Loading...
HomeMy WebLinkAboutR-412415DESIGN CRITERIA VERTICAL LOADS ON VAULT LID: UNIFORM LIVE LOAD : = 150PSF *HS20 TRUCK WHEEL LOADS 13'-6" 14' to 30' TRACTOR ; FRONT AXLE = 81000 Ib. 0 0 o SINGLE REAR AXLE = 321000 lb. FRONT REAR REAR 3' TRAILER ; 0 0 o SINGLE REAR AXLE = 321000 lb, TRACTOR TRAILER DESIGN LIVE LOAD & TRUCK WHEEL LOAD TO BE APPLIED INDEPENDENTLY AND IN COMBINATION WITH THE SOIL COVER DEAD LOAD, IMPACT & FATIGUE: DUE TO THE LOW SPEEDS OF THE SERVICE VEHICLES AND THE SOIL COVER OVER THE LID, INCREASES IN VEHICLE LOADS TO ACCOUNT FOR IMPACT & FATIGUE ARE NOT REQUIRED, SOIL COVER FOR LID DESIGN: PLANK MANUFACTURER SHALL BE RESPONSIBLE FOR DETERMINING THE SOIL COVER DEPTHS USED IN THE LID DESIGN BASED ON THE PERMITTED CIVIL DRAWING, VAULT AND FINISHED GRADE ELEVATIONS, SOIL COVER FOR SUBSTRUCTURE DESIGN: THE VAULT STRUCTURE WAS DESIGNED FOR A SOIL COVER OF 1.8FT MIN TO 5,OFT MAX, FOUNDATION DESIGN: FOUNDATION DESIGN IS BASED ON THE FOLLOWING VALUES VERIFIED BY COBALT GEOSCIENCES IN THEIR E-MAIL DATED 07-30-2020 ALLOWABLE BEARING PRESSURE; 41000 PSF LATERAL EARTH PRESSURES ON DETENTION VAULT; DRAINED LEVEL BACKFILL AT REST CONDITION; 55 PCF EFW SEISMIC PRESSURE COMPONENT; E = 10H PSF UNIFORM SATURATED SOIL DENSITY; 125 PCF SPECIAL INSPECTION PLAN GENERAL: SPECIAL INSPECTION BY A QUALIFIED INSPECTOR IS REQUIRED IN ACCORDANCE WITH THE 2015 IBC. QUALIFICATION: THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF THE BUILDING OFFICIAL, REQUIRED VERIFICATION & INSPECTION: THE SPECIAL INSPECTOR SHALL PERFORM THE VERIFICATIONS & INSPECTIONS NOTED IN THE SCHEDULE BELOW INSPECTION & TESTING SCHEDULE TYPES OF WORK FREQ 2015 IBC SECTION CAST IN PLACE CONC REINFORCING STEEL, PLACEMENT, p 1705.3 INSTALLATION & FASTENING OF PRECAST PANELS P 1705.3 PLACEMENT OF CONCRETE C 1705.3 VERIFYING USE OF REQUIRED DESIGN MIX p 1705.3 TESTING OF THE CONCRETE FOR SPECIFIED STRENGTH, AIR CONTENT AND SLUMP C 1705,3 SOILS VERIFICATION OF SOIL -BEARING CAPACITY: INSTALLATION OF DRAINAGE SYSTEM: C 1705.6 PLACEMENT & COMPACTION OF WALL BACKFILL: p 1705.6 FREQUENCY LEGEND C = CONTINUOUS P = PERIODIC SEE REFERENCES AND STANDARDS LISTED WITHIN THE VERIFICATION & INSPECTION SCHEDULE FOR MEANING OF PERIODIC AND CONTINUOUS INSPECTIONS, CERTIFICATE OF COMPLIANCE: THE SPECIAL INSPECTION AGENCY SHALL PROVIDE A FINAL LETTER CERTIFICATE OF COMPLIANCE STATING THAT THE REVIEWED WORK WAS COMPLETED IN ACCORDANCE - WITH THE PERMITTED DOCUMENTS, SUBMITTAL OF REPORTS: ALL SPECIAL INSPECTION REPORTS