HomeMy WebLinkAboutCapital Improvement Program (1972-1977) >10
1 ) 72 - 977
Cii „
Ilk CD
AT TO CAI? ITAL
IMI' ROVEME NT
PROGRAM
CAPITAL IMPROVEMENT PROGRAM COMMITTEE - -- - -
Del Bennett Public Works Administrator (Chairman)
Gordon. Ericksen Planning Director
Gene Coulon Director of Parks & Recreation
Ted Bennett Finance Director
Jack Lynch Administrative Assistant
ELECTED OFFICIALS
Avery Garrett , Mayor
City Council
Ken Bruce , President
Earl Clymer
Charles Delaurenti
William Grant
George Perry
Dick Stredicke
Henry Schellert
TABLE OF CONTENTS
INTRODUCTION
EXPENDITURE OF FUNDS
LOCATION MAP
CITY PROGRAMS
Airport
Building
Cedar River
Fire Protection
Law Enforcement
Library
Parks
Sewer
Street
Water
INTRODUCTION
The Capital Improvement "Program is an outline of the long- range planning for the
City ' s physical development . This six-year program sets forth each capital improvement
project which will be undertaken by the City of Renton, the time framework for
accomplishment and the financial resources required .
The document serves as a tool for the City personnel in planning their year' s work and
for the City Council in determining budget requirements and expenditure allocations .
The document also provides a statement of intent for Federal and State agencies which
provide grant-in-aid funds . And, most importantly , it provides a guide for individual
citizens and citizens ' groups interested in the City ' s development plan.
Individual projects identified by the various City departments are submitted in
September of each year for review by the Capital Improvement Program Committee . The
Committee , appointed by the Mayor in April , 1972 , is responsible for the long-range
planning and establishment of goals for the physical development of the City .
Improvement projects are prepared according to the guidelines established by the
' Committee and are evaluated according to need fulfillment and compatibility with City
goals . Projects must also be financially realistic . The Committee then assigns
priority for the recommended order of implementation based on City-wide needs and
submits the updated document with the Mayor ' s recommendations to the City Council for
review and adoption.
It must be emphasized that costs and fund sources specified for projects scheduled
beyond the current year are estimates and subject to change with price fluctuations
and availability of financial resources . Approval of the document does not constitute
appropriation of funds .
THE DOCUMENT
1 This document is organized to provide a brief description of each project , an
identification number , the scope of funds required, the source of funds , and the time
in which the project is to be accomplished. A clear destinction is made between current
funded projects and unfunded proposed projects .
For each functional area, the first section lists all capital projects proposed for the
six-year period with general description and anticipated start date . The second section
provides detailed breakdown of funding sources , dollar amounts for each, expenditures
to date , and expenditures anticipated by year for only those projects for which funds
have been secured or allocated. For convenience , funding sources are coded by letter and
keyed at the bottom of each page .
In addition, total expenditures for current year are depicted in chart form to provide
an overview of available resources allocated for each functional category .To assist in determining where proposed projects are located within the City , a map- of
Renton is provided indicating by code the general area in which capital improvements
are to occur .
Line item numbers are for the exclusive use of this document acting as a cross reference
between project description and financial data and project identification on location
maps .
Project numbers are permanent identification assigned to each project and are used for
all accounting purposes .
For 1972
This year ' s Capital Improvement Program document is the initial attempt by the Capital
Improvement Program Committee at the development of a capital improvement program for
the City of Renton and precedes adoption of long-range City goals . This document,
therefore , is a listing of funded and unfunded projects which would fulfill immediate
City needs . Priorities and relationships to broad community goals will be included in
the 1973 edition to be submitted to City Council this ,coming October.
Other omissionss uch as th-e—permane-nt-"Project Control Number, " previous project
expenditures , and the identification of the amount of all funding—by—source for each
project will appear in the 1973 and ensuing documents .
FUNDING SOURCES FOR 1972 PROGRAMS
REVENUE BONDS .04%
$4,5M
L. I .D. FUNDS 4,82%
$497,OM
COUNCILMANIC BONDS 4,85%
- - - - 1500,0M ; .
STATE GAS TAX 5.57%
$574,2M
OPERATING REVENUE 5.66%
$583,OM
OTHER GOV°T FUNCTIONS 79.06%
$8146.0M
. i
II
EXPENDITURES BY FUNCTION - 1972
,68% AIRPORT $64,OM
' /1::: ,47% BUILDING $44,OM
,10% CEDAR RIVER $10,OM
\\ 2,14% LIBRARY $200,0M
1,65% WATER $154,OM
1.11% SEWER $103,9M
'-------.._..-------- \
10.39% PARKS $970,OM
83,43% STREET $7789,OM
_i___ _________ ____
-
I , WIN
LEGEND
A = AI RPORT \ ii _,
B = BU, ILDING
CR = CEDAR RIVER I I;t 1111M rit -
L = LIBRARY '1, , Si\ 1111
\1/4.
P = PARKS I')i
S = SEWER '
ST = STREET ./-- // 1 W = WATER S-1 ' ;(4L.1
1 .
s_ 0 dA -\ • „ ,
l
II
. NEIN 4,
_61 ___1
.\--' . „....... , .
..,.,, h.ie•Nt s _7 :
IP ,
Di .._, , ,
\\\ 711111011_LEMEIL i L I
''''. . w4 \- LAKE p - mm. • .w . 1\lawn,
!..)14,144,.\ WASHINGTON I\
i -
;4 ) " Mel '41•Mtbl '.-_
11 411e4*.ek6. _ • MIMI
I - ii,\r" .1111Mg "'MIMI gall
''''s::::--• Valltilretli '\-1---..-/ MAI j II
'unto-:-)••• -..w. '' ! ogigg0 : _
„ ,.....
er
— IR
11%!1"irejamiliffildlaF pi'irii'7.,...4.14111:31;10'16.4: [7
Iiiaill..464LIE le :t"..180171--- 12 1 E
4
ii""itahlhiiitkitrisliir411,
6 ‘7 ----- itoattelikii2F"s T- . *k
\
1,- -
si.. 1
‘1 Illii , Wir
ikk
:,‘
11111
It
"00.:.--....„
1
,...,-
,,,,,r.„,
• 1
-- NI
1 V
2 /11
"VIVIIiiii mu
'I m 11
Mil 4— A -. - T_7 . 1 1 I I MINE;141 I 1 III)7141 ' •!,,740:4'.11,7*, v
iht
I •
Mil
4 " V‘5111111 11124
..r-.7
. olito%1 7
\\ ,,... ii•••. pi
..
„
..
. .
,411 U I ..
II p.
/1 Air
/4111 Is4H S T-7 g
pi
rat ly
- i \
1 ' ,,,
, ,
..
,.
„
..
,.
,, .
__,
,
„
,
c , „
.
I V
---
I L, • s4fl I 1 L ..
.,
+ yLoAuKNEGs
l_k
1 1 i ,
. el
AIRPORT
11 AIRPORT
The Renton Municipal Airport, held by the City under Federal grant since 1947 , is
operated by the Renton Aviation Board under provisions of the State of Washington
Statutes and Renton City Code . Directorship of the airport is vested with the Public
Works Administrator. Approximately one-half or $50 ,000 of the total yearly revenue
generated by the Airport is in excess of maintenance and operating costs and is set
aside for capital improvements . Physical improvements to the Airport are guided by the
long-range developments recommended in the 1968 Airport Master Plan as revised May, 1972 .
In 1972 , the Airport will participate in an extensive street improvement project known
as the Airport Way Project , a portion of which benefits Airport property directly.
These improvements, comprising Phase .I Airport Development , include improved entrances
at Shattuck Avenue and Logan Avenue , development and realignment of portions of South
Perimeter Road, landscaping and signing along south end of Airport . Funding includes
$24,000 from Airport Fund and $40 ,000 from UAB funds as right-of-way payment for property
acquisition from Airport and lease termination and removal of two City hangars .
Planning will also start in 1972 for the $1 . 4 million Phase II Airport Development
Project , which will include : 1) perimeter road to relieve the severe safety hazard of
auto traffic on taxiway that has long existed (This project necessitates culverting the
Black River Channel to provide space for perimeter road) ; 2) security fencing along both
west and east side to prevent the uninhibited entry of- pedestrian and auto traffic on
runway area; 3) quick egress taxiways designed to improve safety and increase runway
capacity ; 4) landscaping of west bank for soil stabilization and appearance ; 5) improve-
ments to main entrance from Rainier Avenue ; and 6) approach aids and runway lighting.
Construction is scheduled to start late 1972 or 1973 , depending on availability of
funds . Application for FAA and state aid will be made in 1972 . Remaining funding is
anticipated from Revenue Bonds and Airport funding sources .
AIRPORT
LINE ! PROJECT ' EST EST
ITEM GONTROL PROJECT NAME DESCRIPTION TOTAL START
NUMBER
COST YEAR
FUIW DED
_ 1 SOUTH END IMPROVEMENTS In conjunction with Airport widening project ,. 64 1972
PHASE I two hangars SW corner will be removed,
perimeter road relocated and improved along
entire south end, Shattuck Avenue entrance
and intersection improved and extensive land-
scaping and lighting along south edge of
Airport . Funding derived from Airport funds
and UAB payment for right-of-way .
UNFL LADED
2 PHASE II IMPROVEMENTS Design and construct box culvert from SW 1 ,111 1973 -
corner of Airport northerly along west side
to connect with existing culvert at NW corner.
Design and construct perimeter road over
culvert area.
Design and construct Rainier Avenue entrance 35 1973
revisions to improve Airport access and
reduce confusion and safety hazard.
Design and construct two quick egress taxi- 24 1973
ways to increase runway capacity and decrease
average peak-hour aircraft delay.
Landscape for beautification and soil 104 1973
stabilization the bank area on west side .
Install perimeter fencing along both west $ 33 1973
east side perimeter road to prevent
pedestrian and auto traffic entry on runway
areas .
