HomeMy WebLinkAbout0895.06 DFR 280.pdf
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
AES 0895.06 1 of 1 280
Time On Site Time Off Site Date Day of Week
2:15 3:15 2/18/21 Thursday
Travel Time Weather
1 hr. 44°F, Rain Showers
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd S, Renton RJ Development, LLC
General Contractor Contact Field Supervisor Reviewed
Accrete Construction, LLC Joe LAC/MTK
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site? Project No. Permit No.
As requested by the client, ESNW representative was on-site to observe and test the stormwater discharge to the
sewer.
Erosion Control – Temporary
Upon arrival, ESNW rep. tested the pH of the stormwater and conducted an Imhoff Cone test to measure
settleable solids of the western baker tank found onsite. ESNW rep. measured a pH of 10 and 0.0 mL of
settleable solids were observed, which is suitable for discharge into the sewer system.
Daily discharge amount shown on the monthly Industrial Waste Program Self-Monitoring Report.
ESNW rep. will return as requested.
Alexandra Shaner
Senior Field Technician
(206) 355-877