HomeMy WebLinkAboutCapitol Improvement Program (1982-1988) CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM
1982- 1988
' I
i I
- i
TABLE OF CONTENTS
I . Revenue Sources
A. Bonding Capacity
B. Assets
C. Miscellaneous Revenue Sources
I . Mayor's Summary and Recommended Priorities
III . Department Reports
A. Fire
B. Parks and Recreation
C. Police
D. Library
E. Finance
F. Joint Projects
G. Public Works
1 . Traffic Engineering
2. Airport
I ,
3. Water
4. Sanitary Sewer
5. Six-Year Transportation Improvement Program
Approved by Council July 27, 1981
I '
i
PAGE 1
I. REVENUE SOURCES
A. Bonding Capacity - Total City Property Value = $1 ,710,240,038
1 . Indebtedness for General Purposes - without a
vote of the people:
Legal limit: 3/4 of 1% on property value $ ;12,826,800
G.O. Bond liabilities $1 ,050,000
Less redemption fund assets 149,118
Excess of liabilities over assets $ 900,882
' Total Net General Indebtedness $ , 900,882
Margin of Indebtedness Still Available $ 1i ,925,918
2. Indebtedness for General Purposes - with
3/5th vote of the people:
Legal limit: 22% on property value $ 42,756,001
Indebtedness incurred -0-
Net general indebtedness from Section 1 above $ 1 900,882
Margin of indebtedness still available $ 41 ,855,119
3. Indebtedness for Utility Purposes - with
3/5th vote of the people:
Legal limit: 5% on property value $ 85,512,002
Indebtedness incurred -0-
Total indebtedness from Sections 1 , 2 and 3 $ 1 900,882
Margin of indebtedness still available $ 84,611 ,120
4. Indebtedness for Open Space and Park Facilities with a 3/5th vote of the people:
Legal limit: 72% on property value $ 128,268,003
Indebtedness incurred $6,000,000
Less redemption fund assets 650,000
Excess of liabilities over assets $5,350,000
Total Net Open Space and Park Indebtedness $ 5,350,000
Total indebtedness from Sections 1 , 2, 3 and 4 $ 6,250,882
Margin of indebtedness still available $ 122,017,121
i_ PAGE 2
B. Ci y Owned Assets that May Apply to Proposed Projects
Value Project/Page
Land Improvements
1 . Fire Training Site (Lind Ave SW) $ 658,750 $ 1I - 13
2. Fire Station #12 66,000 154,000 y - 17
3• Property - Station #13 on Benson 33,000 5 - 19
•
4. NCR Century 101 Computer 11 ,500 ,26 - 46
5. Present City Shop Site 348,500 27 - 48
$1 ,117,750 $154,000
Tot= 1 Assets $1 ,271 ,750 •
C. Mis ellaneous Revenue Sources
1 . City General Revenue
2. Local Improvement Districts (L. I .D.)
3. Housing and Community Development Block Grants (H&CD)
?+. Interagency for Outdoor Recreation (IAC)
5. King County Parks and Open Space Bond Issue (proposed)
6. Department of Social and Health Services (DSHS) - Referendum #38
Municipal Water Supply Funding Program
7. Federal Funding Sources
a. General Revenue Sharing (FRS)
b. Housing and ,Urban Development (HUD)
c. Economic Development Administration (EDA)
d. Department of Transportation pp (DOT)
e. U. S. Fire Administration (USFA)
f. Federal Aid Urban Systems (FAUS)
g. Federal Aviation Administration (FAA)
h. Airport and Development Program (ADAP)
i . Federal Aid Safety Projects (FASP)
•
Page 1 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Priority Project Project Location and Total Cost Potential Funding Sources
Dept # Y Description Acquisition Development Local ShareState Share Federal Share
Joint Proj. 1 27 Maintenance Shop Facilities - $4,026,512
Pub Works/ pg 48 Highlands adjacent to county
Utility , shops -
Parks 2 7 Gene Coulon Memorial Beach Park $40,000 $8.952,000 G.O. Bonds $7,825,000 Land b Water
P9 �3 Development Fee Simple Investment Conservation
$ 8,000- - - Earnings $ 469,000 Funds $706,000_
Easements
Fire 3 1 Fire Training Facility Unknown $ 85,000 Councilmanic Bonds Revenue Sharing
pg 13 Option #1 Sale of Applicable U.S. Fire
Assets Administration
Finance 4 26 New Computer System $200,000 Trade In Existing Revenue Sharing
' pg 46 Equipment
General Fund S134.420
Joint Proj. 5 28 Cedar River Trail Acquisition $200,000 H&CD IAC
Planning/ pg 50 Thomas Property _
Parks
Parks 6 12 Highlands Administration $ 250,000 General Funds EDA
pg 28 Building Renovation
H&CD
a
I , a1
iI W
I I - •
-- ---- - ----- --- - ---- ---- -- - -- ---
Page 2 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Priority Project Project Location and Total Cost Potential Funding Sources
Dept M N 'escrtp-tIon Atqui-sition Development Local—Share State share Feederal—Share
Parks 7 13 Senior Center Parking Expan- $ 100,000 General Funds IAC Revenue Sharing
pg 29 sion and Pea Patch HWCD
Fire 8 3 Construct Station #14 in $ 80,000 $ 470,000 General Funds U. S. Fire
pg 16 Kennydale G.O. Bonds Administration
4 Relocate Station #12 in $ 80,000 $ 470,000 Revenue Sharing
Appl
pg 17 Highlands Sale of sets - -
cable Assets
Comm. Fac. Fund
Parks 9 8 Heather Downs Acquisition $ 240,000 General Funds
pg 24 (Acq. Fund 1689)
County Bond Issue
Comm. Fac. Fund
Pub Works ' 10 35 Lighting Replacement $ 100,000 General Funds Revenue Sharing
Traffic pg 61
Engineering Arterial Street
Fund (}C gas tax)
Airport Fund
Library 11 25 Renton Main Library Remodel $ 574,148 General Funds Revenue Sharing
pg 44 and Construct Second Floor (Cum. Res. #3390)
Addition Bond - G. 0. or
Councilmanic
a
YI
m
-
Page 3 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Priority Project Project Location and Total Cost Potential Funding Sources
Dept -Q # Descri-ptlon Acquistt of n Development Local Share State Share Federal Share
Parks 12 11 Renton High School Athletic $ 450,000 General Funds IAC Revenue Sharing
page 27 Complex Renton School
District
Joint Proj. 13 29 Burnett Pedestrian Corridor $ 400,000 $ 200,000 General Funds H.U.D.
Parks/ pg 52 Acquisition
C.I.D.
Planning 30 Burnett Pedestrian Corridor
H&CD
pg 53 Development
Parks 14 9 Cedar River Park Community $4,100,000 G. O. Bonds
pg 25 Center County Bond
Issue
Parks 15 '10 Liberty Park Community $ 90,000 H&CD $43,500
pg 26 Building General Funds
The succeeding projects were submitted by the various departments
and do not necessarily reflect the Mayor's priorities.
a
cl
m
vi
Page 4 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Priority Project Project Location and Total Cost Potential Funding Sources
Dept # • # Description Acqui-s-i-ti-on Development Local Share State Shaye Federal—Share
Fire 2 Second Floor Addition to $ 132,000 Comm. Fac. Fund Revenue Sharing
pg t5 Station #11 for Fire
PreventionCouncilmanic Bond
Bureau
Fire 5 Construct Station #15 in $ 470,000 Comm. Fac. Fund Revenue Sharing
pg 19 Earlington Industrial Bonds U.S.F.A.
Area
Sale of Applicable
Asset - Lind Property
Fire 6 Relocate Station #13 $ 80,000 $ 70,000 Comm. Fac. Fund Revenue Sharing
pg 21 Bonds U.S.F.A.
Parks 14 Sierra Heights/Glencoe $ 240,000 Comm. Fac. Fund IAC Revenue Sharing
pg 30 Park Acquisition County Bond
Issue
Parks 15 Golf Course Acquisition $2,278,000 G. 0. Bonds
pg 31 Maplewood County Bond
Issue
Parks 16 Sports Park Acquisition $ 450,000 County Bond IAC
pg 32 Issue
Comm. Fac. Fund
m
a
o
m
as
-
Page 5 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Priority Project Project Location and Total Cost Potential Funding Sources
Dept A' k Desc-r-i-pt-ton Acqui-si-ti-on—Deveiopmerrt LocafiShare State are Federal Share
Parks 17 Heather Downs Neighborhood $ 400,000 County Bond IAC
pg 33 Park Development Issue
Comm. Fac. Fund
Parks 18 Talbot Hill/Springbrook $ 240,000 County Bond IAC
pg 34 Neighborhood Park Issue
Acquisition - - - - -
Comm. Fac. Fund
Parks 19 East Kennydale Park $ 250,000 County Bond IAC
p9 35 Acquisition Issue
Comm. Fac. Fund
Parks 20 Mother's Park Recreation $ 750,000 County Bond Revenue Sharing
pg 36 Center Renovation Issue
HBCD
Comm. Fac. Fund
Parks 21 Tiffany Park/Benson Hill $ 240,000 County Bond IAC
pg 37 Neighborhood Park Issue
Acquisition
Comm. Fac. Fund
Parks 22 Covered Playcourts $ 250,000 General Fund Revenue Sharing
p9 38
D
mry
V
Page 6 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Priority Project Project Location and Total Cost Potential Funding Sources
Dept # N Description Aeq-0-0 tion Development Laca1—Share State—Sfiar`e Federal Share
Parks 23 Cushion Turf Field $ 100,000 County Bond Issue
pg 39 Phillip Arnold Park General Funds
Police 24 Construct Office Building $ 861,144 Bonds
pg 41 and Garage Comm. Fac. Fund
Finance 26 New Computer System $ 200,000 General Fund Revenue Sharing
pg 46 $134,420
Trade In Existing Equipment
Planning/ 31 City Entry Point Minimal $ 100,000 Gas Tax Revenue Sharing
' Parks pg 54 Enhancement L.I.D.
General Fund
Planning/ 32 Cedar River Trail $ 590,000 H&CD IAC E.D.A.
Parks pg 56 Natural Zone Development County Bond Issue
Planning/ 33 Wetland Acquisition $ 600,000 Eastside Watershed
Parks pg 57 Project
$1,250,000
Donations
Comm. Fac. Fund
County Bond Issue
m
a
cm
m
CO
I
Page 7 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Priority Project Project Location and Total Cost Potential Funding Sources
Dept I i Description Acquisition Development Local share State Share Federal—Share
Planning/ 34 Lake Washington Boulevard $ 100,000 L.I.D. D.O.T.
Pub Works pg 58 Bikeway Bicycle Grant
HECD Program
Pub Works 36 Traffic Signal Controller $ 200,000 General Funds FASP
Traffic pg 62 Modernization Comm. Fac. Fund FAUS
--- -Engineering
Arterial Street
Fund (it gas tax)
Pub Works 37 Computer Enhancement $ 220,000 Arterial Street FAUS
Traffic pg 64 Fund (it gas tax)
Engineering Comm. Fac. Fund
Pub Works 1 38 ADAP Fencing Installation $ 125,000 Airport Fund 20% ADAP 80%
Airport pg 65
Pub Works 2 39 Water Main - Upgrading $ 140,000 Airport Fund
Airport pg 66
Pub Works 3 40 Overlay Taxiway "A" $ 337,000 Airport Fund 20% ADAP 80%
Airport pg 67
Pub Works 4 41 Water Main - Complete $ 108,000 Airport Fund
pg 68 Loop System y
c)
m
lI
•
I '
i
Page 8 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Priority Project Project Location and Total Cost Potential Funding Sources
Dept # # Deser-i-ption Acqu-i-s-i-t-ien—Development Local-Share State-Share Federai-Share
Pub Works 5 42 Microwave Landing System $ 250,000 ADAP - 100%
Airport pg 69 -
Pub Works 1 43 Construct Well #9 Pump $ 150,000 Utility Fund Referendum #38
Water pg 70 Station Comm. Fac. Fund Municipal Water
Utility SupSupply Funding
9 ym
Pub Works 2 44 24" Transmission Line $ 350,000 Utility Fund
Water P9 71 Through CBD Capital Outlay
Utility
Pub Works 3 45 Construct West Hill $1,000,000 Capital Outlay DSHS Referendum
Water p9 72 Reservoir Utility Fund #38
Utility
Pub Works 4 46 16" Transmission Main, $ 200,000 Capital Outlay
Water P9 73 Aberdeen Ave. NE from Utility Fund
Utility NE 14th St. to NE 28th Comm. Fac. Fund
St.
Pub Works 5 47 South Talbot Hill $ 50,000 $ 650,000 Utility Fund
Water pg 74 Reservoir Comm. Fac. Fund
Utility
m
n
o
m
O
Page 9 CITY OF RENTON
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM (1982-88)
Pri_cu_Lty rojest Project Location and Total Cost Potential Funding Sources
Dept d II Description Acquisition Development Local Share State-Share Federal-S
Pub Works 1 48 May Creek Sanitary Sewer $2,000,000 Utility Fund
Sanitary pg 75 Interceptors
Revenue Bond
- Sewer
L.I.D.
Comm. Fac. Fund
Pub Works 2 49 Lift Station at NE 4bh and $ 100,000 Capital Outlay
Sanitary pg 76 Union Ave. NE Utility Fund
Sewer
Comm. Fac. Fund
Pub Works 3 50 Replace Line - Mill Ave. S. $ 700,000 Utility Fund
Sanitary pg 77 to Shattuck Ave S., Houser
Sewer Way S.to Cedar River
Pub Works 4 51 Replace Line - Main Ave S. $ 600,000 Utility Fund
Sanitary pg 78 to Shattuck Ave. S., R/R
Sewer Tracks to Grady Way
Pub Works 5 52 Replace Line - N. 3rd St. to $ 700,000 Utility Fund
j Sanitary pg 79 Bronson Way, Burnett Ave. N.
Sewer to Houser Way
Pub Works 6 53 Replace Line - N. 6th St. to $ 600,000 Utility Fund
Sanitary pg 80 N. 3rd St., Burnett Ave. N.
Sewer to Garden Ave. N. -u
a
m
m
PAGE 12
PROPOSED FIRE INPR OR PRIOTMENT RITIZED PROJECTS
ED ORDER
1 . Training Facility
. Station #11 Office Expansion
. Construct Station #14 (Kennydale)
4. Relocate Station #12 (Highlands)
5. Construct Station #15 (Earlington)
6. Relocate Station #13
•
PAGE 13
PROJECT 1
DEPARTMENT: . Fire DEPT. PRIORITY I 1
CAPITAL PROJECT: Construct a training facility that would include a five story
tower, a burn building, flammable liquid and C. P. gas props
and material storage, storm drainage and flammable liquid
separators, fencing, drafting pit, classroom and storage,
blacktop, cement surface for drill and driving area and
hydrants.
ESTIMATED COST: TOTAL $ 678,000
ACQUISITION $
DEVELOPMENT $
FINANCING: 1) General Funds
2) Bonds
3) Revenue Sharing
4) U. S. Fire Administration Grant
OSTENSIBLE ASSETS: 1) City owned property (5 1/2 acres) on Lind S.W.
2)
3)
BACKGRUND: The present training facility being utilized by. the Fire Department
onsists of a three story wooden drill tower located in the Cedar River Park.
his facility is totally inadequate for the proper training of our fire supp-
ession personnel. There is limited floor space, lack of proper access to
he tower, no ability "to provide smoke room drills and the structure should
e at least five stories tall.
POiENTIAL SITE: (location, cost, zoning)
The proposed city shop site in the Highlands adjacent to the county maintenance
facilities. This property is presently zoned for training site use. The
rchitect that has been hired to design the city shops is studying the
feasibility of providing the fire training facility on adjoining property.
COST/BENEFIT ANALYSIS:
he additional costs to the City would include the annual maintenance and up-
eep. The benefits that would accrue include our enhanced ability to properly
rain our on duty personnel on a continual basis. By providing facilities
o test our pump apparatus, we can avoid the cost and additional risk of sending
our equipment to Seattle for testing.
OPTIONS:
1) Build the facility in phases starting with site preparation and a
tower/smoke room.
' 2) Share existing facilities with.other departments.
1
� I
PAGE 14
PROJECT 1
ASSET # 1
Site: SW 19th and Lind SW
Valu --
land: $658,750
improvements:
Total : $658,750
Zoning: Heavy industrial
Size --
land area: 5 1/2 acres sq. ft. or acres
improvements: sq. ft.
sq. ft.
sq. ft.
Appr isal Date: March, 1980
Notes: (background, comments, restrictions)
The site on Lind Ave. SW was purchased in 1965 as a result of a
Survey and Rating Bureau recommendation that the Fire Department
have a training facility. The site was filled and some storm
drains were installed. There was money budgeted for the site to
be built but due to lack of water in the area, it was never
developed. The area is zoned Heavy Industrial and is worth much
more with that zoning. We have contacted Pollution Control and
they advised us that we would not be able to obtain training fire
permits for this area because of its closeness to the freeway.
I feel we should sell five acres and reserve one-half acre for
a possible fire station. -
PAGE 15
PROJECT 2
DEPARTMENT: Fire - Administration Priority #1 DEPT. PRIORITY # 2
CAPIT L PROJECT: Provide a second floor at Station 11 for the Fire Prevention
Bureau
ESTI •TED COST: TOTAL $ 132,000
ACQUISITION $
DEVELOPMENT $
FINAN'ING: 1) General Funds
2) Councilmanic Bonds
3) G. 0. Bonds
OSTEN'IBLE ASSETS: 1)
' I
2)
3)
' I
BACKS OUND: In the original plans for the new station,, the Administration wing
was o be much larger than it is. Due to money restraints, the Administration
wing was reduced in size. When the preliminary plans were being drawn for the
new tation, we only had 5 people working in Administration. We now have 10
people working in an area designed for 7 to 8 people. The Fire Prevention Bureau
has the most people and probably the least floor space per person. Four people
are Confined to one large• room and have no proper facilities to carry out their
assi,ned duties.
POTEN IAL SITE: (location, cost, zoning)
This would be an addition to the present Station at 211 Mill Ave. So.
I I
I-,
COST/,ENEFIT ANALYSIS: There would be approximately $500.00 a year for upkeep.
•
OPTIONS: 1. Find another location in a City facility
2. Lease office space. in an available building in the area
' I
_ I
i I
—,
PAGE 16
PROJECT 3
•
•
i -
UEPA•TMENT: Fire - Suppression Priority 01 DEPT. PRIORITY 0 3
•
CAPI AL PROJECT: Construct Station 14 in the Kennydale area (to be done in
conjunction with department priority 04)
j I
CSTI ATED COST: TOTAL $ 550.000
I ,
ACQUISITION $ 80.000
DEVELOPMENT $ 470.000
FINANCING: 1) General funds
2) Councilmanic bonds
3) G. 0. Bonds
OSTENSIBLE ASSETS: 1) None
2)
_ I
3)
BACKGROUND: This area of the City is developing at an accelerated rate, both
commercially and residentially. The proposed Quendall complex will include
three to thirty story structures and will require ladder responses. Our
! response time to this area now is in the six to eight minute range. We
must be able to reach this area within a four minute time span. The Master
Plan recommended this facility and a Planning Department study done in 1972
also recommended a station in this area.
POTENTIAL SITE: (location, cost, zoning)
Preferably the station location should be in the vicinity of NE 30th
and Highway 405. The area is zoned for business.
COST/BENEFIT ANALYSIS: Costs would include at least twelve personnel ($341,380),
one new pumper ($150,000). land would cost approximately $80,000 and site
• preparation, building and miscellaneous equipment about $470,000.
The greatest benefit would be a much faster response time to the above
mentioned residences and businesses.
•
OPT ONS: 1) Continue with the existing Highlands station and allow the fire
problem to continue.
2) Build the facility over a two year period at approximately $440,000
per year.
•
I '
PAGE 17
PROJECT 4
•
•
DEPARTMENT: Fire - Suppression Priority #2 DEPT. PRIORITY # 4
DAPI—AL PROJECT: Relocate Station 1112 to Sunset Blvd. NE in the vicinity of
Union Ave. NE
'ESTI .TED COST: TOTAL $ 550.000
• ACQUISITION $ 80.000
DEVELOPMENT $ 470.000 •
FINA CING: 1) General funds
2) Councilmanic Bonds
3) G. 0. Bonds
PISTE SIBLE ASSETS: 1) Land - S66,000
2) Building - S154.000
3)
BAC ROUND: Station #12 was built in 1943 and remodeled in 1959. The station
as built to provide fire protection for the Highlands area which has grown
substantially since 1943. In a 1972 Planning Department study on fire station
1 cations, it was recommended that this station be moved east to better serve
the rapidly growing area. The present station is in need of major repair
lecause of its age.
POTE TIAL SITE: (location, cost, zoning)
rea of Sunset Blvd. NE and Union Ave. NE. We understand there is property
in the area zoned R-1.
1
COS /BENEFIT ANALYSIS: Other than the property acquisition and building,
here would be no other annual costs.
•
OPTIONS: 1) Provide service from the present location
•
PAGE 18
PROJECT 4
•
i •
ASSET 9 2
Site: NE 9th and Harrington
Value --
land: $ 66,000
improvements: $154,000
Total: $220,000
Zoning: R-3
Size --
land area: 13,000 sq. ft.xaxxagRAR
improvements: 5,000 sq. ft.
sq. ft.
sq. ft.
.ppraisal Date:
otes: (background, comments, restrictions)
The station was originally built by the Federal government for
fire protection for the federal housing in the area at the time.
When the area was annexed into the city, the Federal government
sold it to the city for $1.00. With the rapid expansion of the
Highlands area, it has become increasingly evident that the
station should be relocated to a more suitable area for proper
fire protection.
I I i
PAGE 19
PROJECT 5
DEPA'TMENT: Fire DEPT. PRIORITY # 5
CAPI AL PROJECT: Construct Station 15 in the Earlington Industrial Area
ESTI ATED COST: TOTAL $ 470,000
ACQUISITION $
DEVELOPMENT $ 470,000
FINANCING: 1) Bonds 4) Revenue Sharing
2) Community Facility Fund 5) USFA Grant
3) Sale of Applicable Asset
OSTENSIBLE ASSETS: 1) Lind SW property
2)
3)
BACKGROUND: As the Earlington Industrial area continues to grow, the need
for a fire facility to serve that area increases: The City has owned
' 5 1/2 acres on Lind Ave. SW since 1965. It is recommended that 1/2 acre
of this property be reserved for a future station site.
POTENTIAL SITE: (location, cost, zoning)
SW 19th and Lind SW
- I
COST/BENEFIT ANALYSIS: After the construction costs, the City would be faced with
additional manpower and equipment costs. A two bay station with one engine
company requires nine to twelve employees to maintain proper manning levels.
The annual maintenance costs would amount to approximately $3,000 per year.
The benefits to providing a new facility in this area would include the
faster response times and the improved service to an area of our City that
contains a very high average assessed value.
•
OPTI'NS: 1) Continue to serve area from Station /13.
•
1
PAGE 20
PROJECT 5
.