Provide runway F taxiway lighting $ approach 86 1973
aids . All items included in Airport Master
Plan. Proposed funding from Federal (FAA) ,
State Aeronautics Comm, & Airport Fund sources .
FUNDED PROJECTS 1972
AIRPORT
LINE PROJECT ' --- --- - -------- FUND --TOTAL -EXPEND- -ES.-T-_E.XP_ESTIMATED ANNUAL EXPENDITURES
ITEM CONTROL- PROJECT. NAME CODE COST TO 1972 1972-77 1972 1973 .1974 1975 1976 •197T
NUMBER
• • 1 SOUTH END IMPROVEMENTS ' G - 24 • 24 24
' M 40 - 40 40 -
64 64 64
•
FUND CODE G Airport Fund
M=UAB
BUILDING
Y r '" " ' / V a xr '
/4
1G. 7: .«.. 'wt '.�qu t+ [ •o . Y y+iRF� f [' s• ' .;v .y,# . v, w ' ..Z a 4�� .. ',
I
4 5. -i"� �S 'fc
ht- 1;`.ryy'-5: a� .4�. a '„#' ; iT $ elf .I•' RN,
r }4,y„ 7�,�, i�`' 't7d �',,,. .�,*iasgy '. " -.: ;.yt :'�J
ft ;.' ! - 4� .t .,3 +t -• 4.Y3 "7a e''k' ry Ili!' ,�e3 t,.i r •,� yf,z'M '41-- ', "^ >Y:M}4.k.+a'r +l.`i,- � ,
y"h•1t `kf'a d "1 'ilk „ " ,,ip, •'x"• n, �1. l a ' {f• + _ .I a '� + . A T.„L
�.;£" r _'tot >t .si}"` d; .1(A' s � !' • AA p .! ': e� zt' a k.l !.
y x "pKr k z a' S 2yt:�i` r 4 v 64.0',. ro°d3 \1, r . .:t,--
:F • „ z1 ♦ 'o. t J-,, Y1 R.1.r-'."`,'--bk. Y' f" `F;;'.;.4.a&.r.�,`t.,„_ .ST' i A t,— , F i :4� rF.•..� r'.e a."' 4` _lN' `4,,t-- . A.•, ( r„ 'a�'�' c
\ J4#r !` t *jr _ - a % .y, v a0.! r*" r= t y - -,,,t--, 9• is d. S•r t '' �.
•
•
C. +. � $ w fw `` ., Y ASet, � 1° f� �•� �i: � t • � •�, ,°•tet •,��:
11
SY f�' 47* -;,- f b.. �. 1 a .may ei'+r'te tre4,:,,+'k **"°yN i Y.�'t' 'tp „k,, " r^" .`e3+ , e-roje t °"�` It''.
• L�+ . � r : •y�' '�S• � W. �` ' "f 1' ,�`"� �. ti �,� t e4rT1Tv h'hl'e•:." w 1{o- �iyi`
t, ro, •
y °' . t • a b 1.' y'' 4••v .,7 Mr'-
i f .-
i'' :t } r�. -, j1 4 1.1 .`it .'r' r . "- 1. iy,. t i r -,,, t'aL x f r- Yr L
y ' < ♦ . •' S al . C ' G 41.••••, �+• :.� a7v. 0, r`,� j'.,i1,rt y�- ' .S * r. S 1. -..
< � '1 ,gx L F r'1 aC 1 ,4-�.i r 'fit s
'x t .' " ..i...';r y„' v. ,i. 3*+r ,, '.•f., ....,i l'" ' v.'e ,r qf•.,.) N•.*•4 pn* C,v
t . i•t .a " S„ tt p • t♦ ' � ,:; �iF X Yr.'s .},+ f .• �• "y r aA' T% 't „,^ 1'` t
l +. r it . 5 w.,M • :+1 t` r ':.W4. i X 1\uYi' 4p! cj�, ✓r y - �'f' .t -e ; R
.,' ''''' r S$A '' T -,-,-:v 1 jf"ja7-... �.l, 3.F_ t . •. Y t l y,'�':. sa ':", tC. x T,,..! ^�i'... !.r1.
` : :.. ,; •Y Y,.£'t a.M L {} S) -i. fI,a`ty` 1: ,i"..,wr:p.x:.f - , 4'4.•e i l ,w1 W s'�f ,'•
t,.. a M • - » :.•}-. 1 t,y ' �:; i x"3 jC,. KtiW aA: S "r,.YT Ti i.;�'J-to x�a.'�Whr .
t } ♦ .K *1 i *. U p . 'y tri- ,.r f-421. .e.'..*:,.-'M.K tF+ it'''`tr `,r-f '"� � "�'e 'S} `'i� a •.
•
r 'i' • t : uf} c 14 x1. :: ,,. 4 'it way s Lr.� }a"� p.' r tl' . ^I - %, ram
h=r • '`p• '1•••,,, ', ,..art R-, ri1$s a�3` .;'$ f• % ""-• '1';i o 1 in � t . t'41 .{F'
@ c A `'.„C r ,t t .r,Gi., s r1' i "}''•7 CT':t i }� A' y- s! r.'4 'yy�.' ,,".
`` 'I YaY.. ..w� N { • t•i 2 •V1p. Y.�'
44
'" i• red # .1.^ x+ S ."' t• fr. 'p14,the 5. # . ,,"h• 't i.. r R+ +X'S
• ,gam� ,/,,,,�` . - 4
f •�`• ..i. t •' rx �;t i -. .. fi.`U ... y. g+r.+ SSi, .,:. ti.x �J''we Y` t r t • `z';,-
•
i _ •h' r t„r r+,is ;01ta',^ +.'iSt.''' a t e,E. *-.' .r.•'•• ""r, i't •. s;
" - ,• , , y ,,1'C -r+t•1 � ..^ t 4N •e .7;-. • ,Y ,
✓ tr..r ., b•.,. r.+rtt',}n,r a L j w _
' .� t ,ax. •,fit. i�9' y �y�y 1 t"� •.5�`ry r S ��y:.7�"'t * i t_ 1:• .
. ir''r s'- s a'�.-.• 'L a, -,„:..- :,x- ,s ', f. ai• • .3, . ,,,*V,..4 et:,.it.
1^' :+S`' 8•h • v-*' + .•'�•"�1 ,%r.
-. +•it 1 t 'A..4f` " '°�'"• t s,4,-,..ryy4.'t+`r�+ - •f ='9"d' '�,`n.a. ',�„ •� ,' ,.
' • r
� •
-.. - . � � 44, t
t
•
•
•
i .. .� ,.
•
* ,. • ..
• r r ,
I
BUILDING
Projects for construction of municipal buildings or extensive remodeling programs
have been precluded by lack of funds . For 1972 , aside from required maintenance
and modest reallocation of office space , only one construction project will be
undertaken. With the assistance of EDA, Public Works Impact Program (PWIP) funding,
the Department will construct a $55 , 000 Street Department Shop within the City maintenance
complex . This structure will provide housing for the Street Crew , Carpenter, and Paint
Shop , thereby centralizing Street Department operations .
Although a number of worthwhile projects have been proposed, only one- -a Civic Center
parking garage project- - is seriously considered at this time . This project involves
construction of a two- to four-story parking garage adjacent to the south side of
City Hall to provide needed additional parking space .
BUILDING
Mg
II LINE PROJECT = - EST ' EST
ITEM CONTROL PROJECT NAME DESCRIPTION - TOTAL START
NUMBER COST YEAR . -
FUNDED
3 CITY SHOP Design and construct new City Shop to house 44 1972
Street Department , including a Sign Shop,
Carpenter' s Shop , crew facilities , and
foreman's office. This project will allow.
consolidation of Street Department and
increase efficiency of operation. Funding
from Federal (EDA) and City sources . .
Application for. state (Jobs Now) aid has been
made in the amount of $10 ,000 .
UNFUNDED
4 CIVIC CENTER PARKING Design and construct covered parking garage 150 1973
for Police and emergency vehicles and
general municipal parking adjacent to City.
Hall . This project will aid in relieving
congestion of existing parking facilities .
Propose funding from City sources (GOB) .
FUNDED PROJECTS 1972
- -- BUILDING
LINE PROJECT FUND TOTAL EXPEND EST EXP' ESTIMATED ANNUAL EXPENDITURES
ITEM CONTROL PROJECT NAME CODE COST TO 1972 1972-77 1972 ' 1973 1974 1975 1976 1977
NUMBER
3 CITY SHOP B1 8 . 8 -- -- 8 . 8 8. 8
R2 35.2 -- -- 35 . 2 35 . 2
44 .0 - - = - 44. 0 44. 0
II
FUND CODE B1 = Com. Res . Fund #1894
R2 = EDA (PWIP)
CEDAR RIVER
CEDAR RIVER -
Designing and development of the Cedar River Project is currently under the jurisdiction of the Planning
Department. The proposed project is an extensive park—like development encompassing water front bicycle
and pedestrian trail systems, parks and water related recreational facilities for the entire 5.1 miles of
the Cedar River within the City limits. This development is included in the approved 1971 King County
Urban Trail Plan. Preliminary concepted design studies have been conducted and are to be continued through
1972.
The program is divided into two phases. Phase I includes a three block City owned section of the river
in the heart of the downtown area -- from Houser Way Bridge to Williams Ave. Bridge. This section will
receive the most intensive development. Phase II concerns design and construction of the remainder of
the river banks and will include much "natural" area development.
Finalizing plans and starting development construction depends largely on availability of funds and Federal,
State and County assistance will be sought. The 1972 City budget contains only $10,000 for the Cedar
River projects. This money will be used for the planning effort.
CEDAR RIVER
LINE PROJECT __= = _ _
ITEM CONTROL - - = == PR=OJE=CT-NAME=-`-_--_--__ - ------- _---- -- - ---- -_-_== --_- --- ---- EST " EST
DESCRIPTION TOTAL START
NUMBER COST YEAR
FUNDED
5 CEDAR RIVER DEVELOPMENT Design development of trail system and various 10 1972
bank treatments to inhouse water-oriented
recreational and commercial uses along ' 5 . 1
miles of Cedar River from its mouth to the
Maplewood Golf Course .
