CABLE SPLICE FAULT INDICATOR WILL NOT PHASE (WNØ) NORMAL OPEN (N.O.) FUSED DISCONNECT: SOLID BLADE DISCONNECT HANDHOLE PULL VAULT UNDERGROUND SWITCH UNDERGROUND J-BOX NEW PADMOUNT XFMR NEW UNDERGROUND XFMR PAD MOUNT XFMR ELECTRONIC MARKER COMBINATION J-BOX/PADMOUNT XFMR NEW UNDERGROUND COMBINATION J-BOX/XFMR TERMINATION CABLE TO REPLACE PROPERTY LINE RIGHT OF WAY CENTERLINE EASEMENT CL Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min (ROW) 36" MIN Cover (PVT PROP) 36" MIN 48" Max Backfill (No rocks over 8" diameter) 3" Bedding Clean Native Soil, Sand or 5/8" Minus 12" Typical TRENCH DETAIL NOT TO SCALE 12" Min Shading Clean Native Soil, Sand or 5/8" Minus - A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches - A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 8" in diameter. FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN 12" MIN 48" MAX 36" MIN EXISTING PAVEMENT / SIDEWALK VERTICAL SAW CUT LINE CRUSHED SURFACING MATERIAL COMPACT TO 95% MAX DENSITY. EXCAVATION AND HARD RESTORATION DETAIL NOT TO SCALE 12" MIN 3" Sand Bedding or 5/8" Minus 12" Min Sand Shading or 5/8" Minus 12" MIN ASPHALT PATCH, 2" MIN MATCH EXISTING Conduit (ROW) 36" MIN (PVT PROP) 36" MIN For contacts below dial 1-888-CALL PSE (225-5773) OWNER/DEVELOPER OAK HILLS CONSTRUCTION 901 ALGONA BLVD N ALGONA, WA 98001 RYAN COVINGTON 417-283-1076 UNDERGROUND CIRCUIT: MAP # . SCALE 1" = 100' 2305E040 JOB SITE 503383771 105095874 587032377 3001059186 510093412 510349424 2801 SUNSE T L N N E 2680 NE SUNSET BLVD (SR-900)N E 1 0 T H S T 2725 2705 NEW 7' X 7' X 4' 500KVA XFMR HARRINGTON AVE NE CUSTOMER TO PROVIDE TRENCH EHC880 - AØ EHC881 - BØ EHC882 - CØ EXISTING TO REMAIN EHC850 - AØ EHC851 - BØ EHC852 - CØ EXISTING TO REMAIN NEW 7' X 7' X 4' 500KVA XFMR + 45' EXISTING SCH80 CONDUIT + 20' EXISTING 5' x 7' x5' J-BOX EXISTING 5' x 7' x5' VAULT, PSE WILL INSTALL 3-4 POS J-BUS CUSTOMER TO TRENCH FROM J02 TO V01 + 20'. CUSTOMER TO INSTALL PSE PROVIDED 1-4" SCH80 CONDUIT FROM J02 TO V01 + 20'. CUSTOMER WILL PROVIDE 11' X 11' WORK PIT & INSTALL PSE PROVIDED VAULT CUSTOMER TO PROVIDE 4' X 4' WORK PIT 221.2 lbs 221.2 lbs 311.5 lbs 313.9 lbs EHH765 - AØ EHH766 - BØ EHH767 - CØ EHH768 - AØ EHH769 - BØ EHH770 - CØ EHC880 - AØ EHC881 - BØ EHC882 - CØ EXISTING TO REMAIN EHC850 - AØ EHC851 - BØ EHC852 - CØ EXISTING TO REMAIN NEW 7' X 7' X 4' 500KVA XFMR PSE TO INSTALL 3 RUN OF 1/0 AL SOL JCKT UG PRI CABLE FROM J01 TO J02 + 65 (L=________' ) PSE TO INSTALL 3 RUN OF 1/0 AL SOL JCKT UG PRI CABLE FROM J02 TO V01 + 35 (L=________' ) + 65' + 35' SITE PLAN SCALE: 1:50 CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY. CIRCUIT FEET REMOVED: 0' CIRCUIT FEET ADDED: 70' WIRE CREW FOREMAN NOTE: ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR CURRENT LOCATION ON 1/0 CABLES AFTER NEW CABLE IS INSTALLED UNLESS OTHERWISE SPECIFIED. PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE DIAGRAM" FOR MAPPING. CIVIL CREW FOREMAN NOTE: MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE. CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS (FOREMAN'S COPIES) AT THE END OF THE JOB. EXISTING UNDERGROUND MAP: # . SCALE: 1:100 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP T. NGUYEN 253-437-6703 10/27/20 C. TOBIN 253-548-4516 10/27/20 N/A N/A N/A C. CHAVEZ 253-234-6307 10/27/20 REQ-CITY OF RENTON SUNSET TERRACE TEMP (1) INSTALL NEW XFMR & J-BOX (CSP) 2715 NE 10TH ST #TEMP, RENTON, WA 98056 N/A N/A N/A 105095874 AS NOTED 2 OF 2 KING