TECHNICAL INFORMATION REPORT
Dalpay Short Plat
18XX Redmond Place N.E.
Renton, Washington
Prepared for:
Dalpay Properties LLC
P.O. Box 2436
Renton, WA 98056
September 24, 2019
Revised February 11, 2020
Revised September 21, 2020
Revised November 3, 2020
Our Job No. 17884
11-3-20
Stormwater adjustment 2020-4 pertaining to this TIR has
been approved.
DEVELOPMENT ENGINEERING
Nathan Janders 11/12/2020
SURFACE WATER UTILITY
jfarah 11/13/2020
Technical Information Report Dalpay Short Plat Renton, Washington Our Job No. 17884
17884.007.doc
TABLE OF CONTENTS
1.0 PROJECT OVERVIEW
Figure 1 – Technical Information Report (TIR) Worksheet
Figure 2 – Site Location
Figure 3 – Drainage Basins, Subbasins, and Site Characteristics
Figure 4 – Soils
2.0 CONDITIONS AND REQUIREMENTS SUMMARY
2.1 Analysis of the Core Requirements
2.2 Analysis of the Special Requirements
3.0 OFF-SITE ANALYSIS
4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
A. Existing Site Hydrology
B. Developed Site Hydrology
C. Performance Standards
D. Flow Control System
E. Water Quality System
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
6.0 SPECIAL REPORTS AND STUDIES
6.1 Geotechnical Engineering Study for Dalpay Short Plat prepared by Earth Solutions NW,
LLC dated December 23, 2015
6.2 Geotechnical Addendum for Dalpay Short Plat prepared by Earth Solutions NW, LLC
dated February 13, 2017
6.3 Response to Review Comments for Dalpay Short Plat prepared by Earth Solutions NW,
LLC dated February 21, 2018
6.4 Response to Review Comments for Proposed Dalpay Short Plat by Earth Solutions NW,
LLC dated October 8, 2019
7.0 OTHER PERMITS
8.0 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ANALYSIS AND DESIGN
A. Erosion and Sediment Control (ESC) Plan Analysis and Design
B. Stormwater Pollution Prevention Plan
9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
10.0 OPERATIONS AND MAINTENANCE MANUAL
Tab 1.0
17884.007.doc
1.0 PROJECT OVERVIEW
The proposed Dalpay Short Plat is located at the intersection of N.E. 19th Street and Redmond
Place N.E., in the City of Renton, King County, Washington. It is also situated within Section 4,
Township 23 North, Range 5 East, Willamette Meridian. Please see Figure 2 – Vicinity Map for a
more accurate depiction of the location of the site. The subject property has slopes ranging from
approximately 2 to 40 percent. The northwest and southeast corners of the site are relatively flat.
The remainder of the site topography consists of a "ravine" with steeper slopes down to a stream.
The stream and slope are contained within an existing Native Growth Protection Easement
(NGPE). On-site soils are Alderwood, which are considered to be "till" type soils and are
generally not conducive to infiltration. With the exception of Lot 1, the entire site is covered with
trees and brush. There are no existing structures on the site.
The project consists of one parcel, containing a total area of approximately 1.66 acres. The
proposal with this preliminary short plat is to create three (3) single-family lots with associated
roadways, utilities, and stormwater facilities. Lot 1 will gain access from Redmond Place N.E.,
while Lots 2 and 3 will gain access from Redmond Court N.E. A private access tract will be
constructed for the access to Lots 2 and 3, per City of Renton standards.
The project will provide one drainage facility for the developed area at the southeast portion of the
site (Lots 2 and 3). This facility will consist of a detention pond and will be located west of Lots 2
and 3. An 8-inch-diameter HDPE pipe is proposed to be installed to convey stormwater
discharge to the natural discharge location, which is the stream located on site. This storm pipe
will be installed underground and where possible it will be installed on the surface of the ground
to minimize the disturbance within the existing NGPE area.
The developed portion of the site located in the northwest corner of the site (Lot 1) does not
require any detention since the developed conditions will only increase the 100-year peak flows
from the site by 0.057 cfs as compared to the pre-developed conditions. Combined with the
0.018 cfs decrease in runoff from lots 2 and 3 after detention for the 100-year flow, the total
increase in the 100-year peak from the site is approximately 0.039 cfs. This is below the threshold
increase of 0.15 cfs for the 100 year from Section 1.2.3.2.E.5 of the 2017 RSWDM. Therefore,
no detention is required. Please refer to section 4.0.D of this report for further analysis.
Water quality facilities are not required for this project as the proposed Pollution Generating
Impervious Surface (PGIS) for the entire project is less than 5,000 SF.