UNFUNDED
6 CEDAR RIVER DEVELOPMENT Complete design development and construction 376 1972
PHASE I of that portion of Cedar River Development
between Houser Way Bridge and Williams
• - Avenue Bridge (3 blk.) . Proposed funding
from state and Federal and City sources .
$10 ,000 in 1972 budget (Cedar River M $ I
Fund) and $28 ,500 Planning funds requested
from state (Jobs Now) .
7 -CEDAR RIVER DEVELOPMENT Design development and construction of balanc: 474 1973
PHASE II of project. Includes necessary land and
right-of-way acquisition. Proposed funding
from state and Federal and City sources .
FUNDED PROJECTS 1972
CEDAR RIVER - -
LINE PROJECT FUND TOTAL EXPEND EST EXP ESTIMATED ANNUAL EXPENDITURES
ITEM CONTROL PROJECT NAME CODE COST TO 1972 1972-77 1972 1973` 1974 1975 1976 1977
NUMBER •
CEDAR RIVER PLANNING C 10 10 10
•
FUND CODE
C = Cedar River MCI Funds
FIRE PROTECTION I
p!,; .400pk,4111Mr.t.)-_ r 2
•
•
•
•
•
•
40114
* •
1001
•
ralaeidbilifikb 44104k
FIRE PROTECTION
Pending availability of funds , three projects are planned. A $110 ,000 addition
to Fire Station #1 is necessary to provide housing space for administrative staff,
the increased number of fire fighters , and additional fire fighting equipment
recently acquired. As an alternative, a new fire station is being considered ,
although location and cost analysis have not been accomplished.
Completion of the fire training site will provide up-to-date facilities for the
training of new firefighters and maintaining a high level of skill for ,all department
personnel . Approximately $150 ,000 is required for completion of utility services
and construction of several training structures .
A Municipal Alarm System for Renton has been under study for some time . The system
proposed would be radio operated, provide public call boxes for Police , Fire , and
ambulance emergency service, and building protection for fire and burglary. Estimated
cost for coverage of the downtown business sector of $100 , 000 . • Although the alarm
system serves a law enforcement function as well , it is included under fire
protection because of the important insurance rates reduction benefits that can be
realized from the installation of this system as well as from the completion of the
training site .
Funding aid from state and Federal sources is extremely limited for fire protection
services ; and although the need for these projects is current, City budget restrictions
preclude development of these projects in 1972 .
FIRE PROTECTION
LINE PROJECT_
I TEM CONTROL -_ , PROJECT NAME----_ - - -- - ---- -_ - -- --- -- - - - EST E.ST
DESCRIPTION TOTAL STAR'
NUMBER
COST YEAR
UNFUT DED
8 STATION NO. 1 ADDITION Design and construct an addition to Fire 110 1972
Station #1 ,, Mill Avenue South, to provide
needed space for administrative staff,
additional firefighter personnel and new
equipment . This project will be started when
outside funding becomes available . Propose
funding from state (Jobs Now) , Federal (EDA) ,
and City sources . -
9 TRAINING STATION Complete ,development of Fire training facility . 150 1973
Present facilities are inadequate to allow the
necessary training required to maintain the
high standards of our Fire Department . This
project will assist in lowering fire
insurance rate in the City. Proposed funding
from state (Jobs Now) , Federal (EDA)-, and• -
City sources .
10 MUNICIPAL ALARM SYSTEM Develop and install in conjunction with Law 100 1973
Enforcement , a radio-operated alarm system
for Renton. This project will also assist in V
lowering insurance rates . Proposed fundingfrom state (LEAA) , City and community sources .
LAW ENFORCEMENT
i
LAW ENFORCEMENT
During 1972, no capital projects are scheduled to be undertaken by the Police Department. A section of
the jail area.remains unfinished and based on need and availability of funds, will be developed, possibly
in 1973. This project would include installing jail fixtures and fittings to complete the men's jail
facility.
LAW ENFORCEMENT '
LINE PROJECT ' f
ITEM CONTROL PROJECT NAME I _ EST
NUMBER
DESCRIPTION TOTAL
COST
UNFUNDED
11 COMPLETE UNFINISHED JOB Install jail fixtures and fittings to complete 36
men' s jail area. Proposed funding from City
sources .
I
/ 414
« % �
CO
/ xt
'
. � � �
•
LIBRARY
The Capital Improvement Program for the Library includes those facilities necessary
to meet the growing need for library services . Currently , library service for
approximately one-half Renton' s population is housed in an old , inadequate branch
facility . The City Council has authorized the construction of a new branch and
provided $200 , 000 of councilmanic bonds for this project . Plans call for the
construction of a new Highlands Branch Library on a 59 ,000-square foot lot , owned
by the City , at 2902 NE 12th Street . This facility will be designed to shelve 25 , 000
hooks , magazines , and recordings . Seating will be provided for approximately fifty
persons , with the capacity of an additional fifty persons in a multi-purpose room.
Projected at 6 ,000 square feet , this facility will provide adequate space as a
community library. Design work for this project will be done early in 1972 ;
construction will start in the fall of 1972 ; and completion is scheduled late in the
summer of 1973 .
LIBRARY
LINE PROJECT EST EST
ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
NUMBER _ -_ - - - - COST - YEAR
i .
FUNDED
12 LIBRARY BRANCH Design, construct , furnish and stock a 200 1972
branch library at 2902 NE 12th Street
(Highlands) . This branch is necessary to
serve approximately one-half of Renton' s
residents . Funding from City (Councilmanic
Bond) .
FUNDED PROJECTS 1972
LIBRARY
LINE PROJECT FUND TOTAL EXPEND EST EXP ,ESTIMATED ANNUAL EXPENDITURES
ITEM CONTROL PROJECT NAME CODE COST TO 1972 1972-77 1972 1973 1974 1975 1976 1977
NUMBER
1 <
12 LIBRARY BRANCH I 200 200 100 100
FUND CODE I = 1972 Library Bond (Proposed)
PARKS
r .
_ _ • •
_ .•
.,
•
•
••
•
•
•
•
. .
, .
•
•
*C. • .
•
•
• • •
' .• .
".Se, .*` ' . • . • ,
PARKS
The capital improvement program for Parks and Recreation is administered by the Parks and Recreation
Department through its Board of Park Commissioners. The program includes acquisition of recreational
property for immediate and future use as well as the development of recreational facilities to meet
citizen needs as determined by the six year Park Captial Improvement Program adopted in 1971.
Due to the extremely tight City budget, only one capital improvement project will be undertaken in 1972.
Final action is anticipated this year, in the Lake Washington Beach Park addition land acquisition
delayed in 1971. This $970,250 project is being financed by Federal, State, and County aid, $670,250,
and a $300,000 limited G. 0. Bond.
PARKS
LINE ' PROJECT
I I TEM CONTROL PROJECT NAME TOTTAL S S TART
TT
DESCRIPTION TEST
__NUMBER_" '' - - - COST YEAR
-- FUNDED ---------- ------- ---
13 LAKE WASHINGTON BEACH Purchase 1500 L. F. of lake front property north of 970 1972
PARK ADDITION existing Lake Washington Beach Park for future park
development.
UNFUNDED
14 CEDAR RIVER PARK Cedar River Park, Houser Way and Maple Valley Highway. 151 1972
Stage 2 development - Construction of multi-purpose
play area of 9 acres which includes backstop, bleach-
ers, parking, access roads, landscaping, drainage and
sprinkling system. Proposed funding from City sources.
15 KENNYDALE LIONS PARK Kennydale Lions Park, N. E. 24th & Aberdeen Ave. N. E. 36 1972
Construction, df._a one-story brick recreation shelter
building with restrooms. Proposed funding from L. I. D.
16 TIFFANY PARK Tiffany Park, Lake-Youngs Way S. E. Site improvement 285 1972
including finish grading, storm drainage, planting of
lawn, landscaping, sprinkling system, and construction
of a one-story brick recreation shelter building with
restrooms. Proposed funding from L.I.D. and state
(Jobs Now). Application submitted to state for
$25,000 Planning Funds.
17 PHILIP ARNOLD PARK Philip Arnold Park, So. 7th & Jones Avenue South. 46 1972
Installation of lightingfor baseball and football
fields and tennis courts, including underground wir-
' _ ing, transformers, panels and meters. Proposed fund-
ing from City sources._
18 LIBERTY PARK Liberty Park, Bronson Way N. E. & Houser Way N. E. 46 1972
Construction of a one-story brick building with lava-
tortes, multi-purpose game social room, and stor-
age space. Proposed funding from City sources.
PARKS
LINE ' PROJECT - EST EST
I i EM CONna PROJECT NAME -
DESCRIPTION - - TOTAL START
NUMBER
— _COST _YEAR
19 TALBOT HILL PARK Talbot Hill Park, Williams Ave. S. & 98th So. Con- 16 • 1972
struction of tennis courts. Proposed funding from
City sources. -
20 EARLINGTON PLAYGROUND Earlington Playground, site to be selected. Purchase 65 1972
of site. Proposed funding from City (LGOB, $32,500)
and federal or state aid ($32,500) sources.
•
21 LAKE WASHINGTON BEACH Lake Washington Beach, Lake Washington Blvd. S. E. 65 1972
Installation of railroad crossing and signals, con-
struction of-access road, sidewalks, etc. Proposed
funding from City ($50,000) and state ($15,000) -
sources.
22 LAKE WASHINGTON BEACH Construct bridge or culvert over stream and provide 20 1972
additional parking north of-existing park site with
access road. This project is necessary to relieve
parking congestion. Proposed funding from City (LGOB) -
23 TALBOT HILL PARK ROAD Develop road on S. 160th adjacent to Talbot Hill Park - 15 1972
to include sidewalk, curbs, and gutters. Road to be
18 ft. wide on 36 ft. right-of-way. Proposed funding
from City source.