AND TESTING REPORTS SHALL BE SUBMITTED TO THE OWNER, SITE STRUCTURES AND THE BUILDING OFFICIAL BY THE AGENCY PERFORMING THE INSPECTION OR TESTING, HOLLOW CORE PLANK SCOPE OF WORK: THE WORK INCLUDED IS THE DESIGN, MANUFACTURE AND DELIVERY OF PRECAST PRESTRESSED CONCRETE UNITS, DESIGN PLANK FOR THE MOST CRITICAL OF THE LOADING CONDITIONS AS SHOWN WITHIN THE DESIGN CRITERIA NOTE, THE MANUFACTURER SHALL SUBMIT STRUCTURAL CALCULATIONS AND PLACEMENT DRAWINGS SIGNED BY A WASHINGTON STATE REGISTERED STRUCTURAL ENGINEER FOR REVIEW PRIOR TO FABRICATION, THE MANUFACTURER SHALL INSTALL ALL BLOCK OUTS REQUIRED FOR STRUCTURAL CONNECTIONS AS INDICATED ON THESE DRAWINGS, NO OTHER PENETRATIONS ARE ALLOWED WITHOUT THE PRIOR APPROVAL OF THE PLANK MANUFACTURER. ALL HOLLOW CORE JOINTS SHALL BE GROUTED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, GENERAL CONSTRUCTION NOTES CODE: VAULT DESIGN AND CONSTRUCTION SHALL CONFORM TO THE PROVISIONS OF THE 2015 IBC AS ADOPTED BY THE CITY OF RENTON, WASHINGTON GENERAL DETAILS: CONSTRUCTION DETAILS NOT FULLY SHOWN OR NOTED SHALL BE SIMILAR TO DETAILS SHOWN FOR SIMILAR CONDITIONS, DISCREPANCIES: THE CONTRACTOR SHALL NOTIFY ENGINEER UPON FINDING ANY DISCREPANCY OR OMISSION IN THE DRAWINGS OR SPECIFICATIONS, SHORING & EXCAVATION: THE CONTRACTOR SHALL BE SOLEY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES, INCLUDING LAGGING, SHORING AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREETS AND UTILITIES, WALL BACKFILL: PRIOR TO BACKFILLING VAULT WALLS THE CONTRACTOR SHALL HAVE PLACED THE LID PLANKS AND PROVIDED A MINIMUM OF 5 DAYS OF CURE ON THE PLANK VOID FILL, BACKFILL SOIL: WALL BACKFILL SHALL BE WELL GRADED FREE DRAINING SOIL FREE OF ORGANIC MATERIAL AS REQUIRED BY THE GEOTECHNICAL CONSULTANT, ALL COMPACTION OCCURRING WITHIN 5' OF THE WALL SHALL BE COMPLETED USING HAND OPERATED MACHINERY, SEE GEOTECHNICAL REPORT FOR PLACEMENT AND COMPACTION REQUIREMENTS, CONCRETE CONCRETE REQUIREMENTS: LOCATION STRENGTH MAX W/C RATIO WALLS & ClP LID 4000PSI @ 28 DAYS 0.50 FTGS & GRADE SLAB 4000PSI @ 56 DAYS 0.53 PLANK VOID FILL TO MEET PLANK MFGR'S REQUIREMENTS* PLANK JOINT GROUT TO MEET PLANK MFGR'S REQUIREMENTS* * MINIMUM STRENGTH SHALL BE 3000PSI @ 28 DAYS, AIR CONTENT; CONCRETE EXPOSED TO WEATHER SHALL CONTAIN 5% +/-1% ENTRAINED AIR, MIX DESIGN; SHALL BE BASED ON FIELD EXPERIENCE OR TRIAL MIXTURES IN CONFORMANCE WITH THE SPECIFICATIONS, SUBMIT MIX DESIGNS TO THE ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION MATERIAL REQUIREMENTS: