HomeMy WebLinkAboutR-408911w
J
w
❑
Z
U
g
v
N.E. 1 /4, SEC. 32 TWP. 24N ., RGE. 5E., W.M.
FACE OF GUARDRAIL - FACE OF GUARDRAIL 1 FACE OF GUARDRAIL NOTES
IN 1. When required by the Contract a Snow Load Post Washer
SCALE: 1 "=20'
shall be used on the backside of the post (in lieu of the 1 3(4"
_ w Post Bolt Washer) and a Snow Load Rail Washer shall be
T R placed on the face side of Beam Guardrail Types 1 and 2.
> N Snow Load Rail Washers shall not be Installed on terminals.
N N PRE -DRILLED HOLES 20 10 0 20 40
FOR FUTURE GUARD- 2. Rail Washers, also called "Snow Load Rail Washers" are not / L L U/\ ( L _ � .
RAIL RAISING required sa new installation except as called for in Note 1. I
Unnecessary Rail washers need not be removed from exist- SEE SHEET G&5 FOR C B TYPE 1 _LU
iIng nstallation shall be except
moved. on posts 2 through 8 of a BCT CULVERT CB TYPE I RIM=138.81 SDOT BEAM HOUSE — \
UPDATED ALIGNMENT I E E— 1 J�4. 8 Q t
DRAIL TYPE 1
I L HMA OVERLAY ( ) RIM — 1 6. U O d
�� 3. Beam Guardrail post spacing for Types 1 through 4 shall be I E= 135,5
TIM POST /
6'- 3" on centers. 1 E (W) =132.2 I E=135.0 / -
- -- J 4. Timber blocks shall be toe -nailed to the post with a16d gal- i /
Qe
TYPE 1 INITIAL INSTALLATION RAIL ELEMENT RAISED vanized nail to prevent block rotation. ? /�/ 9 STEEL
TYPE 1 ALTERNATIVE 5. For post and block details, see Standard Plan C-1 b. j // % / /� / j / — \ / �� _ate 7 — G�"
;;////// 8TF T V
6. When "Beam Guardrail Type - _ Ft. Long Post" is specified 1 1 1 1 r /j / /
FACE OF FACE OF g P 9 P 1 1 1 /i
m the Contract, the post length shall be stamped with numbers,
FACE OF GUARDRAIL 1 1/2' min. high and 3/4" wide at the location where the letter — — _
GUARDRAIL GUARDRAIL FACE OF FACE OF /
GUARDRAIL GUARDRAIL "H' is shown in the ASSEMBLY DETAIL. For wood post app- l J 1 1 \ _ LN
lications, the letter shall be stamped to a minimum depth of / I \ — 1 4'
T 1/4". For steel post applications, the letter shall be legible / / / / l \ �/ O _ _ 0 0
5/8" CARRIAGE BOLT T after the post is galvanized. After post installation, it shall be
Wl HEX NUT & POST i the Contractor's responsibility to ensure that the stamped / / -� \ o Q Q _ ,Q Q / i>� CS TYPE I
BOLT WASHER m n numbers remain visible.
IN 3/4"HOLE _ L �. RIM=154, 99
IN 7. Existing posts shall not be raised. Replace posts as / / O `/ / ��� _ _ _ — c
necessary to achieve required guardrail height. \ \ �\ — — _ _ / \ \ _ — � B I E (J) = 151.6
J JJJJJ JJJ J /
06 >'8.2x12'-53/4" ! ! CB•82 .12'-53/4" I 5/8"CARRIAGE BOLT ! - \� / B— J JJJJ--IJJJ.J �I J '12" CPEP I —151.4
,
G E (N)
N914'HOHER //// // — J JJJJJJ I SSMH
MIN. LENGTH r1 MIN. LENGTH 1� W/ HE NUT 8 POST � /\ / / // % / T� / J JJ - J
TYPES rYPEs TYPEa L �� �� / // //// / / / _ — �$ '✓ RIM=160. 36
FACE OF GUARDRAIL
N
iV
N
RAISED GUARDRAIL BLOCK
FIELD DRILL NEW 3/4" HOLE
FOR 60 BUTTON HEAD BOLT
'I a
EXISTING GUARD-
RAIL POST
'- HMA OVERLAY \
BEAM GUARDRAIL RAISING FOR HMA OVERLAYS
og �- OER4,a Q / // /� /i f8"W E ROLLE� N /
� II E & N =148.11
SEE NOTE 6 1 3l4' POST BOLT WASHER TIMBER BLOCK �� � N ° / / / / / —
� � F ASPHALT
// // /��Q �� / I (�h NEW IE (SW)=148.8
SEE NOTE 4 - FOR TYPES, 3 2 ONLY FOR STEEL POST / / / //�
y // _ _ l / l �� UNDER CONSTRUCTIC o0
TYPES 1 3 2 ,' - I .. .. .