ASSET # 3
Site: Benson Highway Property and SW 19th and Lind SW Property
alue --
1
land: Benson - S33,000
Lind - $55,000
improvements: Benson - Building to be relocated
Lind - Vacant
Total: $88,000
oning:
'ize --
land area: Benson 100 x 200 sq. ft. or acres
Lind 1/2 acre
improvements: sq. ft.
sq. ft.
sq. ft.
ppraisal Date: March 1980
otes: (background, 'comments, restrictions)
Station 13 was constructed with the idea in mind that t t it could be
moved if the need arose.
Station 15 in the industrial area has been suggested for a number
of years.
•
I I i i
I I -
PAGE 21
PROJECT 6
•
•
DEPARTMENT: Fire DEPT. PRIORITY # b
CAPIT PROJECT: Relocate Station #13
I '
I I
ESTIM TED COST: , TOTAL $ 150.000
ACQUISITION $ 80.000
DEVELOPMENT $ 70.000
FINAN ING: 1) General Funds 4) Revenue Sharing
2) Councilmanic Bonds
3) G. O. Bonds
OSTEN IBLE ASSETS: 1)
2)
3)
BACKG•OUND: In 1980 the City constructed Station #13 in South Renton. That
station is centrally located so that it may provide service to the industrial
a ea in the Earlington flats as well as the primarily residential community
s•uth of the railroad tracks. When the commercial/industrial development in
t e valley requires a station located in a closer proximity, the property
ned by the City on Lind Avenue should be developed. This will allow us to
•ve Station #13 to a position further east to serve the expanding residential
community in that area.
POTEN IAL SITE: (location, cost, zoning)
148th S.E. and Petrovitsky Road
COST/:ENEFIT ANALYSIS: By waiting until development in the valley progresses,
w- may better judge where a permanent station should be located east of the
h•spital. The portable nature of the sleeping quarters and equipment shed at
Station #13 will limit the construction cost for a new station. No additional
npower or equipment will be required since this station is already operational.
' I
OPTIO S: 1) Continue to serve the southeast area of the City from Station #13
in its present location.
2) Sell Station #13 and the property on the Benson Road and use the
proceeds to acquire property and construct a permanent facility.
PAGE 22
PROPOSED PARKS DEPARTMENT PROJECTS
IN PRIORITIZED ORDER
1 . eene Coulon Memorial Beach Park Development
2. Heather Downs Neighborhood Park Acquisition
3: Cedar River Park Community Recreation/Arts Center
4. Liberty Park Community Building Renovation
5 Renton High School Athletic Complex Development
61 Highlands Administration Building Renovation
71 Senior Center Parking Expansion/Pea Patch (Old Shop Site)
81 ierra Heights/Glencoe Neighborhood Park Acquisition
9: Golf Course Acquisition
10� Sports Park Acquisition
11 . Heather Downs Neighborhood Park Development
12. Talbot Hill/Springbrook Neighborhood Park Acquisition
131. East Kennydale Neighborhood Park Acquisition
14. Mothers Park Recreation Center Renovation
15. Tiffany Park/Benson Hill Neighborhood Park Acquisition
161. Covered P l aycourts
17. Cushion Turf Field -
I
' PAGE 23
PROJECT 7
i I
DEPART ENT: PARKS 6 RECREATION DEPT. PRIORITY 1
CAPITA PROJECT: GENE COULON MEMORIAL BEACH PARK
ESTIMA ED COST: TOTAL $ 9,000,000
40,000 Fee Simple
ACQUISITION. $ 8,000 Easements
DEVELOPMENT $8L95_ 2. 000
FINANCI G: 1) G.O. Bonds - $7,825,000
� I
2) Land 6 Water Conservation Funds - $706,000
3) Investment Earnings - $469,000
OSTENSI;LE ASSETS: 1)
2)
3)
BACKGROUND:
TIe City acquired the park site between 1955 6 1972 utilizing land trades, Forward
Thrust Bond Issue Funds, HUD Open Space Funds, and City Funds. The citizens of
Rento approved a $7,825,000 Bond Issue to develop the park in the 1979 primary election,
of which $6,000,000 have been sold to date. Completion of the park development project
isl sl ted for late summer, 1982.
POTENT! L SITE: (location, cost, zoning)
Locat d on the southeast corner of Lake Washington, the site is currently in City
ownership. Portions of the site are zoned R-1, R-3, and G. There is no available
lake front property available on this scale for similar development in the City of
Rei ton.
COST BE EFIT ANALYSIS:
The City of Renton residents have placed a high priority on completing this project
and re ffirmed their willingness to support the M60 costs by approving a Bond Issue
fol. de elopment in the fall'of 1979. It would be fiscally irresponsible not to proceed
as rapidly as possible so that funds committed will be maximized negating the high
inflationary trends. The purchase of the land in question, primarily with Federal HUD
funds, precludes use of the land for any other purpose than recreation.
Estimated M60 Costs - $110,000
OPTIONS:
1) No Action.
2) Do only part of the project at this time. -
3) Conplete the project by selling the remainder of the Bonds.
1
•
PAGE 24
PROJECT 8
DE ART ENT: PARKS b RECREATION DEPT. PRIORITY # 2
I� •
CAPITA PROJECT: HEATHER DOWNS NEIGHBORHOOD PARK ACQUISITION - 10 acres
ESITIMA ED COST: TOTAL $ 240,000
.11
ACQUISITION $ 240,000
DEVELOPMENT $
FINANCING: 1) Park Acquisition Fund - #1689
2) County-wide Bond Issue - Proposed for 1982
' 3) Use agreement with City water utility for joint use of existing
utility land on Union.
4) Community Facilities Fund •
OSTENSIBLE ASSETS:
1) $36.000 from sale of Highlands Public Use Area
2) '
BACKGROUND: •
�IThe 'cquisition of this park site is designated as the number one acquisition
prio ity in the City of Renton Comprehensive Park and Recreation Plan.
l
POTENTIAL SITE: (location, cost, zoning)
,Heat er Downs area of Renton (neighborhood #8 - City of Renton Comprehensive Park
and 'ecreation Plan).
COST/BENEFIT ANALYSIS:
II i�
Cost of land in this area it escalating rapidly while the number of viable potential
jsite is rapidly vanishing. Acquisition at this time would be fiscally prudent and
oul. insure the City's ability to provide future park services in the area at the
time when development is mandated.
• Esti ated M&O Costs -• $2,000 undeveloped
$40,000 developed
1
•
OPTIONS:
11) o action (service area with existing facilities at Kiwanis Park)
I) •urchase smaller site.
3) ork with City.utilities to develop existing utility site in area.
i I i
PAGE 25
PROJECT 9
DE'ARTMENT: PARK 6 RECREATION DEPT. PRIORITY # 3
CA'ITAL PROJECT: CEDAR RIVER PARK COMMUNITY CENTER
ESTIMATED COST: TOTAL $ 4,100,000
ACQUISITION $
DEVELOPMENT $ 4,100,000
1
FINANCING: 1) Potential County Bond Issue - 1982
1 2) City Funding - G.O. Bonds
3)
' OS'ENSIBLE ASSETS: 1)
2)
3)
BAKGROUND:
geed for this facility is established in the Renton Comprehensive Park 6 Recreation
lan. Existing facilities are outdated and need major renovation. This physical/
ultural arts facility would compliment the existing performing arts facility (CARCO
THEATRE) giving Renton a Recreational Civic Center.
POTENTIAL SITE: (location, cost, zoning)
Cedar River Park (currently in City ownership).
11
COST/BENEFIT ANALYSIS:
st of construction continues to escalate rapidly while the need for such community
acilities continues to grow. Several revenue generating facilities are included in
1 he proposed project to help offset M60 costs. The proposed location is a good example
market place approach to providing recreation services.
Estimate M60 costs $200,000 (up to 40% of this could be offset by revenue).
OPTIONS:
1) No Action (serve City with existing facilities). •
Remodel and substantially upgrade existing facilities for short term benefit.
3) Construct the facility• In phases.
1
1 PAGE 26
1 PROJECT 10
I DEP RTMENT: PARKS & RECREATION DEPT. PRIORITY # 4
I�
CAPITAL PROJECT: LIBERTY PARK COMMUNITY BUILDING
i
ESTIMATED COST: TOTAL $90,000
ACQUISITION $ -
DEVELOPMENT $ 90,000
FINANCING: 1) HECD - $43.500
1
2) City Funds - $46.500
3)
OSTENSIBLE ASSETS: 1) $90,000 currently budgeted (source noted above) j'
2)
3)
BACKGROUND:
Libe ty ParkCommunity Building is the Ci.ty's old senior center and currently
is u-ed for Developmentally Disabled Programming, Arts & Crafts Classes, meeting
neig borhood summer playground program, and special events such as the 4th of July
cele•ration and flower shows. Part of the building was constructed around 1914 and
'leno ation is necessary for continued use.
. j .
POTENTIAL SITE: (location, cost, zoning)
Libe ty Park.
COST/B:NEFIT ANALYSIS: 1
the igh cost of new construction continues to make renovation a viable alternative
and nflationary trends indicate more of the same. Renovation with an eye to re-
dire 4ted functions is necessary at this time to make the facility more usable and
to p event further deterioration of the building.
i
.
1 1 OPTION
1) Action (continue current limited use until such time as the condition merits .
1 demolition). 1
2) 'emolish and rebuild as needed. , '
.
I
I I
I I i
PAGE 27
PROJECT 11
DEPARTMENT: PARKS b RECREATION DEPT. PRIORITY # 5
CAPIT L PROJECT: RENTON HIGH SCHOOL ATHLETIC COMPLEX
ESTI 'TED COST: TOTAL $ 450,000
ACQUISITION $
DEVELOPMENT $ 450,000
FINA CING: 1) City - No funds currently budgeted.
2) Renton School District - No funds currently budgeted,
3) IAC - Potential for 50% funding/restrictive
OSTE SIBLE ASSETS: 1) NONE
2)
3)
BACKfROUND:
Thi City and School District work very closely together in providing joint use of
pulpit facilities for educational/recreational use. The co-development and mainten-
a4e of Renton High School will result in total community use of badly needed facilities
and is a cost effective approach for the community.
POTENTIAL SITE: (location, cost, zoning)
Renton High School
it
' I
COST BENEFIT ANALYSIS:
By co-developing this nine (9) acre school site, the City will be saving itself the
cot of acquisition of land since the land in question is already in public ownership.
Co development and maintenance also saves the City long term capital and MS0 costs when 1
co pared to the alternative of developing and maintaining City owned property.
OPTIONS:
1) No Action (service area with existing facilities).
2) Acquire, develop, and maintain City property to meet active sports needs of the City.
3) Phase the development of the site working with the Renton School District to provide
1 both capital and maintenance costs.
I -_
PAGE 28
PROJECT 12
DEPARTMENT: PARKS & RECREATION DEPT. PRIORITY # 6
CAPITAL PROJECT: HIGHLANDS ADMINISTRATION BUILDING RENOVATION
ESTIM'TED COST: TOTAL $ 250,000
ACQUISITION. $
DEVELOPMENT $250,000
FINAN ING: 1) City - No funds currently budgeted.
2) H&CD - Facility identified in three (3) year H&CD Plan.
3) EDA - If program refunded and Oroiect selected.
OSTEN IBLE ASSETS: 1) NONE •
2)
3)
BACKGI OUND:
' This building has been used for a variety of governmental functions over the years
and has deteriorated with age. Current use is as a recreation facility and water
shop maintenance. Future use. is anticipated to include recreation with the Water
Division moving to the new City Shops. The Facilities Maintenance Division of the
Park Department ( includes all City buildings ) will then be housed in this area.
POTENTIAL SITE: (location, cost, zoning)
1 Highlands Administration Building
800 Edmonds Ave. N.E.
Renton
CiOST/BENEFIT ANALYSIS:
They high cost of new construction continues to make renovation a viable alternative
and inflationary trends indicate more of the same. Inclusion of Parks and/or
Facilities Maintenance units in the new shops appears to be financially infeasible
at this time and for the near term. Renovation with an eye toward redirected functions
is called for at this time to prevent further deterioration of the building.
OPTIsNS:
1) No Action (continue current use until building condition is such that it must
be vacated).
.2) Demolish building and rebuild as needed.
3) Renovate the building in phases.
PAGE 29
PROJECT 13
DEPARTMENT: PARKS 6 RECREATION DEPARTMENT DEPT. PRIORITY # 7
CAPITAL PROJECT: SENIOR CENTER EXPANSION& PEA PATCH
I
ESTIMATED COST: TOTAL $ 100.000
ACQUISITION, $
DEVELOPMENT $ 100.000
•
•
FINANCING: 1) H6CD - Area is located in NSA
2) IAC Development grant (unlikely) •
3) City - No current funding
OSTENSIBLE ASSETS: 1) NONE
2)
3)
BACKGROUND:
The City shops currently located on the site are slated to be moved within the next
two (2) years. The Renton Senior Center has inadequate parking to meet even current
demands. Forty new spaces are contemplated. The remainder of the land will be kept
in a eyance for future City needs as determined by the City Council. Proposed interim
use is as a pea patch for all Renton residents.
POTENT AL SITE: (location, cost, zoning)
City of Renton Public Works Shop site.
•
COST/BENEFIT ANALYSIS:
i
The cost of acquiring land and developing additional parking in the vicinity of the
Center would be extremely high and would probably involve condemnation. There is
little or no land available in the area for current and future city needs. Parking
is at a premium at the Center even with public transportation (Metro) and car pooling.
The pea patch should be self-supporting and involves the least amount of capital outlay
for jnitial development.
Esti ted M60 - $6,000 (includes operation of maintenance building)
OPTIO
1) 4o action (leave Shop land as is).
i
2) Work within existing parking constraints and encourage car pooling and improvement
of public transportation.
•
•
PAGE 30 '
PROJECT 14
•
DEPAR MENT: PARKS E RECREATION DEPARTMENT DEPT. PRIORITY # 8
CAPIT L PROJECT: SIERRA HEIGHTS/GLENCOE NEIGHBORHOOD PARK ACOUISITION - 10 Acres
ESTI TED COST: TOTAL $ 240,000
ACQUISITION. $240,000
DEVELOPMENT $
FINANCING: 1) Community Facilities Fund
I ,
2) Proposed, County Park Bond Issue - 1982
3) IAC Funding - Potential 60-75%
OSTEN IBLE ASSETS: 1) NONE
2)
-- 3)
BACKGROUND:
Si rra Heights/Glencoe Neighborhood Park acquisition is identified in the City's
Co prehensive Park & Recreation Plan as a high priority. The City constructed
G1 ncoe Tot Lot in 1978 as an interim measure but it is wholly inadequate to meet
th! demand. King County has a 4.7 acre site on the western boundary of this neigh-
borhood outside of the City limits.
TOTE TIAL SITE: (location, cost, zoning) •
1I Si rra Heights/Glencoe area of Renton (neighborhood #11 - City of Renton Comprehensive
Pa k E Recreation Plan).
•
•
OST/BENEFIT ANALYSIS:
1
The availability of land suitable for neighborhood park use is rapidly dwindling and
inflation is driving acquisition costs up rapidly. The purchase of property now that '
is suitable to meet future recreational needs is responsible from a growth management
perspective as well as a fiscally sound investment.
Estimated ME0 Costs - $2,000 undeveloped
$40,000 developed
OPTIINS:
•
1) No Action (serve area with existing facilities).
2) Work with King County to enlarge their present site.
3) Work with King County and the Renton School District for a Joint development
program using County park and School District lands.
PAGE 31
PROJECT 15
DEPARTME T: PARKS E RECREATION DEPARTMENT DEPT. PRIORITY # 9
I
CAPITAL -ROJECT: GOLF COURSE' ACQUISITION
III I
ESTIIMATE' COST: TOTAL $ APPRAISAL IN PROCESS
ACQUISITION $ 3.275.000
DEVELOPMENT $
FINANCI G: 1) G.O. Bonds,
2) Proposed County Park Bond Issue - 1982
3)
OSTENSI:LE ASSETS: 1) NONE
2)
3)
BACKGROUND:
The City is interested in preserving or providing a Golf Course in the Renton area.
Earlipton Golf Course is slated for development as an industrial park area in the
irrtnedate future. Development pressure on Maplewood Golf Course merits an investigation
into the potential acquisition by the City.
POTENTIJL SITE: (location, cost, zoning)
1. M plewood Golf Course (Maple Valley Highway).
2 G neral Renton area if a new course were to be acquired and developed from scratch.
COST/B NEFIT ANALYSIS:
Tie acquisition of Golf Courses must be approached in a very careful manner and generally
only When the private sector, for whatever reason, no longer finds it feasible to market
Golf Course operations. A market place approach to purchasing or developing Golf Courses
should be adhered to with an eye to other functions the course can provide such as open
sipac or urban buffering. If the course can generate sufficient revenues to pay for its
annual operation and long range capital requirements, the cost to the general public is up '
iron in the acquisition and does not present an ongoing burden on the taxpayers. In
retu n, the opportunity for the average citizen to participate in golf as a recreational
outl t is preserved with the user footing the annual M60 costs and usually valuable open
gree space is added or preserved.
OPTION :
) o Action (allow normal private sector supply and demand to dictate the availability
2) df Golf. Course). •
ope for inclusion of,a Golf Course in the Renton area in the 1982 proposed County
Bond Issue then hope the issue is successful. -
3) Work with potential developers of such land to preserve a nine (9) hole course.
1
PAGE 32
PROJECT 16
DEPARTMENT: PARKS 6 RECREATION DEPARTMENT DEPT. PRIORITY II 10
CAPIT L PROJECT: SPORTS PARK ACQUISITION/20-30 Acres
•
ESTIM TED COST: TOTAL $ 450.000
ACQUISITION $450.000
DEVELOPMENT $
FINAN'ING: 1) City -.No funds currently budgeted.
2) IAC - Potential for 60-75% funding.
3) Proposed County Park Bond Issue - 1982.
4) Community Facilities Fund.
OSTEN IBLE ASSETS: 1) NONE
2)
3)
BACKGROUND:
The City has been impacted by tremendous growth in team sports such as soccer, softball,
and baseball with the result that existing facilities are overused and damaged.
POTENTIAL SITE: (location, cost, zoning)
Site could be located in either the northeast or southeast planning quadrant of
Renton as service area access and land availability are optimum in these areas.
i
I
•
COST/�ENEFIT ANALYSIS:
Th cost of repairing existing turf fields that receive multi-sport use is substantial,
especially those exposed to soccer use in the winter. Some fields will eventually have
tobe totally renovated 'if we continue (Liberty Park had to be totally renovated in
1973).
OPTI'NS:
1) No Action (provide existing level of services).
2) Work with King County and/or Renton School District to acquire property and/or
develop existing properties.
3) Acquire and develop smaller sites.
I -
PAGE 33
PROJECT 17
•
•
DEPART ENT: PARKS & RECREATION DEPARTMENT DEPT. PRIORITY # 11
CAPITA_ PROJECT: HEATHER DOWNS NEIGHBORHOOD PARK DEVELOPMENT
ESTIMATED COST: TOTAL $ 400,000
•
ACQUISITION $
DEVELOPMENT $ 400,000
FINANCING: 1) City -.No. funds currently budgeted
2) IAC - Potential for 60-75% funding.
3) Proposed ,County Park Bond Issue - 1982.
4) Community Facilities Fund
0STEN IBLE ASSETS: 1) NONE
2)
3)
•
BACKG'OUND:
'The need for developing this site is established in the City of Renton Comprehensive
Park E Recreation Plan. Recent development of multi-family units in the area and
:development pressures in general mandates completion of this project.
1
•
•
POTEN71AL SITE: (location, cost, zoning)
Hea her Downs area of Renton (neighborhood #8 in the City's Comprehensive Park
and Recreation Plan)
• COST/ ENEFIT ANALYSIS:
•
De elopment at this time would help to negate the impact of inflation on this project.
Since a final site has not been selected and the availability of easily developed sites
is diminishing rapidly, final construction costs could contain an inordinant amount of
si e corrective measures adding to the project's costs.
1
OPTIoNS:
1) No Action (service area with existing facilities).
2) Develop utility land in area or combination utility-City.
3) Continue to work with developers to include recreational facilities in their
developments.
PAGE 34
• PROJECT 18
•
DEPARTMENT: PARKS & RECREATION DEPARTMENT DEPT. PRIORITY # 12
CAPITAL PROJECT: TALBOT HILL/SPRINGBROOK NEIGHBORHOOD PARK ACQUISITION - 10 Acres
ESTIMATED COST: TOTAL $ 240.000 '
ACQUISITION $ 240,000
DEVELOPMENT $
FINANCING: 1) City -'No funds currently budgeted.
2) IAC - Potential for 60-75% funding.
3) Proposed County Park Bond Issue - 1982.
•
4) Community Facilities Fund
OSTENSIBLE ASSETS: 1) NONE
2) •
•
3)
BACKGIROUND:
Th need for acquiring a site for a neighborhood park in this area of Renton is
called for in the City's, Comprehensive Park & Recreation Plan:
' I ,
FIOTEhTIAL SITE: (location,, cost, zoning)
Talbot Hill/Springbrook area of Renton (neighborhood #4 in the City's Comprehensive
Pa & Recreation Plan).
COST/BENEFIT ANALYSIS:
Acquisition at this time would help to negate inflationary trends and insure better
options for potential sites. Site availability is declining as growth occurs.
Es imate M&O Costs - $2,000- undeveloped
$40,000 developed
•
O
PTI'NS:
1) No Action (service area with existing facilities).
2) Purchase smaller site.
3) Work with King County Parks to secure land.
! , 4) Look for opportunities to work with developers to set aside land.
' PAGE 35
PROJECT 19
DEPAR MENT: PARKS 6 RECREATION DEPARTMENT DEPT. PRIORITY N 13
CAPIT'L PROJECT: EAST KENNYDALE NEIGHBORHOOD PARK ACQUISITION
•
ESTIM TED COST: TOTAL $ 250,000
ACQUISITION. $250,000
DEVELOPMENT $
FINANCING: 1) City - No funds currently budgeted.
2) IAC - Potential for 60-75% funding.
3) Proposed County Park Bond Issue - 1982.
4) Community Facilities Fund
OSTENSIBLE ASSETS: 1) NONE
I
2)
3)
BACKG'OUND:
The need for acquiring an East Kennydale Neighborhood Park is established in the City's
( Comprehensive Park 6 Recreation Plan.
i
POTENTIAL SITE: (location, cost, zoning)
Ea-t Kennydale area of Renton (Neighborhood #13 - City of Renton Comprehensive Park
an• Recreation Plan).
•
LOST/ ENEFIT ANALYSIS:
Acquisition now would help to negate inflationary trends and secure land suitable for
th- intended purpose. Cost savings for acquisition and development will be realized
by purchasing now.
OPTI'NS:
1) No Action (service area with existing facilities). -
2) Purchase smaller site.
3) Lookfor opportunities to work with developers to set aside land.
PAGE 36
PROJECT 20
DEPA' MENT: PARKS t. RECREATION DEPARTMENT DEPT. PRIORITY # 14
CPI AL PROJECT: MOTHERS PARK RECREATION CENTER RENOVATION
•
ESTI ATED COST: TOTAL $ 750,000
ACQUISITION $
DEVELOPMENT $ 750,000
FINA CING: 1) City - No funds currently budgeted.