CEMENT; ASTM C150, ADMIXTURES; ACI 301, AGGREGATES; ASTM C33. WATER; ASTM C94. EXPOSURE CATEGORIES: FREEZING THAWING FO SULFATE SO IN CONTACT w/ WATER W1 CORROSION PROTECTION Cl PLACING REQUIREMENTS: PLACING; PLACE CONCRETE AS NEARLY AS PRACTICABLE TO ITS FINAL POSITION TO AVOID SEGREGATION. DEBRIS; REMOVE ALL DEBRIS FROM FORMS PRIOR TO PLACING CONCRETE, CONSOLIDATION; CONSOLIDATE CONCRETE BY SUITABLE MEANS. THOROUGHLY WORK CONCRETE AROUND EMBEDDED ITEMS AND INTO CORNERS OF FORMS. CURING REQUIREMENTS; CURING, CONCRETE SHALL BE MAINTAINED IN A MOIST CONDITION FOR A SUITABLE PERIOD OF TIME AFTER PLACEMENT. WEATHER CONDITIONS; ADEQUATE PRECAUTIONS SHALL BE TAKEN DURING HOT AND COLD WEATHER IN ACCORDANCE WITH THE SPECIFICATIONS. LID PLANK PLACEMENT: IN NO CASE SHALL THE LID PLANKS BE PLACED BEFORE THE WALLS HAVE BEEN ALLOWED A MINIMUM OF 3 DAYS OF CURE. WHEN AVERAGE AMBIENT TEMPERATURES ARE LESS THAN 50 DEGREES FAHRENHEIT, THE CONTRACTOR MUST ALLOW A MINIMUM CURE TIME OF 7 DAYS OR PROVIDE AN ADDITIONAL SET OF CYLINDERS TO BE BROKEN AT THE TIME OF LID PLACEMENT DEMONSTRATING A MINIMUM CONCRETE STRENGTH OF 11000 PSI HAS BEEN REACHED, REINFORCING BAR MATERIAL REQUIREMENT: REINFORCING BARS: USE DEFORMED BARS CONFORMING TO ASTM A615, GRADE 60, EXCEPT AS NOTED ON THE DRAWINGS. FABRICATION AND PLACING REQUIREMENTS: BENDING: BARS SHALL BE BENT COLD, BARS PARTIALLY EMBEDDED IN CONCRETE SHALL NOT BE FIELD BENT UNLESS NOTED OR SHOWN OTHERWISE OR AUTHORIZED BY THE ENGINEER. PLACING: REINFORCEMENT SHALL BE SUPPORTED AND TIED TO PREVENT DISPLACEMENT BY CONSTRUCTION LOADS OR BY PLACING OF CONCRETE, MAXIMUM SPACING OF SUPPORTS SHALL BE 3'-6" CONCRETE COVER: MINIMUM CONCRETE COVER FOR REINF. SHALL BE AS FOLLOWS, UNLESS NOTED OTHERWISE; CONCRETE CAST AGAINST EARTH 3" CONCRETE CAST AGAINST FORMS AND EXPOSED TO EARTH 2" WET SETTINGS: REINFORCEMENT ANCHOR BOLTS, OR ANY EMBEDDED ITEM WITHIN THE CONCRETE, MAY NOT BE SET INTO THE CONCRETE AFTER IT HAS BEEN POURED WITHIN THE FORMS, LAP SPLICES: LAP ALL BARS 24" MIN UNLESS SHOWN OTHERWISE ON THESE DRAWINGS, DEFERRED SUBMITTALS THE FOLLOWING AREAS OF WORK SHALL BE CONSIDERED AS "DEFERRED SUBMITTALS" AS DEFINED IN THE 2015 IBC a. PRECAST PRESTRESSED HOLLOW CORE PLANK ALL DEFERRED SUBMITTALS SHALL BEAR THE STAMP AND SIGNATURE OF A CIVIL ENGINEER LICENSED TO PRACTICE IN THE STATE OF WASHINGTON WHO HAS CURRENT DESIGN EXPERIENCE IN THE TYPE OF WORK REVIEWED. