Minor Franchise Permit: MFP20003813
IVR Number: 20003813
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:08/27/2020Application Date:7227801075Parcel Number: 2715 SUNSET LN NE, APT
Permit Type:02/12/2021Issue Date:Franchise
Permit Work Class:02/14/2022Expiration Date:Minor Utility
Job Number: 101128849Franchise Type:Electric
Description: Puget Sound Energy Electric TRUCK TO BE SET AT P1A, P01, P02 & J01. CREW TO PULL WIRE FROM P1A TO
J01, J01 TO J02. WIRE TO BE REMOVED FROM P02 TO P01. HS CUTS AT J01 AND P1A. CUSTOMER PROVIDED
ADDRESS 1073 HARRINGTON AVE NE. UPDATED ADDRESS PROVIDED TO US FROM CITY. RESTORATION PER
CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contact
COLPITTS SUNSET LLC 2256 38TH PL E
SEATTLE , WA 98112
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP20003813
Scott Warlick CED 2/12/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
SUNSET LN NE1010P1A
P01
P02
Vault J01
SUNSET LN NEGLENNWOOD AVE NE1212
1010
10
10
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999
INFRASOURCE LLC
000
00000
00 NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSTOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LA
N
E
ROAD
AHEAD
100'X'X'
ROA
D
WOR
K
AHEA
D W20-1100'FLAGGERS SHALL STOP TRAFFIC
IN ALL DIRECTIONS (SHORT DURATION:
APPROX 10 MINUTES) FOR LINE DROP.
STOP
FLAGGER
USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
PSE PUGETSOUNDENERGY
JOB101128849
1073 HARRINGTON AVE NE, RENTON
08/04/2020
FLAVIANA.NUNES@PSE.COM
425-424-7809
SHEET 1 of 2
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
VAULTVault
MFP20003813
SUNSET LN NE1010P1A
P01
P02
Vault J01
SUNSET LN NEGLENNWOOD AVE NE1212
1010
10
10
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999
INFRASOURCE LLC
000
00000
00 NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSTOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'FLAGGERS SHALL STOP TRAFFIC
IN ALL DIRECTIONS (SHORT DURATION:
APPROX 10 MINUTES) FOR LINE DROP.
STOP
FLAGGER W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROAD
WORK
AHEAD W20-1BEPREPAR
E
D
TOSTOP W3-4100'100'100'STOP
FLAGGER
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
PSE PUGETSOUNDENERGY
JOB101128849
1073 HARRINGTON AVE NE, RENTON
08/04/2020
FLAVIANA.NUNES@PSE.COM
425-424-7809
SHEET 2 of 2
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
VAULTVault
MFP20003813
N
Vicinity Map
47.5007, -122.1828
Owner / Developer Contact Info
officeATTN:
RENTON HOUSING AUTHORITY
2900 NE 10TH ST
RENTON, WA 98056
SEAN MCCARTY 425.226.1850
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
509236944 101128849
N/A 108120687
N/A 583064085
N/A 593219649
N/A 594136910
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Removal
OH XFMR
OH Wire
UG MISC
Job Order
Distribution
Service Stubs
HP Svc/MSA
Phone
INTOLIGHT Contact Information:
MATT MAYNARD
425.559.3448
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. BLACKIE 253.395.6850 07.22.20
A.M. PAULSEN 206.437.9150 07.22.20
...
A.M. PAULSEN 206.437.9150 07.22.20
REDT # ( RW-118748 )CITY OF RENTON
SUNSET OAKS
SCHEDULE 73 OH-UG CONVERSION
1073 HARRINGTON AVE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A N/A
N/A 101128849
NOTED 1 OF 4
KING N/A N/A QCSOKE
09NW-T23N-R05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
COMCAST
BILL WALKER
253.288.7538
CENTURYLINK
KENNETH LUU
206 346.0144
RIGHT OF WAY
VALERIE CONNELL
425.462.3518
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RANDY BLACKIE
253.395.6850
randy.blackie@pse.com
x
xx
11/18/20 R.BLACKIE NEW CAD, NEW TRENCH ROUTE
...