2) Proposed County Park Bond Issue - 1982.
3) H&CD Funds.
4) Community Facilities Fund
OSTE SIBLE ASSETS: 1) NONE
2)
3)
BACKGROUND:
Mothers Park Recreation Center was constructed in 1939 and has served the City for
ov-r 40 years. It is still heavily used and badly needed and if renovated and added
to could continue to serve the City for the foreseeable future.
POTE TIAL SITE: (location, cost, zoning)
Mo hers Park (already in City ownership).
COST/BENEFIT ANALYSIS:
T ere is an obvious financial benefit to the City to renovate this facility. The
c.st of replacement would be at least four times greater. The park was donated to
t e City for recreational use only so it would be wise to maximize its capacity to
p ovide recreational opportunities.
E timate M&0 Costs - $12,000
OPTIONS:
1 No Action (provide existing level of services until building is no longer usable).
2 Phase renovation with annual capital program.
3 Complete feasibility study, a Master Plan, and renovate the building.
PAGE 37
PROJECT 21
DEPARTMENT: PARKS 6 RECREATION DEPARTMENT DEPT. PRIORITY # 15
CAPITAL PROJECT: TIFFANY PARK/BENSON HILL NEIGHBORHOOD PARK ACQUISITION/ 7-10 Acres
ESTIMATED COST: TOTAL $ 240,000
ACQUISITION. $240,000
DEVELOPMENT $
FINANCING: 1) City - No funds currently budgeted.
2) Proposed County Bond Issue - 1982.
3) IAC - Potential for 60-75% funding.
4) Community Facilities Fund.
OSTENSIBLE ASSETS: 1) NONE
2)
3)
BACKPROUND:
Th- need for a neighborhood park in this area was established in the City's
C. prehensive Park and Recreation Plan.
I ,
POTE TIAL SITE: (location, cost, zoning)
Be son Hill area of Renton (Neighborhood #5 - City of Renton Comprehensive Park
an• Recreation Plan).
I �
COST BENEFIT ANALYSIS:
Th� rapidly escalating cost of land in this area along with a limited number of
potential sites makes early acquisition a critical issue. It is in the City's
best interests to begin implementation of and aggressive program to secure park
si es for future development.
Es imate M60 Costs - $2,000 undeveloped
$40,000 developed
OPTIONS:
1) No Action (service area with existing facilities).
2) Purchase smaller site.
3) Work with King County and/or the Renton School District to Jointly secure land
and/or make better use of existing public owned land.
I PAGE 38
- PROJECT 22
1
i
I
DEPARTMENT: PARKS & RECREATION DEPARTMENT DEPT. PRIORITY d 46
CAPIT L PROJECT: COVERED PLAYCOURTS/PHILIP ARNOLD, KIWANIS,_ TIFFANY, TALBOT HILL, AND
KENNYDALE LIONS PARKS.
EISTIM TED COST: TOTAL $ 250,000
ACQUISITION $
DEVELOPMENT $250,000
FINANCING: 1) City - No funds currently budgeted.
I
2)
3)
I
OSTENSIBLE ASSETS: 1) NONE
2)
3)
BACK ROUND:
Weather conditions in this area mandate extensive use of indoor or undercover
facilities. Dual use for inclement weather picnic shelters is anticipated.
FOTErTiAL SITE: (location, cost, zoning)
Ph lip Arnold Park/Kiwanis Park/Tiffany Park/Talbot Hill Park/Kennydale Lions Park -
all in City ownership.
COST/BENEFIT ANALYSIS:
These structures have dual use capabilities and are a viable alternative to buildings
wh ch are far more expensive to maintain and operate.
• Es imate M&O Costs - $5,000
OPTIONS:
1) No Action (serve areas with existing facilities).
2) Complete Philip Arnold and Kennydale Lions Parks projects only (others are
located near school gyms).
3) Complete projects on phased basis.
1
' PAGE 39
PROJECT 23
DEPARTMENT: PARKS b RECREATION DEPARTMENT DEPT. PRIORITY # 17
CAPITAL PROJECT: CUSHION TURF FIELD
ES(TIWTED COST: TOTAL $100,000
ACQUISITION. $100,000
DEVELOPMENT $
FPNANsING: 1) City -.Currently there is no allocation.
2) Proposed County Park Bond Issue - 1982.
3)
OSTEN IBLE ASSETS: 1) NONE
2) ,
3)
BACKG'OUND:
Fal -winter sports are currently wrecking havoc on our turf fields causing undue
mai tenance and associated costs. One way of meeting this demand is the installation
of - cushion turf field at Philip Arnold Park which has existing lighting.
POTEN IAL SITE: (location, cost, zoning)
Philip Arnold Park.
COST/ ENEFIT ANALYSIS:
Co r struction of this facility would make multiple, year-round use of existing park
property possible using 'an existing sports lighting system. It would lessen MSO
Cots while increasing use-potential.
Estimate MS0 Costs - $4,000
' I
I I .
OPTI'NS:
1) Purchase,and develop additional property.
2) No Action (use existing facilities). •
3) Work with the Renton School District to develop and maintain unusable School
lands. '
- I
PAGE 40
PROPOSED POLICE DEPARTMENT PROJECT
li. Construct Office Building and Garage
•
_ I
RECEIVED PAGE 41
JUN 8 1981 PROJECT 24
CITY OF RENTON
i MAYOR'S OFFICE
DEP.RTMENT: Police DEPT. PRIORITY # One (1)
CAPITAL PROJECT: Construction of 9,600.square.foot.office building and garage • .
over.the existing police parking lot
JEST MATED COST: TOTAL $ . . .861,144
ACQUISITION$ .none . . . .
DEVELOPMENT $. 861,144
FIN NCING: 1) Councilmanic Bonds . . . . .
2) General Obligation Bonds . .
3)
IOST:NSIBLE ASSETTS: 1) none
2)
3)
BACKGROUND: In October 1968 the Renton Poice Department moved into its present
location. At that time the police department had (51) officers and (10) civilian
e ployees and the building space allocated to the police department was adequate
fcr the department's needs at that time. As we progressed from 1968 to 1981, the
p lice department has added personnel and has had tomake changes within the building
to accommodate the department's growth. Several areas have been enclosed to make
additional office space. The additional space was needed as the department has
gOwn to (59) commissioned personnel and (20) civilian personnel. Many of the
personnel added have been in the Support Services such as the Detectives, Jail,
Photography Laboratory and Records. As each necessary support position was added,
4ace inside the police department had to be found. Support areas that have been
a+ded are: (1) Training Section
2 Research & Development Division
(3) Narcotics Unit
(4) Investigations Clerk
(5) Community Relations Section
(6) Polygraph Section
(7) Juvenile Detective
(8) Increase in Detective Division from (4) man division to (10)
man division (Narcotics and Juvenile not included in this figure).
(9) Chief Clerk
The police department at the present time is overcrowded due to the increases in
staff listed above. With the projected increase in the City by future annexations
and proposed buildings (through April'81, 96-single family houses, 362-multiple
units, and 6-commercial units have been built with 1,790 multiple family units
proposed to be built in 1981 or early 1982) the police department has reached a
critical point in its need for additional space.
POT NTIAL SITE: (location, cost, zoning)
Parking lot currently used for parking police vehicles located on the
leas side of the present City Hall building. No cost for property acquisition
bec use the City owns the site and it is currently zoned for such a building.
COSIT/BENEFIT ANALYSIS: The proposed building would allow for an orderly expansion
o� the police department and allow for additional security for police vehicles. In
reducing the overcrowding it would allow for more efficient use of manpower as there
Would not be continual interruptions for persons who share offices.
_ I �
ccntinued-
•
1t
PAGE 42
PROJECT 24
OPTIONS: 1. Find additional office space either in City Hall
or located in another facility.
2. Add portable buildings or trailers on a temporary
basis.
3• Do nothing - which could result in less efficiency
within the support and field divisions due to
overcrowding.
I '
PAGE 43
PROPOSED LIBRARY DEPARTMENT PROJECT
7 . Renton Main Library Remodeling and Second Floor Addition -
1
. i
RECE1y ,9E T 25
JUN 29 1981
CITY OF RENTON I
`_. "—--— -- -. MAYOR'S OFFICE
PEPA TMENT: LIBRARY DEPT. PRIORITY / l
RENTON PUBLIC LIBRARY Remodeling & Second Floor Addition
CAPITAL PROJECT:
•
ESTI TED COST: TOTAL $ 574,148
. Acquisition $
Development $ 574,148 '.
FI NCING: 1) Cumulative' Reserve Fund for Library Facilities' Planning,
2) Acquistion, Improvements and Construction.
3)
•
OST NSIBLE ASSETS: 1) Cumulative Reserve Fund #3390 ----$10,258.92
2)
3)
'1 BACKGROUND:
Se Floor Addition $222,394 Energy Conservation $22,942 Repairs $33,737
Bo kstacks (steel) $ 25,222 Equipment/Furniture $17,790 Carpet $47,283
Bogk Security System $ 14,043 Circulation Control -System $42,000
Wa�slhington Library Network (Computer System Services) $27,960
Heating/Cooling System (Energy efficient beat pump) $115,000
(POTENTIAL SITE: (location, cost, zoning)
1 Renton Public Library -- Building includes a roofed clearstory area of 3,000
1 square feet planned as a future second floor addition.
COST/BENEFIT ANALYSIS:
^ Addition will provide needed book storage capacity for a collection that will meet
molt needs of Renton residents and provide for future growth of City. Access to a
computer network at the State level and automated circulation control system will
- enable existing staff to meet increased demands for service; a cost avoidance measure.
Bobk security will cut losses and provide patrons with more reliable service. All
! I energy conservation and heating/cooling system projects will be analyzed on a life
' cylcle cost basis to provide maximum benefit. Most of the repair items are security
and safety items which will upgrade the building to meet the current building and
fire codes. These changes and repairs will benefit and protect the public and the
OP'IONS: building.
Heating/Cooling System - Weigh against potential energy savings, comfort of
library users which are more and more adult as the
profile of the City changes, and preservation of books
in a controlled environment.
I I
PAGE 45
PROPOSED FINANCE DEPARTMENT PROJECT
1 . Purchase New Computer System
PAGE 46
PROJECT 26
PT PRIORITY DCPAR MENT: Finance ' DEPT. # t
•
CAPITAL PROJECT: Purchase New Computer System
ESTI TED COST: ; TOTAL $ 200,000
ACQUISITION $ 200,000
DEVELOPMENT $
F1NAN;ING: 1) $134,420 budgeted in 1981 supplemental budget
2) General Revenue
3)
OSTENSIBLE ASSETS: 1) Existing equipment (NCR Century 101). trade-in value $11,500.
I 2)
3)
BACKGROUND: The City has had its existing system (NCR Century 101) since 1976. The
pure ase price for this equipment was $138,458. The final payment was made in 1979.
hil this system is still performing well and meeting the basic needs of the city,
down ime has steadily increased as the machinery has aged. The Century 101 has logged
Over 12,000 operating hours to date.
In t e 1981 budget, funds were allowed for consultants to study the computer needs of
the ity. The results of this study are due in September, 1981. The 1981 budget also
earmarked $134,420 in an acquisition fund so that the equipment could be purchased as
soon as the needs assessment was complete.
POTE TIAL SITE: (location, cost, zoning)
COS BENEFIT ANALYSIS: Presently, files are updated as much as a week after transactions
occ r, leaving departments without current information in the interim. An interactive
system would allow immediate updating of files, giving the using departments instant
acc ss to account information.
Sine all input would be .via CRT's, a new system would eliminate the need for punch
cards, an annual $1,500 expenditure. Paper requirements would also be reduced
significantly as users would gain much of their information directly through their CRT's.
Even though repair costs are covered by an annual maintenance contract, increased down-
' time will eventually affect crucial deadlines like payroll, vendor payments, utility
bilrngs, etc.
•
OPTIONS: 1. Budget funds for acquisition at a later date.
2. Investigate contracting for computer services.*
3. Lease new equipment.* '
* These options will be addressed in the consultants report.
PAGE 47
PROPOSED PROJECTS TO BE DEVELOPED
BY MORE THAN ONE CITY DEPARTMENT
1 . Maintenance Shop Facilities
2. Cedar River Trail Acquisition
13. Burnett Pedestrian Corridor Acquisition
'4. Burnett Pedestrian Corridor Development
5. City Entry Point Enhancement
6. Cedar River Trail Development
17. Wetland Acquisition
'8. Lake Washington Boulevard Bikeway
PAGE 48.
PROJECT 27
c
DEPARTMENT: Public Works DEPT. PRIORITY / •
CAP TAL PROJECT: Maintenance Shop Facilities
.,EST MATED COST: TOTAL $ 4,765,628
REL TED COSTS: Acquisition $ 614,503
-, $100,000 1/2t Gas Tax Project Architect $ 190,000
1 on Monroe Ave. NE Development $ 3,961,125
$15,000 Furnishings - Contingency Fun]
FINANCING: 1) Balance remaining in '316' Fund $ 609,000
i 2) Utility Bond Issue allocation $ 240,000
3) Councilmanic Bonds $1,800,000
$2,649,000 Total
OSTENSIBLE ASSETS: I) Existing shop site 6 building
2)
3)
OACKGROUND:
New offices, shops, garage, storage and vehicle parking facilities to be built on
site purchased from King'County - south of NE 4th Street and east of Monroe Ave. NE,
adj cent to the new County Shops. Will house Maintenance Administration; Street/
Stotm Sewer/Sanitary Sewer/Water System Maintenance crews plus Central Garage/
Equipment Rental, Sign 6 Paint crew, Carpentry Shop, Survey Crew and Signal/Communications.
cr Document storage will be included together with space for Police Department
11evi ence storage and vehicle searches.
PO ENTIAL SITE: (location, cost, zoning)
1As escribed above - cost of $450,000 plus 8.4% interest; downpayment (already paid)
$45,000 + 10 annual payments of $61,450.37. Combined total $614,503.70.
CO T/IENEFIT ANALYSIS:
N t available. However', it will take many years of improved efficiency to
anortize the multi-million dollar. cost. The selected site is not as conveniently
1•cated relative to the CBD area, etc., and the NE 4th Street/NE 3rd Street corridor
will often be a problem because of traffic density.
OP IONS:
1 Continue to use existing shops. Continue to house Water Maintenance in
'temporary' leased property.
2 Continue to use existing shops but purchase or construct a building for Water Maint.
3 Downgrade the proposed New Facilities in size and features - commit to a
long-range "Add-On" program over several years.
PAGE 48a
PROJECT 27
Proposed New Maintenance Shop Facilities
1 ., Right-of-Way (Acquisition) Costs
Purchase of site from King County $ 614,503
2. Development Costs
Architect Fees - Design & Construction Inspection $ 190,000
Entry Roadway $ 170,000
Water Main System $ 150,000
Site Development
(paving, storm drainage, roads, landscaping, $ 555,000
lighting, fencing)
Buildings , covered parking, gas pumps, car wash $3,076,125
Latecomer Fees: Sewer System Hook-up $ 10,00,0
$4,765,628
•
PAGE 49
PROJECT 27
' I
ASSET # 5
Site: Present City Shop Site
slue --
!
land: $348,500
improvements:
Total: 5348,500 ($4.00 sq. ft.)
Zoning: L-1
Size --
land area: 2 ± sq. ft. or acres
improvements: sq. ft.
sq. ft.
sq. ft.
'ppraisal Date: April, 1980
Notes: (background, comments, restrictions)
The improvements that are currently located on the site
would probably not add to the value of the property since
the highest and best use of the site is probably medium
density residential.
PAGE 50
PROJECT 28
DEPARTMENT: Planning DEPT. PRIORITY * 2
CAPITAL PROJECT: Cedar River Trail Natural Zone - Acquisition
ESTIMATE COST: Total $
Acquisition: Parker property - $250.000 (al ready acqui red)
Thomas property - $260.000
Development: (See development proposal In Parks
Department section.
FINANCING: 1) General City Revenues
2) IAC Grant Provisions
3) H/C D Block Grant
OSTENSIBLE ASSETS: 1) 24 square feet acres acquired between 405
and Cedar River BN Bridge
2)
3)
BACKGROUND:
The City has previously purchased 24+_acres representing approximately 7,000
feet of r ver frontage. The proposed extension east to the C ount y's Cedar River
Park will link nearly 4 miles of riverfront linear trail and recreational opportunities.
Acquisition of the two remaining parcels could add between 35 and 90 acres
of open pace, trail and varied recreational facilities.
POTENTIAL SITE: (location, cost, zoning)
The Parer parcel could consist of between 24 and 46 acres. The site is zoned
SR-land a prior condemnation action set the value at $176,000. Additional site
area is currently being negotiated. The Thomas parcel is unincorporated with
a value of $260,000 proposed. Appraisal of the 50+_acre site will be required
to confirm the cost estimate.
COST/BENEFIT ANALYSIS:
The proposed purchase will partially off-set the need for active recreation sites.
Acquisition costs of neighborhood park acreage typically exceed $40,000 per
acre. The proposed purchase is expected to cost approximately $8,000 per acre.
OPT9075:
No_irofect: Loss of utility of parcels 3, 3A, 3B consisting of 3+ acres.
Parker Parcel only: If sufficient area and/or access can be obtained, the Cedar
River Trail system could terminate at this location.
'
'
�
�
PLOT
PAN t
wevan
MANIC
sot
Parker- Property.
1710
CEDAR RIVER TRAIL NATURAL ZONE
� c- `p
m >
p u)
� + m
' CO �
PAGE 52
DEPARTMENT: Planning DEPT. PRIORITY s 3 - PROJECT 29
CAPIT L PROJECT: Burnett Corridor-Senior Housing
ESTIMATED COST: Total $ 400,000
Acquisition: $ 400,000
Development: Housing Authority (future)
FINAN , ING: 1) H/CD Block Grant
2) Department of Housing and Urban Development
(future construction)
3)
OSTENSIBLE ASSETS: 1) $60,000 H/CD 1982 Grant
2) $60,000 H/C D 1982 Match
', If housing Implemented
3) Property owner agreeable to purchase proposal
BACKGROUND:
The Bu nett Corridor—Senior Housing project Is the final link in redevelopment
of the N railroad line formerly located on Burnett Avenue South. This H/CD
Block rant project calls for site acquisition for expansion of Cedar Terrace
to be aiccomplished by the Housing Authority at a future time. Pedestrian access
from tl1e Cedar River Trail to the central business district is also contemplated.
1
POTENTIAL SITE: (location, cost, zoning)
The' site is the former BN railroad right-of-way between Burnett Avenue South
and ILogan Avenue South, north of South 2nd Street. The two prime parcels are
the northerly one-half consisting of approximately one and one-half acres. A
June, 1981, appraisal places the value at $225,000 for this area. The current
L-1 zoning allows multiple family development..as proposed.
CQ/BENEFIT ANALYSIS:
Costs cf other sites conveniently located to the Cedar Terrace development and
Senior Center are anticipated to be twice as great. Availability of alternate
sites is very limited in the Central Business District area. Use of this site provides
for ]needed redevelopment of the existing eyesore.
I
Oki S
No ro ect: Potential loss of current H/CD grant.
Alternate Location: More costly purchase and future housing administration.
I -
PAGE 53
PROJECT 30
•
DEPAR MENT: PARKS & RECREATION DEPARTMENT DEPT. PRIORITY # 4
CRPIT L PROJECT: BURNETT PEDESTRIAN CORRIDOR
ESTIM,TED COST: TOTAL $ 200,000
ACQUISITION. $
DEVELOPMENT $ 200,000
FINAN, ING: 1) L.I.D.
2) H&CD
3) City Funding (none currently budgeted).
OSTEN'IBLE ASSETS: 1) NONE
2)
3) ,
BICKG'OUND:
This project would link the downtown business district with the Cedar River Trail
arilo ing pedestrian movement and at the same time improving the aesthetics of the
area. It would also complete the linear link-up along Burnett tying together Burnett
Linear Park on the south, the Burnett Parking lot system and Cedar River.
,II
POTEN IAL SITE: (location,' cost, zoning)
The a andoned railroad right-of-way between Logan Avenue South and Burnett Avenue South
extending northerly from 2nd Street to the river. Zoning along this corridor includes
a'Imix ure of light industry, business, and multi-family. Cedar River Terrace senior
housing is located adjacent to the corridor.
COST/BENEFIT ANALYSIS:
The a quisition development of this property will not only provide a permanent
"(fink- p between downtown and the river but should stimulate renovation of businesses
in th- area that have declined considerably over the years. The opportunity to purchase
this and may soon be gone;as adjoining businesses are beginning to expand into the
r ght of-way. Part of this land could be used for senior housing and the corridor path-
way w uld allow ease of access to the downtown for a population group largely dependent
on no -mechanized modes of travel.
Eltim ted M&0 - $6,000 '
I I
OPTIONS:
1',:) N Action (allow businesses to purchase and utilize).
1 2) C ntinue park & ride lot as a parking area for downtown business.
3) P pose L.I.D. for all:phases of project including M&O.
II
•
PAGE 54
PROJECT 31
1
DEPARTIfIENT: Planning DEPT. PRIORITY s 5
CAPITAL PROJECT: Entry Point Enhancement
ESTIMATED COST: Total $ 100.000
Acquisition: Minimal
Development: $ 10-20,000 per entry
FINANCING: 1) General City Revenues
2) Gas Tax
3) LJ.D.
OSTENSIBLE ASSETS: 1) 6 major points of entry (see attached)
2)
3)
BACKGROUND:
They City has a number of entry points/corridors with minimal, if any, Identification
and,beeutification. This proposal will provide for installation of landscaping
and'signing of key locations to enhance the City's image with the traveling public.
Enhancement would be constructed with concurrent street improvements.
POTENTIAL SITE: (location, cost, zoning)
1) Rainier Avenue North at airport entry
2) Sunset Boulevard North at FAI-405
3) Maple Valley Highway at Maplewood Roadside Park
4) pt ai ni er Avenue South at 405
5) ! prady Way S.W. at Valley Parkway
6) Sunset .Boulevard S.W. at Powell S.W.
COST/BENEFIT ANALYSIS:
The minimal Improvement costs should be readily off-set by the Improvement
in t'he Citys Image. Additional street tree and private property improvements
along the "entry" corridors will dramatically enhance the character of the community,
its me chants and employers.
OPTI S:
No project
Lesser number of locations
i
1
. .. \' '‘ i L
1 .... t.I
i , R
7 .
`•� Et — PAGE 51 \
\ i 1\
PROJECT 1 -.-. 1
• LAKE ' • _-' '�I it
1
WASHINGTON 1
INNtrie 16::
IP JAX111,.
•�
igf"
i .� '
i 1 / V110.
Li c'•r- RAINIER AVENUE NORTH
�
Entry & Street Trees Ti 1
41 nil 1 •Lift
WO
)11 i ' \_ , : \\\çEIN:SUNSET BLVD. NORTH 100
•
1
. 11 Entry & Street Trees It116114j11
I'
h with street widening 441
•-•- I PAC. CAR
akSi ' / Milli 11 FO ND'i
i WO.41 I — J. IL ) - - - 1
i ( ' *t4P . t7.-1
--- • 14■
.