The runoff from lot 1 will be conveyed to the drainage facilities that were designed and
constructed with the original Dalpay Short Plat that was constructed about 10 years ago. The
Level 1 Off-Site Drainage Analysis for the original short plat are located in Section 3.0 of this
report.
Figure 1
Technical Information
Report (TIR) Worksheet
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/1/09
1 17884.002.doc
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner Dalpay Properties LLC
Phone (206) 399-6302
Address P.O. Box 2436
Renton, WA 98056
Project Engineer Don E. Dawes, P.E.
Company Barghausen Consulting Engineers , Inc.
Phone (425) 251-6222
Project Name Dalpay Short Plat
DDES Permit #
Location Township 23N
Range 5E
Section 4
Site Address 18XX Redmond Place N.E.
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Landuse Services
Subdivision / Short Subd. / UPD
Building Services
M/F / Commercial / SFR
Clearing and Grading
Right-of-Way Use
Other
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other
Shoreline
Management
Structural
Rockery/Vault/
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
Type of Drainage Review Full / Targeted /
(circle): Large Site
Date (include revision 2-11-20
dates):
Date of Final:
Site Improvement Plan (Engr. Plans)
Type (circle one): Full / Modified /
Small Site
Date (include revision 2-11-20
dates):
Date of Final:
Part 6 ADJUSTMENT APPROVALS
Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket
Description: (include conditions in TIR Section 2)
N/A
Date of Approval:
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/1/09
2 17884.002.doc
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date:
Completion Date:
Describe:
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan : City of Renton
Special District Overlays:
Drainage Basin: Honey Creek
Stormwater Requirements:
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream
Lake
Wetlands
Closed Depression
Floodplain
Other
Steep Slope
Erosion Hazard
Landslide Hazard
Coal Mine Hazard
Seismic Hazard
Habitat Protection
Part 10 SOILS
Soil Type Slopes Erosion Potential
AgC (Alderwood) 8-15% Moderate
AgD (Alderwood) 15-30% Moderate
High Groundwater Table (within 5 feet) Sole Source Aquifer
Other Seeps/Springs
Additional Sheets Attached
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/1/09
3 17884.002.doc
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION / SITE CONSTRAINT
Core 2 – Offsite Analysis
Sensitive/Critical Areas
SEPA
Other
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply)
Discharge at Natural Location Number of Natural Discharge Locations: 1
Offsite Analysis Level: 1 / 2 / 3 dated: 12/3/03 (Cramer NW, Inc.)
Flow Control Level: 1 / 2 / 3 or Exemption Number
(incl. facility summary sheet) Small Site BMPs
Conveyance System Spill containment located at: Detention Pond
Erosion and Sediment Control ESC Site Supervisor: TBD
Contact Phone:
After Hours Phone:
Maintenance and Operation Responsibility: Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Provided: Yes / No
Liability
Water Quality Type: Basic / Sens. Lake / Enhanced Basicm / Bog
(include facility summary sheet) or Exemption No.
Landscape Management Plan: Yes / No
Special Requirements (as applicable)
Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None
Requirements Name:
Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None
100-year Base Blood Elevation (or range):
Datum:
Flood Protection Facilities Describe:
Source Control Describe landuse:
(comm./industrial landuse) Describe any structural controls:
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/1/09
4 17884.002.doc
Oil Control High-use Site: Yes / No
Treatment BMP:
Maintenance Agreement: Yes / No
with whom?
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Control
Dewatering Control
Dust Control
Flow Control
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize Exposed Surfaces
Remove and Restore Temporary ESC Facilities
Clean and Remove All Silt and Debris Ensure
Operation of Permanent Facilities
Flag Limits of SAO and open space
preservation areas
Other
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
Flow Control
BMPs
Other
Pond
Biofiltration
Wetpool
Media Filtration
Oil Control
Spill Control
Flow Control BMPs
Other
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2009 Surface Water Design Manual 1/1/09
5 17884.002.doc
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other
Cast in Place Vault
Retaining Wall
Rockery > 4' High
Structural on Steep Slope
Other
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
Signed/Date
2-11-20
Figure 2
Site Location
Figure 3
Drainage Basins,
Subbasins, and Site
Characteristics
Figure 4
Soils
Tab 2.0
17884.007.doc
2.0 CONDITIONS AND REQUIREMENTS SUMMARY
2.1 Analysis of the Core Requirements
Core Requirement No. 1: Discharge at the Natural Location.
Response: All runoff from the developed site will be discharged to the on-site stream,
which is the natural discharge location.
Core Requirement No. 2: Off-Site Analysis.
Response: The Level 1 Off-Site Drainage Analysis is provided in Section 3.0 of this
report.
Core Requirement No. 3: Flow Control.