...
sm@rentonhousing.org
SITE
x
SUNSET OAKS
SCHEDULE 73
OH TO UG CONVERSION
NOTE:
DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING
EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE,
SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS,
COMPACTION, ALL HARDSURACE RESTORATION AND RELATED
LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE
TEMPORARY EXCAVATION PLATING (IF REQUIRED).
& ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS.
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
EROSION & SEDIMENT CONTROL REQUIREMENTS
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
GENERAL 1.
Pre-construction Notify appropriate City or County 48 to 72 hours or as required by
permitting agency before starting work on any right-of-way involving a permit.
Follow all requirements as outlined by the permitting agency.
Locate and mark all underground utilities prior to start of construction. If there is a
conflict with the intended trench route as shown on the site plan and existing utilities or
obstructions, trench route may need to be moved to opposite side of street.
Cooperation with Quality Inspector, Puget Sound Energy Contractor, City or County
authorities during Pre-construction meeting will determine the final trench route.
2. Existing Utilities
Hand excavate (pothole) all marked utility crossings to verify exact location and depth
at point of crossing. Protect underground utilities during excavation. Use hand
excavation methods if necessary to avoid damage. Fabricate and install adequate
temporary structures to support and protect underground utilities while exposed during
construction.
Maintain 6" minimum clearance at crossings between existing utilities and new duct
installations. Transition trench or tunnel profile gradually as required at crossings.
Maintain 24" minimum separation between new trench or tunnel and parallel existing
utilities or as required by the permit agency.
In the event of damage to an underground utility, notify Puget Sound Energy at once.
Contractor agrees to make work force and resources available at once to Puget Sound
Energy or municipal authorities to repair damage at no cost.
3. Work Drawings
Maintain on site, in good condition, a complete file of all work drawings. These
drawings shall be available at all times to a Puget Sound Energy representative.
Corrections and changes made during the job shall be recorded continuously on these
drawings. All underground electrical facilities shall have a minimum of 36 inches of
cover. Any change must be approved by the PSE engineer or project manager.
Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the
end of the job.
4. Safety
Provide signs, barricades, and traffic control in conformance with local jurisdictions and
regulations. Provide flagging and or other vehicle traffic control as needed in
conformance with local regulations. (see SPM # 100.4000) Provide adequate signage
and protection to traffic during non-working hours. Maintain traffic flow as required by
permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and
bicycles.
Install warning barricades at least every 50 feet along the trench route from the time the
trench is opened until the trenching is complete.
5. Existing Systems
Maintain existing electrical system in service until new system is complete, tested, and
ready for service. Disable existing system only to make cutovers and connections as
directed by Puget Sound Energy's representative.
Provide temporary wiring and connections to maintain existing systems in service during
construction; if a scheduled outage is not possible. When work must be performed on
energized equipment or circuits, use qualified personnel for such operations.
EARTHWORK
See Puget Sound Energy SPM 6800.4050
1. Back hoe, Hand Dug Excavations
Paved Surfaces
Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow
off the edge of paved surface far enough to minimize asphalt disturbance. Repair any
blow out areas (where edge has been broken) by sawing. The depth of the trench shall
be enough to allow 36" of cover . Backfill material shall be Controlled Density Fill (CDF)
cover or select fill (5/8" minus) to meet permit requirements.
Unpaved Surfaces
Conduit/cable trenches are to be excavated just off the existing road edge or in the
shoulder of the road behind the existing ditch line. Contractor shall use a back hoe with
the narrowest width bucket practical or plow. Trench shall be deep enough to allow a
minimum of 36" of cover over the top most cable. All ditch crossings shall have a
minimum of 36" cover from the lowest point within the existing ditch line.
Culverts; when installing facilities under a culvert, excavation must be filled with packed
crush rock. If any culvert is damaged it will be repaired or replaced in accordance with
permitting agency and contractors responsibility.
Spoils shall be removed quickly to minimize blocking of traffic. All spoils and wastes
become the property of the contractor immediately upon removal. Remove spoils and
wastes promptly to an approved disposal site. Remove spoils containing asphalt or
concrete to a disposal site specifically approved for such materials. Provide Puget
Sound Energy with a disposal receipt for all spoils.