I ki) •
%
lip- p •""" "'. \ Street Trees with
� / � -, �'�%. Developm- t ,
u` ,"' Street Trees with
i.l,lif . Developmen i i 1v 9V\ '/
•
t:e..• illyit Plr i ppir .
mid g ....j,. il \
SUNSET BLVID. WEST op , ‘‘‘‘
ntry &, Street Trees -
�'. i, _ , - 1_2. 7 -
Street Trees with Developmen 01111W7,e. MAPLEWOOD ROADSIDE •
N I .
Entry & Street Tree-
050000) .....-4;;;;- • •
.r►�;-1-n.1°g12.i5._5-1_5 -%
) „...rj'
. .
- ; 0, ', 1
-i. :'':r 1\ itl .. A."-•
i ) 1
Ia RAINIER AVENUE SOUTH
. I) �. r Entry at freeway terminous iikk*
. S.f W. GRADY WAY
' Entry with Grady
Way Bridge vr.....;..,
vsof
: ji,
. 4..
• , — I .•--+ •
PAGE 56
PROJECT 32
� I
DEPARTMENT: PARKS & RECREATION DEPARTMENT DEPT. PRIORITY II 6
CAPITAL PROJECT: CEDAR RIVER TRAIL DEVELOPMENT/NATURAL ZONE
ESTIMATED COST: TOTAL $ 590.000
ACQUISITION $
DEVELOPMENT $
FIN NCING: 1) H&CD
2) City - No funding currently available.
3) IAC - Potential funding source for 60 to 70 percent of the total cost of
park development.
4) EDA - If program were refunded and project selected:
5) County Bond Issue - If the proposed bond issue is successful (1980 or
19!1) this is a potential project (City and County participation possible).
OS ENSIBLE ASSETS: 1) NONE
BACKGROUND:
Acquisition of property currently underway. Project would link up with existing Cedar
River Trail (Urban Zone).
POTENTIAL SITE: (location, cost, zoning)
East of Highway 405 along the Cedar River to the King County Regional Park east of
M Iplewood Golf Course. Some portions are currently under City ownership.
•
COST/BENEFIT ANALYSIS:
T e cost of constructing and maintaining this section of the Trail system should be
considerably less than the Urban or Industrial sections. The benefits to the public
will be equal to or greater than that offered by the other sections due to the natural
amenities offered by the site which are not available elsewhere on the trail. Develop-
mInt costs are inflating rapidly, so construction costs would be lessened.
Estimated M&O Costs - $40,000.
OPTIONS:
1) No Action (serve trail users with existing facilities).
2) Maintain area in natural state as a conservancy with the City's role being that
of stewardship.
3) Develop the trail for minimal access and use only.
PAGE 57
PROJECT 33
DEPARTMENT: Planning DEPT. PRIORITY s 7
CAPITAL PROJECT: Wetland/Wildlife Habitat/Recreation Acquisition
Green River Valley
ES TED COST: Total $ 600,000 - 1,250,000
Acquisition: $ Same
Development: $ To be determined
FINANCING: 1) Benefit Area Charges
2) Donations
3) Eastside Watershed Project
OSTENSIBLE ASSETS: 1) Renton Wetlands
2)
3)
BACKGROUND:
During the fall of 1980, the Planning Department prepared a Wetland Study evaluating
all significant wetland areas In Renton. The Planning Commission is currently
evaluating the report and is expected to recommend policy actions for Council
consideration by the end of 1981.. The most probable recommendation will be
the purchase of all or portions of the significant wetlands Identified in the study.
POTENTIAL SITE: (location, cost, zoning)
*1 Black River Riparian Forest (north of Earitngton Golf Course)
* Additions to the Renton Wetlands (S.W. 27th west of Lind Avenue S.W.)
Panther Creek wetlands (east side of SR 167)
All of the above locations have varying levels of importance from an environmental
and storm water/flood control standpoint. Each has varying degrees of cost,
potential for development, and participation (i.e. dedication) by property owners.
U,po a final selection by the City, a plan for acquisition can be developed.
CO/BENEFIT ANALYSIS:
The costs of allowing development of any of these sites is considerable in environ-
mental terms. Purchase by the City would reduce the necessity for filling and
thus removal of vital flood run-off storage. Wildlife enhancement including fish
runs would be added benefits.
OPT ON&
No project.
Altenate� sites - A total of 14 sites have been identified. A cost/benefit analysis
should be used to distinguish between available alternatives.
PAGE 58
PROJECT 34
DEPARTMENT: Planning DEPT. PRIORITY * 8
CAPITAL PROJECT: Lake Washington Boulevard Bikeway
ESTIMATED COST: Total $ 100,000
Acquisition: $ Minimal
Development: $ 100,000
FIN/iNCING: 1) Local Improvement District
� I
2) H/CD Block Grant
3) DOT-Bicycle Grant Program
OSTENSIBLE ASSETS: 1) Existing undeveloped street right-of-ways
2) Coulon Beach Park
3)
BACKG7OUND: •
The LLake Washington Boulevard Bikeway is one of five regional links that joins
a total bicycle network In South King County. It is the major link between bicycle
facilities In Bellevue and those In Renton and South King County. The route
is aparit of Renton's bicycle plan and has been identified in the King County
General Bicycle Plan: Focus 1990, and the King County Urban Trails Plan.
POTENTIAL SITE: (location, cost, zoning)
ThelLake Washington Boulevard Bikeway is located on the eastern shore of Lake
Washington between the central business district and the Kennydale neighborhood
to the north. It Is approximately 3.9 miles in length and extends from the intersection
of Riverside Drive and Bronson Way to the May Creek Interchange of FAI-405
at N.E. 44th Street. The route will follow Park Avenue North to 5th Street and
then will turn east to Garden Avenue. It will then head in a northerly direction
until linking with Lake Washington Boulevard. The route will then follow this
course until reaching its terminus at N.E. 44th Street.
COST/BENEFIT ANALYSIS:
Alternative locations will reguire land acquisition in fee or by easement with
the potential cost exceeding $8 per foot. The only alternative routes parallel
to Lake Washington Boulevard are the BN railroad tracks (possible easement)
andi I-40. Although the state is constructing a bikeway link between Newport
Hill's and Ripley Lane, the freeway location is not desirable from a safety standpoint.
OPTIONS:
No !project--possible hazard on the current underdeveloped street
BN ,ralroad—possible railroad opposition
Freeway I-405—safety related considerations
NG
LA K E' \NA H.I l •'
e) i \ 0 . � + K E V V A I ' se n"ST PAGE 5
RPN'TON PLAPJP I410 DEPT. ` APR IL Ig30 ' i
PROJECT 34
�•
i i
aMao-_
_(....__Li_.
. i \ ' I\ :
1 i 177 8- 3 ...
1 .
A ______.
1 • L... is ________,
\---....-----
\ ''s. 1
•
O *"•••_
1 iE
. LAKE Jai '
IIII
• WASHINGTON �3
N. ;,! III
UlfI - -._... : 1
ii III '
41;1,;,',411.; 1
. , ,
.1 I a if V\ /
111? a
1
"l ► -: • \'"\\BoEING �'
+ 'r
� _ r.I Z. ,..1
1
IF\ 1 _ r ` 1 .
CAR deliii
I {'®• V..
� FOUNDRY/
I, N
_
..•...r w.IMM. NoriliF
PAGE 60
PROPOSED PUBLIC WORKS PROJECTS
IN PRIORITIZED ORDER
GENERAL FUND
Traffic Engineering
1 . Lighting Replacement
2. Traffic Signal Controller Modernization
3. Computer Enhancement
ENTERPRISE FUND
Ai retort
1 . ADAP Fencing Installation
2. Water Main Upgrading
3. Overlay of Taxiway "A"
4. Water Main - Complete Loop System
5. Microwave Landing System
WATERWORKS UTILITY FUND
Water Projects
1 . Construct Well #9 Pump Station
2. Complete CBD Transmission Line
'3. Construct West Hill Reservoir (1 MG)
4. Install 16" Transmission Line - Aberdeen Ave. NE from
NE 14th St. to NE 28th St.
5. Construct South Talbot Hill Reservoir (1 .5 MG)
Sewer Projects
'1
1 . Install May Creek Trunk Sanitary Sewer Main
2. Sewer Lift Station - NE 4th and Union Ave. NE
3. Replace Sewer Line - Mill Ave. S. to Shattuck Ave. S. ,
Houser Way S. to Cedar River
4. Replace Sewer Line - Main Ave. S. to Shattuck Ave. S. ,
Railroad Tracks to Grady Way
5. Replace N. 3rd St. to Bronson Way, Burnett Ave. N. to Houser
Way
16. Replace N. 6th St. to N. 3rd St. , Burnett Ave. N. to
I Garden Ave. N. —
PAGE 61
PROJECT 35
- I
©EPA TNENT: Public Works/Traffic Engineering Division DEPT. PRIORITY
CAPI AL PROJECT: Lighting Replacement
ESTI TED COST: TOTAL $ 100,000
Acquisition $ 100,000
Development $
FINANCING: 1) General Funds
2) Arterial Street Fund (1/2t Gas Tax)
3) Airport Funds
OSTENSIBLE ASSETS: 1) Street Light Luminaires
2)
3)
ISAC ROUND:
As part of its efforts to conserve energy, the Traffic Engineering Division has
initiated a program of replacing existing luminaires with more energy conservative
uni s. Surprisingly enough, because of advances in technology, we have been able
i to rovide the same amount of illumination. As we replace these units, we will be
able to turn on lights which we turned off as a part of our energy reduction program.
I '
POTENTIAL SITE: (location. cost. zoning)
The following are locations and changes we are suggesting:
1. N 3rd/N 4th Sts. - Logan to 3rd P1. (60) 400 W Mercury Vapor to 150 W Sodium Vapor
2. Airport Perimeter Road (29) 400 W Mercury Vapor to 150 W Sodium Vapor
3. Grady Way S - Main to Rainier (55) 400 W Mercury Vapor to 250 W Sodium Vapor
4. Bronson Way - Factory to Mill (36) 400 W Mercury Vapor to 250 W Sodium Vapor
15. Airport Way - Logan to Rainier (20) 400 W Mercury Vapor to 250 W Sodium Vapor
6. Downtown Area (150) '400 W Mercury Vapor to 250 W Sodium Vapor
CO T/OENEFIT ANALYSIS:
Be efit = 00,0
$283 380 = 2.83
C st 100
Using today's energy cost expanded over the .30 anticipated life years of the luminaires
versus the $100,000 initial outlay, we realize a benefit cost ratio of 2.83. This is
above the social impacts of energy conservation which are not.as easily measurable.
OITIONS:
Tle other option is to continue with a program of eliminating existing luminaires
from service. This is undesirable in that the basic reasons behind street lighting -
Ticular, pedestrian and vandalism protection - are still valid. If future energy
frecasts are realized, we may be forced to turn off luminaires even with the proposed
replacement program. The condition without energy conservative luminaires may be
unacceptable.
I I
PAGE 62 '
PROJECT 36
•
DEPARTMENT: Public Works/Traffic Engineering Division DEPT. PRIORITY / 2
CAPITAL PROJECT: Traffic Signal Controller Modernization
I �
ESTIMATED COST: TOTAL $
200,000
Acquisition $ 200,000
Development
FINANCING: 1) General Funds
2) Federal Aid Safety Projects (FASP)/Federal Aid Urban Systems (FAUS)
3) Arterial Street Fund (1/U Gas Tax)
4) System Development Fees
OSTENSIBLE ASSETS: I) 20 used traffic signal controllers
2) ,
3)
BAC ROUND:
The City has a total of 20 traffic signal controllers which are atypical to our standard
Multiponic unit. Consequently, we are unable to control them with the existing master
computer. Furthermore, 13 of the existing controllers were purchased in 1968 and 7 were
Purcl!ased in 1972. Although the units purchased in 1972 are relatively new, that was
the last year that particular controller was manufactured. We have been able to acquire
p'arte for these units; however, future acquisition is not assured. Also, electronic
equipment has undergone extensive improvement over the last several years. Improvements
have been made in the areas of flexibility, durability and economy of operation and
rain enance.
POT NTIAL SITE: (location, cost, zoning)
The ollowing locations are suggested for controller replacement:
1. lE Sunset Blvd. & Union Ave. NE 8. Sunset Blvd. N 6 N Park Drive
2. E Sunset Blvd. & NE i'2th St. 9. NE Sunset Blvd. & Duvall Ave. NE
3. NE Sunset Blvd. & NE 10th St. 10. Park Ave. N 6 N 6th St.
4. NE Sunset Blvd. 6 Harrington Ave. NE 11. Park/Garden/Lake Wash. Blvd. N
5. unset Blvd. NE & NE 7th St. 12. N 4th St. & Factory Ave. N
6'. unset Blvd. N & N 3rd St. 13. N 4th St. & Garden Ave. N
j, E Sunset Blvd. & Edmonds Ave. NE 14. N 4th St. & Park Ave. N (cont. on P. 2)
COST/BENEFIT ANALYSIS:
The benefits of replacing the controllers listed above are numerous. From the traffic
ope ational standpoint, these new controllers have greater flexibility in responding
to xisting traffic demand. This'will provide additional capacity for already
con ested intersections, provide energy savings in the neighborhood of 1,600 gallons
•
Hof uel per intersection per year, enhance the operation of emergency vehicle preemption
las ell as provide for potential future connection to the City's master traffic signal
I com uter. From the safety standpoint, it will give us the option of providing
protected turning movements to alleviate accident situations. Maintenance will be less
and parts will be easier to obtain.
OPTIONS:
As the existing,units are no longer manufactured, there does not exist substantial
opportunity to improve the existing situation with existing equipment. This equipment
is simply not compatible; with equipment now being manufactured. If we allow the
si uation to continue, we will continually be faced with the question of reliability
an our ability to repaiir the equipment in a timely and cost effective manner
i �
I
PAGE 63
PROJECT 36
CAPITAL, PROJECT: Traffic Signal Controller Modernization
POTENTIAL ITE: (cont.)
15. N 4th St. & Williams Ave. N
16. N '4th St. & Logan Ave. N
17. N 3rd St. & Williams Ave. N
18. N 3rd St. & Park Ave. N
19. N 3rd St. & Garden Ave. N
20. N 3rd St. & Factory Ave. N
I
1
1
1
1
PAGE 64
PROJECT 37
•
•
I I
DEPARTMENT: Public Works/Traffic Engineering Division DEPT. PRIORITY /
CAPIT PROJECT: Computer Enhancement
ESTIMATED COST: TOTAL $ 220,000.00
Acquisition $
Development $
FINANCING: 1) Federal Aid 'Urban Systems. (FADS)
2) Arterial Street Fund (1/2G Gas Tax)
3) Systems Development Funds
OSTENSIBLE ASSETS: 1) existing Multisonics Traffic Signal Computer
2)
3) _ __
- I
IIICKCIROUND:
In 19 3 the City purchased a traffic signal computer to complement the traffic control
syste that was installed. The existing computer has the capability of controlling
appro Cimately 40 intersections. However, the City currently has 70 signalized inter-
sects ns. Also, this particular computer is no longer available; so it is difficult
to obtain parts. Because of its age we are also beginning to experience computer
failure. The proposed project would replace the existing main computer.
OTENTIAL SITE: (location, cost, zoning)
Traffic Engineering Division, fourth floor, Renton Municipal Building.
COST BENEFIT ANALYSIS:
The 1froposed project would replace the existing central core of the computer with an
updaed model. This would allow us to control from the office all of the existing 70
signalized intersections. Additionally, we would be able to interface with the new
011 controllers which we are installing. The existing computer cannot coordinate
because the systems are not compatible. The new controllers have greater flexibility
Which we discussed under the Controller Modernization project.
OPTIONS:
The Iption would be to keep the existing system and hope that we can secure replace-
�ment parts as necessary. Also we would not be able to supervise the new 911 controllers.
Eventually, as we need to; replace the controllers, we will lose all master control of
cur system. Therefore, if master control is desirable, which we believe it is, we
will have to replace the computer in the near future.
1 - 1
I i '
PAGE 65
PROJECT 38
Airport
WAR ENT: Public Works/Airport DEPT. PRIORITY / '1
CAIPIT PROJECT: ADAP Fencing Installation
II
ESTI TED COST: TOTAL $ 125,000
I '
Acquisition $ - 0 -
Development $ 125,000
FINANCING: 1) Federal ADAP @ 80% = $100,000
2) Airport Funds P 20% =S 25.000
3)
OSTENSIBLE ASSETS: 1) •
2)
•
3)
BACKGROUND:
FAA inspections of Airport facilities have resulted in a determination
that certain areas need to be fenced to comply with federal operating and safety
standards.
POTENTIAL SITE: (location, cost, zoning)
I . .
COST/BENEFIT ANALYSIS:
Compliance with federal requirements and potentially a reduction in liability
exposure.
40TEI ADAP funding decision might be made during 1981.
(Project is listed in 1981 Budget)
OPTIONS: i
•
PAGE 66
PROJECT 39
Airport
DEPARTMENT: Public Works (Airport) DEPT. PRIORITY / 2
CAPIT PROJECT: Water Main - Upgrading
ESTIMATED COST: TOTAL $ 140,000
Acquisition $
Development $ 140,000
FINANCING: 1) Airport
2)
3)
•
OSTENSIBLE ASSETS: I)
1 2)
1
3)
BACKGROUND: (a) 12" and 16" Intertie at northwest corner, between Rainier Ave.
and newly constructed 8" main to the Sunbird Restaurant will
remove this service from Boeing Agreement. ($34,000)
(b) 8" and 12" Water Service Extension to Control Tower from
Rainier Ave. at N.W. 6th St. (Abandon old leaking 2" line).
($34,000)
(c) 12" Water Service Extension, Logan Bridge to Boeing Bridge.
Tie in new 12" line to Renton's water system - provide more
reliable water service to southeast corner; remove fire line
POTENTIAL SITE: (location, cost, zoning) from Boeing System, allowing Renton
system to provide domestic service.
($72,000)
NOTE: Each project element, i.e. (a), (b) and (c), might
have to be contracted separately, depending upon
budget, etc.
COST/BENEFIT ANALYSIS:
1
!OPT ONS:
PAGE 67
PROJECT 40
Airport
DEPARTMENT: Public Works/Airport DEPT. PRIORITY
API AL PROJECT: Complete Overlay of Taxiway "A"
ESTIMATED COST: TOTAL $ 117 nnn
- I
Acquisition $ -.0 -
Dawlopmont $ 337.000 1
�I CING: 1) Federal ADAP @ 80% = $269,600
1
2) Airport Funds @ 20% $ 67,400
.3)
•
OSTE SIDLE ASSETS: 1)
• 2)
3)
BAC ROUND:
Recommended in Airport Master Plan
Possible 1982 if ADAP Funds are available.
►OTENTIAL SITE: (location, cost, zoning)
.
•
COST/BENEFIT ANALYSIS:
Reduced liability exposure.
•
OPTIONS:
•
i I
PAGE 68
PROJECT 41
Ifte.45RS
DCPAR ENT: Public Works (Airport) DEPT.-PRIORITY / 1
CAPIT PROJECT: Water Main - Completion of Loop System
ESTIMATED COST: TOTAL $ 108,000
Acquisition $ ,
Development $ 108,000
FINANCING: 1)
2)
3)
OSTENSIBLE ASSETS: 1)
2)
3)
11iACKGROUND: Complete a, loop system around the Airport by extending main
along east and north sides to the northwest corner.
i I
POTENTIAL SITE: (location. cost. zoning)
COST/BENEFIT ANALYSIS: The benefits to the completion of the watermain loop
would be the reliability of the system as well as
improved fire flow capacity. It also would allow
the installation of fire hydrants in that area of
the airfield.
•
(OPTIONS:
� F
PAGE 69
PROJECT 42
Airport
DEPARTMENT: Public Wnrkc/Airport DEPT. PRIORITY /
CAP TAL PROJECT: Microwave Landing System
EST MATED COST: TOTAL $ 250.000
Acquisition $ - 0 -
Development $ 250,000
CFI LING: 1) FPdera1 AnAP Funds (d inns = S7S(_nnn
2)
3)
I
OSTENSIBLE ASSETS: I) '
2)
3)
BACKGROUND: Possible 1987 or 1988 timing.
POTENTIAL SITE: (location, cost, zoning)
COS /BENEFIT ANALYSIS:
OPT ONS:
PAGE 70
PROJECT 43
•
DEPARTMENT: Utility Department DEPT. PRIORITY / 1
CAPI AL PROJECT: Construction of Well #9 Pump Station
ESTIMATED COST: TOTAL $ 150,000.00
Acquisition $ . -0-
Development $ 150,000.00
FINANCING: 1) Capital Outlay - Utility Fund
2) Referendum #38 - Municipal Water Supply Funding Program
3)
OSTENSIBLE ASSETS: I).
2)
3)
BACKGROUND:
When Well #8 was drilled and constructed in 1968, an exploratory
well was also drilled. This was used as an observation well at
that time, with the eventual use to be as the site of future Well
#9. The existing 8" casing will be pulled and an appropriate
size casing installed. Due to the possible conflicts with the
D.S.H.S. and well construction in the Cedar River this project
should be done as soon as possible. The facility will provide
additional water supply to the City's supply. This will allow
for continued growth and expansion of Renton.
POTENTIAL SITE: (location, cost, zoning)
The site for future Well #9 will be at the present observation
well location in the N.E. corner of the Cedar River'Park.
There should be no cost for the site and no zoning problems.
•
COST/BENEFIT ANALYSIS:
The City of Renton can pump water from the Cedar River Basin
at a lesser cost than if water was purchased from the City of
Seattle (The only other water purveyor in the area). All existing
watermains in this area have' been designed to accept water from
proposed future well sites.
OPTIONS:
a) Purchase water from the City of Seattle at an increased cost.
b) Remain as is, and eventually be short of water supply to serve
the City of Renton.
PAGE 71 I
PROJECT 44
l I
p
DEPARTMENT:
Utility Department DEPT. PRIORITY / 2
CAPITAL PROJECT: Complete installation of 24" transmission watermain thru the C.B.D.
ESTIMATED COST: TOTAL $ 350,000.00
•
Acquisition $ -0-
Dew lopmant $ 350,000.00
Utility 1) Capital Outlay - U y Fund
2)
I 3) ,
' OS-ENSIOLE ASSETS: 1) 1
2)
3)
•
II KGROUND: '
This project was first proposed in the 1965 Water Study Compre-
1 hensive:Plan. It was also one of the projects proposed in the
1975 Water & Sewer Bond Issue. The completion of this trans-
mission line will balance the flows from the Talbot Hill
Reservoir and the Mt. Olivet Reservoir. This project will
increase the fire flows and reliability of the system in the
C.B.D. and also improve the entire water system reliability.
P'TENTIAL SITE: (location, cost, zoning)
The location of the remaining portions of this project are in
Talbot Road South from South Grady Way to South Renton Village
Place; Burnett Avenue South from Houser Way South to South Tobin
Street; South Tobin Street from Burnett Avenue South to Williams
Avenue ,South; Williams Avenue South from South Tobin Street
! to South Riverside Drive; South Riverside Drive from Williams
Avenue South to Wells Avenue South; across Wells Avenue Bridge ,
to North Riverside Drive; then in North Riverside Drive to
Liberty Park and then thru Liberty Park to Wells #1 and #2.