Response: The project will provide a detention pond in the southeast corner of the site
near Lots 2 and 3. Flow control facilities for Lot 1 are provided by the original Dalpay
Short Plat located just to the north of Lot 1. Detention facilities will meet duration
standard matching forested conditions, as required by City of Renton.
Core Requirement No. 4: Conveyance System.
Response: The site development stormwater conveyance is comprised of a series of
catch basins and stormwater pipe network, which will convey the runoff to the detention
pond located in the Private Access Tract. The sizing of this conveyance network is
based on the Rational Method delineated in the 2017 City of Renton Surface Water
Design Manual (RSWDM) and sized to adequately convey the anticipated stormwater
discharge based on the stormwater runoff developed from a 25-year storm event.
Conveyance calculations will be provided with the final engineering plans and TIR. Spill
control will be provided by a spill control tee in CB#3. See sheet C9 of the Construction
plans for a detail of the oil/water separator manhole.
Core Requirement No. 5: Erosion and Sediment Control.
Response: Temporary erosion and sedimentation control plans will be included in the
site development documents prepared for this project that meet the requirements of the
City of Renton. These drawings will indicate the clearing limits, temporary and
permanent erosion control measures, perimeter/off-site protection (silt fence) along the
downstream edge of the site, construction traffic stabilization (rock construction
entrance), and other pertinent temporary erosion and sediment control measures.
Core Requirement No. 6: Maintenance and Operations.
Response: In accordance with the City of Renton and the 2017 RSWDM, the
stormwater facilities will be privately owned and maintained. An Operation and
Maintenance Manual is included in Section 10.0 of this TIR.
Core Requirement No. 7: Financial Guarantees and Liability.
Response: Financial guarantees will be sufficiently instituted to cover the cost of
correcting, if necessary, incomplete or substandard drainage facility construction work
and to warrant for 1 year the satisfactory performance of the newly constructed drainage
facilities or any facility that will be assumed by the City of Renton for maintenance
operation.
17884.007.doc
Core Requirement No. 8: Water Quality.
Response: As dictated by the 2017 RSWDM, the Basic Water Quality Protection Menu
must be followed for this project. This project is exempt from providing water quality
because less than 5,000 square feet of new pollution generating impervious surface is
proposed to be added to the site.
Core Requirement No. 9: On-Site BMPs.
Response: None of the required large lot BMPs are feasible on these lots due to soil
conditions and proximity to steep slope hazard areas, landslide hazards, and erosion
hazard areas.
2.2 Analysis of the Special Requirements
Special Requirement No. 1: Other Adopted Area-Specific Requirements.
Response: There is no known adopted area-specific requirements for this short plat.
Special Requirement No. 2: Flood Hazard Area Delineation.
Response: The project is not located within a floodplain or floodway.
Special Requirement No. 3: Flood Protection Facilities.
Response: No flood protection facilities are proposed or will be modified.
Special Requirement No. 4: Source Control.
Response: There are no known source controls required with this development.
Special Requirement No. 5: Oil Control.
Response: This project is not considered a high-use site; therefore, special oil controls
are not required for this development.
Special Requirement No. 6: Aquifer Protection Area.
Response: This project is not located within an Aquifer Protection Area.
Tab 3.0
17884.007.doc
3.0 OFF-SITE ANALYSIS
Please refer to the following Level 1 Downstream Drainage Analysis from the Storm Drainage
Report prepared by Cramer Northwest Inc. dated December 3, 2003.
Note: Only the Level 1 Downstream Analysis from the Cramer Northwest Storm Drainage Report
has been included in this section.
We have reviewed the downstream analysis prepared by Cramer Northwest and it appears to be
accurate for the current site conditions.
CramerNorthwestInc.SurveyorsPlannersEngineersSTORMDRAINAGEREPORTAV.If•.fl’,I3LL•••‘‘—‘‘.‘--‘.\L,FORJIMDALPAY4033NESUNSETBLVD,STE3RENTON,WA98059December3,2003ecfl5tcl.iCN.I.JOBNO.2003-161PreparedbyLarryS.Krueger,RE.Phone:253.852.4880Tollfree:800.251,0189VisitCramerNorthwestonthewebathttp:t/wwv.cramemw.com.I9OFDALPAYSHORTPLATNE19THSTREETRENTON,WA94%N.CentralAveSuitei04Kent,WA98032Fax:253.852.4955
APPENDIXAOFFSITEANALYSISREPORT
LEVELIDRAINAGEANALYSISOFDALPAYSHORTPLATNE19THSTREETRENTON,WASHINGTONFORJIMDALPAY4033NESUNSETBLVD,STE3RENTON,WASHINGTON98059December3,2003C.N.I.JOBNO.2003-161PreparedbyLarryS.Krueger,P.E.