2. Backfill
Unpaved Road Surfaces
Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1/2" material compacted
to 95% density. Backfill for unpaved road sections shall consist of native material
compacted to 95% density.
At the end of each workday, backfill or plate all trench, remove all spoils and clean
roadway surface of large hazardous debris.
3. Surface Restoration
Unpaved Surfaces
Restore ground surface to original contour. Restore to original condition or better.
4. Landscaping
Arrange and perform work to minimize impact to existing landscaping. Restore
landscaping that has been disturbed during the course of work, including seeding of
banks and fills. Vaults set in bank areas may require re-sloping the surrounding land to
avoid sloughing. Leave area in its original state or better at the end of construction.
Hand dig if required to prevent damage to tree roots.
ELECTRICAL
1. Conduit
Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC SCH80 direct burial.
Maintain 36" minimum cover above top conduit at all times or as required by the permitting
agency.
Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top
conduit at all times or as required by the permitting agency. Bends shall be made with as long a
radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during
installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before
penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the
4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10'
minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and
cap conduit to prevent the entry of dirt and moisture.
Arrange work so conduit plays directly off reel into trench. Place the conduit in the trench as
straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs
may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing
under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs,
cut the conduit ahead of kink and splice to new conduit to continue run.
2. Underground Primary Cable
Primary cable shall be 1/O Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene
jacket. Primary cable shall be 61 strand 750 MCM aluminum conductor rated for 15 KV service
with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run
with each 3 phase circuit of 750 MCM.
Install cable into existing or new conduit systems using approved installation equipment.
Approved equipment includes either cable pullers and/or cable pushers. Pulling socks shall be
non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not
be used to pull cable. Cable pulling equipment (winches, hoist, driven reels, etc.) shall be
equipped with instrumentation to continually monitor and record peak tension encountered during
a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy.
Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if
pulling tension equals or exceeds rating (828/1657lbs for 1/0 or 5000lbs for 750 .) Do not exceed
minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations.
Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy
approved lubricant to cable continually during pulling to reduce pulling tension and to permit future
removal.
Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment
and prevent un-necessary damage to sidewalks.
Train and coil cables in vaults as required to form a smooth transition from conduit to termination.
if terminations are to be performed by others, coil 15' of cable in vault and cap end.
3. Terminations and Splices
Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115-
5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and
cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317.
Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice
cables in runs between vaults. See Puget Sound Energy SPM 2233.2075-2076.
4. Concrete Vaults
Excavate, install base material, and compact base material in accordance with Puget Sound
Energy SPM 6775.0040.
Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use
precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes
plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road
elevation. Install hillholders as required on sketch or by construction notes.
5. Grounding
Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable
is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth
in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2
copper jumper or to Concentric neutral at each splice vault location. Minimum grounding
requirement is 4 grounds per mile.
6. Existing Underground Primary Cable (if applicable)
Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall.
Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return
scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as
required by permitting agency.
7. Traffic Control
All traffic control to comply with current specifications in M.U.T.C.D.
GENERAL OVERHEAD NOTES:
1. Poles, conductors, devices to be installed per PSE Standards & Specifications.
2. Poles are to be installed or relocated as staked.
3. All new poles set shall be the class indicated on the sketch or better.
4. Install ground plate assembly on all new poles.
5. Install grid numbers on all new and existing poles as shown on sketch.
6. Treat all field-drilled poles with copper Naphthenate wood preservative.
7. Customer/Developer to coordinate between utilities.
8. All new and relocated poles -locations- to be approved by City of Renton
OVERHEAD CIRCUIT MAP - EXISTING (2305E040)
SCALE: 6" = 1 MILE
JOB
SITE
EXISTING PROPERTY LINE
EXISTING UG RISER
NEW UG RISER
J-BOX
NEW TRENCH LINE
EXISTING 3Ø WIRE
EXISTING CENTER LINE
CONDUCTOR TO BE REMOVED
DISCONNECT - FUSED
EXISTING 1Ø WIRE
EXISTING RIGHT OF WAY
PULL VAULT
EXISTING POLE
DOWN GUY
EXISTING SECONDARY SERVICE LINE
DISCONNECT - UNFUSED
STREETLIGHT
NEW POLE
NEW PADMOUNT TRANSFORMER
EXISTING PADMOUNT TRANSFORMER
NEW HANDHOLE
P
ELECTRIC SYMBOLS LEGEND 101128849R1
R1
MFP20003813
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. BLACKIE 253.395.6850 07.22.20
A.M. PAULSEN 206.437.9150 07.22.20
...