TThhm�r will be no cost for right-of-way for the watermain.
CiST/BENEFIT AMAL`►515:
'1 This will increase the fire flows and reliability of the C.B.D.
as well as the reliability of the entire water system. .
PTIONS:
I
Remain the same.
.
i
PAGE 72
PROJECT 45
DEP RTMENT: Utility Department DEPT. PRIORITY I �3_
CA ITAL PROJECT: Construction of West Hill 1 MG Reservoir
ES IMATED COST: TOTAL $ 1,000,000.00
Acquisition $ -0-
Development $ 1,000,000.00
FINANCING: 1) Capital Outlay - Utility Fund
2) D.S.H.S. Referendum #38, Municipal Water Supply Funding Program
3)
OSTENSIBLE ASSETS: I)
2)
3)
BA' KGROUND: The West Hill is served by water purchased from the City of Seattle.
There is insufficient water supply for fire protection in some
areas of West Hill. The only storage presently available is in
the City of Seattle Transmission line. The City of Seattle imposes
a penalty charge of what is called a demand charge when a system
has insufficent storage. Renton is presently paying this penalty.
al
P'TENTIAL SITE: (location, cost, zoning)
The City owns one potential site presently on N.W. 4th Street
at 84th Avenue South. The latest design might require a different
site.. This new proposed site would be at Thompson School which
is located at South 123rd Street at 82nd Avenue South in King
County. The use of this site would have to be negotiated with
the Renton School District. There could be zoning or King
County opposition to the construction of an elevated tank at
this site.
C'ST/BENEFIT ANALYSIS:
The cost benefit would be the elimination of the demand
change for lack .of storage that Renton is presently
paying to the City of Seattle.
Additional benefits would be in improved system reliability
and fire flow capability.
OPTIONS:
Remain the same.
PAGE 73
PROJECT 46
,
1
.
1 DE ARTMENT: UTILITY DIVISION DEPT. PRIORITY /
I .
1 ITAL PROJECT: Install 16" transmission water main in Aberdeen Ave. N.E. from
' N.E. 14th St. to N.E. 28th St. ,
1 ESTIMATED COST: TOTAL $ 200,000.00
Acquisition $ A -0-
Development $ 200,000.00 _
FINANCING: 1) Capital Outlay - Utility Fund
2)
3)
•
TENSISLE ASSETS: I)
• 2) .
- . 3) ---
MCKGROUND:
This project was in the 1965 water study. It would improve the fire flows to
NW section of the Highlands, but is basically designed to increase the fire flows
n the lower Kennydale area where there is anticipated commercial and multifamily
rowth in the near future.
I I
TENTIAL SITE: (location, cost, zoning)
1
he location of this project is all in public right-of-way of Aberdeen Ave. NE.
herefore there is no costs for property involved.
1
' ST/IENEFIT ANALYSIS:
The benefit of this project would be increased fire flows to the aforementioned
areas.
OPTIONS:
Remain the same, and limit building and development to meet the existing fire flows
the system can presently deliver.
r 1
I 1 1 '
! PAGE 74 I
PROJECT 47
I i
DEPARTMENT: UTILITY DEPARTMENT DEPT. PRIORITY
CAPITAL PROJECT: South Talbot Hill Reservoir (1.5 mg)
ESTIMATED COST: TOTAL $ 700,000.00
Acquisition $ , 50,000.00
Development $ 650,000.00
! FINANCING: I) Capital Outlay - Utility Fund
2)
3)
I
OSTENSIBLE ASSETS: I)
2)
3)
BACKGROUND: .
T e reliability of any water supply is the capability of supplying water under
a verse conditions such as power failures, etc., and at a quantity to meet the
r quirements or demands' of the system. The 350 ft. hydraulic pressure zone that
t is proposed reservoir would serve is presently planned to meet its fire service
d mands by pumping water through the south Talbot Hill Pump Station. The system
i intertie with two pressure reducing stations to the Rolling Hills elevated tank
s stem. These interties alone are not sufficient to supply the complete system
d mands.
PO ENTIAL SITE: (location, cost, zoning)
The approximate location of the site for this proposed reservoir is just south of
C4rr Road and west of the Benson Rd. (SR 515) extended. The cost of the site is
estimated to be $50,000.00
I
! 1
j
C ST/BENEFIT ANALYSIS:
1
T e benefit would be increased reliability of the existing system.
I
TIONS:
Remain as is. ,
1
•
PAGE 75
PROJECT 48
1
d
DEPARTMENT: Public Works DE►T. PRIORITY / 1
CAPITAL PROJECT: Install May Creek Trunk Sanitary Sewer Mains
ESTIMATED COST: TOTAL $ 2,000,000.00
Acquisition $ . -0-
Development $ 2,000,000.00
FINANCING: I) Capital Outlay - Utility Fund
2)
3)
OiTENSIBLE ASSETS: 1)
2)
3)
BACKGROUND:
The northeast section of town where the Sunset Lift Station exists has
insufficient capacity to handle the existing sewage presently being
generated. There is a moratorium on the building in this area presently.
1 .
POTENTIAL SITE: (location. cost, zoning)
The site location is down the ravines of the May Creek and Honey Creek
:. basins. Utility easements will be aquired for the proposed installatibn.
COST/BENEFIT ANALYSIS:
The benefit of this installation would better serve the existing users
• in this area as well as stop the overflowing of the existing lift station
into the May Creek basin. This system will also provide sewage capacity
for future growth.
1
OPTIONS: •
Remain the same or reconstruct lift station, force main, and down stream ..
gravity system through the highlands.
•
•
PAGE 76
PROJECT 49
•
•
DEPARTMENT: Public Works DEPT. PRIORITY / 2
CAPITAL PROJECT: Construct Sanitary Sewer lift statinn at N F 4th R !Minn Ava N.E.
.
i ESTIMATED COST: TOTAL $ 100,000.00
Acquisition $ •-0-
D.wlopmsnt $ 100,000.00
FINANCING: 1) Capital Outlay - Utility Fund
. 2)
3) •
ENSIOLE ASSETS:
OS I) •T
2)
'I
3)
-------
BACKGROUND:
Growth of the City in the southeast area of the highlands through
annexation will require that a lift station be installed to serve
this additional area.
POTENTIAL SITE: (location, cost, zoning)
•
Intersection of N.E. 4th Street and Union Ave. N.E. •
q •
•
COST/ ENEFIT ANALYSIS:
Additional lands will be allowed to be serviced by sanitary sewers. .
11.
OPTI S: •
•
Remain the same. Construct hravity sewer main from N.E. 4th St.
and Union Ave. 'N.E. down to the metro Cedar River Trunk
d PAGE 77
PROJECT 50
•
DEPARTMENT: Public Works DEPT. PRIORITY /
' I
CAPITAL PROJECT: Sanitary Sewer Replacement - Mill Ave. S. to Shattuck Ava C
Houser Way S. to Cedar River.
ESTIMATED COST: TOTAL $ 7oo.0on.nn
Acquisition $ -0-
Devalopsrnt $ 700,000.00
•
FINANCING: 1)
2)
3)
OSTENSIBLE ASSETS: 1) •
2)
3)
•
BACKGROUND:
The mains in the aforementioned area are approximately 50 years old and
are no longer in an maintainable condition.
POTENTIAL SITE: (location, cost, zoning)
City right-of-way
•
•
•
COST/BENEFIT ANALYSIS:
Reduced maintence costs and elimination of possible damage claims against.
the City from sewage back-ups.
•
••
OPTIONS: •
1 Remain as is.
7.1
I �
PAGE 78
PROJECT 51
•
DEPARTMENT: Public Works DEPT. PRIORITY I
CAPITAL PROJECT: Sanitary Sewer Replacement - Main Ave. S. to ShAtturk Ave S.,
R/R tracks to Grady Way
ESTIMATED COST: TOTAL $ 600,000.00
Acquisition $
Development $
F INANC I NG: 1)
. 2)
3)
•
OSTENSIBLE ASSETS: I) •
. 2)
•
• 3)
•
11ACKCROUND:
1
. •
.
POTENTIAL SITE: (location, cost. zoning) • 1
•
•
•
COST/BENEFIT ANALYSIS:
•
OPTIONS:
•
1
�I
PAGE 79
PROJECT 52
DEPARTMENT: Public Works DEPT. PRIORITY /
i
CAPITAL PROJECT: Sanitary Sewer Replacement - N. 3rd St. to Rrnncnn Wi
Burnett Ave. N. to Houser Way.
ESTIMATED COST: TOTAL $ 700,000.00
Acquisition $
Development $
FIPANCING: 1)
•
. 2)
3)
OSTENSIBLE ASSETS: I) •
I 2)
3)
BACKGROUND:
_ I
•
I ..
POTENTIAL SITE: (location, cost, zoning) •
1
COST/BENEFIT ANALYSIS:
' � I
•
•
•
•
I .
OPTI S: •• •
' I
PAGE 80
PROJECT 53
•
d
DEPIAR ENT: Public Works DEPT. PRIORITY
CAPITAL PROJECT: Sanitary Sewer Replacement - N. 6th St. to N. 3rd St.
. Burnett Ave. N. to Garden Ave. N.
ESTIMATED COST: TOTAL $ 600,000.00
Acquisition $
Development $
FINANCING: 1)
Z)
3)
OSTENSIBLE ASSETS: 1) •
I 2)
3)
BACKGROUND:
•
POTENTIAL SITE: (location, cost, zoning)
d .
COST BENEFIT ANALYSIS:
I
I � �
OPTIONS: •
•
PAGE 81 •
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1982 — 1987
1
CI
PRIO TY # ANNUAL ELEMENT PROJECTS
-ITGrady Way Bridge Replacement
Renton Area Transportation Study
Miscellaneous Street Improvements -
East Valley Road, SW 16th St. to SR 167 ramps
SW 27th St., East Valley Road to Valley Parkway SW
NE 4th St./NE 3rd St. from Union Ave. NE to Sunset Blvd. North
I7 Wells Avenue Bridge Replacement
Illggg Williams Ave. North & North 3rd/North 4th Streets Intersection Improvements
9 Factory Ave. North & North 3rd St. Intersection Improvements
10 Logan Ave. South & South 2nd St. Intersection Improvements •
11 Burnett Ave. S; & S 2nd St. Intersection Improvements
12 Sunset Blvd. North & North 3rd Intersection Improvements
13 Talbot Road South, South 16th St. to South 41st St.
14 SW 16th St., Lind Ave. SW to Monster Road SW
South 7th St.,' Rainier Ave. South to Smithers Ave. South
;56
Controller Modernization
17 Computer Enhancement
SECOND YEAR PROJECTS
18 SW Grady Way, Lind Ave. SW to Longacres Dr. SW
19 Monster Road SW - alternate access
THIRD YEAR PROJECTS
20 Garden Ave. North, North 4th St. to North 8th St.
21 Monroe Ave. NE, NE 6th St. to NE 12th St.
FOURTH — SIXTH YEAR PROJECTS
2 Valley Parkway SW, SW Grady Way to South 140th St.
3 North 1st St., Park Ave. North to Burnett Ave. North
4 Monroe Ave. NE, NE 2nd St. to NE 4th St.
5 NE 12th St., Edmonds Ave. NE to Kirkland Ave. NE
26 Lind Ave. SW, SW 16th St. to SW Grady Way
27 Sunset Blvd. North, Bronson Way North to FAI 405
8 Valley Parkway SW, SW 41st St. to SW 16th St.
F9 Valley Parkway SW, SW 16th St. to SW Grady Way
30 Lake Wash. Blvd. North, North Park Drive to North City Limits
31 SW 27th St., Valley Parkway SW to West Valley Road
32 SE Puget Drive, Jones Place SE to Edmonds Ave. SE
33 Sunset Blvd. NE, FAI 405 to NE Park Drive
34 Benson Road South, South Grady Way to SE 31st St.
35 Taylor Ave. NW/Taylor Place NW, Renton Ave; Ext. to Stevens Ave. NW
36 NE 12th St., Lynnwood Ave. NE to Union Ave. NE
37 Union Ave. NE, NE Sunset Blvd. to NE 24th St.
38 Edmonds Avenue Extension
II
-
•
s A 1-2 3t-X. YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1912_ TO 1987 Page 1 of 6
•
— OBLIGATION PROGRAM — Hearing bate July 20, 1981
— -- •
_Adoption Date July 27. 1981 _
City/County _Keypunching Note:Data entered in cote I-B must -EXHIBIT--"A" - -24-10-yP 9 Resolution Number
&NIT°. 1.0.7-1-0-a=.o be-en-all-cards-punchedLfrorn ti .
County No. 1 7 7-8 this•form. o v PRO-J.ECT.CO5T5•1N THOUSANDS OF'DO-LL. R5
o PROJECT IDENTIFICATION • ec
n " OBLIGATION SCHEDULE FUNDING SOURCE
2 Tit le,Route,Road Log No., Section No., o Work Total a •Id __-Y_E A: F�
Location Termini Deecrl Lion of Work, ,.3 Length \.o FEDERAL TOTAL
•
u Beginning Milepoet bridge No. 04. Code (Mi es) 'r(An�oa1 2 nd 3 rd 4,5 U.A.B. LOCAL FUNDS
1 1 a 0 Element) ft GM AMOUNT PROGRAM
:i 8 5- 4. 5 078 9 . .10 . II 12 13 - 14 15 16. IT`! .. A5„6 57 40 41 44 iv 48 47 MI ' N 52..'_- . 53 so Se Ge Cape rn* . 91 X 73 76 73 60 Be
_ G,R,ALD,Y, 1W,A,Yt ,B,R,IID,G,E, ,RIE,P,LIALC,EIMIEIN 4 AB f/G , ,DIH ,OL1LO M U X ,41115. ,- , 1 , , , , a I 1 1 6 ,31312. 1 1BIR.•, 1 1 a 1 t813, 1 , 141115,
1' Bridge Replacement (joint with Tukwila) - Plans, - L - -- - _ - - Bridge _ _ Forward
Specifications & Estimates Only �� Repl. Thrust - -
2, R1E,NIT,OINI IA,R,E,A, IT'R,A,N,_SIP,O,R,T, 1SiT,U,DiY 8MIU, 1 , I 1 , U 1 1310 1 ,610 , ,3,0 lit , t 1 , I i , lit 11,2,0 t , 1l,210
Develop a multiaxial transportation plan for the
l;.r
City.
3. M,IIS,C,E,L,LiA,NIEjO,U,S, 1SITIRIEIElT, IItMIPiRIO,V 4r% D, , , , 4 , U 111110 1 1918 al,,lt0 121210 I I I I 1 I , I i 0,3,8 t 1 151318
Street Division Five-Year Plan (overlays) I�z¢tkri 146
• I
4 E, ,V,A,L,LiE,Y, , S,W, ,l,6,T,H, 1T,O, ,S, R, 11,6,7, 2IlBIDiF■G 1146,0 C U 410,0,0 t 1 1 I I I I I I I I I I I I ,. 1 1 4,0,,0 0 , ,4,0,0, 0
.
Drainage, paving, curbs, gutters, sidewalk, illumin- H J 100%
ation, channelization, 44' roadway LID
5. S1W, 1217,TIH1 ,El ,V,AIL,L, IT1Ot ,V,AILILI ,P,KIWIY 11y/,A,B,D,F ,0A6,8 S U 1,5,0,0 I I t ill 1 I , ill III 1 1 1 1,5,0,0 1 ,115, 0, 0
Grading, drainage, paving, curbs, gutters, sidewalk, GHIJ 100%
illumination, signal, bike route, channelization, L M 0 LID -
landscaping, bridge, 44' roadway
6. N.E. ,4,T,H,/,3,R,D, ,M,O0N1R101E, ,T,O, 1S.U,N,SLE1T 2 r BID,F,G 104415 M U ,310,0 1 , 1 I , , 1 1 1 I I t 1 1 , 1. 11 13,0,0 , , ,3,010
Drainage, resurface, curbs, gutters, sidewalks and H 100%
widen to 5 lanes (2-way left turn lane) LID
7,- W,E,LIL,S, ,A,VIE, ,B,R,I,DIGIE, IR.IE,PILtA,C,E,M,EIN 4 /A,B,F,G, ,040,4 S U,X 110100 ,6,8,0 , , , , I '1 1131414 1 , t t , 1 13,3t6 1 ,1,6,810
Bridge Replacement H J L Bridge Forward
Repl. Thrust
8.- W,I,L,L,I,A,M,Si IA,V,E, IN.3,R,D,/,NI4,T,H, 1I,M,PIR 6V/4H,K,L, , _4 I MU 1 Ili0 , 1 , 1 1 1 i I i I , 1 ill III 1 11,0 1 1 1 11,0 a
Signal modifications, channelization and signing cl
, m
V a,
• D15TRI Bull oN t.,
I COPY DISTRICT STATE AID ENGINLER _
-007 ulo-e49- I COPY C,R.A.15,(COUN.T16e ONLY)- - -- -
Jars. MOO - - - _
SA R.
• SIX- YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19 8Z, TO 19 87., Page 2 of 6 '
• — OBLIGATION PROGRAM — Nearing Date July 20, 1981
- EXHIBIT "A" Adoption Date July 27. 1981
City/County Keypunching Motes Data entered in cote 8 must -- - Resolut=ian=Nurober_ 2410
City-No. 1 0 710 s_-I. be on all cards punched from II
• County No. 1 7 7-8 thirri. 1 k P R-Ord-EC-T—COSTB1-N-11-10USANDBLOF'DO_:LABS
• PROJECT IDENTIFICATION "oY G 1 OBLIGATION-:5CHEDUL2 .FUNDING SOURCE
o Title,Route,Road LogNo., Section s Total ed `
No., moo. Work gab Y_E A. R FEDERAL .TOTAL•
Location/Termini,Deecription of Work, 03 Code Length .0\,a 1st
nBeginning Milepost 4 Bridge No. -e o (Miles) .� t(���ua1 2 not 3 rd 4,5 U.A.B. LOCAL FUNDS
I.. e- a S Element) #6 th AMOUNT PROGRAM
_2 " S- 4 5 g 78 9 .10 . 11 12. ' 13 - 14 15 16. IT'y
y .. ei!a :,,a7 44 4S ee 47 4e . N'R..._ E5 10 e9 CO p 04 6140 71 It15 74 ;sae as
F,A,CIT,OIRIyI ,A1V1E, ,Si ,N, 131RID, IIIM1PIRIOIVIE 61 MIKLIJY1 tit S U , •1 'S, i• , , , , , 1 , 1 1 1 , Morn ,'1 J , , I I 15. 1 1 1 1 15.
9' Signal modifications, channelization and_.signing _ -
V' - - -
10. L,OtG,A,N, ,ALV,E, .6, IS, 121N,D, ,IIM,P,R,OLV,EIMIE 6 M H,K,I, , l , M U , , 15 , 1 i Ito I i I 1 1 1 ' to 1 I . 11 15 5
Signal modifications, channelization and signing
BIUIRINIEIT,T, ,A1ViRI ,&, IS, ,21NID, 1IIMIPIR,O,V1E 6 H,K,II , 4 , M U 1 1210 I , 1 , 1 1 1 1 1 Ili III , 1 , 1 12,0 1 1 1 1210,
1,/ 11. Channelization modifications, possible signalization
and signing.
•
S.UIN,S,E.TI .B,LIV.D, IN, ,61 IN' 13,R.11 1I,M,PIR,0 6 /eAiBID,F I j I MU 1110,0 I it III II I 1 „ i I I 1 i 1 04,010 , 1 111010
12. Signal improvements, curbs, gutters, sidewalks, H I
channelization, paving and signing •
13. T,A,L,B10,T, ,RED, ,SI 1116,T1H, 1T,O, 1SI 1411,S,T1 2M B,D.F.G 11010 C U I I , i , , 161010 1 1 1 I I I 1 I , • 1 1 , 161010 1 1 ,6,010
Drainage, paving, curbs, sidewalk, illumination, H J 15%
channelization (joint with King County) LID •
14. S.W. ,1,61T1H, ■L,I,N,D, IAIVIEI ,T,O, IM,O,N,S,TIEIR 2 ' ,BID,F.G 104910 C U 2101010 I , 1 I I I I I I III III I I i 2 10 10 10 1 .210.010
Drainage, paving, curbs, gutters, sidewalks, illum- H J L 100%
ination, channelization, bridge, 44' roadway LID
S, 17,T,H, 1RIAII,N,I,E1R, IT'D' ISIMIIiTIH,E,R,S1 , 2 A,B,D,F ,045,0 S U i ,2,0 I l i , I 12i010 1 I 1 1 I I I I I ,2i210 , 1121210
15. Drainage, paving, curbs, gutters, sidewalk, illum- I Developer
ination, channelization, 44' roadway. Partial work & LID
_ from Rainier to Shattuck in 1982
16. CiO1N.T,R•OIL1L,E1 R, ,M,O,D,E,R,N,I,ZIAIT.I,OIN, a , 7 V/II i 1 . j 1 U J 14i0 1 1410 , .4,0 , 18,0 I , 1 i 1 , , 1 I ,210,0 L , 12,010 v
Purchase of traffic signal controllers to replace cni
obsolete equipment. r
. w
DISTRIBUTION
1 COPY DISTRICT STATE AID ENGINEER
DOT 140-049 1 COPY C.R.A.B.(COUNTIE5 ONLY)
Jan. 1990
•
BALL
• SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19 82 TO 19 8 7 Page 3 of 6
— OBLIGATION PROGRAM — „ „ Hearing pate July 20, 1981
•
EXHIBITA /{doplion Date July 27 1981
City/County Jfeypunching Mote:Data entered in tole I-S-moot Resolution Number 2410
City-No. 1- 0-_7-1-0-L 0 be-en-an-cards-punched-from --- ----
County No. 1 7 7-8 this-form. ,o PRO.J.ECT CO5T5"1N THOUSANDS OF DOLLARS
• •
PROJECT IDENTIFICATION aY 1 OBLIGATION SCHEDULE .FUNDING SOURCE
z Zit le,Route,Road Log No., Section No., o` Work •Total d ;.b ...Y.E.A_£.A FR
E .Location/Termini,Deecription of Work, Y. Code Length \.o FEDERAL _. _TOTAL
r Beginning Milepost # Bridge No. -a o {Miles) .� 't(A��oril 2 nd 3 rd 4,5 U.A.B. LOCAL, FUN D'.J
'-' C' Element) 41.G th AMOUNT PROGRAM
4 I. S- 4 5 8 7 8 S 10 . 11 ' la 13 - 14 _ 15 16 17•.
.. _aim • !7 40 41 44 4s 4@ 47AS ' St 52..__ 53 i0 a e 5 e 04 ct it 91 at 15 7e fa es
17.
