HomeMy WebLinkAboutW_Waiver_210303_v2DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPICATIONS
Planning Division - 1055 South Grady way - Renton, WA 98057 - Phone: 425-430-7200 - www.rentonwa.gov
LAND USE PERMIT SUBMITTAL REQUIREMENT COMMENTSCHANGED BYTYPE
RequiredAffidavit - Public Information Signs Installation
WaivedArborist Report BG
ModifiedArchitectural Elevations BG Staff is granting the Applicant's Request,
photos of structure and engineering
drawings will replace elevations.
WaivedBiological Assessment / Critical Areas Study BG
WaivedColored Rendering BG
RequiredCovenants, Existing
WaivedDensity Worksheet BG
WaivedDrainage Control Plan NJ
RequiredEasements, Existing
ModifiedFlood Hazard Data BG Show special flood hazard area boundary
on site plan.
RequiredFloor Plans
ModifiedGeotechnical Report BG A geotechnical report will be required at
time of building permit application.
WaivedGrading Plan BG
WaivedHabitat Data Report BG
WaivedHazardous Materials Management Statement BG
RequiredJustification for Variance Request
RequiredLand Use Master Application Form
WaivedLandscape Analysis, Lot Coverage, Parking Analysis BG
RequiredLegal Description
RequiredLetter of Understanding - Geologic Risk
RequiredNeighborhood Detail Map
RequiredPhotographs of the Property
WaivedPlat Certificate BG
WaivedPre-Application Meeting Summary BG
RequiredProject Narrative
RequiredSite Plan
WaivedStream and Lake Mitigation Plan BG
RequiredTitle Report
RequiredTopography Map Topography lines are present on the site
plan.
WaivedTree Retention Worksheet BG
ModifiedTree Retention/Land Clearing Plan BG Include the species and diameter of all
significant trees on site.
LAND USE PERMIT SUBMITTAL REQUIREMENT COMMENTSCHANGED BYTYPE
RequiredUtilities Plan, Generalized NJ The only aspect of a utility plan that is
needed is a plan showing the location of
the existing septic system, an as-built is
preferred, but a sketch would be
acceptable.
RequiredWaiver Form
WaivedWetland Assessment BG
WaivedWetland Mitigation Plan - Preliminary BG
WaivedWetlands Delineation Map BG
PROJECT NAME: Hopkins Shed Variance DATE: 3 / 3 / 2021