A.M. PAULSEN 206.437.9150 07.22.20
REDT # ( RW-118748 )CITY OF RENTON
SUNSET OAKS
SCHEDULE 73 OH-UG CONVERSION
1073 HARRINGTON AVE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A N/A
N/A 101128849
NOTED 2 OF 4
KING N/A N/A QCSOKE
09NW-T23N-R05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
COMCAST
BILL WALKER
253.288.7538
CENTURYLINK
KENNETH LUU
206 346.0144
RIGHT OF WAY
VALERIE CONNELL
425.462.3518
.
.
.
11/18/20 R.BLACKIE NEW CAD, NEW TRENCH ROUTE
...
...
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UNIVERSAL MAP - EXISTING (2305E034)
SCALE: 1" = 50'
SCALE: 1" = 100'
UNDERGROUND CIRCUIT MAP - EXISTING (2305E034)
JOB
SITE
JOB
SITE
101128849R1
MFP20003813
GLENNWOOD AVE NESUNSET LN NE
PUBLIC ALLEY
FEED
PRI
11#2ACSR#2ACSRABCN
1130
TO BE RELOCATED
SW#:T83987
FUSE @ 40T
NEW
1123 & 1125
1131
FUT: 1-4"
"A"
"B"
16'
NEW
52'
43' N OF EXST. LOC.
TRANSFER
TRANSFER
TRANSFER
1" = 20'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. BLACKIE 253.395.6850 07.22.20
A.M. PAULSEN 206.437.9150 07.22.20
...
A.M. PAULSEN 206.437.9150 07.22.20
REDT # ( RW-118748 )CITY OF RENTON
SUNSET OAKS
SCHEDULE 73 OH-UG CONVERSION
1073 HARRINGTON AVE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A N/A
N/A 101128849
NOTED 3 OF 4
KING N/A N/A QCSOKE
09NW-T23N-R05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
COMCAST
BILL WALKER
253.288.7538
CENTURYLINK
KENNETH LUU
206 346.0144
RIGHT OF WAY
VALERIE CONNELL
425.462.3518
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-11
6.8.20
188 197 230
0 0 0
224 231 260.333
11/18/20 R.BLACKIE NEW CAD, NEW TRENCH ROUTE
...
...
CIRCUIT FEET REMOVED: 340'
CIRCUIT FEET ADDED: 440'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF
LOCATE MARKS OF PSE ENERGIZED
FACILITIES 101128849 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
REMARKS
SITE
#
POLE DATA POLE
TEL TV FIBER TRAN RMVD ID NUMBER (ADDITIONAL INFORMATION)
GRID # HEIGHT CLASS YEAR TOPPED RMVD
P01 318579-166656 45 CL3 1959 SLAT3153 CENTURYLINK, COMCAST
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P1A 318583-166654 45 3 2020 PSE Equip #
CROSSING CONDUIT TABLE
X-ING
#
LOCATION POWER
XING
LENGTH
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY
X01 "A" "B" 4 SCH 80 2 25 PRIMARY
4" SCH 80 PVC = 50 FT 4" PVC PLUG /CAPS = 4
TYPICAL AUGERED WORK SITE - 0150.3200
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
NOT TO SCALE
TYPICAL POLE WITH RISER DETAIL
Schedule 80 Bend
Ground Line
10' (Overall)
Schedule 80
Conduit8'
Min.
20'
DB 120
Conduit
36" Primary
24" Secondary
Note: Schedule 80 conduit shall
extend a minimum of 8' above
and 12" below ground line.