N/A N/A QCNOKE T23N, R05E, 9-NW N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A 2305E034 105095874FOREMAN NOTE: CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7 BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS & BODILY INJURY. Potelco, Inc.DESIGNED BY VAULT & EQUIPMENT TABLE SITE GRID NUMBER VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) REMARKS LB DC J01 318512 166685 EXISTING JUNCTION BOX J-BOX BELOW GRADE W/ 3-4 POS. J-BUS EXISTING 3 - REPLACE ELBOWS & CONDUCTORS WIRE CREW TO INSTALL GRID NUMBERS J02 318527 166698 EXISTING JUNCTION BOX 6 6 INSTALL NEW 3-4 POS. J-BUS V01 318511 130703 HH 7' X 7' X 4' W/60" X 24" ACCES W/8' SQ COVER MAT ID: 7917901 NEW 500kVA PM XFMR 277/480v EXISTING 3 - INSTALL NEW 7' X 7' X 4' 3-PH PM 500KVA XFMR. INSTALL NEW ELBOWS & CONDUCTORS. WIRE CREW TO INSTALL GRID NUMBERS TOTALS :12 6 CIVIL CREW NOTE: ALL 4" - 90° BENDS MIN 60" RADIUS SCH-80 PVC ALL 4" - 45° BENDS SCH-80 PVC - ALL CONDUITS SHALL BE CAPPED AT EACH END UNTIL CABLE IS INTALLED PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)REMARKS FROM TO SIZE (in)QTY DESIGN LENGTH (ft) ACTUAL LENGTH (ft) TYPE BENDS PULL (lbs) PULL REV (lbs) SIZE DESIGN LENGTH (ft) ACTUAL LENGTH (ft) CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only Check applicable box DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS BUILT J01 J02 --0 221.2 221.2 1/0 AL JKT 65 EHH765 EHH766 EHH767 0 J02 V01 --0 313.9 311.5 1/0 AL JKT 35 EHH768 EHH769 EHH770 0 TOTAL 4"0'TOTAL 3Ø 100'TOTAL LUBE 0 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Svc Size: Svc Length:20' #250 AL 3.6% 0.5% 450 AMPS 59 KW N/A 400 AMPS >3,500' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 318511-130703 500 KVA 6259250 SITE SPECIFIC NOTES J01 (EXISTING) 318512-166685 -INST (3) L/B ELBOW (ELB10J) J02 (EXISTING) 318527-166698 -INST (3) J-BOX 200A 15KV 4-BSH -INST (6) L/B ELBOW (ELB10J) -INST (6) DUST CAPS (7630600) V01 (NEW) 318511-130703 -INST HH AND GNDS 7' X 7' X 4' (6045.5000 PM3P15M) (3-19B) -INST COVER HH 8' SQ W/60" X 24" ACCESS (MID:9996109) -INST 500KVA, 277/480V PM XFMR (MID: 6259250) -INST (3) #2 TO 500KCMIL CONNECTOR LUGS (MID: 7651002) -INST (6) MOUNTING BOLT KITS (MID: 7651008) -CONNECT 2-RUNS CUSTOMER OWNED #250 AL SPAN SPECIFIC NOTES J01 - J02 -INST (3) 1/0 AL SOL JCKT PRI CABLE, + 65' (L=______' ) IN EXISTING (2-55) PSE INSTALLED 4" SCH80 CONDUIT -INST CABLE TAGS AS SHOWN IN ONE LINE J02 - V01 -INST (3) 1/0 AL SOL JCKT PRI CABLE + 35' (L+______' ) IN (2-55) CUSTOMER PROVIDED TRENCH AND 4" SCH80 CONDUIT W/ 3/8" POLLY PULL ROPE -INST CABLE TAGS AS SHOWN IN ONE LINE V01 - M01 -CONNECT AND TAG CUSTOMER OWNED WIRE SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE Assumed Lot Corner CONDUIT VOLTAGE DROP VOLTAGE FLICKER ASBUILT INFORMATION SIZE LENGTH Design (ft) SIZE LENGTH Design (ft) BENDS Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) V01 M01 250 30 20 3 20 0.5%3.6% CONDUIT DIAGRAM NOT TO SCALE PRIMARY CABLE DIAGRAM NOT TO SCALE 3Ø PM TRANSFORMERS (480Y/277V) 277V WINDINGS 480V WINDINGS LOCATION SIZE R/X MIN %Z FAULT CURRENT MIN %Z FAULT CURRENT V01 500KVA 0.2 --2.30 24,918 A 2" Excavation - 20 cubic yards 8'-0" or 10'-0" 7'-0" 8'-0"8" 4'-2" SIDE VIEW 4'-6"Crushed 6" Rock 11' 11' TOP VIEW 3'-6" 7'-0" 6054.5000Not to scale VAULT & EXCAVATION DETAIL COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL NOT TO SCALE 12kV CABLE ROUTING EXISTING HYDRANT 12"X6" TEE WITH END CAPAND CONCRETE THRUST BLOCK