C10,M,P,U,T,E,R, 1E1N,HIAIN,CIE,M,EIN,TI I I I 1 1 I 7(///,��I' , 1 , L I U 1212104 ,•, I • 1 1 I • , 1 1 , 11181_3•FIAIUIS•J 1317 ill 1 1 1212104
Add additional control capacity, replace obsolete - i/ti�
equipment
18. s1w1 ,G,R,AID,Y, IL,I,N1D, 1T10, IL,01N,G,AiC,RIEIS, 2W.BIDIF,G , 17,0 S U 1 , i 1 15 1010 i , , , 1 i 1 i I I t I , t , i 1,5,010 i ,1151010
Drainage, paving, curbs, sidewalk, illumination, H J L • 100%
channelization, P-1 Bridge, 56' roadway • LID •
�� M,OINIS,T,E,RI 'RID'. IA,L,TIE,R,NIAtTIE, IAICiCtE,SIS 1�%B,D,F,G ,042,2 C U 1 , 1 ,2 ,5t2 ; 1 1 I I I 111310 FIAISIP i i 1 1112,2 1 1 121512
• Drainage, paving, curbs, sidewalk, channelization H /I:'J >./;-1, L o (' -;.)4., ii/ 1,
Lem,
� �, �c�: I
G,A,R,D,E,N, ,A,V,E, ,NI ,4,T,H, ,T,0, ,N, ,B�T,H1 , 21,BID4F.G ,0 ,2,5 S U , I I ,3,0,0 , , , , 1 I L , 1 _ 1 , 1 tit 13010 3 0 0
20. Drainage, paving, curbs, sidewalk, illumination, H J 75%
channelization
LID
M,O,NIRIO,E, ,A,V,E, INIE,6,TIH1 ITIO, IN,E11,2,T,H1 2MB,D,F1G ,0+3,8 C U ill 1 1 , 1151810 I I I III Ili III 1151810 I I11518,0
21. Drainage, paving, curbs, sidewalk, illumination, H J 25%
channelization, 44' roadway LID •
V,A,L,L,E,Y, ,P,KIW,Y, ,G1RIA,D,Y, ,T,0, ,1,4,0,T,H1 lIFA1B,D,F ,1l0,0 M U i , i i 1 i , i , 5151010 , , , i i 1 , i 1 5,5,010 , ,5, 5,01 0
22. Grading, drainage, paving, curbs, sidewalk, gutter, GHIJ Developsr
illumination, signal, bike route, channelization, L M 0
landscaping. bridge. 56' roadway .
23. NI ,l,S,T, 'Sin ,P,AIR,K, IT101 IBIU,R,NO'T,T, IAIV 3V<B,D,FiG ,042,0 A U I I I , I I , I I ,311'16 I I I I I i I I , ,31116 i 131116
. Drainage, paving, curbs, gutters, sidewalk, channel H
' ization
MIO,N,R,O,E, ,AIV, ,N1E, ,2,N,D, ,T,01 ,N,E, ,41T,H, 1[�//.B,D,F,G ,M,8 C U , , i 1 , , I , , ,61010 I I I 1 i , , , , ,6,0,0 , , 161010
24. Drainage, paying, curbs, sidewalk, H J O.
g g gutters, illumin-
ation, channelization, 44' roadway t^
0o
r
DISTR!ThUTI ON
I COPY DISTRICT STATE AID tmonsi£ER
_ --DO•, 140-049 -- - - 1-COPY C,R.A.E.(COUN.TIE5 OMLY--
-- 1 _ _ ] l
BALL
31-X YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19$� TO 1987 , Page 4 of 6
- _ - - -- - — OBLI-GAT_IO.N PROGRAM — __ Nsa. ng_ ate_ July 20. 1981
EXHIB „IT A
_-City/CourtlySCe unchIn Notes-Dafe-tittered-in_Colo-1-Stnu5t ReeoJ• tin Date July 22. 1981
yp g- L?eeoJ_utiao Number 2410
City No. 1 0 710 3-.4 be en all cards punched from f,
• County No. 1 7 7-8 this forn1. .. J
a PR C05T5'1N THOUSANDS OF-DOLLARS -
• PROJECT IDENTIFICATION oY r' 2 1 OBLIGATION:-SCHEDULE .FUNDING SOURCE
0 Title Route,Road !.o No. Section No. Tbtal d 7 h _. Y_E A F�
z Location Termini Deacri lion of Work a.)'t
Work length \;ost FEDERAL _ •FUNDL
u Beginning Milepoet Q bridge No. a o Code (Miles) c § r(A,,nudl 2 nd 3 rd 4,5 U.A.B. LOCAL FUNDS
F, I.? a a Element) et 6 its AMOUNT PROGRAM
_ . _
.i _Z • -S- 4 5 9 78 5 .10 . II 12v 13 14 15 16 17•.
1 AS 86 • s7 40 41 44 45 4@p744e ' F4 Si...- es w se Go is 04 •r1,4s 7t a TS 76 is to es
25. N,E,i1;2,T1Hi .EtD.M,O,N1-D,S, ,T,OI ,Kt It RI KtLI-AIN,D 2I%/,-B�Dt-F,G ,.0a3,-1 C U- 1 i t , .• 1 t • _. • i . 15t814, i 1 I • i I I_ e', 1 , • L51814• I 1 1518144
Drainage, paving, curbs, gutters, sidewalk, illumin- H J 50%
ation, channelization LID
26. L;IL N,D W1
1 ,A,V,E, ,S, 1161TiH, ,T,O, iSiWi !GIR,AIDIY 2Y//BiDiF,G 104210 S U tit tit , 1 , 1 ?_,4, 010 1 1 L . I 1 , 1 , _ 21410,0 112141610
Drainage, paving, curbs, gutter, sidewalk, illumina- HIJL Developer
tion, signal, channelization, bike route, landscaping, M 0
FAI-405 Bridge. 44' roadway
27. StT1,NISIEIT. IA.T.1Vif1 1RIRIf),N,S,fhN, 'not ,I,4,015 21�� 0a B,D1F,G . 5.0 M U I I I 1 11 I . I I ,81410 1 I I 11 ill 161410 , 1 181410
Drainage, paving, curbs, sidewalk, gutters, signal, H I J 20%
illumination, channelization, widen to 68 feet . LID
V,A,L,L,E,Y1 ,P,IC,W,Y, )Si WI411LS T T O ,S,W,116,T 1 /,A,BID,F ,147,0 M U I I I , II III 6101010 III , I 1 / , I 6101010 , '6101010
28. Grading, drainage, paving, curbs, gutter, sidewalk, GHIJ Developer
illumination, signal, bike route, channelization, L M 0
landscaping, bridge
VIA,Li LiEIY, -LP!K1W1Y, IS,W11161Till' ,T10, IGIRIAiDiY 1WAiB.DIG ,04110 M U I I I i 1 , , , I 5i 01 010 , i I I I I I I I 5101010 I 'Si%010
i �• Grading, drainage, paving, curbs, gutter, sidewalk, GHIJ 20%
illumination, signal, bike route, channelization, L M 0 LID •
1 landscaping. bridge. 66' roadway
L.K. ,W,A.SOH. .B.L.V.D1 1NI IPiKt 1T,01 ICII,TIYu IL 2rABi91F.G 1310,3 S U 1 1 , , 1 i I I 1 4181010 11 , i t i 1 I i 418.0.0 1 .4,81010
30. Drainage, paving, curbs, sidewalks, gutter, illumin- H J 25%
anon, channelization LID
S1W, 1217,TIH, IV,AILILI IPIKIWIY, ,T101 1W, ,V.AiL1 ).f'//��A.B.D,F 10a513 S U , 1 i 11 1 1 1 1 2151010 1 i i 1 1 i 1 i 1 21510to 1 12151010
31. Grading, drainage, paving, curbs, gutter, sidewalks, GHIJ Developer
illumination, signal, bike route, channelization, L M 0
landscaping, 44' roadway
SiE, ,P1U,GIEITI ID.R. 1J10.NIE.S1 LT,OI_ .EIDIMIOIN,D 2I///.B,D1F,G ,047,8 S U i , i 1 I I tit 191610 I . I I I I 1 I I ,91610 t , ,9,610 .
32. Drainage, paving, curbs, sidewalk, gutter, illumin- H J cA,
' ation, channelization, 44' roadway I1
co
. DISTRIBUTION
I-COPY_D-I$TRICT STATE AID E1410I1-46ER
DOT 140-049 I-COP-Y-C,R.A.8.-(COUIILTIE5 ONLY - - -- -
Jan. 1990
i
. I51A ,-t SIX. YEAR TRAN8P0RTAT10N IMPROVEMENT PROGRAM 192Z. TO 19 g7 Page 5 of 6 '
— 0-BLIGATION____P--RO-aRA-M July_20,_1981 - —
• EXHIBIT "A" Hearing-Date
Adoption Date July 27. 19 81
City/taunt _Keypunching-Note:-Data-entered-in-c-ole-l-8-muat Reeolution-Number 2410 '
City No. 1 0 71 o s-a. be an all cards punched from it •
County No. 1 7 7-6 thin form. e x PR O-J.ECT.COSTS'IN THOUSANDS OF'DOLLARS •
n °' a OBLIGATION:SCHEDULE• PROJECT IDENTIFICATION 0X � , FUNDING SOURCE
0 Title,Route,Road Log No., Section No., 2 o Work •Total .b __•_._Y.E A. CZ .
E Location/Termini7Deecrtption of Work, ,.' Code •Length .2\;a FEDERAL .- .TOTAL
,u Beginning Milepoet 4 Dridge No. -d o (Miles) -2.� t(Aiinv�1 2 nd 3rd - 4,5 U.A.B. LOCAL FUNDS
1-: O. tY Element) 4 Gill AMOUNT PROGRAM
4 E LS-- 4 5 676 • 9 • 10 . II IE 13 . - 14 15 16. 17•
-9 ., 1!Se 41 4Q 44 45 40 47 48 • Si 62._-_ 55 70 ' 34 00 33 04 • •7 N . II 12 73 74 78 80 08
Sit/Jig StEITI IB1x.IIVIDi -.II4i0151 ITI0, IPIAlRtK1 IDIR-2KB,D�FIG ,0>191C S U - 1 .1• (-, ,• 1 i • . ,- I •1181010,-_1--1 i I I ..1 I -1-.118101Q 1 L1181010,
33.
Drainage, paving, curbs, sidewalk, gutters, channel- H J
ization and illumination ���/�,
34. B,EINIS,0,NI ,R,D, IG1RIAIDIYI ITI0, LSIEI 13111S,T1 2V) B,DIF,G ,118,0 S U 11 1 , , 1 1 , i 214,010 III 11 , I I 1 214,0,0 1 12,4,0,0
• Drainage, paving, gutters, curbs, sidewalks, illum- 10%
ination, channelization (dependent on SR 515 Phase 2) LID
35 TIAlYILIOIRa 1N,W, iR,E,N,T10,N, ,T,0, ,SI T,E,V,E,NI S 2 , B,D,F,G ,OL6,0 C U I I I I I I 1 1 1 1712,0 1 I I I I I , 1 , 171210 1 i 17i210_
.
Drainage, paving, curbs, gutters, sidewalks, ilium- H J 25%
ination, channelization LID
N,E, ,1, 2,T,H, 1LY, ,NIN,W,0101D, ,T,01 ,U,NII101N, , 2MBIDIF,G ,016, 0 C U I i I I , , I I 1 1,01010 1 1 I i i , 1 , 1 110,0L0 , ,1, 0,010
36. Drainage, paving, curbs, gutters, sidewalks, illum- H J 50%
ination, channelization LID
U,N,I101N, ,A,V, ,N,E, 1S,U,NIS,E,T, ,T10, ,N,E,2,41T 2MB,D,F,G ,047,0S U tit III III ,610,0 1 1 I 1 1 1 1 1 i ,610,0 1 1 16,0,0
37' Drainage, paving, curbs, gutter, sidewalk, channel- H 50%
ization
��
LID •
E,D,M,O,NID,SI ,A,V,E, ,EIXITIEINIS,I,0 N 1 1MAIB,D,F ill U I I 1 I , I III III lit III III AI ,
38. Connection from NE 3rd to Maple Valley Highway. G H I L
Alignment not determined at this time. ����K
•
I I „ , I I I , I I I I I I , I I I , I 1 , 1 I 1 R , I , , • , III III III 1 1 'I lit lit III III 11 1 1 1
Kill-
III III III III III III III oil III 1 1 I 1 1 ._
n
DISTRIBUTION
1 GOPYDISTRICT STATE AIO ENAIMLER_ -
DOT I40-049 - - -- - --- --
Jnn.-13tit3 I COPY CR.A.E.-(COUNTIC3_ON1.Y)
3A1-t
3T-X. YEAR.TRANSPORTATION IMPROVEMENT PROGRAM 19 82 TO 19 87 Page 6 of 6
-- _ - - _ — O-BLI -AT-iO-�---IPROdRAM`  -- EXHIBIT "A" - - Heering Date- July 20. 1981
ADDENDUM #1 - STATE HIGHWAY PROJECTS Adoption Date July 27. 1981
CHHy/County _Xeypunching- Tote---Data-entered-in-cols-I--8-must eeo ufla`If is 1410
Gay No. 1 0 710 s-a be on all cards punched from 1
County No. 1 7 7-8 this form. 81 R PRcvaecr.CO5TB•1N THOUSANDS OF'DOLLARS
• ., �' c OBLIGATION"SCHEDULE o
PROJECT IDENTIFICATION ex FUNDING SOURCE
z Ttt le,Route,Road Log No., Section No., a Total d -a b _ Y E A R
�o Work. FEDERAL _ .TOTAL
Location/Termini,Deacrlption of Work, 03length &\;o
n Beginning Milepoai Bridge No. tl(0.
Code {Miles) c.g t/ .-_-1 2 •
nd 3 rd 4,5 U.A.B. LOCAL FUNDS
►� • _ II'c., C3 Element) et 6 th AMOUNT PROGRAM
i -Z 6. =33 4 5 8 7 8 3 .10 . II 12 13 14 15 16. 17'
_Jrapdr 44 4s 4@f17 48 ' 6I 52--'-._ 5510 ' 69 CO e6 et • vie . . Ta le 76 71, 1969 es
S,R. 15.1151 (S. IP,UIG,ElTI rDIRI IT,OI ISl ICIIITIX lf%/,FIGIHII ,110,6 M U J I- 1 , 1- , I ► . , I . 1 . I . 11. I . 1 1 I .'1 i 1 ♦ 1 1 1 . 1 1 1 1 1 1
State DOT Project - construct new roadway. J
City participation: sidewalk, curbs, signalization,
illumination, channelization _
F,A,I, ,4,0,5, ,N, .CiliT,Y, .T,O, ,S, IC,I,TIY, I I 2 y// 1 1 , 1614,4 M U 1 1 I 1 1 1 III 1 1 1 III III III III I I I I I
State DOT Project - capacity improvements r��
•
SIR! 11.6,9. 10.U,EIE INI ,SIEI ,TIO1 1114191 TIH! ISIE 1Y// 1 I , .1a414 M U III . I I . 1 1 I I I III I I I ill III IIIII
State Project - construct five lane roadway y//�
S,R1 '9,0,0. ,R1EIN,T101N, IT10, 121S,S,A,4,U1A,H, , 2P/l 1 1 . 1,10,0 M U r I , I , I , 1 1 tit lit I , , , , I I , , 1 , , 1 1 ,
State Project - widen to four lanes with five lanes
' at intersections
SIR, .511.5, IS,7,T,H, IT101 ,A,I,R,P,OIR,TI IWIA.Y1 1 M BJD,F,G 0347,0 M U III 11 . , I I II . III III I I I 1 1 1 IIIII
Drainage, paving, curbs, sidewalk, illumination, HIJL
signal, channelization, bridge, 56' roadway .
' milt 1 / 1_1 . 1 4 . I I I ill 1 1 1 , 1 1 1 III III III III IIIII
I „ I , I I I , , I , I 1 1 1 1 I I 1 I I I , 1 1 L . . , I a I III III III 1 1 I Ill I I I III III 11 1 1 1
l I , I 1 , I I I 1 . I Mitt . 4 1 1 1 1 III III III 111 III III ill I I I I I
1
11315TRIBUTI ON
I COPY DISTRICT STATE AID ENGINEER
DOT 14o-049 1 COPY C,R.A.D.(COUNTIES 0111LY)
Jan,.—I990
•
•
i
/ , ii Mw,...dar 1 i
/02 72 st qAs 74 X FtiNA - CAPindu... 0 LimAly.
PAGE 8'8
, ! PRoTecr L./Sr/A/0
' -77--- ---- _ _ .7.—___. (I? _------____71-F-_. _
, .
• TOTAL ' 5/2/b4E icAsP 0 il .
--. Alqii Reoret r i 4,AeofiglA,7oN F4vs ROL. or 74,
7449 OAS 74
.- . --- r—• , • • :
211o/2, earegte4F.72.pl. ,7)14.1seg 37Soo; ,' ,
3,11 /.17 NE Sunsef•sig.tals, Conor. . .32100. 2895y 0 32/co!
4 if2, g/A'Xing Ilarkiiigs!Audit.
.4546_ 0 rady Bridge __IPS 4'E .73 308. . .. _ ' /7080.
,..!, (41.50.SEE 3oi FuNb) 1
. . . .
40et NE 41C/niao 9 Ave. Audit 700.. 1
1 i . . 7o0i
•,1 Ara 41
i - 8 p68 Tial bal. les;1.S. consrrr , //6 922. : ..
. . . 1/6 922i
. 9[072 nionrbe Ave.NE r.onst-r. /00000, 1 • l00006,
11
'0 /144 Valley e41.1.4714Y__Av1ih Soo ! Sop'
1 5/1/ . sly 27#* Slimly I Audit .. Soo ; Soo' .
i 2177 Pugel•br S Alemsorii. Lonsrr 210 Ooc:i II7it 0 ad, . 36000!
, i !
• , . • ,
-- 3.1,
4:1/2 3 Hayes PI.NW OPer/ay 2oo V . ' • 2000
,./z44 .1iczniii Ave NW , A ylgoo . y Boo
. 1/25 Me/son P/. Nw 1 2250 .
; . . 2 2 SO
.1/12: NW 3rd.Sfr /2 oo • • , . .
,
..V27 NW 3rd.l'/, , , 25"So :
. . .
9 'I/2 ' NW174%. SY-.• 3 3o o • • t • . . . . 3 306,
0 i/29 Map& A ve,AM/ .' 6000 . 6 pod
T-
., i/30 NW 2h . ./aoo , /Boo,
d Pl . . . .
.293/ NIV 2Au/SI: /Boo , . . .1 Boo'.
•
.3.132. Lind Ave. NW 1 67go : . , . . . . 675p.
.-1.:133 SI-everur Ave.Niv i0500 : . . . . . . . 10500
Ni4, 5,44 AY.
1 i Soo /5°6
-*evens CourfrNki
., . /goo i . . . . I Soo,
,
.7 V3 MVO% P/. j, . 3 7 5*o 1 . . . . . . . . 37 So.
--Iii/371 Seneca Ave NW / . 9750 ; . . .
, /.38 nitylor,4ve NW goo : . . . .
?pp.
,„,a 7,44, sfr .. . - 33 op
. .170oo. 1 . . . ‘. Boo.°
. . .
i
diliVil NW 5,4 Si7 /COO . . . /506.
il 1
Seneca Ave.NW 2 5165o . . . . . . . S 650.
4!'/4'31 NAV 3rd.S1-. 24400. . . . 24coo.
____alefaCi
li 1
.r4451 Noi CHIP/.
i 27S0 . . . 2750
: --- ,i4a Houser Way N Overlay 29000 , 29 000
,_ .,_ 65Yerhxy Subiblal:10917So) . ^ • ..
•,, PA sop, 0 qe
---, sehooe
_ .._ . . i -7-0i74L EV..7 . RCA-. twev,LA o 4A -74 X
1 , .
28 ego 0 '
631 780 /V 000 175480 2700 0 4oEb7o
•
•
1 .
--- _... . 411-. „E'rbetiale Fond Baiarice . r. _._ -,0-
/952 B411)0Er 9 M.. Inge
3W M
3o/ FORWARD T1�R(/J7 F na - CAP/TAL ou'rLA> PAGE 89
•
' PA•oTEcT L/ST/wG
— �__— - __ (11 _ (2) (3) (4) (5) , I
Aeo(i , ToTAG B�Q/D yE (/T/t/7y FwD.
all, PROTECT fIPP�Ga4C/ATiaN UAB RE-Pi.. O TNRv.S`r
1
dr .
PseE .
:I 2 arder, Ave N. consfr. 9,5-/251 . . . . /5/25
311 (A/so set L/. ) . . I .. . .
'II I PS;'Es
. Io2B Z. /214•.1't C.o•,sir. /96 5oo /9•6 Soo '
lo'2q Logan Ave.N. dead,. S000d . . . I S0000 .
i9� .
101 I
11!101 0.AVe//s Ave.Bridge Co sh-. 600001oj . . ,yca0000! /20 000
I 11
. W $6 rad Way Bridge C sn.r r ,B22 00o .65 0.00� . /bc000
y N 9 i . 7
.51 I 61/so see /o2 Fund) 1
16 j • 1(70/P4 project Altikk4/a) . . i . . . . .
'
I
'al/// 15W 413rd sr Conrf r. /,26/,Soo; ✓/2op.00l_ . - ; . 6/Soo:® 6975o; .
9I (�Tointprof�ct�Kenh� •
/Q 250:®
II(Also see Lb) 323),
11 I 11 . .
ppSE'E I
z= //3 572 S/SP�,arell Constr. rf25000. . . . I 4 ZS000
,3I ,
'+. . . . • . . • i
' I
s1
6i
I •
I
Dry jPMoPRn4r#eA/ (JAB R5PL. 1 .
'_- 3,445o,/25.. 4/2o,0oo ;/37,000 6/Soo© /,/2/,37.5'
/o 25o 0 ,
.7
.3! Endmn9 Friyc . . . . . . . . . . . • . . .
-- .4I Balance .
,si /6�C9 r/75
I
r,� /q82 Buoc�e-r .
9 6,ogq,600 ._ . . . . . . • .
•J,: I
1.I
I
. . 'Es*.Er+drn9Furid-Ba/. ,64,c75,-- -"- -
Affidavit of Publication
STATE OF WASHINGTON
COU TY OF KING ss. _ __
1
- c RENTON
I .b a -NOTICE J
Audr.e ...De J �oie being first duly sworn on n„ PUBLIC
RENTON COUNCIL
oath,deposes and says that.she.is the ...c.hie.f...c.1.erk. of p'1 OTICE HEREBY GI-
THE DAILY RECORD CHRONICLE,a newspaper published six(6)times a VEND Renton City
week.That said newspaper is a legal newspaper and it is now and has been
Council ( 23rd
for more than six months prior to the date of publication referred to,
"daycWAugusf,198 plg:;bar?:
printed and published in the English language continually as a newspaper $a]t(xb Council Champublished four(4)times a week in Kent,King County,Washington,and it is ers oft Renton Munici
now and'during all of said time was printed in an office maintained at the -Building, o a ED Avene
aforesaid place of publication of said newspaper.That the Daily Record "South,Renton,Washingto
Chronicle hasl been approved as a legal newspaper by order of the Superior as the EStI am fa ,
Court of the County in which it is published,to-wit,King County,
2Jpublichearinglbconsid
the following:
1983'89• Capital Im='
I
Washington.That the annexed is a.Nati e•e•••of•••I ie•e ti•g 1:•l5rovement Program.Re-
quests(Im[gyp Depart-
ent,Library„G an.