TABLEOFCONTENTSI.TASKISTUDYAREADEFINITIONANDMAPSII.TASK2RESOURCEREVIEWIII.TASK3FIELDINSPECTIONIV.TASK4DRAINAGESYSTEMDESCRIPTIONANDPROBLEMDESCRIPTIONSV.TASK5MITIGATIONOFEXISTINGORPOTENTIALPROBLEMS
TASKISTUDYAREADEFINITIONANDMAPS
TASKISTUDYAREADEFINITIONThisprojectissoutheastoftheintersectionofNE19thStreetandRedmondAveNE.ItliesalongthesouthsideofNE19thStreet.Theparcel#is042305-9032.Thesiteisapproximately2.5acres.Thenorthernportionofthesiteconsistsofmostlyofgrassandscotchbroom.ThereisalargedetentionvaultlocatedinthenortheastportionoftheprojectthatwasdesignedtodetainthestormwaterfromthissiteandtheDalpayEstatesprojectnorthwestofthisproject.Thesouthernportionoftheprojectiscompletelyforestedwithmostlyevergreensandhasaravinethatrunsthroughit.Theexistingdrainagetendstosheefflowtowardstheravine,whereitbecomesasmallstreamthatflowstowardNESunsetBoulevard.ThesmallstreamthenjoinsanotherstreamthatparallelsNESunsetBoulevard.Thesite’ssoilisanAlderwoodGravellySandyLoam(AgC)andisconsideredaTypeCsoil.MAPSAvicinitymap,sensitiveareasmap,aerial,andoffsitedrainagemapcanbefoundintheproceedingpages.
jocQ3fr7F7T&WN’)A‘.tt1SSUUIJtI————rro”‘iI9£•O,C1r-°f_____•.__.5*S±JG1gHill3N1c19!________6IIL_____oz’o;[ILI.-H--w_tILt—tIV3IjLEL1d!jS0—LSH1613N______1+11Th•1rn6cI—‘mc—-L.I,;-;-;;‘LJUl/4IrI,vst0’!9‘II‘-.1.aoJII9iLhj°‘VV•jII9dSINIIiJ‘VP60t—nI\____—111i3iiFzco8IdSIII6Zj9—NU)c9-3NLlLOlZZOLIOLILOL9S?LOLZLOL6LOLIäOf.8/LC
eXZ10609\,z”1soVeo9logSI79660__________________________3643_____________________________________$T\__2ISTSTU,—.7‘‘‘‘75.8/?__
____72Z5\‘ISE85.5_1LI/2/C..2442//___
___255I’S/4.90855__<26NEYCREEKIH85.5WIOf8-00//40-___
_
___‘317.3—k.Lb/4283]__
__
__
___10_____
_1k85,5ri\\28051cI_____
___
_
____
_
____
_
______
_E105ThLr31046-\___
___/35/O\84.76I/22.26-000A14LiPL1€‘‘k‘73’cp3fr/—.GREENWAYg____
___
__¶.\&sIAcuIN22026Tt34kI)/58Ac42‘_____s\I276V‘I3CO278.9710—68.82I55I94,JI27873097A’I226oL=278$?p/90020%TH45.245553263-SE/06/3I,I,I,I)‘IN73,0Ac__
_
_
_____\tTL260303I6Ac943270471455467I428d095ALuN.E.8Park____
_
_‘95;,50f?.?N11717kLaJ_J4Iu_
_____9!0Z‘I—<t1S‘4I3--p36_\084____g—.-st—NE17THST__
_
_
_______
_
_-7)77I8560473.