24 LIBERTY PARK Liberty Park, Bronson Way N. E. & Houser Way N. E. 312 1973
Construction of indoor-outdoor pool enclosure, "A"
frame type with windows, removable cover, and radiant -
_ heating system. Proposed funding from City (GOB)
' — - ' sources. —
25 SIERRA HEIGHTS PLAYFIELD Sierra Heights Playfield, site to be selected. Pur- 90 1973
chase of site. Proposed funding from City (LGOB,
$45,000) and state or federal ($45,000) sources.
PARKS -
II LINE PROJECT ' EST EST
ii ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
_-_-- NUMBER — -— COST YEAR
26 CASCADE PLAYFIELD Cascade Playfield, site to be selected. Purchase of 90 1973
site. Proposed funding from City (LGOB $45,000) and
state or federal ($45,000) sources.
27 TALBOT HILL PARK Talbot Hill Park, Williams Ave. So. & 98th So. In- 46 1973
stallation of lighting for baseball and football
fields and tennis courts, including underground wir-
ing, transformers, panels and meters. Proposed fund-
ing from City sources.
28 HIGHLANDS PARK Highlands Park, 800 Edmonds Ave. N. E. Construction 48 1974
of a shower building with dressing rooms and lavator-
ies, and storage space for recreation and maintenance
supplies. Proposed funding from City sources.
29 KENNYDALE LIONS PARK ADDITION Kennydale Lions Park Addition, adjacent to present 46 1974
park at N. E. 24th & Aberdeen Ave. N. E. Purchase of
site. Proposed funding from City (LGOB $45,000) and
state or federal ($22,750) sources.
30 HEATHER DOWNS PLAYFIELD Heather Downs Playfield, site to be selected. Pur- 90 1974
chase of site. Proposed funding from City (LGOB
$45,000) and state or federal ($45,000) sources..
31 LAKE WASHINGTON BEACH ADDITIONS' Lake Washington Beach Additions' development, adjacent 328 1974
to present Lake Washington Beach Park. Development of
Additions 1, 2 and 3. Proposed funding from Forward
Thrust ($164,000) or federal aid ($164,000) sources.
ii .
32 SPRINGBROOK PLAYFIELD Springbrook Playfield, site to be -selected. Purchase 90 1975
of site. Proposed funding from City (LGOB $45,000)
and state or federal ($45,000) sources.
PARKS
LINE PROJECT EST EST
-I-TEM CONTROL - - - - ----PROJECT NAME -- - - -_ DESCRIPTION TOTAL START
_ NUMBER COST , YEAR
33 WINDSOR HILLS PARK Windsor Hills Park, 400 block on Windsor Way N. E. 14, 1975
Construction of picnic kitchen containing sinks,
stoves and covered area. Proposed funding from City
sources.
34 - SOUTH HAZELWOOD.PLAYFIELD South Hazelwood Playfield, site to be selected. Pur— 90 1976
chase of site. Proposed funding from City (LGOB
$45,000) and state or federal sources.
35 BLACK RIVER PARK Black River Park, located near Metro Plant and Black 100 1976
River Channel. Purchase of site. Proposed funding
from City (LGOB $50,000) and state or federal .($50,000)
sources.
36 EAST CASCADE PLAYFIELD East Cascade Playfield, site to be selected. Purchase 90 1977
of site. Proposed funding from City (LGOB $45,000)
and state or federal ($45,000) sources.
37 BRYN MAWR PLAYGROUND Bryn Mawr Playground, "site to be selected. Purchase 65 1977
of site. Proposed funding from City (LGOB $32,500)
and state or federal ($32,500) sources.
FUNDED PROJECTS 1972
-PARKS- - --
LINE PROJECT ' FUND TOTAL EXPEND EST EXP ESTIMATED ANNUAL. EXPENDITURE
ITEM COMM. PROJECT NAME CODE COST TO- 1972 1972-77 1972 1973 1974 1975 1976 197
NUMBER
13 LAKE WASHINGTON BEACH PARK ADDITION R1 475 --- 475 475
S3 131 ---- 131 131
K 64 ---- 64 64
H 300 ---- 300 300 .
. 970 970 970
•
•
•
•
- FUND CODE R1 = HUD K Forward Thrust (Park)
S3 = Physical Environment H = G 0 Bond (Park)
SEWER 1
•
•
•
•
•
•
•
M,
- 3
yi
P•
•
•
•
•
1 SEWER
The sewer improvement program is designed to provide improved collection facilities within the Cith through
separation and rehabilitation projects and new line installation to serve developing areas.
In 1972, seven sewer projects are scheduled which will serve both residential and industrial areas. City
financing is offset where ever possible by HUD and EDA sources. Of the $965,000 total expenditures, $386,900
is anticipated from federal and state sources.
Three projects are of high priority for 1972. The Lake Washington Industrial Sanitary Sewer is necessary
to serve an area north of Kennydale along Lake Washington. Further development of this land is dependent on
this sewer project. Funding has been secured through HUD and the Staters Jobs Now Program.
The Highlands and Houser Way Sanitary Sewer Project will replace an old and inadequate line now serving
one of the City's most populated residential and commercial areas. Further development is also not allowed
until the sewer line is replaced. HUD funds in the amount of $97,000 have been secured, and the City has
applied for Jobs Now assistance.
Earlington Gardens Sewer Trank Project would serve a currently unsewered area zoned industrial. Several
industries have indicated a desire to locate in this area when sewer facilities become available. HUD
funding in the amount of $42,000 has been awarded and the City has applied for Jobs Now assistance.
SEWER
eLINE PROJECT
Y TEM CONTROL PROJECT NAME EST EST
DESCRIPTION TOTAL START
_ — NUMBER COST YEAR
- - - -- -- -- - turiUt;ll
38 HIGHLANDS AND HOUSER WAY ---- 1900' of 12"sanitary-sewer-trunk-par-allel__Highway- 405 18_5_.2___ _ 1972
between N. E. 7th and N. Renton Interchange. 1150' of - -
18" sewer trunk in Houser Way .N. between Renton Inter-
change and Metro at Lake Washington Blvd. N.
39 NORTH 6TH STREET 1800' of 24" sanitary sewer trunk in N. 6th from Gar- 114.4 1972
den Ave. to Metro Trunk at Burnett Ave.
40 LAKE WASHINGTON BEACH 4800' of 10" sanitary sewer trunk and lift station a- 327.1 1972
long Lake Washington between N. 28th St. and N. 40th
to connect waterfront property to the Metro sewer
trunk.
41 EARLINGTON GARDENS. 2100' of 12" sanitary sewer trunk between Metro sewer 91.0 1972
north of railroad and S. W. Grady Way to a point on
S. W. 12th and Maple Ave. S. W.
42 N. E. 27TH AND EDMONDS 5600' of 12" sanitary.sewer trunk to serve areas be- 168.5 1972
tween N. E. 20th and Kennydale Elementary School.
48 ELDON ACRES TRUNK - 1500' of 12" sanitary sewer south of N. 28th St. east- 59.8 1972
erly of Lake Washington Blvd.
44 LAKE WASHINGTON - INDUSTRIAL Sewer lines in vicinity of Barbee, Baxter, and Riley 93.0 1974
properties. Proposed funding from Curr. Rev. ($9,500)
and Developers ($85,500) sources.
SEWER
LINE ' PROJECT 1 EST EST
II ITEM CONTROLCTR PROJECT NAME DESCRIPTION TOTAL START
COST YEAR
---- ---- - - -------
UNFUNpED - -
45 LIFT STATION REPLACEMENT Replace lift stations at Union Ave. and Sunset Blvd. 11.6 1972
and Talbot Crest. Proposed funding from Curr. Rev.
sources.
46 REPLACE SEWER LINES Replacement of existing old and inadequate sewer lines 948 1972
in downtown area, Highlands ($30,000 each area to start
in 1972) and North Renton and Renton Hills ($336,000
to start in 1974). Proposed funding from Rev. Bonds
and Curr. Rev. sources.
47 TALBOT TRUNK Trunk sewer from vicinity of Victoria Park south to 80 1972
connect with Metro at S. W. 36th St. Proposed funding
from Developers Sources.
48 PACIFIC CAR Trunk sewer along Garden St, from 5th to 6th St. Pro- 10 1972
posed funding from Developers sources.
49 S. W. 43RD AND E. VALLEY HIGHWAY Trunk sewer from S. 36th north along East Valley High- 110 1973
way to S. W. 23rd. Proposed funding from LID source.
50 LIND AVE. S. W. & S. W. 16TH ST. Trunk sewer in Lind Ave. S. W. and S. W. 16th to S. W. 116 1973
19th, and trunk sewer in S. W. 16th from Paymond to
East Valley Road. Proposed funding from LID ($104,400)
and Curr. Rev. ($11,600) sources.
I 51 ABERDEEN AVE.- N. E. & N. E. 20TH Trunk_sewer in Aberdeen Ave. N. E. and N. E. 20th St. 555 1973
area. Proposed funding from LID and Rev. Bond sources.
52 GLACIER PARK DEVELOPMENT Extend sewer lines throughout Glacier Park Development. 600 1973
Proposed funding from Developers sources.
SEWER
LINE PROJECT EST • EST
I -I TEM . CONTROL _ ,PROJECT NAME DESCRIPTION TOTAL START
NUMBER -__ - _ - _ _ _ _ COST YEAR
53 UNION AVE. - HEATHER DOWNS Trunk s --ewerfrom=vicinity_of__He ather Downs (Union Ave. 435.4 1974--
N. E.) to Maplewood Addition. Proposed funding from - --
LID ($352,800) and Curr. Rev. ($82,600)
54 EARLINGTON HILL Trunk sewer to serve lower Earlington Hill north of 140 1974
Chicago-Mil.-St. Paul Railroad south of Sunset W. and -
West of Maple Ave. S. W. Proposed funding from LID
sources.
