HomeMy WebLinkAboutP_Infiltration_Detail_One_210128_V1PLAN VIEW B-B
N.T.S.
FIBERGLASS SEPARATION
CYLINDER AND INLET
CENTER OF CDS STRUCTURE, SCREEN AND
SUMP OPENING
PVC HYDRAULIC SHEAR
PLATE
2'-0"[610](2'-0"[610])1'-9" [533](4'-6"[1372])ELEVATION A-A
N.T.S.
FIBERGLASS SEPARATION
CYLINDER AND INLET
SOLIDS STORAGE SUMP
SEPARATION
SCREEN
INLET PIPE
(MULTIPLE INLET PIPES
MAY BE ACCOMMODATED)
OUTLET PIPE
PVC HYDRAULIC
SHEAR PLATE (4'-0"[1219])OIL BAFFLE SKIRT
CONTRACTOR TO GROUT
TO FINISHED GRADE
GRADE
RINGS/RISERS
48" [1219] I.D. MANHOLE
STRUCTURE
TOP SLAB ACCESS
(SEE FRAME AND COVER
DETAIL)VARIESGENERAL NOTES
1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
2. DIMENSIONS MARKED WITH ( ) ARE REFERENCE DIMENSIONS. ACTUAL DIMENSIONS MAY VARY.
3. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR CONTECH ENGINEERED
SOLUTIONS LLC REPRESENTATIVE. www.ContechES.com
4. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS DRAWING.
5. STRUCTURE SHALL MEET AASHTO HS20 AND CASTINGS SHALL MEET HS20 (AASHTO M 306) LOAD RATING, ASSUMING GROUNDWATER
ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER
ELEVATION.
6. PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF SCREEN CYLINDER. REMOVE AND REPLACE AS NECESSARY DURING
MAINTENANCE CLEANING.
INSTALLATION NOTES
A. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE
SPECIFIED BY ENGINEER OF RECORD.
B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE CDS MANHOLE
STRUCTURE (LIFTING CLUTCHES PROVIDED).
C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE.
D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN.
E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT
IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.
CDS2015-4-C DESIGN NOTES
CDS2015-4-C RATED TREATMENT CAPACITY IS 0.7 CFS [19.8 L/s], OR PER LOCAL REGULATIONS. MAXIMUM HYDRAULIC INTERNAL BYPASS CAPACITY IS
10.0 CFS [283 L/s]. IF THE SITE CONDITIONS EXCEED 10.0 [283 L/s] CFS, AN UPSTREAM BYPASS STRUCTURE IS REQUIRED.
THE STANDARD CDS2015-4-C CONFIGURATION IS SHOWN. ALTERNATE CONFIGURATIONS ARE AVAILABLE AND ARE LISTED BELOW. SOME
CONFIGURATIONS MAY BE COMBINED TO SUIT SITE REQUIREMENTS.
GRATED INLET ONLY (NO INLET PIPE)
GRATED INLET WITH INLET PIPE OR PIPES
CURB INLET ONLY (NO INLET PIPE)
CURB INLET WITH INLET PIPE OR PIPES
CONFIGURATION DESCRIPTION
SEPARATE OIL BAFFLE (SINGLE INLET PIPE REQUIRED FOR THIS CONFIGURATION)
SEDIMENT WEIR FOR NJDEP / NJCAT CONFORMING UNITS
IN COMPLIANCE WITH CITY OF RENTON STANDARDS----GREEN’S LANDING SHORT PLATGREEN’SLANDINGSHORTPLATSHEET06LUA----C----GREEN’SLANDINGSHORTPLATR-----PR----