‘7Z280________
_
_
____0484Ac/03//0910332__
_
_
___
_
_
_
_
_
_
_
_
_
_
_
____
_
_
________________________
_
_
_
_
_
_
_______________
_
_________oiSo/70SC/8367___
_
_
_327/9TI3632*1836586sba08548462‘Lurt/73TI57TI4!TI/83TI40fr-’ItJii0—53J1O4,U54,1155.05164I—3-__,J55Q7TL275TI19’—’7/03SUNSETJI104..‘17ç%106‘kI’12lII207\_LuTLToi--.‘7<ji__IF1/1TI0___t%:JI\iz9i‘036AcTI2oiAQy802AcT1N35
2
7
7
2
71
4
2
‘4’/5,7.9,ZI__
_
__
_
_
_
__
_
__
_
__\
0r300ci0=0Ii!.-o_.‘-.pa00ci500SS(4[__/4,ViSaNo0U
DALPAYSENSITIVEAREAS________1C143Jfl!M2fr:7192YX1O’1-CM-yw41r4--“<tiL35stzitti-UC_’i1kWa3’1--.iMl2jjcGrtAAaz!4*IfteiJi_--Qrnans4J{€8764difl-‘4’——1’:ae764qIè940G*J1rcd&-G4AYJ:t:.hs4r:::Ja!::-12-lI,,,c3nL-.C413359c49,_,
-
----(14flL%-k4tJdLZ415°tCIL’4i-.‘(4f-e>bl95eY85cvl23D03SiJCCO1&tjaftC.tafl14?t?Wo8&)34l48OtGS&Cj‘5”__NElfl.HJT___42iaim4k-•t••a;Ma1fr<Yd134495t01d0-.CT611’3Q,1i-)asa’dosa98389ccx18*278fl(fl220c-l23OYiC:811005t30-cl2YSkkICtl589Joo32YY3gl“3t(443.k13CV..-1tSttrt1_dcv.._Vjk4lf50————--—25W&1XX0çt%32i3&72--NEJSTHST143.tS4tJYJ*30!435,a---—I--V423O59E2+c3tbi1S’°“texreo-
.--VCin-411c1n14L3JSJ105‘-k)2°1lzkL4-ctøaaa4ojC)3KinC.untyL’42X5SX)-l--
--4‘ID.1O1mia3zm2jLegend,,4tSelectedFeatures--.-Jrc;t-oiSÃOEtosbnAStreetsLakesandLargeR&ers--100YearFbodplainSÃOStreamSÃOWetisridCaI[:-SÃOLandslideCus2°ccnnSÃOCoalMineSÃO/VC-o)
4
TASK2RESOURCEREVIEW
TASK2RESOURCEREVIEWAdoptedBasinPlansandFinalizedDrainageStudies:ThesiteislocatedintheMayCreekBasinPlan.BasinReconnaissanceSummaryReports:Noknownreportsareknowntoexist.CriticalDrainageAreaMaps:Thesiteisnotknowntobelocatedinanycriticaldrainageareas.(FEMA)Maps:Thesiteislocatedoutsidethe100yearfloodplain.OtherOffsiteAnalysisReports:ADrainageReportwaspreparedbyDickStuthfortheDalpayEstatesprojectlocatednorthwestofthisproject.SensitiveAreasFolio:Noneofthesiteislocatedinornearanysensitivearea(seesensitiveareasmapunderTask1).DNRDrainageProblemsMaps:Notapplicable.RoadDrainageProblems:Notapplicable.KingCountySoilsSurvey:Thesite’ssoilismostlyAlderwoodGravellySandyLoam,6to15percentslopes(AgC).TheextremesouthernportionofthesitecontainsAlderwoodGravellySandyLoam,15to30percentslopes(AgD).WetlandsInventoryMaps:Therearenowetlandslocatedonornearthesite.MigratingRiverStudies:Notapplicable.DrainageComplaints:AccordingtothelistofdrainagecomplaintsprovidedbyKingCounty,therewerenocomplaintsnearthedownstreamanalysistimitsofthisprojectthatarearesultofrunofffromthisproperty.
TASK3FIELDINSPECTION
TASK3FIELDINSPECTIONAfieldinspectionwasconductedonDecember3,2003toinspecttheonsitedrainagesystemofthesite.Offsitedrainagesystemswerealsoinspecteddownstreamapproximately1/4mile(s)fromthedischargepointofthesite.TheinspectioninvolvedinvestigationofthetenspecificitemsofaLevel1InspectionpertheKingCountySurfaceWaterDesignManual,1990.Theinspectionyieldedthefollowingfindings:1.Therewerenoexistingorpotentialproblemsobserved.2.Theexistingdrainagesystemcapacitywasadequate.3.Therewerenoexistingorpotentialfloodingproblems.4.Therewerenoexisting/potentialovertopping,sedimentation,scouringorbanksloughingproblems.5.Nosignificantdestructionofaquatichabitatororganismswasnoticeable.6.Qualitativedatasuchaslanduse,impervioussurfaces,topography,andsoiltypeswasnotedandcanbefoundinTask4information.7.Informationwascollectedonpipes,ditches,andstructures.ThisinformationisalsoincludedintheTask4information.8.TributarybasinsdelineatedinTask1wereverified.9.Noneighborswerecontacted.10.Theweatherconditionsatthetimeoftheinspectionwerecoolandcloudy.
