HomeMy WebLinkAbout0895.06 SWFR 274.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 1 of 4 Report No. 274 Time On Site 10:40 Time Off Site 11:10 Date 1/29/21 Day of Week Friday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N N/A 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck F Y -Light track out observed on road, street sweep as needed -Wheel wash is onsite 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams G N N/A 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Sediment Pond (Temp. or Perm.) • Water Truck F Y -Repair silt fence in NW corner of site -Silt fence was installed around majority of site perimeter 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Straw Stockpiles • Stockpiles • PAM F Y -Continue to place straw on exposed soils in south western portion of site -Cover stockpiles unworked for 2 days and before weekends 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors G N -Straw wattles in place to divert water away from western slopes 7. Protect Drain Inlets • Catch Basin Inserts • Gutter; Road G N -CB inserts on road working as intended 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets G N N/A 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling F Y -Continue to treat stormwater with dry ice to lower the pH 10. Control Dewatering - - N/A 11. Maintain BMPs F Y See recommended notes 12. Maintain SWPPP & Site Logbook G N Available upon request 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement - - N/A Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 2 of 4 Report No. 274 Time On Site 10:40 Time Off Site 11:10 Date 1/29/21 Day of Week Friday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed?  Yes  No List the completed, not-yet-completed, or ongoing action items in the table below: Actions Items Completed? (Yes; No; Ongoing) Date (If Completed) Sweep site entrance when soil is seen on roadway O 1/28/21 Add straw to exposed soils in SW corner of site O 1/22/21 Repair silt fence in northwestern corner of site N Current Weather: 43°F, Mostly Cloudy Precipitation since last inspection (approximate): 0.65 inches Precipitation in the last 24 hours (approximate): 0.17 inches Was water quality sampling part of this inspection?  Yes  No If “Yes”: • Record results in the table below. • Characterize the stormwater discharge, e.g., the presence of suspended sediment, “cloudiness”, discoloration, or oil sheen, if present: Clear and colorless • Hanna Turbidity Meter # 93703 Monitoring Location Turbidity (NTU) pH Notes Western Baker Tank 23.85 7 Eastern Baker Tank 24.35 7 Is the site in compliance with the SWPPP and the permit requirements?  Yes  No If “No”: • Indicate the tasks necessary to bring the site into compliance in the table above. • Has the non-compliance been reported to the Department of Ecology?  Yes  No • Should the SWPPP be modified?  Yes  No “This report is true, accurate, and complete to the best of my knowledge and belief.” Inspector Name: Alexandra Shaner CESCL Number: ECO-3-9272007 Inspection Date: 1/28/21 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 3 of 4 Report No. 274 Time On Site 10:40 Time Off Site 11:10 Date 1/29/21 Day of Week Friday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC w BMP LEGEND SILT FENCE STOCKPILES QUARRY SPALL ENTRANCE BAKER TANK WHEEL WASH SWALE SEDIMENT TRAP WATTLE Section of silt fence to repair Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 4 of 4 Report No. 274 Time On Site 10:40 Time Off Site 11:10 Date 1/29/21 Day of Week Friday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC Photo 1: The section of silt fence requiring repair.