5B" • 18" BUTTON HEAD SEE NOTE B O 32350 O 4 / / / / // / / / i / \ 2�39. 1 / �/ 7/32" OVAL �6ssB�ISTER�G1} ; 4� � � � // //� / / / / // �` / / y S� TIME OF SURVEY �
o a WBs9OR �DNALE / // // / // / �� ` _ -: — ;./ i 12 CPE� O
TYPES 3&4 0 0 WB'15 3 / / / / / / \ _ :_�.. >\ \ o
5B" • 25" BUTTON HEAD
BOLT W/ 7/32" OVAL GRIP a 7 ' /'Ln
TYPES 1 S 2
OR 5/8" • 1U' BUTTON HEAD I C B TYPE I
8 RECESSED HEX NUT BEAM GUARDRAIL I �' _.' RIM = 1 6 1. 1 2 0
/ \ • -` _
5/8" ROD THREADED BOTH BOLT W/ 7/32" OVAL GRIP & TYPES 1 — 4 i /¢J" / \ % ,/
ENDS WI HEX NUTS HEX NUT W/ CUT WASHER (W-BEAM // ��/�i'� / / / \ l� O�/Q / / / ' - — I E= 15 7 0
STANDARD PLAN C-1777���
5/B" = 1 114" BUTTON HEAD — d
SPLICE BOLT W! 7/32" OVAL SHEET 1 OF 2 SHEETS /�
GRIP & RECESSED HEX NUT / / / / . / / (j� / / I - . l� B TYPE 1
(EIGHT REQUIRED PER SPLICE) APPROVED FOR PUBLICATION / POST / / / /
TIMBER STEEL POST -r —
ALL MOUNTING AND SPLICE Pasco Bakodch 111 06-16-11 n/ / I _
HARDWARE SAME AS FOR TIMBER snie ocsioe exo¢ern oaTe / �� ' / / I / — i / / �� I WIS 0 L I D LID
RIM=166, 77 0
POST EXCEPT AS NOTED wmhlnpten State ooponmom M inn.ymmxm I / / / I / 1 / / -- — / / - • ❑ P ° 13
ASSEMBLY DETAIL �/' 1E (S)=162.5 a�
e / ... ' IE N —162.2
/ p: -:... QT
U I
SSMH
S 0'F I I� ) '/Ii // / / --� — — — — I W �� _
�:. ��� _ RIM 162.31
/ I MMLJrPAI TYP / — —
/ :r. / / / W Qe
/ '� // bMgER �STI/ / (S & NE)-154.23 �s
/i /— // / / / 1 / /
00
/ / - /z— - — TBM=60D SPIKE IN PC 0
oo
B
0
BLOC/ / / // �.' �.'.•: / /'� / /
ILJLI
00
i
/ I
CB TYPE I
L T 2 / — / /OT / / / W SOLID LID
RIM=183.91
I / I / / / / /e / _ I E S 1 79, 4
7`�/ / / / / / / I / / // / `a I E (N) =179, 2
/0 L9T W
{—--
/00
N88°34' 1 "IN \ / - / a / •- _ _ , P °
I_ — ----
1 I I _ 410.190 I I ?— 0_00
GARAGE — / // // �� I / 1 I � ❑ I I l � fEL° - --
/ ------ / W W—/ W/ W /f W WV PD
/ MB
FD. REBAR / ` VIH X/3 0
_-- I
/ X 3
W P.L.S. 94 70---------------- / w
0, 4' SOUTH OF LINE
0
/ —
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
O
TING1
DEVELOPMENT ENGINEERING �f
jchavez 07/20/2020
a
WASH/
O
of
�j n
4
35 w
his
ONAL 0�
pG3C CC G�3G3C D
EmaflNEER0ma9 �Lc
' EC
�E
1 "=20'
VER7IGL: NAVD 1
HOtiQ01RAL NO „ 371091
DATUM
ELEV-185.20
•
CITY OF
RENTON
U
Planning/Building/Public Works De t
D D p D 4
�p DC MC �Oo p i]C �1� �G��G�� p�Q�
1625 25 N F= 33 0 h ��
a�����9 �Q
D o o D D D
���� r�i �3 WATER r�i p r�i ��0���
387H ST o UNC OLN AMC
l %V- 6 �oAo
/ 2
LJ
�
0
a
D
FIaDeDDu BOOK
PAGE
CIVIL ENGINEERING - PROJECTMGT- ADV.HYDRAULICS
11627 SE 58TH STREET PH (206) 501-5708
BELLEVUE, WA 98006
EMAIL: PELLCENGR®GMAIL.COM
DRAWN: JJK
o INS,
AT FULL SWE
F ONE IM YP
D oNIPAGM
C -11
CHMKM.
STL
NO.
REVISION
BY
DATE
APPR
APP �
�'�' 11 °�" 99