Loading...
HomeMy WebLinkAboutC_Valley Vue_Final Closeout Inspection_20210209.doc [DATE] [Applicant’s Name] [Applicant’s Address] [Applicant’s Address] Via Email: [Applicant’s Email] SUBJECT: MAINTENANCE AND DEFECT SURETY #[SURETY #] VALLEY VUE PERMIT #C17001891 [PROJECT ADDRESS] Dear [Applicant’s Name]: This letter is to notify you that the City has performed a “Final Closeout Inspection” to determine if the above noted Maintenance and Defect Surety for the Valley Vue project can be released. The enclosed shows the punch list items identified during the “Final Closeout Inspection” that are required to be resolved to final this inspection and release the surety. Please contact in the City’s Construction Inspection line (425-430-7203) within 30 days from the date of this letter (by [DATE OF LETTER + 30 DAYS]) and a minimum of 24-hours prior to performing the work on site to correct “Final Closeout Inspection” punch list. If you have any questions, please contact me at bbannwarth@rentonwa.gov or (425) 430-7299. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: Justin Johnson, Assistant Development Engineering Manager File Enclosure: “Final Closeout Inspection” Punch List