•
•
-- --- --- --
•
rUNlltll rISUJCI.I J 1,/L
SEWER
•
LINE 11KUJEC'1' _ _ - _ EXPEND EST EXP ESTIMATED ANNUAL EXPENDITURES
. - _ - FUND TOTAL ITEM CONTROL_ __PROJECT NAME CODE COST TO_ 197-2=-1972-77 1972 1973 -.1974- 1975 1976 1977
NUMBER - - _
38 HIGHLANDS AND HOUSER WAY L 26.2 --- 26.2 26.2
R1 79.5 ---- 79.5 79.5
A 79.5* 79.5 ' 79.5
185.2 185.2 185.2 _
39 NORTH 6TH STREET R1 46 --- 46 46
T 68 .4 ---- 68.4 68 .4
114.4 --- 114.4 114.4
40 LAKE WASHINGTON BEACH R1 122 ---- 122 122
L2 163 .1 -- 163.1 163 .1
Q 46* --- 46 46
327.1 ---- 327.1 327.1
41 EARLINGTON GARDENS R1 41 -- 41 41
S2 50*. ____ 50 50
42 N. E. 27TH & EDMONDS R1 68.5 ---- 68 .5 68.5
L 31.51 ---- _ .31.5 31.5
A 68.50 _ --- 68.5 68.5
168 .5 ---- 168.5 168.5
43 ELDON ACRES TRUNK R1 29.9 ---- 29.9 29.9
A 29.9* --- 29.9- 29.9
- - -- - - - --- -- - - - -- -- -- 59.8 59.8 59.8
S2 = Jobs Now
FUND CODE L = LID A = Current Revenue *Application to Jobs Now Q = Developers
R1 = HUD T = Utility Fund L2 = LID 270 - Funds
FUNDED PROJECTS 1972
SEWER
--- -LINE ---PROJECT__ _ _ _ - FUND TOTAL EXPEND EST EX 'ESTIMATED--ANNUAL EXPENDITURES
ITEM CONTROL PROJECT NAME _ -- __- CODE -COST- - -1O-19.7-2 _1972-77. 1972 1973 1974 1975 1976 1977
NUMBER --- -
44 LAKE WASHINGTON - INDUSTRIAL R1 - 42 --- 42 42
S2 51 --- 5
93 ---- 93 93
•
•
1 - - - - - - -- - - -
FUND CODE R1 = HUD
S2 = Jobs Now
STREET
1
E
1
1
i
1
k
C
4
4
L*fir; ,}LL
I
yk
x T, x
r
rd ,-s. z �' '" s y. ,r s , . .. ; ,a. ? Q'3't'� x sY 2 NYi e.F,je «,
-- - --- -- - - - -
STREET
The largest capital expenditures for improvement projects in 1972 will be made for street improvements.
Included in this category are widening of existing streets, new street and road construction, undergrounding
of overhead utilities, signalization and traffic control, street lighting, bridge construction, and land-
scaping of right-of-ways. Funding sources for street projects in 1972 include -UAB, Street Forward Thrust,
topics, Arterial Street, State Highway, and LID and ability company funding for undergrounding.
The single, largest, and most significant project undertaken in 1972 consists of portions or all of ten
industrial street projects (line items58 through 67) combined to form the Central Business Development
(CBD). The physical area encompassed by the $2.2 million CBD project is indicated on the adjacent map
and includes storm sewers, paving, parking revision, signalization and traffic control, undergrounding
of utilities and innovation street lighting and landscaping. Although construction is scheduled for 1972-73
it is planned that concepts and mode of development established by the project will be expanded throughout
the downtown areas, and the CBD project will continue beyond 1973 .
Other notable projects for 1972 include the $1.4 million Airport Way/Logan Ave. improvement which will
widen these streets, improve traffic flows, rebuild the Logan Ave. Bridge accross the Cedar River, and provide
extensive street beautification. The Maple Valley Highway project will widen the existing highway to
four lanes to relieve the severe congestion problem of many years.
A number of other projects of significant proportion are scheduled to start in 1972. Although these projects
involve large undertakings, only a portion of the work will be accomplished this year due to financial
restrictions. Projects in this category include : S. W. 43rd Street $3,750,000, S. W. Grady Way $1,540,000,
and East Valley Road $1,880,000.
r 1
1 r
CONSTRUCTION SCHEDULE U
Start Complete
RAINIER AVE.
:7s;,t'7N-,44•
•4',
1 m_, a , '04*•? :*"1
Phase I 11;LJ 1-1-,,'2 /A'22--
Phase III Ca/-1-73 it 3-- i- 7-/ %,:-.7; I
Phase III 1105:2-73 7-a- 73
i•:,..-------- „,,i E.
t I 1 •ff
i•., 1
I ,
lilt 8
1 iral
....
....
SHATTUCK AVE. 'At' ..•,, .....•2 .:...•'•••• :
'''•:
,. ..
...4.1
WHITWORTH AVE. •V''..*:•-• *;!..- . •'1';',...f.i>,.0 -• /
G\ •J
1 41 •••N
cl‘ I .650 11111;zi‘'
1 -13\--1 r;;,,
—1 h...../41
. - MORR I S AVE.
1 -7 ......_. :Tti
t,•
II' / / .
N\--- I , .i.
.1... „,...
1 / ...._:.,.
i , , cro ...
at4: 1 SMITHERS •, • '....' --- ;
\ 71 I ..k:,,ti,,OGAisf..•,,,V,E;,`,•,:.....:. _-----1
'#.
1, 1
13VIRNETT AVE . I
: •
, .t•
•••
Cr) -• I
e•-•
4'' • ,
,0",12.9FlOt AVV.E0.5 •• ' 9''$4477 . .,''AvE,P.'',..tr"—^7;-•""•-•-,c7f:-'7,a•77,cf,I,7,i,rt',1'.r•.
.. ,
', 4
F.'". .A lq ICA50-11111..
ik. • I
P'' •
0 '• •,' • •' r-.(-11f Y 017 •...0,r ". r 7
''';:'• :‘::;'0 Ell ' 4,*,,,,t - '. -', -. ....,,Y. 4', i'..W•..4.
:, . 9.liwii/ir
'•,':
i, ..
. .
_.11,4,
•.,1 IlliTiAb— 111...„,irs
1`4114A-INA , ....-.• I,'-• z liiiiii 1
,)•• * .*'-';,• ,.
k . IL40,,,••, , /
\
I
t,%•0. 1—71 -:•,,,,:.
MILL AVE .
(5)
CITY • OF RENTON 1
DOWNTOWN IMPROVEMENT PROJECT
STREET
LINE PROJECT I EST E$T
ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
. NUMBER COST YEAR
CONSTRUCTION Ell
- 55 RAINIER AVENUE - -- - -- - - Widening project from north City limits to Grady Way- 660 1972
includes paving, curbs, sidewalks, street lighting,
traffic control and signals, storm sewer, and land-
/
scaping.
56 RENTON AVE, AIRPORT WAY, An extensive improvement project extending from west 1,496 1972
LOGAN AVE. City limits to N. 6th St. includes widening, paving,
curbs, sidewalks, storm sewer,traffic control and
signals, right-of-way acquisition, bxidge construction
and landscaping.
57 SUNSET BLVD. N. E. Widening project from Edmonds Ave. N. E. to East City 543 1972
limits includes paving, curbs, sidewalks, traffic con-
trol and signals, street lighting, drainage, land-
scaping and undergrounding.
58 SOUTH 3RD ST. Street improvements from Rainier Ave. S. to Main Ave. 380 1972
S. as part of the CBD project will provide sidewalks,
paving, traffic control and signals, street lighting,
undergrounding, drainage and landscaping.
59 SOUTH 2ND Street improvements from Mill Ave. S. to Rainier Ave. 300 1972
S. includes paving, traffic control and signals, street
lighting, sidewalks, undergrounding, drainage and
landscaping as part of the CBD project.
60 MAIN AVE. S. This project which is part of the CBD extends from S. 60 1972
2nd St. to Houser Way S. and includes paving, storm
1 sewers, sidewalks, curbs, traffic control, street
lighting, undergrounding and landscaping.
61 WELLS AVE. Extensive street improvement project between S. Grady .356 1972
Way and N. 6th St. Includes widening, paving, side-
walks, storm sewers, drainage, street lighting,
traffic signals and control, curbs, alignment adjust-
ments. right-of way. bridge. and landscanina. Three
STREET
LINE PROJECT EST EST
ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
. NUMBER COST YEAR
CONSTRUCTION
(WELLS AVE. cont.) blocks are within the CBD project.
62 LOGAN AVENUE Street improvements from S. 3rd St. to Airport Way 356 1972
includes widening, grading, paving, curbs, sidewalks,
street lighting, traffic signals and control, right-
of-way, storm sewers, drainage and landscaping. One
block is within the CBD project.
63 BURNETT AVENUE S. From Houser Way S. to S. 2nd St., widening, storm 20 1972
sewers, sidewalks, curbs, paving, signals and street
lighting. Total project is within CBD.
64 WILLIAMS AVENUE This project is an extensive improvement of Williams 1,300 1972
Ave. from S. Grady Way to N. 6th St. and includes
structure, widening, grading, paving, curb, sidewalk,
storm sewers, street lighting, traffic control, rail-
road adjustment, and landscaping. Four blocks are
within the CBD project.
65 SHATTUCK AVENUE From S. 2nd St. to S. 7th St., widening, paving, curbs , 370 1972
structure, sidewalks, storm sewers, street lighting,
traffic signals and control, and landscaping. One
block is within CBD Project.
66 MORRIS AVE. S. S. 2nd St. to S. 4th St., curbs, sidewalks, paving, 50 1972
storm sewers, street lighting and traffic control ,
_ landscaping. One block is within CBD Project.
