HomeMy WebLinkAboutAgenda
AGENDA
Planning & Development Committee Regular Meeting
5:00 PM - Monday, November 9, 2020
Video-conference
1. ADU Fee Schedule Resolution
a) AB - 2750 Community & Economic Development Department recommends extending the
sunset date for reduced ADU (Accessory Dwelling Units) fees to December 31, 2022, and
adding these changes to the 2021/2022 Fee Schedule.
2. Emerging Issues in CED
- ADU Designs and Process
Currently, due to the spread of COVID-19, all regularly-scheduled committee meetings will be held as necessary via
video-conference. City hall is closed to the public.
If you would like to attend this week's meeting remotely, you can do so by going to
https://us02web.zoom.us/j/89456364071
Zoom Meeting ID 894 5636 4071 Passcode 816175
You can call through Zoom at 253.215.8782 and use the Meeting ID
AB - 2750
City Council Regular Meeting - 02 Nov 2020
SUBJECT/TITLE: Accessory Dwelling Unit (ADU) Fees
RECOMMENDED ACTION: Refer to Planning & Development Committee
DEPARTMENT: Community & Economic Development Department
STAFF CONTACT: C. E. "Chip" Vincent, CED Administrator
EXT.: 6588
FISCAL IMPACT SUMMARY:
N/A
SUMMARY OF ACTION:
In October 2017, the City adopted reduced fees applicable to ADUs, with the exception of fire and school impact fees, in
order to encourage this type of moderately affordable housing. The fees were reduced by 50% and waived for the third
ADU created within a new subdivision. When the reduced fees were scheduled to sunset December 31, 2018, City
Council voted to extend the reduced fees until December 31, 2020. In total, six ADUs have been built since the reduced
fees were adopted in 2017. Staff proposes to further incentivize ADU development by waiving ADU fees and extending
the sunset date for these fee reductions/waivers to December 31, 2022.
EXHIBITS:
A. Issue Paper
STAFF RECOMMENDATION:
Staff recommends extending the sunset date for reduced ADU fees to December 31, 2022, applying a temporary fee
reduction of fifty-percent (50%) for the use of public works facilities, which include system development charges, and
full waiver of fees related to building permits and impact fees for transportations, parks, fire, and schools, applicable to
all new ADUs within the City.
AGENDA ITEM #1. a)
DEPARTMENT OF COMMUNITY &
ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:November 2, 2020
TO:Ruth Pérez, Council President
Members of Renton City Council
VIA:Armondo Pavone, Mayor
FROM:C. E. “Chip” Vincent, CED Administrator
STAFF CONTACT:C. E. “Chip” Vincent, CED Administrator
SUBJECT:Accessory Dwelling Unit (ADU) Fees
ISSUE:
Should Council approve a resolution to the City of Renton Fee Schedule to extend the
sunset date for reduced Accessory Dwelling Unit (ADU) fees and further reduce the
amount imposed on ADU development?
RECOMMENDATION:
Staff recommends extending the sunset date for reduced ADU fees to December 31,
2022, applying a temporary fee reduction of fifty-percent (50%) for the use of public
works facilities, which include system development charges, and full waiver of fees
related to building permits and impact fees for transportations, parks, fire, and schools,
applicable to all new ADUs within the City.
BACKGROUND SUMMARY:
In October 2017, the City adopted reduced fees applicable to ADUs, with the exception
of fire and school impact fees, in order to encourage this type of moderately affordable
housing. The fees were reduced by 50% and waived for the third ADU created within a
new subdivision. When the reduced fees were scheduled to sunset December 31, 2018,
City Council voted to extend the reduced fees until December 31, 2020. In total, six
ADUs have been built since the reduced fees were adopted in 2017. Staff proposes to
further incentivize ADU development by waiving ADU fees and extending the sunset
date for these fee reductions/waivers to December 31, 2022.
