Loading...
HomeMy WebLinkAboutCM_ConstructionMitigation_210217Construction Mitigation Plan 601Monster Rd SW Renton, WA BNBuilders 2601 Fourth Avenue Suite 350 Seattle, Washington 98121 206.382.3443 Construction Office Construction Parking Laydown / Loading & Unloading Dumpster Sit e E n t r a n c e / E x i t Project Information / Procedures: Construction Timeline: March 27, 2021 - September 20, 2021 Work Hours: Mon - Fri 7am - 3:30pm Erosion Control / Dust Mitigation: All work shall occur within the envelope of the building. Haul out of debris will be directly to covered dumpsters, site laydown and storage areas will be swept daily and stored materials will be covered from exposure Noise Control: All roof work will occur during normal construction hours to mitigate off hours noise Traffic Control: All deliveries to be scheduled minimum 24hrs prior during normal business hours. No staging offsite is permitted.HAUL ROUTE