Loading...
HomeMy WebLinkAbout0895.06 DFR 280.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. AES 0895.06 1 of 1 280 Time On Site Time Off Site Date Day of Week 2:15 3:15 2/18/21 Thursday Travel Time Weather 1 hr. 44°F, Rain Showers Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd S, Renton RJ Development, LLC General Contractor Contact Field Supervisor Reviewed Accrete Construction, LLC Joe LAC/MTK Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site? Project No. Permit No. As requested by the client, ESNW representative was on-site to observe and test the stormwater discharge to the sewer. Erosion Control – Temporary Upon arrival, ESNW rep. tested the pH of the stormwater and conducted an Imhoff Cone test to measure settleable solids of the western baker tank found onsite. ESNW rep. measured a pH of 10 and 0.0 mL of settleable solids were observed, which is suitable for discharge into the sewer system. Daily discharge amount shown on the monthly Industrial Waste Program Self-Monitoring Report. ESNW rep. will return as requested. Alexandra Shaner Senior Field Technician (206) 355-877