As a city located in King County, Renton is required to comply with the provisions of the
Growth Management Act (GMA), which includes development and adoption of a 20-
year comprehensive plan to help manage local growth. Comprehensive plans must
include a section for each of the GMA’s 13 planning elements, which range from urban
growth and economic development to sprawl reduction and housing.
AGENDA ITEM #1. a)
Ruth Perez, Council President
Page 2 of 3
November 2, 2020
The basis for the GMA’s housing element is to increase housing supply. State legislation
requires jurisdictions to establish development regulations that encourage the
availability of affordable housing to all economic segments of the population of this
state, promote a variety of residential densities and housing types, and encourages
preservation of existing housing stock (RCW 36.70A.020). To that end, local jurisdictions
are utilizing Accessory Dwelling Units or “ADUs” to create affordable housing
opportunities, increase housing inventory and diversity while maintaining the character
of single-family neighborhoods.
The term ADU refers to a small, self-contained dwelling located on the same lot as a
single-family dwelling. Independent from the primary residence, ADUs provide the same
basic functions of a typical single-family residence; complete with a kitchen, sleeping
area, and bathroom facilities, but are designed to be smaller or “accessory” to the
primary residence. The definition of an ADU may vary depending on the regulations
adopted by the local jurisdiction; Renton Municipal Code defines an ADU as “An
independent subordinate dwelling unit that is located on the same lot, but not within a
single family dwelling.”
Encouraged by affordable housing and environmental advocates, high land costs,
changing social norms, and an aging population, interest in ADU development has
surged. Communities experiencing significant growth, lack of affordable housing and
limited housing stock have identified ADUs as one way to control sprawl and create
affordable housing opportunities while increasing and diversifying housing inventory. A
2017 study of ADUs in the Cascadia region indicated that a majority of units rent for
below market rate, and thus may be considered a form of affordable housing, or at the
very least utilized as a form of low-cost market-rate housing for households earning less
than the area median income (Jumpstarting the Market for Accessory Dwelling Units:
Lessons Learned from Portland, Seattle and Vancouver, 2019).
Compared to new single-family residential development, ADU construction on lots with
an existing single-family home is more cost effective because it eliminates the need to
acquire and improve land. For residential property owners, ADU construction allows
them to provide housing for adult children or aging parents. Alternatively, property
owners may utilize the ADU to generate supplemental income by renting the unit to a
tenant. Finally, ADUs provide the opportunity for older adults to downsize while “aging
in place.” In these circumstances, the property owner might rent the primary residence
to a tenant and reside in the accessory structure.
The City of Renton adopted its first ADU development regulations in 2009. In an effort
to incentivize ADU construction, City Council adopted a 2017 resolution to the City of
Renton Fee Schedule that reduced the following fees by half (50%): transportation and
parks impact fees, utility system development charges and land use review and building
AGENDA ITEM #1. a)
Ruth Perez, Council President
Page 3 of 3
November 2, 2020
fees. The duration of the reduced rate was intended to last one year and was later
extended an additional year, scheduled to expire December 31, 2020. Despite these
efforts and increasing interest from residential property owners, the number of legally
established ADUs remained in the single digits. In 2019, staff completed a
comprehensive review of its ADU regulations with the intent of streamlining the
application process and reducing barriers to ADU development. The newly updated ADU
ordinance went into effect January 1, 2020.
Over the past several months, City staff has worked with an architect to develop
predesigned and pre-engineered ADU base plans that meet the City’s design and
development regulations. The base plans will be available to residential property
owners within the City’s jurisdictional boundary through the City’s forthcoming ADU
program at either no cost or for a nominal fee. The intent is to subsidize the design and
engineering phase of ADU development so that property owners can apply the savings
to construction costs.
To further promote ADU development and the success of the preapproved ADU
program, staff proposes to extend the fee reduction of 50% for the use of public works
facilities, which include system development charges and full waiver of ADU fees related
to building permit and impact fees for transportation, parks, fire, and schools; applicable
to all new ADUs within the City for a period sunsetting on December 31, 2022.
AGENDA ITEM #1. a)