Ground Line
Common Neutral
6" Minimum above common neutral.
even with the common neutral for secondary.
12
13
10
11
3
5"
Min.
5
6 7
1
4
2
CL
Climbing
Space
Climbing
Space
Direction of Vehicular Traffic
5" Min.
Conduit
Conduit Clamp
Standoff Bracket
15" Min Length
Field Face
Quadrant
Road Face
Quadrant
PLACE PEA GRAVEL
BAGS (MID 9995892)
FOR SEDIMENT TRAP
PLACE STRAW MULCH
ON DISTURBED AREA
AUGERED HOLE
POLE
DITCH OR SENSITIVE AREA
Cables should enter the vault so that all of
the cables will lay in the same direction.
Top View, 12 kV Cable Routing
24" Min
Separation
Telephone 2-4"
Cable TV 2-4"
Primary Power 4"
Gas
12" Min
Separation
NOTE: Install 12" shading
if the backfill contains rocks
greater than 10" dia.
48"
Max
36"
Min
Cover
24" Min
Final Grade
ROADSIDE
Excavated Dirt Pile
NOT TO SCALE
TRENCH EXCAVATION DETAIL
12"
48" Typical
(Power, Gas, and
Communications)
Over Power Conduits
6" Min Sand Cover
4"
(When Present)
(When Present)
J- BOX CABLE ENTRY DETAIL
NOT TO SCALE 12kV CABLE ROUTING
CLEAR WORKING SPACE FOR VAULTS
NOT TO SCALE
FIELD SIDE (PREFERRED)
ROAD SIDE (PREFERRED)
6' MIN
3'
MIN
3'
MIN
3' MIN
4"
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
318579-166656
25kVA
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
ADDRESS 1123/1125
NEW:
%V DROP: 2.2 @ P1A
% FLICKER: 2.4 @ P1A
EXISTING:
% V. DROP: 2.9% @ P01
% FLICKER: 2.5% @ P01
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
7'-0"
4'-0"
1'
4'-8"
VAULT DETAIL @ J01
NOT TO SCALE
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P1A
318583-166654
37.5kVA
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
4. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
NOT TO SCALE
ANCHOR DETAIL - PLATE
6' to 8'
6" to 12"
Backfill and
Compact
Cut slot
to lay rod in
SITE NOTES
AT P01 (318579-166656) 1959 45'- CL 3
RELOCATE POLE APPROX. 43' NORTH
REMOVE EX. 25kVA OH TRANSFORMER TO P1A
TRANSFER AND EXTEND "1123/1125" EX. OH SVC TPX TO P1A
TRANSFER AND SPLICE "1130" EX. OH SVC TPX TO P1A
TRANSFER "1131" EX. OH SVC TPX TO P1A
REMOVE EX. POLE AND ALL PSE FACILITIES
COORDINATE/NOTIFY CITY OF RENTON OF REMOVAL OF PSE LIGHT (SLAT 3153).