67 WHITWORTH AVE. S. S. 2nd St. to S. 4th St., curbs, sidewalks, storm 50 1972
sewer, paving, street lighting and traffic control,
landscaping. One block is within CBD Project.
STREET
LINE PROJECT EST 1 EST
ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
NUMBER
- - -- - - - - -- COST_ YEAR
CONSTRUCTION —
��_ MAPLE VALLEY HIGHWAY This project involves revising Maple Valley Highway 405 1972
from Bronson Way to East City Limits to a four lane
road and includes wideing, curbs, sidewalk, drainage, -
street lighting, traffic control and landscaping.
69 N. 6TH ST. From Logan Ave. N. to Garden Ave. N., includes right- 180 1972
of way, widening,, paving, storm sewer, drainage,
curbs, sidewalk, traffic signals and control,. Rail-
road crossing, street lighting and landscaping.
70 S. W. 43RD ST. An extensive project extending from West Valley High- 3,750 1972
way to Springbrook Road includes right-of-way, widening,
structures, grading, paving, curbs, sidewalks, storm
sewer, traffic signals and control, drainage, street
lighting, and landscaping.
71 TALBOT ROAD S. Between Grady Way to Puget Drive, widening, paving, 144 - 1972
sidewalks, storm drains, traffic signals and control,
and street lighting.
72 S. W. GRADY WAY From Rainier Ave. S. to West City limits. Includes 1,540 1972
widening, paving curbs, sidewalks, storm sewer,
structure, street lighting, traffic signals and con-
trol, bridge and landscaping.
73 GARDEN AVENUE N. N. 4th St. to N. 8th St., widening, grading, paving, 150 1972
II curbs, sidewalks, storm sewers, drainage, street
lighting and traffic control
STREET
LINE PROJECT EST ' EST
ITEM CONTROL . PROJECT NAME DESCRIPTION TOTAL START
NUMBER COST YEAR
CONSTRUCTION — - , .
•
74 HOUSER WAY S. From Main Ave. S. to Bronson Way N., includes widening, 270 1972
grading, paving, curbs, sidewalks, storm sewer, drain-
age traffic control, street lighting and bridge re-
construction. _
75 S. 4TH ST. From Main Ave. S. to Shattuck Ave. S. Right-of-way, 605 1972
widening, grading, paving, curbs, sidewalk, storm
sewers, traffic control, street lighting and land-
scaping.
76 EAST VALLEY ROAD From S. W. 16th and Lind Ave. S. W. to S. W. 43rd, 1880 1972
widening, grading, paving, storm sewers, curbs, side-
walks, traffic control, street lighting, and under-
grounding.
77 S. 4TH PLACE Between Shattuck Ave. S. and Rainier Ave. S., paving, 20 1972
curbs, sidewalks, storm sewer, and street lighting.
78 UNION AVENUE From Sunset Blvd. to North City limits, widening, grad- 510 ' 1972
ing, storm sewer, curbs, sidewalks, paving, street _
lighting, traffic control and landscaping. -
78 1972
STREET
LINE PROJECT EST I EST
— ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
NUMBER COST YEAR
UNDERGROUNDING
79 - WILLIAMS & WELLS AVE. S. From S. 2nd St. to Cedar River, undergrounding of all 200 1972
overhead utilities as part of CBD.
80 MAPLE VALLEY HIGHWAY (SR 169) Undergrounding of overhead utilities from I 405 to - 40 1972
East City limits and install street lighting
CONSTRUCTION UNEJNDED
81 N. E. 4TH ST. Install sidewalks, street lighting, and traffic con- 130 1972
trol. Proposed funding from Arterial Street, Forward
Thrust, and TOPICS source.
82 EDMONDS AVE. N. E. From N. E. 3rd to Sunset Blvd. N. E., widen, pave, 420 1972
install curbs, sidewalks, storm sewers, street light-
ing and traffic control. Proposed funding for this
six year project from UAB, Forward Thrust, and Arteri-
al Street sources.
83 TALBOT ROAD S. Also a six year project extending from Puget Drive to 370 1972
S. 19th St. and S. 23rd to 32nd St. includes widening,'
curbs, sidewalks, storm sewers, drainage, traffic ccn-
trol, street lighting, and utility adjustments. Pro-
posed funding from UAB, Forward Thrust, and Arterial
Street sources.
84 TAYLOR AVE. N. W./TAYLOR PLACE A six year project involving widening, grading, curbs, 150 1972
N. W. sidewalks, paving, storm sewers, street lighting and
! traffic control on these two streets. Proposed fund-
ing from Forward Thrust, UAB, and Arterial Street
sources.
STREET
LINE.' PROJECT EST ' EST
ITEM CONTROL PROJECT NAME f DESCRIPTION . TOTAL START
NUMBER
- - COST YEAR
CONSTRUCTION - -- - -- --. -. -- -- --- - ---
85 SMITHERS AVE. S. From S. Grady Way to S. 3rd St., a six year project to 600 1972
widen, grade, and install drainage, storm sewer,, paving,.
sidewalks, street lighting, railroad crossing, and.
right-of-way. Proposed funding from UAB, Arterial
Street, Forward Thrust and State Highway sources.
86 S. 7TH ST. A Six year project from Rainier Ave. to Hardie,- and 270 1972 :.
Rainier Ave. to Grady Way includes widening, storm
sewer, sidewalks, street lights, paving, and traffic - ,
signals. Proposed funding from UAB, Forward Thrust,
and Arterial Street sources.
87 MONSTER ROAD S. W. A six year project from North City limits to S. W. 580 1972 _
43rd includes widening, curbs, gutters, sidewalk,
drainage, paving, street lighting, and traffic control.
Proposed funding from UAB, Forward Thrust, Arterial
Street, and TOPICS sources.
88 'LIND AVE. S. W. Also a six year project involving new construction 880 1972
right-of-way, paving, curbs, gutters, sidewalks,
drainage, street lighting, and traffic control. Pro-
posed funding from UAB, Forward Thrust, Arterial .
Streets and Federal sources.
89 S. E. 31ST ST. Between Benson Road S. and Kennewick Place S. E., 4 1972:
widening, storm sewer, sidewalk, curbs, paving, sig-
nals, and street lighting. Proposed funding from
• Arterial Street sources.
90 N. E. 3RD ST. Sunset Blvd. N. to N. E. 4th St.. Improvements in- 200 1973 .
clude sidewalks, street lighting and traffic control.
Proposed funding from Forward Thrust- and Arterial
-
Street sources.
STREET
LINE ' PROJECT EST " EST
ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
NUMBER - COST , YEAR_
CONSTRUCTION
91 BENSON ROAD S. (EXISTING) Improve existing road from Grady Way to South City 1,100 1973
limits by widening and providing drainage, storm
sewers, paving, curbs, sidewalks, street lighting,
signals and landscaping. Proposed funding from UAB
and Forward Thrust sources.
92 PUGET DRIVE From Talbot Road S. to Edmonds Ave. S. E., widen, pave , 450 1973
and install sidewalks, storm sewer, traffic signals,
traffic control, and landscaping. . Proposed funding
from Arterial Street and Forward Thrust sources.
93 N. E. 12TH ST. Between Edmonds Ave. N. E. and Union Ave. N. E., widen , 810 1973
grade, pave, and install curbs, sidewalks, storm sew-
ers, drainage, street lighting, and traffic control.
Proposed funding from UAB, Forward Thrust and Arterial
Street sources.
94 N. E. 10TH ST. From Sunset Blvd. N. E. to Union Ave. N. E., widening, 486 1973
grading, right-of-way, paving, storm sewers, curbs,
sidewalks, street lighting and traffic control. Pro-
posed funding from Forward Thrust and Arterial Street
sources.
95 BURNETT AVE. N. From Lake Washington Blvd. to N. 30th St., and N. 30th 305 1973
St. to FAI 405. Widening, grading, curbs, sidewalks,
storm sewers, paving, traffic control, and street
lighting. Proposed funding from UAB, Forward Thrust,
and Arterial Street sources. '
STREET
IILINE PROJECT EST " EST
ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
NUMBER
- COST- YEAR -
CONSTRUCTION T —96 MONROE AVE. N. E. From N. E. 4th St. to N. E. 12th St., widening, grad- 564 1973
ing, paving, curbs, sidewalk, traffic control, street
lighting, and drainage. Proposed funding from Forward
Thrust, UAB, and Arterial Street sources.
97 BURNETT AVE. N. Between N. 30th St. and Lake Washingtorf Blvd, widening , 260 1973
grading, paving, storm sewers, curbs, traffic control,
and street lighting. Proposed funding from UAB, For-
ward Thrust, and Arterial Street sources.
98 LIND AVE. S. W. An extensive improvement project between S. W. Grady 1,220 1973
Way to S. W. 16th- St. to include widening, grading,
paving, storm sewer, curbs, sidewalk, street lighting,
and highway overhead crossing structure. Proposed
funding from UAB, Forward Thrust, Arterial Street, and
TOPICS sources. -
99 SR 515 RELOCATION From Puget Drive to south City limits, sidewalks, sig- 200 1974
nals and traffic control. Proposed funding from For-
ward Thrust and state sources.
100 PARK AVE. N. Between Bronson Way N. and N. 8th St., paving, storm 401 1974
sewer, sidewalks, curbs, traffic control, and street
lighting. Proposed funding from UAB, Forward Thrust,
and Arterial Street sources.
_ -__ -- _-- -- -_ _ SUNSET BLVD. .N-. E. __ _ - _ _ From Bronson Way N. to Edmonds Ave. N. E. Widening, 680 1974
grading, paving, storm sewers, sidewalks; curbs, traf- — -- -- ----- — ---
fic signals and control, and street lighting. Pro-
posed funding from UAB, Forward Thrust, and Arterial
Street.
STREET
11 LINE PROJECT EST EST
ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
NUMBER -
COST YEAR
CONSTRUCTION --- - - --_ -,--
102 LAKE WASHINGTON BLVD. From Houser Way to N. E. 44th-St. includes widening, 4,200 1974
grading, bridge structure, paving, storm sewer, curb,
street lighting and traffic control. Proposed funding
• from UAB and Forward Thrust sources.