TASK4DRAINAGESYSTEMDESCRIPTIONANDPROBLEMDESCRIPTIONS
TASK4DRAINAGESYSTEMDESCRIPTIONANDPROBLEMDESCRIPTIONSSiteDrainageThisprojectissoutheastoftheintersectionofNE19thStreetandRedmondAveNE.ItliesalongthesouthsideofNE19thStreet.Theparcel#is042305-9032.Thesiteisapproximately2.5acres.Thenorthernportionofthesiteconsistsofmostlyofgrassandscotchbroom.ThereisalargedetentionvaultlocatedinthenortheastportionoftheprojectthatwasdesignedtodetainthestormwaterfromthissiteandtheDalpayEstatesprojectnorthwestofthisproject.Thesouthernportionoftheprojectiscompletelyforestedwithmostlyevergreensandhasaravinethatrunsthroughit.Theexistingdrainagetendstosheetfiowtowardstheravine,whereitbecomesasmallstreamthatflowstowardNESunsetBoulevard.ThesmallstreamthenjoinsanotherstreamthatparallelsNESunsetBoulevard.Thesite’ssoilisanAlderwoodGravellySandyLoam(AgC)andisconsideredaTypeCsofl.OffsiteDrainageAnOff-SiteAnalysisDrainageSystemTableisprovidedonthenextpagethatdescribesindetailtheoffsitedrainagecomponentsatleast1%miledownstreamfromtheprojectdischargelocation.PleaserefertotheoffsitedrainagemapinTask1becausethemapsymbolslistedinthetablecorrespondtodrainagecomponentsymbolsontheoffsitedrainagemaps.
C,)Co0iCDCDml—zøzOG)OmCDrn-ICDz1%)-I--l000
TASK5MITIGATIONOFEXISTINGORPOTENTIALPROBLEMS
TASK5MITIGATIONOFEXISTINGORPOTENTIALPROBLEMSAfterathoroughfieldinspectionandadetailedresourcereviewtherewerenomajororexistingproblemsidentified.Theproposedimprovementswillnotproduceasignificantimpacttotheexistingdrainagepatternsoncethesitehasbeenstabilizedandtherunoffhasbeencontrolledviatheexistingdetentionvaultandcontrolstructureonsite.Atemporaryerosionandsedimentationcontrolplanwillbecreatedtominimizethetransportofsedimentladenrunofftothedownstreamconveyancesystempriortopermitissuance.
Tab 4.0
17884.007.doc
4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
A. Existing Site Hydrology
The existing 1.66-acre site is primarily covered with trees. The only exception to this is
Lot 1, which was cleared with the original Dalpay Short Plat. There are no existing
buildings on the site. Soils are Alderwood, which are considered to be "till" type soils.
Based on site reconnaissance, available topography maps, and adjacent developments,
there is no upstream contributing basin area as noted in Section 3.0. The natural
discharge location for the site is the existing stream that discharges along the west
boundary of the site. Please refer to the enclosed Existing Basin Area Map for a graphic
depiction of the site topography and characteristics.
17884.007.doc
B. Developed Site Hydrology
In the developed condition, the site will contain three (3) residential lots with associated
houses and driveways. An underground pipe conveyance system will be installed to
convey stormwater runoff from the developed site (Lots 2 and 3) to a detention pond,
then to the bottom of the hill at the natural discharge point. This facility has been
designed to provide the required detention for Lots 2 and 3. The developed portion of the
site located in the northwest corner of the site (Lot 1) will drain to the existing storm stub
installed with the original Dalpay short plat.
The Site has been analyzed as a whole to determine the change in runoff from the
existing conditions to the developed conditions. The pond has been sized to minimize the
change in runoff. The total increase in runoff from the site in the 100-year peak storm is
approximately 0.0095 cfs. This is below the threshold increase of 0.15 cfs for the 100
year from Section 1.2.3.2.E.5 of the 2017 RSWDM for an exemption from further
detention requirements. A drainage adjustment will be provided per section 1.4 of the
RSWDM for this project to explain how this design provides the best practicable
alternative for achieving the spirit and intent of the flow control requirements.
Water quality facilities are not required for this project as the proposed Pollution
Generating Impervious Surface (PGIS) for the entire project is less than 5,000 SF.
The on-site tributary area to the proposed detention pond is approximately 0.434 acres
per the enclosed Developed Basin Area Map. All runoff routed to this facility will be
detained to meet flow control duration standard matching forested site conditions before
being discharged to the stream. All disturbed pervious areas will use the Soil amendment
BMP as outlined in the RSWM Section C.2.13 and are thus being modeled as pasture
per that section.
Proposed new pervious areas will implement the Soil Amendment BMP per the 2017
RSWDM Section C.2.13. Per that section, Areas meeting the design guidelines shall be
entered into approved runoff models as “Pasture” rather than “Lawn.
Please refer to the enclosed basin area map for a detailed breakdown of the on-site
areas and land covers, as well as the calculations for the proposed detention pond.
17884.007.doc
C. Performance Standards
Based on the flow control application map located in the 2017 RSWDM, this project is
located within a flow control duration matching forested site conditions area. A detention
pond has been proposed to meet this flow control requirement.