R8155 p. _
Recreation De artment,
Policy Development De=
as it was published in regular issues(and pat lent, Public Works,''
not in supplement form of said newspaper) once each issue for a period i De-,,�P, tment,, ay''
�s(S ewer) Droision, Utility
(Watgr)`Dwision and
Airport::,
of I 1 consecutive issues,commencing on the y, l�interestedper
11 f,invited lb pre
b t hsent to voice approval• , dis=(,
.. .day f August ,19...82.,and endingthe ' " � ,
same,91 AI opinions ions on'
,ie i- i. ,, -,, ,,- • LA r'
1 `,"` * v' 'City • Renton
... y,iday of -� ,19... both dates r r); Maxine' Moter
in 4 e, and that such net P as regularly distributed to its sub-
scribers'during all of said period. That the full amount of the fee ~+t:Published lathe DailyR
• Chronicle-August'`( ;
R8155. o
charged for he foregoing publication is the sum of $ .. which
has been paid in full at the rate of per folio of one hundr for the
first insertior•and per folio of one hundred words for each subsequent • -
insertion'. -
I
•
1 Chief...Clerk
i
Subscribed and sworn to before me this 16th day of
I, ;
Aui 'u t _ , 19'82
.__ 1 . . „_.42 ,-- _
I: : Notary Public in and for the State of Washington,
residing at K5ek King County.
—Passed by the Legislature,1955,known as Senate Bill 281,effective June
9th, 1955.
i
—Western nion Telegraph Co. rules for counting words and figures,
adopted b the newspapers of the State.
I
VN#87 Revised 5/82
I
Affidavit of Publication
STATE OF WASHINGTON
COUNTY OF KING ss.
allRENTON
J PUB
NLICOTICE
CN
Audrey..DeJ ie being first duly sworn on $3 R NTON l COUNCIL
NOTICE E HEREBY Q
EN GU gin Renton Cii17
oath,deposes and says that alas.is the ...ell3Gf...elerk of Council 1 23rd
THE DAILY RECORD CHRONICLE,a newspaper published six(6)times a •ay62August,1982,E(38:00
week.That said newspaper is a legal newspaper and it is now and has been r'Tm.fill ,Mil Council Charnb--
for morel than six months prior to the date of publication referred to, d�(i-5 Renton Municipal
printed and published in the English language continually as a newspaper '.` I•`9 i'All Din Avenue
published four(4)times a week in Kent,King County,Washington,and it is 1South,Renton,Washington,
now and during all of said time was printed in an office maintained at the kas'Rollo kaii•'1 for p'
aforesaid place of publication of said newspaper.That the Daily Record public f"�xA t consider
Chronicle haslbeen approved as a legal newspaper by order of the Superior the following:.-
Court of the County in which it is published,to-wit,King County, 1983 89 Capital Im-
improvement- .. . Re
•uests -Depart-
Washington.That the annexed is a.Nonage.f- e'8tin Milt Library, at and,
I
Recreation Department,
• s Policy Development De-'•
118155 ; partent 'Public Works
� ,D; pa�rtment Milli ty
as it was published in regular issues(and (Sewer) Division, Utility
not in supplement form of said newspaper) once each issue for a period tt`(�Wate) Division and
r Airport.
I `Any and ED interested per-
kliP3 • 47L7pre-
of 1 consecutive issues,commencing on the ,sent; ;,5:2,approval, dis
approval.: opinions' on.
same ix ;)1 , '
...6 th..'day f 41,1P118:b 19...82.,and ending the a ,l "i
cz, � �►rf�Reriton
(u E Motor.t
s Acting City4lerk',
4„�•P-ublished(al the Daily Re-
day of ,19...{.�. both dates LJ Chronicle August 6,
in e, and that such ne t� as regularly distribdtl to its sub- 198.2:G IPPI,
scribers during all of said period. That the full amount of the fee
I
charged ifor -he foregoing publication is the sum of $... which
has been!paid.in full at the rate of per folio of one hundr2c xl,o 4 for the
first insertion and per folio of one hundred words for each subsequent
insertion'. d
-.0 ,3fzI‘,);:• • •
Subscribed and sworn to before me this 16 ill day of
f3u(,ust ,- 9.82n..
e I
• - I -•Notary Public in and for the State of Washington,
residing at Kent King County.
i A7 U
—Passed by the Legislature,1955,known as Senate Bill 281,effective June
9th, 1955.
1
—Western Union Telegraph Co. rules for counting words and figures,
adopted br the newspapers of the State.
1
I
VN#87 Revised 5/82
Renton City Council
2/22/82 Page 5
Old Busin-ss - Continued - Utilities Committee - Continued
Solid Waste the Current Fund/Garbage Account. Referral to Ways and Mears
Management Plan Committee requested for drafting ordinance. The report also recom-
Contin'ued mended the Public Works Department submit a proposal to the Utilities
Committee for improvements to the Renton Transfer Station, funding
from Referendum 39, Capital Improvement monies - Puget Sound Coun-
cil of Government (PSCOG) . MOVED BY MATHEWS, SECOND STREDICKE, CON-
CUR IN COMMITTEE REPORT. CARRIED.
Deak LJCAG Utilities Committee report recommended Council concur with ,he
Public Works Department to approve granting of the Dr. Deak Late-
' comer's: Agreement in the amount of $19,340 for a period of ten years.
The Mayor and City Clerk are authorized to sign agreement. MOVED
BY MATHEWS, SECOND STREDICKE, CONCUR IN COMMITTEE REPORT. CARRIED.
Utility Portion The committee report noted review of the Six Year Capital Improve-
6-YeariCaOtal ment Program - Utilities and recommended the Public Works Dept.
Improvement Pgm. prepare a list of the prioritized projects and their current status.
Information only, no action required.
Councilman Reed examined the committee report attachment: Proposed
Public Works Projects in Prioritized Order and questioned ;lighting
replacement of 155 luminaires (5 year program) , asking re d corative
lighting in CBD. Houghton explained 155 luminaires are replacement
in downtown, but not decorative street lighting but the high sodium
Vapor lights.
ORDINANCES AND RESOLUTIONS
Ways and Means Ways and Means Committee Chairman Stredicke presented ordinance for
i
CommititeeI second and final readings (first reading 2/8/82) which amended
(Ordinance #3611 the fee schedules of Title IV. Building Regulations and Title IX
Number Re erved) Public Ways and Property of the City Code, by adding annexation
filing fees and lot line. adjustment fees. Annexation filing fee:
Ordinance #3612 $200 for 10% petition and $300 for 75% petition (Resolution 2429) .
Filing� Feip Following reading, it was MOVED BY STREDICKE, SECOND HUGHES, COUNCIL
Annexatiohs and ADOPT THE RESOLUTION. Councilman Stredicke questioned same fee for
Lot Line single lot annexation as numerous parcel annexation; Rockhill noted
Adjustments intent to encourage large annexations. Upon inquiry, Policy Develop-
, ment Director Clemens noted the filing fee covers basic city costs
for processing annexation. ROLL CALL: 5-AYE: CLYMER, HUGHES, ROCKHILL,
REED, MATHEWS; ONE NO: STREDICKE. CARRIED.
First Rea ing The Ways and Means Committee recommended first reading for an ordi-
nance providing for appropriation and transfer of $36,188.87 from
Cumulative Reserve Fund 3278 Unemployment Compensation to Unemploy-
ment Compensation Fund #608. MOVED BY STREDICKE, SECOND CLYMER,
REFER THE ORDINANCE BACK TO THE WAYS AND MEANS COMMITTEE FOR ONE
WEEK. CARRIED.
First Reading The committee recommended first reading of an ordinance authorizing
acquisition of property by condemnation in Superior Court for the
construction/installation of sanitary sewers, water mains, curbs ,
etc. in the vicinity of East Valley Hwy and SW 16th St. , LAID #314.
Following reading, MOVED BY STREDICKE, SECOND ROCKHILL REFER ORDI-
NANCE BACK TO THE COMMITTEE FOR ONE WEEK. CARRIED.
•
Ordinance #3613 Ways and Means Committee Chairman Stredicke presented an ordinance
Gene Coulpn for first reading . suspension of rules advance to second and
Memorial leach final readings and adoption. The ordinance provides foriissuance;
Park Bonds specifies maturities and terms of $1 ,825,000 General =Obligation
Park Bonds 1982, authorized by voters at a special election,
pursuant to Ordinance No. 3336, amended by Ordinance 3350.,
Following first reading, it was MOVED BY STREDICKE, SECOND; HUGHES,
COUNCIL SUSPEND RULES AND ADVANCE ORDINANCE TO SECOND.AND FINAL
READINGS. CARRIED. City Clerk Mead read ordinance. • MOVED BY
STREDICKE, SECOND HUGHES, ADOPT THE ORDINANCE AS READ. ROLL CALL:
ALL AYES. CARRIED.
I
Renton ity Council
2/22/82 Page 6
Ordinances and Resolutions - Continued - Ways and Means Committee - Continued
Resolution #2437 The committee recommended reading and adoption of a resolution
Propose Alley setting the date of 5, April 1982 for public hearing1on proposed
Vacatio VAC 3-82 vacation of alley located between Burnett Ave, N and Park Ave. N
Kennydale and N 32nd St. and N 33rd St. ; petition filed by Davidson; VAC 3-82.
Following reading, it was MOVED BY STREDICKE, SECOND ROCKHILL,
RESOLUTION BE ADOPTED AS PRESENTED. CARRIED.
Voucher Approval Ways and Means Committee recommended approval of Vouchers#38132
through #38404 in the amount of $982,967.72 having received depart-
mental certification as to receipt of merchandise/service . Approval
includes LID #314 Revenue Warrant R-11 $13,725.80; LID #317 Revenu-
Warrant R-7 $23,051 .61 and LID #320 Revenue Warrant No. Ril $1 ,340.
(Machine Voids: #38127 - #38131 ) . MOVED BY STREDICKE, SECOND BY
CLYMER, APPROVE VOUCHERS FOR PAYMENT. CARRIED.
The committee report recommended withdrawal of request of Personnel
Director for amendinglegislation for Finance Director poition,
9
noting present ordinance reflects desired amendment. Stredicke
inquired as to date ordinances first codified and process of up-
dating to maintain current status. City Clerk Mead explained the
Master Code Book is available for departments to check their books ,
that ordinances first codified in 1957, recodification underway,
scheduled for 1982 completion; new Code Books to be issued. ,
NEW BUSINESS Councilman Clymer called attention to Public Hearing 2/25/82 Special
Special Meeting Meeting re land use regulations for adult motion pictures, 7:30 p.m. .
Executive Session Council Chambers. Clymer requested an Executive Session be held
following regular meeting to discuss pending litigation.
Garbag- Contract Councilman Stredicke noted new garbage contract limits the number
Increa es limited of times collection fees can be increased to once per year and
to Onc per Year estimated higher costs claiming King County raises dump fees with-
out prior notice and often mid-year. Stredicke urged option for
contract to allow increase. Finance•and Public Works comments invited.
ADMINISTRATIVE Mayor Shinpoch commended Clark Peterson, noting presentation of
REPORT certificate of merit from the Vocational Technical Institute for
his service to students.
Mayor Shinpoch spoke to 60 first grade students about the City
functions such as clean water, police, parks , etc. i The Mayor dis-
tributed drawings from the class , noting her enjoyment of the ques-
tions asked, such as "Do you know where Lola, montana is?"
Mayor Shinpoch noted Councilwoman Mathews and City. Clerk Mead would
be addressing Kennydale School girls in Mayor's absence.
Nation- 1 Cities Mayor Shinpoch announced she would be leaving Thursday toIattend
Confer-nce the National Cities Conference in Washington, D.C. Council Presi-
dent Clymer also attending following Council 's Public Hearing 2/25.
HB 101 , Opposed Councilman Stredicke presented letter to state government officials
requesting denial of support of HB 1014 and cork for passage of
sales tax increase without the requirement to prohibit system
j development fees and limit utility taxes. The letter explained
fairness of systems development .fees. MOVED BY STREDICKE, .SECOND
REED, LETTER BECOME OFFICIAL COUNCIL STAND AND AUTHORIZE SENDING .
CARRIED.
Executive Session MOVED BY STREDICKE, SECOND CLYMER, COUNCIL RECESS TO EXECUTIVE
SESSION. CARRIED. 10:45 P.M. Council reconvened in regular
session. All Council Members were present at Roll Call . l MOVED BY
ADJOURINMENT CLYMER, SECOND STREDICKE, MEETING ADJOURN. CARRIED. 11 :i00 P.M.
I
(Z.:I' --U-e . //".<- 1
Delores A. Mead, C.M.
City Clerk 1
I
1
VIP
,
Rentonl City Council
2/22/82 rage 4
OLD BUSINESS
Committee of Whole Council ' President Clymer presented Committee of the WholelReport
StreetIVacation requesting that the citizens of Rolling Hills obtain a MAI appraisal
SE 18th S't. of that portion of SE 18th Street as requested for vacation VAC 5-81 .
VAC 5-81 The report stated the matter is tabled until the appraisal is pre-
sented to the Council . (Matter referred 12/14/81 ) MOVED BY CLYMER,
SECOND HUGHES, COUNCIL ADOPT THE COMMITTEE OF THE WHOLE REPORT.
CARRIED.
Disposition The Committee report recommended acceptance of the plan for use of
Old Shop Site the old shop site property as a pea-patch as outlined by the Housing
and Community Development Coord ni ator, Ed Hayduk. MOVED BY CLYMER,
!
SECOND STREDICKE, CONCUR IN RECOMMENDATION. CARRIED.
!
City Shop The committee report recommended the Administration request the
Projec1t R view Finance Department closely monitor the bond market for favorable
1 conditions for selling the councilmanic bonds. Information.
Planning , nd Planning and Development Committee Chairman Rockhill presented
Development committee report noting consideration of request of CHG International
Commitheel to amend the P.U.D. Ordinance to provide for temporary or ' final
P.U.D.,1Orl1inance, occupancy permits prior to completion of the entire P.U.D. plat.
Condition 1 The report recommended Council concur in the recommendation of the
Use Permit Policy Development Director (letter to Committee 2/18/82) and refer
the matter to the Ways and Means Committee. MOVED BY ROCKHILL,
SECOND HUGHES, CONCUR IN RECOMMENDATION OF PLANNING AND DEVELOPMENT
1
COMMITTEE. CARRIED.
Fence Height The committee report noted review on 2/11/82 of Council referral of
Variances 6/1/81 re the subject of variance of fence heights. The committee
recommended Council acceptance of the recommendation of the Building
and Zoning Department report 2/11/81 . N0' leaislative action required.
MOVED BY ROCKHILL, SECOND REED, COUNCIL ACCEPT, RECOMMENDATION OF
THE COMMITTEE. CARRIED.
! . .
StreeU Stredicke inquired re holes in street, noting earlier claimsl for
Improvem=nt damages. Public Works Director Houghton noted the streets now
repaired. Stredicke inquired of schedule for street resurfacing
and was advised the 6-Year Street Improvement Program would soon
be considered.
Metro Bus . Councilman Reed asked the delay be investigated for replace Tent of
Passenge shelter for Metro bus passengers at new location of Mill Ave. S,
Shelter noting 60• day delay. Houghton acknowledged request. ,
Reed also requested upgrading of parking lot markings forihandicapped
spaces,. noting deterioration of paint.
Utilities Utilities Committee Chairman Mathews submitted committee report
Comm— it ee[ regarding request from West Hill Water Districts to purchase water.
West Hill Water The report noted meeting with Public Works Dept. and recommended •
the City cooperate with the districts in developing a joint use
water system improvement plan to best serve all interested water
districts and the City West Hill area. MOVED BY MATHEWS, 'SECOND
STREDICKE, CONCUR IN THE COMMITTEE REPORT. Councilman Clymer
called attention to plan several years ago to build water tank in
the West Hill area, however Water Districts withdrew and funding
was lost. Public Works Director .Houghton explained proposed construc-
tion working with comprehensive plan for joint facility, noting tanks
in Highlands and Rolling Hills. Houghton also noted funding may
still be available. MOTION CARRIED. 1
it 1
Solid Waste Utilities Committee report noted consideration of. solid waste manage-
Management Plan ment plan to bring King County into compliance with state ard federal
requirements. The report recommended Council authorize participa-
tion in the program at a cost not to exceed $2,396.00 to be paid from
zRentoi I ty Counc'
7/27/81 Page 3 '
Ordin races and Resolutions - Continued
Zoning Inquiries Councilman Shane inquired regarding zoning of annexed la d,
being of the opinion that all property should be annexed as
R-l . Acting Planning Director Clemens called attention to City
ordinance establishing G-1 zone for all annexed property with
subsequent rezoning. Councilman Stredicke noted for the record
that Council sets policy; General classification provided by
State law; Council has not chosen to deal with zoning of property.
Resolution #2410 The Ways and Means Committee recommended reading and adoption of
Six-Yoar the following resolutions:
Transportation
Impro ement Resolution was read adopting the City's Six-Year Transportation
Program Improvement Program and Arterial Street. Plan; public hearing
1982- 987 was held 7/20/81 . MOVED BY CLYMER, SECOND ROCKHILL, ADOPT
THE. RESOLUTION AS READ. CARRIED.
Resolution #2411 A resolution was read giving Council approval of a final plat
Hilli Homes for the subdivision of property located at the east side of
Final Plat Edmonds Ave. NE at NE 23rd P1 . ; known as the Hillis Homes Co.
FP-0 1-81 Weatheredwood II . MOVED BY CLYMER, SECOND SHANE, ADOPT THE
RESOLUTION AS READ. CARRIED.
Resolution #2412 A resolution was read authorizing transfer of $7,525.56 from
Fund Transfer ADAP Project Fencing Acct. to Equipment Rental Account, flor the
All-Weather Mower purchase of an all-weather Mower. MOVED BY CLYMER, SECOND BY
HUGHES, ADOPT THE RESOLUTION AS READ. Stredicke recalled Aviation
Committee had recommended retention for Airport. CARRIED.
First Reading
Ordinance re An ordinance was read appropriating funds in amount of $197,522
Pa'jrke - Property for acquisition of Parker property, Cedar River Trail ., MOVED
Acqui . ition BY CLYMER, SECOND ROCKHILL, REFER BACK TO WAYS AND MEANS COMMITTEE.
VOU' CARRIED.
CH RS FOR Ways and Means Committee recommended, approval for payment of
PAYME T Vouchers No. 34871 through No. 35092 in the amount of $929,290.65
having received departmental certification as to receilp of
services/merchandise. Vouchers #34861 through #34870 machine
voided. Approval includes LID #322 Revenue Warrant No.R-5
in amount of $1 ,032.01 . MOVED BY CLYMER, SECOND HUGHES, APPROVE
VOUCHERS FOR PAYMENT. CARRIED.
Parker iProperty Upon request, City Attorney Warren explained acquisition of the
Acqui tion Parker property, 24 acres located on Cedar River Trail , that
Cedar River the City went to Court for condemnation and suffered defeat,
Weida ds that Council authorized the City Attorney to negotiate acquisition;
$225,000. Warren noted the property owner is making gift to the
City of additional 25 acres located adjacent to Cedar 'River; also
verbal commitment that property under power lines could be used
for park purposes. Warren noted acquisition made of al trail
property to City limits. Parks and Recreation Director Webley
explained the Park Board is still determining development plans,
that property will be natural low-maintenance, bike/pedestrian out
to Jordan LaRue property, then pedestrian only due to terrain.
Mayor Shinpoch commended the forsight to obtain the trail property
for the citizens.
NEW BUSINESS Council President Stredicke asked the matter of First Cities
First Cities Equities Rezone #R-057-80 be taken from the table following
Equities Rezone Thursday Committee of the Whole meeting concerning drainage in
Green River Valley.
Telephone Taxes MOVED BY STREDICKE, SECOND HUGHES, THE MATTER OF TELEPHONE TAXES,
HOUSE BILL #61 , BE REFERRED TO THE WAYS AND MEANS COMMITTEE FOR
RECOMMENDATION. CARRIED.
Clean Up Councilman Stredicke reported contact with King County Executive
Costs Dunlap re reduction of County dump fees for HSCD clean1up; being
encouraged to continue project but advised no reductionlin-fees
policy.
Ren Qn City Council
7/2 /81 Page 4
ADM NISTRATIVE Mayor Shinpoch reported Renton Host City for girls Little
REPSRT League Baseball State Tournament; Renton team is one of eight
participating. Mayor Shinpoch commended volunteers and contributors.
ADJ0r RNMENT MOVED BY STREDICKE, SECOND SHANE, MEETING ADJOURN. CARRIED.
8:4: p.m.
Delores A. Mead, C.E1.C.
City Clerk
3
' EKPIII 35 CITY OF RENTON
DATE 7/27/81 WARRANT DISTRIBUTION
I
• FUND TOTAL WARRANTS
m MACHINE VOIDS: #34861 - #34870
�• CURRENT •164,l611.50
14 PARKS 029,426.37
1e ARTERIAL STREETS
•15,5111.00
!• STREETS 1155,I821485
LIBRARY •2,036.81
. I
n FEDERAL SHARED REVENUE 0214,597.00
STREET FORWARD THRUST 111422.94
0 COULON BCH PK CONSTR •246,575.29
A WATERWORKS UTILITY •129,635.51
AIRPORT 02.504.27
A 1975 W 6 S CONSTRUCTION •5,160•44
EQUIPMENT RENTAL •44g318.80
w FIREMEN'S PENSION 015,725.66
LID CONTROL 01,032.01
a TOTAL OF ALL WARRANTS 0929,290.65
17
WE, THE UNDERSIGNED MEMBERS OF THE WAYS AND MEANS COMMITTEE OFITHE
RENTON CITY COUNCIL, HAVING RECEIVED DEPARTMENTAL CERTIFICATION THAT!
MERCHANDISE AND/OR SERVICES HAVE BEEN RECEIVED OR RENDERED, DO HEREBY
a
APPROVE FOR PAYMENT VOUCHERS NO. 34871 THROUGH NO' 35092 IN THE AMOUNT
so i
OF I •929,290.65 T I 27TH Y OF JULY 1981e
ss j
COMMITTEE CHAIRMAN MEMBER 0 ni ON
,• i L.I.D. #322, REVENUE WARRANT No. #R-5 32.01
MEMBER • • ■ 7
� I
M
I
1
l
Ren,,p City Council
9/ 4/81 Page 4
Old Businesk - Continued - Committee of the Whole - Continued
Six-Year Capital CLYMER, ITEM FOR REPLACEMENT OF LIGHTING BE DESIGNATED ITEM #ARRIED.
Improvement AND ITEM FOR ADDITION TO LIBRARY BE DESIGNATED AS ITEM #7.