103 S. W. 16TH ST. From East Valley Road to Monster Road S. W., widening, 730 1974
grading, paving, curbs, sidewalks, storm sewers, street
lighting, and traffic control. Proposed funding from
UAB, Forward Thrust, and Arterial Street sources.
104 KIRKLAND AVE. N. E. From N. E. Sunset Blvd. to N. E. 10th St., curbs, side- 26 1974
walks, paving, storm sewers. Proposed funding from
Arterial Street sources.
105 ABERDEEN AVE. N. E. From Sunset Blvd. N. E. to N. E. 27th St., widening, 680 1975
grading, paving, drainage, storm sewers, curbs, side-
walks, and street lighting. Proposed funding from
UAB and Forward Thrust sources.
106 N. E. 7TH ST. Between Sunset Blvd. N. E. and Monroe Ave. N. E., storn 320 1975
sewer, paving, curbs, sidewalk, traffic control, and
street lighting. Proposed funding from UAB, Forward
Thrust, and Arterial Street, sources.
UNIFORMITY STANDARDS
107 MUTCD UNIFORMITY STANDARDS Conform to New Federal Uniformity Standards on traffic 45 1972
- -- __ _ signing, _pavement markings and signals, throughout
City. Most -pavement markings and traffic signals--are---- --- - - -- - - - ---
being updated during regular street construction pro-
jects. Traffic signing must be updated as separate
item. Proposed funding from street fund source.
STREET
LINE I PROJECT EST EST .
ITEM- CONTROL PROJECT NAME DESCRIPTION_ - TOTAL START
NUMBER COST YEAR
•
CONSTRUCTION ---- — — --_ .. — - - - ------- ---- ---
102 - LAKE WASHINGTON BLVD. ' From Houser Way to N. E. 44th.St. includes widening, 4,200 1974 _
grading, bridge structure, paving, storm sewer, curb,
street. lighting and traffic control. Proposed funding -
- from UAB and Forward Thrust sources.
103 •� •• S. W. _16TH ST. •� . - . From East Valley Road to Monster Road S. W., widening, 730 ' 1974
- - ' . grading, paving., :curbs, sidewalks, storm sewers, street
lighting, and traffic control.. Proposed funding from
UAB, Forward Thrust, and Arterial Street sources. . - ' -
104 • KIRKLAND AVE. N. E. From N. E. Sunset Blvd. to N. E. 10th St., curbs, side- 26 1974
walks, paving, storm sewers. . Proposed funding. from -
Arterial Street sources.
105 ABERDEEN AVE. N.. E. - • From Sunset Blvd. N. E. to N. E. 27th St., widening, 680 1975
• . . . ' grading, paving, drainage, storm sewers, curbs, side-
. walks, and street lighting. Proposed funding from . .
UAB and Forward Thrust sources. .
106 . - N. E. 7TH ST. - Between Sunset Blvd. N. E. and Monroe Ave. N. E., store 320. 1975
•
_- sewer; paving, curbs, sidewalk, traffic control, and
- . . street lighting. - Proposed funding from UAB, Forward ,_
Thrust, and Arterial Street sources.
UNIFORMITY STANDARDS • . , .
107 •
MUTCD UNIFORMITY STANDARDS, Conform to New Federal Uniformity Standards on traffic 45 1972
- - signing, pavement markings and signals, throughout .
-- --- - -- -- -
City. Most- pavement markings and traffic signals- are - - -- - - -- - - - -- -
being updated during regular street construction pro- -
jects. Traffic signing must be updated as separate
item. Proposed funding from street fund source.
STREET
LINE PROJECT EST EST
ITEM CONTROL I PROJECT NAME DESCRIPTION TOTAL START
NUMBER COST YEAR
SIGNALIZATION__ _-
114 SR 169/ CEDAR RIVER PARK Provide traffic signals and coordination equipment. 33 1972
Proposed funding from UAB, Forward Thrust, and Ar-
terial Street sources.
115 SUNSET BLVD. N. E./N. E. 7TH ST. Replace existing signals. Proposed funding from Street 20 1972
fund source. -
116 1973 SIGNAL PROGRAM Install signals at following locations:
(A) N. E. 4th St./Monroe Ave. N. E. (Traffic) 24
(B) Talbot Road S. and S. 23rd St. (School crossing) 20
(C) N. 3rd St./Houser Way N. (Railroad crossing) 20
(D) Edwards/Hardie Ave. S. W./S. W. 7th (Traffic) 25
Proposed funding from UAB, Arterial Street and Street
Fund sources.
Total 1973 89 1973
117 1975 SIGNAL PROGRAM Install signals at following locations:
(A) Lake Washington Park entrance (Railroad) 27 1975
Proposed funding from Street Fund and Current Revenue
sources.
118 1977 SIGNAL PROGRAM Install signals at following locations:
(A) N. 8th St./Houser Way N. (Railroad) 18
(B) N. 30th St./Park Ave. N. (Traffic) 20
(C) Bronson Way N./Garden Ave. N. (Traffic) 33
Proposed funding from Forward Thrust, Arterial Street,
Street Fund, and Federal sources.
Total 1977 71 1977
FUNDED PROJECTS 1972
e - STREET - •
LINE ',PROJECT ' FUND TOTAL EXPEND ESTEXP- ESTIMATED ANNUAL—E)(PEND-I-T-URE-S
ITEM CONTROL PROJECT NAME CODE COST TO 1972 1972-77 1972 1973' 1974� 1975' 1976 1977
NUMBER .
CONSTRUCTION
55 RAINIER AVE. M 594 ---- 594 594
J 66 ---- 66 66
660 ---- 660 660
56 RENTON AVE., AIRPORT WAY, LOGAN AVE. M 1,346 1,346 1,346 ,
J 150 150 150
1,496 1,496 1,496
57 SUNSET BLVD. N. E. - M 421 . ---- 421 421
J -47 ---- 47 47
468 ---- 468 468
58 SOUTH 3RD ST. M ----
J ----
L1 ----
O ----
P 50 ---- 50 50
380 380 380
59 SOUTH 2ND ST. M ----
J ----
Ll ---
O ----
- - - -- - P ----
- -300- - - - 300 - 300 - - - - - - - -
FUND CODE M = UAB Ll = LID 274 P = State Highway
J = Street Forward Thrust 0 = TOPICS
FUNDED PROJECTS 1972
iSTREET
LINE " I - FUND- TOTAL EXPEND EST-EXP ,ES-T-IMATED-ANNUAL_EXPENDITURES
ITEM CONTROL PROJECT NAME CODE COST TO 1972 1972-77 1972 1973 1974 1975 1976 1977
NUMBER
CONSTRUCTION
60 MAIN AVE. S. M ---
J ----
Ll ----
O ----
P ----
60 60 60
61 WELLS AVE. M ----
J ----
N ----
0 ----
Ll ----
1,451 1,451 400 520** 330** 67** 67** 67***
62 LOGAN AVE. M ---- -
J ----
N ----
O , ----
Ll ----
356 356 155? 201** _
63 BURNETT AVE. S. M ----
J ----
Ll ----
20 20 20
FUND CODE M = UAB Ll = LID 274 P = State Highway ** = Unfunded
J = Street Forward Thrust 0 = TOPICS N = Arterial Street
FUNDED PROJECTS 1972
- - - STREET
LINE .PROJECT FUND TOTAL EXPEND EST EXP EST I-MATE-D ANNUAL--EXPE-ND-I--T-URE--S ,
ITEM CONTROL. ' PROJECT NAME CODE COST TO 1972 1972-77 1972 1973 1974 1975 1976 1977
NUMBER
CONSTRUCTION
.64 - • W ILLIAMS AVE. M ----
J ----
N ----
0' ----
Ll ----
' • 1,300 1,3.00 30 270** 500** 168** 166** 166**
65 SHATTUCK AVE. M ----
J ----
L1 ---
0 • ---
• N ---
370 370 300- 34** 36**
66 MORRIS AVE. -S. M • ----
J - ----
L1 ---
•
0 ---
N ---
-50 50 50
67 WHITWORTH AVE. S. M
J ----
L1 - ----
- - - - : - -I -
N •
- F_-- - ------ -- - -: -- - - -
50 50 50
a
FUND CODE M = UAB Ll = LID 274 P = State Highway N = Arterial Street
J = Street Forward Thrust 0 = TOPICS • ** = Unfunded
FUNDED PROJECTS 1972
STREET '
LINE PROJECT - - - ---FUND-T-O-T-AL-EXP-END___EST EXP_ ESTIMATED ANNUAL E)(PENDITURES
ITEM CONTROL PROJECT NAME CODE COST TO 1972 1972-77 1972 1973 1974 1975 I976 -1977
NUMBER
CONSTRUCTION
68 MAPLE VALLEY HIGHWAY M 364 ---- 364 162 207
J 41 — 41 18 23
405 -- 405 180 230
69 N. 6TH STREET M 162 ---- 162 162
J 18 --- 18 18
180 --- 180 180
70 - S. W. 43RD STREET M 675 ---- 675 675
J 38 --- 38 38
0 100 --- 100 ?