AT P1A (NEW)
INSTALL 45' CL3 POLE (DEVELOPER TO STAKE) (PD453) 6010.1000
INSTALL 3Ø PRIMARY NEUTRAL DEADEND (DEP312) 6033.3040
INSTALL 3Ø TERM ON NEW FIBERGLASS ARM W/ LINKBREAK CUTOUT
& SURGE ARRESTOR (TSU3C1F) 6043.1000
INSTALL (3) 40T FUSES (MID: 3412500)
INSTALL (3) STIRRUPS (MID: 2254100) 6099.9999
INSTALL "H" CONNECTOR (MID: 2167000)
INSTALL SWITCH NUMBER T83987
INSTALL 37.5 KVA120/240V TRANSFORMER (TRFPXF) 6025.1000 TAP BØ
INSTALL 4” PRIMARY RISER ON NEW STAND OFF BRACKET (RIS4CSS) 6042.1000
INSTALL 3/8" DOUBLE PRIMARY NEUTRAL DOWN GUYS (GYDD3SA) 6013.0100 (S)
INSTALL 20" PLATE ANCHOR (ANDP20) 6012.1000 W/ ± 12 FT LEAD (S)
INSTALL NEW GRID (318583-166654)
AT P02 (318560-166652) 2017 45'- CL3
POLE TO REMAIN
REMOVE PRIMARY DEAD END ARMS
REMOVE EX. 3Ø TERM
INSTALL NEW 1Ø TERM TO TRANSFORMER CUTOUT
REMOVE EX. DOWN GUY AND ANCHOR (S)
SPAN NOTES
P1A TO P01
REMOVE ± 180' #2 ACSR OH PRIMARY/NEUTRAL WIRE;REMOVED ( ') #2 ACSR
P01 TO P02
REMOVE ± 740' #2 ACSR OH PRIMARY/NEUTRAL WIRE; REMOVED ( ') #2 ACSR
P02 TO J03
REMOVE ± 155' 3Ø 1/O AL JKT UG PRIMARY; REMOVED ( ') 3Ø 1/O AL JKT
P01 TO P1A
INSTALL/SPLICE ± 20' 1/O OH TRIPLEX SERVICE TO 1123/1125 INSTALLED ( )' 1/O OH TRIPLEX
R1
MFP20003813
CONDUIT LEGEND
PRIMARY 4"
"A"
"B"
45°
45°
45°
45°
22°
45°
22°45°
45°FEED
PRI
11
SW#:T83987
FUSE @ 40T#2ACSRABCN
NEW 1/O AL
EIS443-AØ
EIS444-BØ
EIS445-CØ
NEW 1/O AL
EIS446-AØ
EIS447-BØ
EIS448-CØ
AØEHC862
BØEHC863
CØEHC864
NEW 1/O AL
EIS442-AØ
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. BLACKIE 253.395.6850 07.22.20
A.M. PAULSEN 206.437.9150 07.22.20
...
A.M. PAULSEN 206.437.9150 07.22.20
REDT # ( RW-118748 )CITY OF RENTON
SUNSET OAKS
SCHEDULE 73 OH-UG CONVERSION
1073 HARRINGTON AVE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A N/A
N/A 101128849
NOTED 4 OF 4
KING N/A N/A QCSOKE
09NW-T23N-R05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
COMCAST
BILL WALKER
253.288.7538
CENTURYLINK
KENNETH LUU
206 346.0144
RIGHT OF WAY
VALERIE CONNELL
425.462.3518
.
.
.
11/18/20 R.BLACKIE NEW CAD, NEW TRENCH ROUTE
...
...
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO
SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL
P1A J01 4 1 65 - 2 - -228 520 1/0 AL JKT 135 EIS443 EIS444 EIS445 -1.1
J01 J02 4 1 250 -5 2 -919 906 1/0 AL JKT 270 EIS446 EIS447 EIS448 -3.0
J01 E01 4 1 25 - - - -CONDUIT ONLY ---FUTURE PLAT
J03 P02 CABLE ONLY 78 35 1/0 AL JKT 155 EIS442 --EX. 4" CONDUIT 1.0
1Ø 1/0 AL JKT TOTAL (ft) =155 TTL (Gal.)5.1
4" SCH80 (FT) & BENDS =340 - 7 2 -3Ø 1/0 AL JKT TOTAL (ft) =405
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101128849NOT TO SCALE
NEW CONDUIT DIAGRAM
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALEVAULT & EQUIPMENT TABLE
SITE # GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
J01 318573
166654
4'8"x7'x5'
w/2-3' Sq Doors
Matid: 7663200
J-Box Below Grade
w/4-Pos J-Bus x3
Matid: 7625900
6 6 JBOX15L 6055.1010
ELB10J 6041.1000
Existing
J02
318557
166662
4'8"x7'x5'
w/2-3' Sq Doors
Matid: Existing
J-Box Below Grade
w/4-Pos J-Bus x3
Matid: Existing
3 -
ELB10J 6041.1000
Existing
J03
318554
166653
4'8"x7'x5'
w/2-3' Sq Doors
Matid: Existing
J-Box Below Grade
w/4-Pos J-Bus x3
Matid: Existing
1 2 CAP(7630600)
ELB10J 6041.1000
R1
MFP20003813