Based on the water quality application map located in the 2017 RSWDM, this project is
located within a Basic Water Quality Treatment area. This project is proposing to add
less than 5,000 square feet of new pollution-generating impervious area, so it is exempt
from water quality requirements.
17884.007.doc
D. Flow Control System
The flow control facility in this site has been designed to conform to the standards in the
2017 RSWDM. According to Core Requirement #9: On-site BMPs in Section 1.2.9, “On-
site BMPs must be selected and applied according to the basic requirements,
procedures, and provisions detailed in this section and the design specifications for each
BMP in Appendix C, Section C.2.”
Large Lot BMP Requirements: According to Section 1.2.9.2.2, the following BMPs are
required for lots/sites larger than 22,000 square feet when feasible: full dispersion, full
infiltration, limited infiltration, rain gardens, bioretention, permeable pavement, Basic
Dispersion, Reduced Impervious Surface Credit, Native growth retention credit, Tree
Retention credit, Soil Amendment, and Perforated pipe connection.
Full Dispersion: According to Appendix C, Section C.2.1, “Where geotechnical
evaluation and approval is required for full dispersion that proposes to discharge towards
or is within described setbacks of a steep slope hazard area, erosion hazard area,
landslide hazard, or slopes greater than 15%, full dispersion is considered infeasible and
not required.” Since Lots 2 and 3 all drain towards a steep slope erosion hazard area
(see Earth Solutions NW (ESNW) report, Section 6.1), this BMP is infeasible.
Full Infiltration: According to Appendix C, Section C.2.2, “Where geotechnical
evaluation and approval is required for full infiltration that proposes to discharge towards
or is within described setbacks of a steep slope hazard area, erosion hazard area,
landslide hazard, or slopes greater than 15%, full infiltration is considered infeasible and
not required” Since Lots 2 and 3 all drain towards a steep slope erosion hazard area (see
ESNW report, Section 6.1), this BMP is infeasible. In addition, the in-situ soils have
extremely low permeability that will not allow for infiltration.
Limited Infiltration: According to Appendix C, Section C.2.3, “Where geotechnical
evaluation and approval is required for limited infiltration that proposes to discharge
towards or is within described setbacks of a steep slope hazard area, erosion hazard
area, landslide hazard, or slopes greater than 15%, limited infiltration is considered
infeasible and not required.” Since Lots 2 and 3 all drain towards a steep slope erosion
hazard area (see ESNW report, Section 6.1), this BMP is infeasible. In addition, the
in-situ soils have extremely low permeability that will not allow for infiltration.
Bioretention: According to Appendix C, Section C.2.6, “Where the minimum design
requirements call for geotechnical evaluation and approval for bioretention that proposes
to discharge towards or is within described setbacks of a steep slope hazard area,
erosion hazard area, landslide hazard, or slopes greater than 15%, bioretention is
considered infeasible and not required.” Since Lots 2 and 3 all drain towards a steep
slope erosion hazard area (see ESNW report, Section 6.1), this BMP is infeasible. In
addition, the in-situ soils have extremely low permeability that will not allow for infiltration.
Permeable Pavement: According to Appendix C, Section C.2.7, “Where the minimum
design requirements call for geotechnical evaluation and approval for permeable
pavement that proposes to discharge towards or is within described setbacks of a steep
slope hazard area, erosion hazard area, landslide hazard, or slopes greater than 15%,
permeable pavement is considered infeasible and not required.” Since Lots 2 and 3 all
drain towards a steep slope erosion hazard area (see ESNW report, Section 6.1), this
BMP is infeasible.
Rain Gardens: Rain gardens have the same infeasibility criteria as bioretention
according to Appendix C, Section C.2.12, so they are also infeasible.
17884.007.doc
Basic Dispersion: According to Appendix C, Section C.2.4, “Where geotechnical
evaluation and approval is required for basic dispersion that proposes to discharge
towards or is within described setbacks of a steep slope hazard area, erosion hazard
area, landslide hazard, or slopes greater than 15%, full dispersion is considered
infeasible and not required.” Since Lots 2 and 3 all drain towards a steep slope erosion
hazard area (see Earth Solutions NW (ESNW) report, Section 6.1), this BMP is
infeasible.
Reduced Impervious surface credit: This project will implement the Reduced
Impervious Surface Credit according to the guidelines listed in Appendix C, Section
C.2.9. The technique to be used for the Reduced Impervious Surface Credit will be
Restricted Footprint, according to Section C.2.9.2. The maximum impervious surface
allowed on each lot will be reduced from 70% to 50% in order to meet the minimum BMP
implementation of 20% of the site as required in Section C.1.3.1.5. The roof downspouts
will be connected to the storm system via perforated stub-out connections.