Program
Council President Stredicke listed priority of items for the
Continued Six Year Capital Improvement Program: #l . Maintenance Shop Facility
in Renton Highlands; #2. Gene Coulon Memorial Beach Park Develop-
ment; #3. Cedar River Trail Acquisition; #4. Heather Downs Park
Property Acquisition; #5. Kennydale Fire Station; #6. Lighting
Replacement; #7. Library Addition; #8. Fire Training Facility;
. NewASo System. CARRIED.BY ORIGINAL MOTIONCKE, SECOND KHILL,
MOTION
CARRIED.*
Executive Session MOVED BY STREDICKE, SECOND REED, COUNCIL MOVE INTO EXECUTIVE
SESSION. CARRIED. 9:08 P.M. -Council reconvened at 9:29 P.M.
Real Estate
Purchase `ROLL CALL: All Councilman present.
OLD BUSINESS Council President Stredicke inquired
reespinse toscr itizen
Water Pressure questions re water mains and water pressure
Hills
Questioned and Victoria Park areas. Mayor Shinpoch noted matter under
investigation. .
Aviation Committee Aviation Committee report re ADAP Project 5-53-0055-03 Overrun
Chairman: explained final billing submitted on this project which included
Stredicke $20,597.38 for FAA's portion of the overrun which has not been
paid to the. Airport because there was no ADAP legislation allowing
ADAP Project bel
e asked
original ggna to be amended. The
amendment for thatrt amounted andhe FAArty requires
asked to signgrantClerk to
a resolution be passed authorizing the Mayor
rand
dlCityd lerk
sign. The committee recommended Council app SECOND referral
to the Ways and Means Committee. MOVED BY STREDICKE,
BY
TRIMM, APPROVE THE REPORT. CARRIED.
Fanche'r Flyways The Aviation Committee report noted_ meeting
with Mrs. Wirz of
Leases Fancher Flyways and the matter of compulsory garbage service
was satisfactorily agreed. The committee recommended the leases
be reinstated and the Mayor and City Clerk be authorized to
execute the lease documents. MOVED BY STREDICKE, SECOND TRIMM,
ADOPT THE AVIATION COMMITTEE REPORT AUTHORIZING THE MAYOR AND
CITY CLERK TO EXECUTE LEASE DOCUMENTS OF FANCHER FLYWAYS. CARRIED.
Aerodyne Leases Aviation Committee Chairman Stredicke noted ngotiate nswi Aerodyne
th
Aerodyne on three leases, that upon Attorney's
has been advised to deal directly with leasing party,The Boeing
Company; and that Boeing Rep. Bob Morgan keeping City advised.
Transportation
The Transportation Committee report recommended concurrence with
Committe;e Public Works Dept, for acceptance of completed
Railroad
Gradefinal
Final e Payment Crossing Markings Project #RRS-OOS and approve The report also recommended
Swans,ton and final payment of $10,752.07.
Equipment Co. release of retainage of $1 ,194.68 subject to required clearances.
(See Consent Agenda Page 2.) MOVED BY TRIMM, SECOND STREDICKE,
CONCUR IN RECOMMENDATION OF THE TRANSPORTATION COMMITTEE. CARRIED._
Planning & Planning and Development Committee report was presentediby Chairman
Development Rockhill adding clarification to original committee .report of
Committee 8/24/81 regarding appeal of One Valley Place Properties for Pre-
One Valley Place liminary Planned Unit Development
thattnoPeDrror2ofl and fact andDlaw4-81 .
were
Appeal PPUD 032-81 The committee reportHearin Council
and PPU 044-81 foundwe r, then clarificationser's shouldchavenbeenon to made toe assist the
however,
Report Amended Hearing Examiner: (1) Accessory Uses: Section 4-710(2) AccessorY
Uses usually incidental to allowed uses in P-1 Zone are clearly
delineated; if non-permitted use proposed as primary use, then
Conditional Use Permit request can be processed with Final PUD.
(2) Height: Applicant's proposal to construct six storylbuilding
exemplifies problem with ordinance only Council can address through
police as ordinance has incompatible sections, such as 0702(L)
and (M) allowing flexibility; however Section 4-2709(1)BI1limits
requirements. The committee report recommended Council determine
• the terms "lot size and setbacks" also address the general bulk
dimensional requirements of the proposed structures, thus giving
Examiner more review flexibility. MOVED BY ROCKHILL, SECOND REED,
ACCEPT AMENDED REPORT. CARRIED.
11
Renton City Council
9/14/8 Page 3
Consent Agenda - Continued
Damagel Claim Claim for Damages was filed by J & L Construction Co. , 11433 SE
J & L ',instruction 86th St. , alleging damage to waterlines in amount of $3,074.82
at the Central Highlands Plaza. Refer to City Attorney and the
Insurance Carrier..
Damage Claim Claim for Damages was filed by John E. Douchette, 856 S. Central ,
J. E. - Doucette Kent, in amount of $65.88 for tire damage alleging cement sections
of divider island out of place. Refer to City Attorney and
Insurance Carrier.
Damage Claim Claim for Damages was filed by Richard W. Roscow, 11454 Marine
R. W. "oscow View Dr. , Seattle, in the amount of $6,827.52 for 'damage to auto
which ran off the end of Valley Parkway SW alleging City failed
to sign Valley Parkway. Refer to City Attorney and Insurance
Carrier.
Appoinmment Mayor Shinpoch appointed John R. Tomkins as Police Officer
Police Officer effective 10/4/81 subject to the new probationary ;period'' require-
ment of one year. Tomkins certified by Civil Service to fill the
vacant Renton Police Officer position. Council concur.
Board of Mayor Shinpoch reappointed Kenneth Swanigan to Position #6 of
Adjust�jent the Board of Adjustment for four year term effective to 9/6/85.
Appoinoment Other Board Members: Position #1 Felix Campanella; #2 David M.
Young; #3 Francis A. Holman; #4 James Dalpay; #5 Gerald Holman;
#7 Barbara Lally. Refer to Ways and Means Committee.
Consen' Agenda MOVED BY STREDICKE, SECOND CLYMER, ACCEPT CONSENT AGENDA AS
Approv= l PRESENTED. CARRIED,
CORRESONDENCE Letter from Dean W. Bitney, Owner of Leisure Estates, 201 Union
Leisurl� Estates Ave. SE, described attempted purchase and rezone of 30 acre
Mobile Home Park parcel of property lying south of Leisure Estates Mobile Home Park,
re east of new King County shops property, east of Union Ave. SE
Properly and north of Maplewood Golf Course. The letter explained $3,000
AcquiTion per month hold cost since option agreement 2/81 and advice that
and Rerone rezone 'request would not be acted upon until the Comprehensive
Plan for. the Northeast Quadrant has been completed, that the date
has slid and will probably not be finalized prior to option expira-
tion. The letter noted problems of meeting the Mobile Home Park
Ordinance requiring a rezone to multiple designation prior to T
mobile home designation; there being no.T Comprehensive Plan desig-
nation and noted rezoning area to multiple is upsetting to area
residents. Bitney suggested revision to the City ' Code 4-714 T
Trailer Parks and requested permission to present rezone request
directly to Council as done previously on adjacent ten acres.
MOVED BY STREDICKE, SECOND SHANE, REFER COMMUNICATION TO COUNCIL'S
PLANNING AND DEVELOPMENT COMMITTEE FOR RECOMMENDATION.
OLD B 1. I NESS
Commi .itee of Council President Stredicke presented Committee of the Whole
the W Ole report concerning Policy for Development in the Green River Valley
Devel •'•ment Policy Drainage Basin Area. The committee recommended referral of letter
Green Fiver Valley from the Federal Emergency Management Agency dated 8/20/81 and
Drain-'.e Basin the Mayor's recommendations to the Council dated 9/4/81 , to the
Planning and Development Committee for consideration. MOVED BY
STREDICKE, SECOND CLYMER, CONCUR IN RECOMMENDATION. CARRIED.
Stredicke noted letter re flood insurance recommended Council
disallow fill in certain areas pending further study and the
matter sent to committee without recommendation.
Six-Y-=r Capital The Committee of the Whole presented the Mayor's recommended
Impro -ment priorities for the Six-Year Capital Improvements Program without
Progr. recommendation. MOVED BY STREDICKE, SECOND CLYMER, ADOPT THE
SIX-YEAR CAPITAL IMPROVEMENT PROGRAM.* MOVED BY CLYMER, SECOND
ROCKHILL, AMEND MOTION, MOVE ITEM #5 (Cedar River Trail Acquisition,
Thomas Property) TO ITEM #3; MOVED ITEM #9 (Heather Downs Acquisi-
tion) TO ITEM #4. CARRIED. MOVED BY REED, SECOND SHANE, MOVE
ITEM #8 (Construct Fire Station #14 in Kennydale and Relocate Sta.
#12 in Highlands) TO ITEM #5. CARRIED. MOVED HUGHES, SECOND BY
_
e ,t7N ,_)--)
COMMITTEE OF THE WHOLE
COMMITTEE REPORT
September 14, 1981
POLICY FOR DEVELOPMENT IN THE GREEN RIVER VALLEY DRAINAGE BASIN AREA
The Committee of the Whole recommends that the letter from the
Federal Emergency Management Agency dated August 20, 1981 , and
the Mayor's recommendations to Council dated September 4, 1981 ,
be referred to the Planning and Development Committee for con-
sideration.
SIX-YEAR CAPITAL IMPROVEMENTS PROGRAM
The Committee of the Whole presents the Mayor's recommended priorities
or the Six-year Capital Improvements Program without recommendation.
L./.. -
Age.'
/v*
itic• . M. Stredicke
Council President
I
1
wr 4 . _,
Renton City Council
9/14/81 Page 3
Consent Agenda - Continued
Damages Claim Claim for Damages was filed by J & L Construction Co. , 11433 SE
J & L Construction 86th St. , alleging damage to waterlines in amount of $3,074.82
at the Central Highlands Plaza. Refer to City Attorney and the
Insurance Carrier..
Damages Claim Claim for Damages was filed by John E. Douchette, 856 S. Central ,
J. E. .D•ucette. Kent, in amount of $65.88 for tire damage alleging cement sections
of divider island out of place. Refer to City Attorney and
Insurance Carrier.
1
Damages Claim Claim, for Damages was filed by Richard W. Roscow, 11454 ;Marine
R. W. Roscow View Dr. , Seattle, in the amount of $6,827.52 for damage to auto
which, ran off the end of Valley Parkway SW alleging City failed
to sign Valley Parkway. Refer to City Attorney and Insurance
Carrier.
Appoilntment Mayor Shinpoch appointed John R. Tomkins as Police Officer
Police Officer effective 10/4/81 subject to the new probationary period require-
ment of one year. Tomkins certified by Civil Service to fill the
vacant Renton Police Officer position. Council concur.
Board of Mayor Shinpoch reappointed Kenneth Swanigan to Position#6 of
Adjustm nt the Board of Adjustment for four year term effective to 9/6/85.
Appoint ent Other Board Members: Position #1 Felix Campanella; #2 Da4id M.
Young,; #3 Francis A. Holman; #4 James Dalpay; #5 Gerald Holman;
#7 Barbara Lally. Refer to Ways and Means Committee.
Conselnt genda MOVED BY STREDICKE, SECOND CLYMER, ACCEPT CONSENT AGENDA AS
Approval PRESENTED. CARRIED.
CORRESPONDENCE Letter from Dean W. Bitney, Owner of Leisure Estates, 201 Union
Leisulre Estates Ave. SE, described attempted purchase and rezone of 30 acre
Mobile H.me Park parcel of property lying south of Leisure Estates Mobile Home Park,
re east of new King County shops property, east of Union Ave. SE
Property and north of Maplewood Golf Course. The letter explained $3,000
Acquisition per month hold cost since option agreement 2/81 and advice that
and Rezo e rezone request would not be acted upon until the Comprehensive
Plan for. the Northeast Quadrant has been completed, that the date
has slid and will probably not be finalized prior to option expira-
tion.' The letter noted problems of meeting the Mobile Home Park
Ordinance requiring a rezone to multiple designation prior to T
mobile home designation; there being no T Comprehensive Mien desig-
nation and noted rezoning area to multiple is upsetting to area
residents. Bitney suggested revision to the City Code 4-714 T
Trailer Parks and requested permission to present rezone request
directly to Council as done previously on adjacent ten acres.
MOVED BY STREDICKE, SECOND SHANE, REFER COMMUNICATION TO COUNCIL'S
PLANNING AND DEVELOPMENT COMMITTEE FOR RECOMMENDATION.
OLD BUSINESS
Committee of Council President Stredicke presented Committee of the Whole
the Whole report concerning Policy for Development in the Green River Valley
Developm nt Policy Drainage Basin Area. The committee recommended referral of letter
Green River Valley from the Federal Emergency Management Agency dated 8/20481 and
Drainage Basin the Mayor's recommendations to the Council dated 9/4/81 , to the
Planning and Development Committee for consideration. MOVED BY
STREDICKE, SECOND CLYMER, CONCUR IN RECOMMENDATION. CARRIED.
Stredicke noted letter re flood insurance recommended Council
disallow fill in certain areas pending further study and the
matter sent to committee without recommendation.
Six-Yar Capital The Committee of the Whole presented the Mayor's recommended
Improvem-nt 'priorities for the Six-Year Capital Improvements Program without
Program recommendation. MOVED BY STREDICKE, SECOND CLYMER, ADOPT1HE
1 SIX-YEAR CAPITAL IMPROVEMENT PROGRAM.%', MOVED BY CLYMER, SECOND
ROCKHILL, AMEND MOTION, MOVE ITEM #5 (Cedar River Trail Acquisition,
Thomas Property) TO ITEM #3; MOVED ITEM #9 (Heather Downs Acquisi-
tion) TO ITEM #4. CARRIED. MOVED BY REED, SECOND SHANE, MOVE
ITEM #8 (Construct Fire Station #14 in Kennydale and Relocate Sta.
12 in Highlands) TO ITEM #5. CARRIED. MOVED HUGHES, SECOND BY
s'':v.-,
c Z..
Renton City Council
9/14/81 P- e 4
Old Busine-s - Continued - Committee of the Whole - Continued
Six-Year C-pital CLYMER, ITEM FOR REPLACEMENT OF LIGHTING
BE DESIGNATED ATED ITEM #6
CARRIED.
Improvement B
AND ITEM FOR ADDITION TO LIBRARY of items for the
Program Council President Stredicke listed priority
Continued Six Year Capital Improvement Program: #1 . Maintenance Shop Facility
_ in Renton Highlands; #2. Gene Coulon Memorial Beach Park Develop-
ment; #3. Cedar River Trail Acquisition; #4. Heather Downs Park
Property Acquisition; #5. Kennydale Fire Station; #6. Lighting
1 Replacement; #7. Library Addition; #8. Fire Training Facility;
#9. New Computer System. MOVED BY STREDICKE, SECOND ROCKHI'LL,
MOTION AS AMENDED BE ADOPTED. CARRIED. ORIGINAL MOTION CARRIED.*
L MOVE
E
Real Esta ` ess' MOVESESSION.BY STREDICKE,
CARRIED. 9:08ND P.M. Counncillreconvened0atX9:�91P.M.
Real Estal I
Purchase `ROLL CALL: All Councilman present.
OLD BUSIWSS Council President Stredicke inquired re response to citizen
1
Water Pre-sure questions re water mains and water pressure in Windsor Hills
Questione. and Victoria Park areas. Mayor Shinpoch noted matter under
investigation.
Aviation gommittee Aviation Committee report re ADAP Project-5-53-0055-03 Overrun
Chairman:1 explained final billing submitted on thi's project which included
Stredic a $20,597.38 for FAA's portion of the overrun which has not been
paid to the. Airport because there was no ADAP legislation allowing
ADAP Project the original grant to be amended. The report stated the City will
be asked to sign a grant amendment for that amount and FAA ,requires
a resolution be passed authorizing the Mayor and City Clerk to
sign. The committee recommended Council approval and referral
to the Ways and Means Committee. MOVED BY STREDICKE, SECOND BY
TRIMM, APPROVE THE REPORT. CARRIED.
Fancher Flyways The Aviation Committee report noted, meeting with Mrs. Wirz, of
Leases Fancher Flyways and the matter of compulsory garbage service
was satisfactorily agreed. The committee recommended the leases
be reinstated and the Mayor and City Clerk be authorized to
execute the lease documents. MOVED BY STREDICKE, SECOND TRIMM,
ADOPT THE AVIATION COMMITTEE REPORT AUTHORIZING THE MAYORIAND
NARRIED.
CITY CLERK TO EXECUTE LEASE DOCUMENTS OF FANCHER FLYWAYS.
Aerodyn Leases Aviation Committee Chairman Stredicke noted negotiations with
Aerodyne on three leases, that upon Attorney's advice, Aerodyne
has been advised to deal directly with leasing party,The Boeing
Company; and that Boeing Rep. Bob Morgan keeping City advised. .
Transportation The Transportation Committee report recommended concurrence, with
Committ-e Public Works Dept. for acceptance of completed Railroad Grade
Final PII
.yment Crossing Markings Project #RRS-OOS(19) and approve first and final
SwanstoI and final payment of $10,752.07. The report also recommended
Equipme t Co. release of retainage of $1 ,194. subject
tI , SECOND
to required
Sclearances.
(See Consent Agenda Page 2.) MOVED
CONCUR IN RECOMMENDATION OF THE TRANSPORTATION COMMITTEE! CARRIED.
Planni g & Planning and Development Committee report was presented by
Chairman
Develo•�jnent Rockhill adding clarification to original committee report of
Commit7e 8/24/81 regarding appeal of One Valley Place Properties for Pre-
One Va ley Place liminary Planned Unit Development PPUD 032-81 and PPUD 044-81 .
Appeal PPUD 032-81 The committee report stated that no error of fact and law were
ncil
and PPID 044-81 found in the Hearing Examiner's recommendation to the City
however, two clarifications should have been made to assist the
Report ' ended Hearing Examiner: (1) Accessory Uses: Section 4-710(2) Accessory
Uses usually incidental to allowed uses in P-1 Zone are clearly
delineated; if non-permitted use proposed as primary use, then
Conditional Use Permit request can be processed with Final PUD.
(2) Height: Applicant's proposal to construct six story building
exemplifies problem with ordinance only Council can address through
police as ordinance has incompatible sections, such as 4-2702(L)
and (M) allowing flexibility;- however Section 4-2709(1)B limits
requirements. The committee report recommended Council determine
the terms "lot size and setbacks" also address the general bulk
dimensional requirements of the proposed structures, thus giving
Examiner more review flexibility. MOVED BY ROCKHILL, SECOND REED,
ACCEPT AMENDED REPORT. CARRIED.
- I
Renton City Council
9/14/81 Page 5
Utility /Upon inquiry by Councilman Rockhill regarding priority of utility
Priorities items concerning Six-Year Capital Improvements Program, Mayor
Shinpoch explained needfor'separate funding. MOVED BY STREDICKE,
SECOND SHANE, THE UTILITY PORTION OF SIX-YEAR CAPITAL IMPROVEMENT
PROGRAM BE REFERRED TO THE UTILITY COMMITTEE, SPECIFICALLY REFER-
, R G TO HIGHLANDS TRUNK LINE. CARRIED.
RDINANCES AND RESOLUTIONS
Ways and Means The Ways and Means Committee recommended second and final !readings
Committee of the following ordinances which had been placed on first readings
Chairman: Clymer 8/24/81 :
Ordinance #3573 An ordinance was read adopting State Statutes by reference relating
Criminal Liability to complicity and criminal liability of corporations and their
agents. MOVED BY CLYMER, SECOND ROCKHILL, ADOPT THE ORDINANCE AS
READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance #3574 An ordinance was read adopting State Statute by reference relating
Cause for Arrest to probable cause for arrest. MOVED BY CLYMER, SECOND HUGHES,
ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance #3575 An ordinance was read repealing Chapter 28 Title V Business
Used Car Dealers Regulations of the City Code relating to Used Car Dealers ! in
Licensing Pre- order to comply with State law. MOVED BY CLYMER, SECOND ROCKHILL,
empted biy State ADOPT THE ORDINANCE WAS READ. ROLL CALL: 6 AYES: REED, SHANE,
TRIMM, CLYMER, HUGHES, ROCKHILL; ONE NO: STREDICKE. CARRIED.
•
First Reading The Ways and Means Committee recommended first reading of :an
ordinance amending the gambling tax as concerns tax payments.
MOVED BY CLYMER, SECOND ROKCHILL, REFER ORDINANCE BACK TOITHE
WAYS AND MEANS COMMITTEE FOR ONE WEEK. CARRIED.
i I
Resolution #2418 The committee recommended reading and adoption of a resolution
Park Funding authorizing application for funding assistance for outdoor recre-
ation project to the Interagency Committee for Outdoor Recreation
as provided by Marine Recreation Land Act relating to acquisition
of park site properties. (See Consent Agenda Page 2) . MOVED BY
CLYMER, SECOND ROCKHILL, ADOPT THE RESOLUTION AS READ. CARRIED.
Voucher Payment The Ways and Means Committee recommended Council authorization
for payment of Vouchers No. 35516 through No. 35767 in the amount
of $1 ,292,822.78 having received departmental certification that
merchandise and/or services rendered. MOVED BY CLYMER, SECOND
ROCKHILL, APPROVE VOUCHERS AS PRESENTED. CARRIED.
NEW BUSINESS CounciL,President Stredicke inquired re notification procedure
when signs on public right-of-way are picked up by the Public
Council President Works Department, specifically noting florist stand in Highlands.
Inquiries Stredicke complimented the Administrative Assistant and Departments
involved Sunday in handling of sanitary sewer overflow in Earlington
area. Council President Stredicke extended reminder of Tuesday
Primary Election.
Reply Received Mayor Shinpoch reported that reply has been received from;King
County Executive Ron Dunlap to questions asked by Council President
Stredicke during Dunlap's visit to Renton Council .
Policy Optional Councilman Stredicke inquired of Police Representative Persson,
for the record, policy in use of force or weapons in apprehending
suspect. Lt. Persson explained Officer to use own judgment for
appropriate response to individual situation taking all particulars
into account.
Land Use MOVED BY STREDICKE, SECOND SHANE, LETTERS CONCERNING RALPH EVANS
Inquiries INQUIRIES BE REFERRED TO THE PLANNING AND DEVELOPMENT COMMITTEE
FOR FURTHER STUDY. CARRIED. (See 8/17/81 Council Minutes. )
Insurance Councilman Reed requested information be forwarded to his 'committee
Review for review of City insurance.
II l
Renton lity Council
8/14/81 Page 6
ADMINIST'ATIVE Mayor Shinpoch announced the sales tax receipts of the City are
REPORT down $25,000. The State borrowed needed funds from New York, the
Mayor noted everything State does has impact on the City.
Mayor Shinpoch expressed regret in having granted an interview
sometime ago which will be published shortly, explaining the City's
financial situation has deteriorated since the interview.
AUDIENCL COMMENT City Clerk Mead announced tabulation of votes for City Council
Clerk's lOffice Position No. 3 following close of the, polls Tuesday, 9/14/81
Tabulat-s Votes Primary Election.
ADJOURN ENT MOVED BY STREDICKE, SECOND REED, COUNCIL MEETING ADJOURN. ; CARRIED.
10: 15 P IM.
-
Delores A. Mead, C.M.
City Clerk
•
' I