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED BY THE ENGINEER OF RECORD, 484 PRECAST CATCH BASIN BASE SPECIFICATIONS: PRECAST CATCH BASIN BASE SHALL MEET ASTM C478 AND THE APWA/WSDOT STANDARD SPECIFICATION FOR PRECAST CONCRETE MANHOLE SECTIONS, MATERIALS: a. REINFORCING STEEL Fy=60KSI MINIMUM b. CONCRETE f'c=4,000PSI MIN @ 28 DAYS MINIMUM REQUIREMENTS:: CIRCUMFERENTIAL WALL THICKNESS SHALL BE NO LESS THAN 5" THICK AND SHALL HAVEA MINIMUM OF 0.12 SQ. IN/FT OF REINFORCING STEEL HORZ AND VERT PLACED AT THE CENTER OF THE WALL. BASE THICKNESS SHALL BE NO LESS THAN 6" THICK AND SHALL HAVE A MINIMUM OF 0.15 SQ. IN/FT OF REINFORCING STEEL IN EACH ORTHOGONAL DIRECTION PLACED AT THE CENTER OF THE SLAB. IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING ` �' bbannwarth 02/19/2021 311 MAx ADD ONE VERT, EA SIDE OF BLOCKOUT ADD (2)-#5x4'-0"@3"o/c NEAR INSIDE FACE OF WALL ABOVE BLOCKOUT 12" m INLET OR OUTLET PIPE ,r.. .................. ...................... 00 AT PERPENDICULAR PIPE NON SHRINK GROUT VOID FILL TOP OF GRADE SLAB - FOOTING WALL REINF @ PIPE PENETRATION NEAR BASE OF WALL 3/4"=1'-0" ..................................................................... . +0............ �.� 1211 z .�� °° �.................... rs'...................... ................... ADD #5x TOP AS SHOWN .• •. ■................... ilk.. ....... .......... Age .... .............. 3" MAX E BLOCKOUT FOR PIPE ADD #50'-0" DIAG BARS EA. SIDE OF OPENING NON SHRINK GROUT VOID FILL CUT NO MORE THAN 1 WALL VERT REINF BAR @ BLOCKOUT WALL REINF @ PIPE PENETRATION NEAR TOP OF WALL 3/4"=1'-0" 3" MAX FILL WITH GROUT AS DIRECTED BY PRECAST PLANK MFGR. CONT, BACKER ROD IF REQ'D, TYP PLANK JOINT DETAIL SCALE 1114-0" CONC DOBIE OR CHAIR TYP GRADE SLAB SECTION SCALE 1-1/2"=1'-0" AT SKEWED PIPE I 1.■ .... I .................... ADD 2 VERT. EA SIDE OF BLOCKOUT ADD (2145x6'-0"011o/c EA FACE OF WALL ABOVE BLOCKOUT INLET OR OUTLET PIPE TOP OF GRADE SLAB - FTG NON SHRINK GROUT VOID FILL ADD (1145x5'-0" TOP & BOT @ PLACED BETWEEN TYP WALL HORZ REINF. 18" 30" 30'I ADD #5x TOP AS SHOWN BLOCKOUT FOR PIPE ADD #50'-0" DIAG BARS EA. SIDE OF OPENING NON SHRINK GROUT VOID FILL CUT NO MORE THAN 2 WALL VERT REINF BAR @ BLOCKOUT Z O cc a v z J W a o co � o W Lu N V d Z W � � J cn O z W J J J > a COp LL V In a Lu in ind W Lu � ca ccz � � N N N N 0 0 0 0 WN N � � H O r*- ti Ln OC C"7 9 N O 0 0 0 o U 0 a Y i CD •L_ co m Y Z W J �j Y m i 0 Y za o w w � Q ?r v I Q W d 0►�.0�IT ;mLj K W -o ¢ GcrU2074 E�o�y�►��`v AL �. ss�oNAL O 25 Z a _ 3 0 CO N W Z Z _O H W W in W H a 0 I SHEET: z cc LL O V Si OF 3 S-20-039