N� 2937 ---- 2937 37
Z ---
3750 ---- 3 0 750 1344**1344**
71 TALBOT ROAD S. M 130 130 65 65.
J 14 ---- 14 7 7
144 --- 144 1 72 72
72 S. W. GRADY WAY M ---- 173
J --- 193
1540 -- 1540 366 319** 319** 317** 317**
-
-73 GARDENAVEN-. - - -- - - --- - - - -J- - - __30__ 30
N 120 --- - 120 - - - --- -- -------
150 --- 150 20 100** 30**
FUND CODE M = UAB 0 = TOPICS Z = Other ** =,Unfunded
J = Street Forward Thrust N = Arterial Street
•
FUNDED PROJECTS 1972 111 STREET - - -
LINE -PROJECT - ' FUND TOTAL EXPEND EST EXP- ESTI-MATED -ANNUAL-EXP.-ENDI-T-URES
ITEM CONTROL PROJECT NAME LODE COST TO 1972 1972-77 1972 1973 1974 1975 1976 1977
NUMBER
CONSTRUCTION
74 HOUSER WAY S. M --- 113
•
J -- 13
N --- 20
270 --- 270 146 124**
- 75 - S. 4TH STREET M 445 ---- 445 223 222
J 49 --- 49 25 24
494 --- 494 248 246
•
76 EAST VALLEY ROAD M ---
J ---
- - N ----
1880 -- 1880 1175 705**
77 S. 4TH PLACE N 20 20 20
78 . UNION AVE. M
J
N
510 .510 20 20** 10** 154** 153** 153 77
FUND CODE M = -UAB N = Arterial Street. L1 = LID 274 ** = Unfunded
J = Street Forward Thrust A = Current Revenue U = Utility Co.
FUNDED PROJECTS 1972
STREET
LINE PROJECT-' _ _-_ _ _ FUND_TOTAL EXPEND EST EXP. ESTIMATED ANNUAL EXPENDITURES
ITEM CONTROL PROJECT NAME BODE COST TO 1972 1972-77 197-2 -19.73 1974 -1975-1976-1977—
NUMBER -
J
UNDERGROUNDING -
79 WILLIAMS & WELLS AVE. S. LI 200 200 200
80 MAPLE VALLEY HIGHWAY (SR 169) U 40 40 , 40**
- - - - -
FUND CODE Ll = LID 274 ** = Unfunded - U = Utility Co.
WATER 1 .
r
.
.
•
•
• i
a
WATER
Under the jurisdiction of the Engineering Department, replacement of old inadequate water mains and the
installations of new water transmitting facilities will continue in 1972 as specified in the 1965 Munici-
pal Water System Comprehensive Plan for Renton. Scheduling of water projects are based on several criteria.
As a general rule, all water pipeline revisions are scheduled when possible to coincide with street improve-
ment or resurfacing. New water supply acquisition and development are based on future industrial growth
and population increase needs. Replacement of existing pipelines are determined by physical observation
and expected life of the materials.
Expenditures for water system development will total $154,200 in 1972.
WATER
II LINE 1 PROJECT EST EST
ITEM TROL PROJECT NAME DESCRIPTION I TOTAL ISTART
NUMBER COST YEAR
-
UNFUNDED
•
126 CEDAR RIVER PARK Install 3800 LF of 24" D.I. Transmission main per 100 1972
comprehensive plan from well No. 8 to Mt. Olivet stor-
age tank to provide better hydraulic conditions from
well No. 8 and a secondary supply line to Highlands
area. Proposed funding from Rev. Bonds ($20,000) and
Federal sources.
127 TALBOT HILL RESERVOIR Construct a six million gallon ground level concrete 443 1973
reservoir at Talbot Hill. Proposed funding from Rev.
Bonds, state and federal sources.
128 BENSON HIGHWAY RELOCATION Replace substandard water main along SR 515 relocation 30 1973
from S. Renton Village Place to S. 15th St. with 1300
LF of 24" D. I. main in conuunction with state highway
relocation project. Proposed funding from Curr. Rev.
and state highway sources.
129 BENSON ROAD S. Relocate and install 1300 LF of 8" C. I. main from 13.6 1973
Eagld Ridge Road S. E. to Interstate 405 to replace
the poorly located and substandard water main now
serving northwest Talbot Hill. This project to be
accomplished in conjunction with state highway SR 515
widening project. Proposed funding from Curr. Rev.
and state highway sources.
130 RENTON AVE. EXTENSION Install 1700 LF of 12" C. I. transmission main from ' 20.4 1973
Lind Ave. N. W. to 84th Ave. S. E. to provide part of
the secondary supply and- Seattle-to-Renton conversion
system. Proposed funding from Curr. Rev. and LID
sources.
131 CHLORINATOR BLDG. REPLACEMENT Replace with new structure the deteriorated chlorina- 15 1974
tor building from Curr. Rev. sources.
WATER
LINE 1 PROJECT
11 ' ITEM CONTROL PROJECT NAME
DESCRIPTION EST EST
TOTAL START
NUMBER OWED COST . YEAR
119 SPRINGBROOK WATER SHED PAYMENT -Payment toward acquisition of water- shed--at Spring- _ 71 _ 1972 _ _
brook Springs. Decreasing payments over next 6 years.
_ 120 SUNSET BLVD. N. E. (SR 900) Replace substandard water main from N. B. 12th St. to 36 1972
138th Ave. S. E. as recommended by comprehensive plan
with 4100 LF of 8" and 3400 LF of 12" C. I. water main
in conjunction with State Highway widening and paving
project of SR 900.
121 137TH AVE. S. E. Installation of 300 LF of 8" C. I. watermain from 4 1972
S. E. 135th St. to S. E. 136th St. to provide better
water circulation and fire protection by looping 138th
Ave. S. E. and the plat of Heather Downs. This pro-
ject to be accomplished in conjunction with King Co.
widening of 138th Ave. S. E.
122 MAPLE VALLEY HIGHWAY (SR 169) As stipulated in comprehensive plan, 2800' of 12" C.I. 36.6 1972
transmission main will be installed from S. E. 5th St.
to south end of plat of Maplewood Div. #2 in conjunc-
tion with state Highway widening project for BR 169.
123 WEST HILLS SITE ACQUISITION Purchase site for booster pump station necessary for 6 1972
converting West Hills area from Seattle to Renton
Water service.
124 AIRPORT WAY Replace existing water mains along Airport Way, Lake 20.8 1972
Ave. S. and Logan Ave. S. with 2600 LF of 8" C.I
water main to provide improved fire protection.
ii125 EAST VALLEY HIGHWAY Install 4500 LF of 12" C.I. Transmission water main 54 1972
from 27th St. to S. W. 16th St. to provide a secondary
water supply system to Valley General Hospital, and
provide water to the south industrial area.
WATER
LINE ' PROJECT EST ' EST
ITEM CONTROL PROJECT NAME DESCRIPTION TOTAL START
NUMBER COST YEAR
132 N. E. 12TH ST. - Replace-substandard main between Highlands Reservoir 33.6 1974
and Union Ave. N. E. with 1600 LF of 16" C.- I. main-to -
flow capacity. Proposed funding from Curr. Rev.
sources.
133 LIND AVE. N. W. Install 1800 LF of 12" C. I. main per comprehensive 21.6 1974
plan from N. W. 3rd place to Renton Ave. extension as
final portion of secondary supply and Seattle-to-Ren-
ton conversion system for West Hills. Proposed fund-
ing from Curr. Rev. and LID sources.
134 138TH AVE. S. E. As stipulated in the comprehensive plan, replace exis- 25 .6 1974
tirig substandard main between Sunset Blvd. N. E.
(SR 900) and S. E. 101st St. with 1600 LF of 12" C.I.
main and 800 LF of 8" C. I. main in conjunction with
King Co. widening project of 138th Ave. S. E. Pro-
posed funding from Curr. Rev. and LID sources.
135 1975 WATER SYSTEM UPGRADING PER The comprehensive plan specified installation of 2300 -1)42.( 1975
COMPREHENSIVE PLANNING LF of 12" C.I. main in N. 28th St. between 1405 and -2)43.
Burnett Ave. N. (-1), 2200 LF of 12" C.I. main in N.E. -3)36.0
26th St. between Park Ave. N. to Lincoln Ave. N.E. -4)73.(
(-2), 2000 LF of 16" D.I. main in S. 19th St. and Pu- 195.0
get Dr. from Talbot Reservoir to Benson Rd. S. (-3),
and 4600 LF of 16" D.I. main in Puget Drive S.E. from
Benson Rd. S. to Rolling Hills Reservoir (-4) to re-
place substandard mains and facilitate the Seattle-to •
-
Renton water service conversion in 1975. Proposed
funding from Curr. Rev. and Rev. Bond sources.
j 136 1976 WATER SYSTEM UPGRADE -Replace substandard water mains in Meadow Ave. No. -3)17.2 1976
from N.E. 36th St. to N. 40th St. with 2100 -LF-of 8" -4) 9.0
C.I. main, and in N.W. 2nd St., N.W. 2nd Place, N.W. 26.6
3rd Place and Maple Ave. N.W. with 1600 LF of 6" C.I.
main. Proposed funding from Current Rev. and Rev.
Bond sources.
•
FUNDED PROJECTS 1972
I - - WATER - -
LINE . PROJECT FUND TOTAL -EXPEND EST-EXP- EST--I-MATE-D-ANNUAL"_EXPENDITURES
ITEM CONTROL PROJECT NAME CODE COST TO 1972 1972-77 1972 1973 19-74 1975 1976 1977
NUMBER
119 SPRINGBROOK WATER SHED PAYMENT A 71 71 18 18 17 6 6 6
120 SUNSET BLVD. N.E. (SR 900) A 18.4 ---- 18.4 18.
P 18.4 ---- 18.4 18.4
36.8 --- 36.8 36.8
121 137TH AVE. S.E. A 4 4 4 "
122 MAPLE VALLEY HIGHWAY (SR 169) - A 20.6 ---- 20.6 20.6
P 16 . --- 16 16
. 36.6 -- 36.6 36.6
123 WEST HILLS SITE ACQUISITION A 1.5 -- 1.5 1.5
H 4.5 4.5 4.5
6.0 -- 6.0 6.0
124 ' AIRPORT WAY - A 10.4 10.4 10.4
M 10.4 ---- 10.4 10.4
20:8 --- 20.8 20.8
125 EAST VALLEY HIGHWAY R2 * . ----
S2 * ----
54 54 54
a a
FUND CODE A = Current Revenue H = 1965 Rev. Bond R2 = EDA - *Application submitted
P = State Highway M = UAB S2 = Jobs Now