Loading...
HomeMy WebLinkAboutRino SL 010 - PSE Plan.pdf PO Box 667 Ph: 360-469-4941 Maple Valley, WA 98038 Fax: 425-728-8224 Page 1 of 1 February 24, 2021 Cobi Clark SL#: RC-ACC-010 Accrete Construction 801 Valley Ave NW Ste. A Puyallup, WA 98371 SUBJECT: Response to Accrete Ongoing PSE Deficiency RE: Weatherly Inn – PSE Plan Cobi, RINO Construction (RINO) attended the PSE Preconstruction meeting as scheduled. During the meeting we discussed the following Plan: Onsite Work 3/1 – 3/2 – Excavate for Vaults “J01 and V01” (PSE to approve excavation after complete) 3/2 – 3/4 – Excavate JUT from J01 – V01 (Spoils will be handled onsite will be stockpiled adjacent to the excavation. Layout will be coordinate with Accrete to avoid utilities and Future Gas as we do not have plans for those.) 3/4 - 3/8 - Backfill JUT upon completion of conduit installation. Bring in sand for backfill as needed for cover. Vaults to be delivered and set and tied into on 3/5 per latest email from PSE today. Excess material displacement from trench to be exported. Road Crossing Work 3/8- 3/9 - Sawcut Road and Excavate (Steel sheets and approved TCP) will be utilized on roadway. 3/10 – 3/12 – Backfill, and restoration (curb) 3/15 – Complete restoration (weather dependent) Note: All inspection coordination with PSE shall be the responsibility of Accrete. Please reference SL# - RC-ACC-009 for RINO’s notice of protest for this work for which RINO has reserved its rights for an equitable adjustment in contract sum and time. Sincerely, Nick Rawlins Project Manager Enc: cc: Jason Wood, Mark Richardson, Michael Cholerton, Jeff Bennett, Joe Whilte, Jacen Renfrow, Nikki Penland, Nick Rawlins, Todd Henry