Soil Amendment: This project will implement the Soil amendment BMP according to the
guidelines listed in Appendix C, Section C.2.13. Implementation Options: The soil quality
design guidelines listed in Section C.2.13.1 can be met by using one of the methods
listed below:
1. Leave undisturbed native vegetation and soil, and protect from compaction during
construction.
2. Amend existing site topsoil or subsoil either at default “pre-approved” rates, or at
custom calculated rates based on tests of the soil and amendment.
3. Stockpile existing topsoil during grading, and replace it prior to planting.
4. Stockpiled topsoil must also be amended if needed to meet the organic matter or depth
requirements, either at a default “pre-approved” rate or at a custom calculated rate.
5. Import topsoil mix of sufficient organic content and depth to meet the requirements.
More than one method may be used on different portions of the same site. Soil that
already meets the depth and organic matter quality standards, and is not compacted
does not need to be amended.
A detention pond has been proposed to provide flow control for this site. The stormwater
will then be discharged to the existing on-site stream. Please refer to the enclosed
WWHM calculations for further details on the sizing of this facility.
As previously noted, the drainage facilities for the original Dalpay Short Plat located north
of Lot 1 were sized to accommodate Lot 1. Therefore, no new facilities are proposed to
accommodate the runoff from Lot 1.
The Site has been analyzed as a whole to determine the change in runoff from the
existing conditions to the developed conditions. The pond has been sized to minimize the
change in runoff. The total increase in runoff from the site in the 100-year peak storm is
approximately 0.0095 cfs. This is below the threshold increase of 0.15 cfs for the 100
year from Section 1.2.3.2.E.5 of the 2017 RSWDM for an exemption from further
detention requirements. A drainage adjustment will be provided per section 1.4 of the
RSWDM for this project to explain how this design provides the best practicable
alternative for achieving the spirit and intent of the flow control requirements.
WWHM2012
PROJECT REPORT
STORMWATER
CALCULATIONS
BCE #17884
NOVEMBER 3, 2020
DALPAY SHORT PLAT
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 2
General Model Information
Project Name:17884-Full Site Analysis-2020-11-03
Site Name:
Site Address:
City:
Report Date:11/3/2020
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.167
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 0.434
Pervious Total 0.434
Impervious Land Use acre
Impervious Total 0
Basin Total 0.434
Element Flows To:
Surface Interflow Groundwater
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 4
Basin 2
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 0.177
Pervious Total 0.177
Impervious Land Use acre
Impervious Total 0
Basin Total 0.177
Element Flows To:
Surface Interflow Groundwater
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 5
Basin 3
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Steep 1.049
Pervious Total 1.049
Impervious Land Use acre
Impervious Total 0
Basin Total 1.049
Element Flows To:
Surface Interflow Groundwater
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 6
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Pasture, Flat 0.282
Pervious Total 0.282
Impervious Land Use acre
ROADS FLAT 0.05
ROADS MOD 0.01
ROOF TOPS FLAT 0.092
Impervious Total 0.152
Basin Total 0.434
Element Flows To:
Surface Interflow Groundwater
Trapezoidal Pond 1 Trapezoidal Pond 1
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 7
Basin 2
Bypass:Yes
GroundWater:No
Pervious Land Use acre
C, Pasture, Flat 0.1033
Pervious Total 0.1033
Impervious Land Use acre
ROOF TOPS FLAT 0.0459
DRIVEWAYS FLAT 0.0278
Impervious Total 0.0737
Basin Total 0.177
Element Flows To:
Surface Interflow Groundwater
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 8
Basin 3
Bypass:Yes
GroundWater:No
Pervious Land Use acre
C, Forest, Steep 1.049
Pervious Total 1.049
Impervious Land Use acre
Impervious Total 0
Basin Total 1.049
Element Flows To:
Surface Interflow Groundwater
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 9
Routing Elements
Predeveloped Routing
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 10
Mitigated Routing
Trapezoidal Pond 1
Bottom Length:25.00 ft.
Bottom Width:25.00 ft.
Depth:4.5 ft.
Volume at riser head:0.1042 acre-feet.
Side slope 1:3 To 1
Side slope 2:3 To 1
Side slope 3:3 To 1
Side slope 4:3 To 1
Discharge Structure
Riser Height:3.5 ft.
Riser Diameter:12 in.
Orifice 1 Diameter:0.45 in.Elevation:0 ft.
Orifice 2 Diameter:1.1 in.Elevation:2.5 ft.
Element Flows To:
Outlet 1 Outlet 2
Pond Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
0.0000 0.014 0.000 0.000 0.000
0.0500 0.014 0.000 0.001 0.000
0.1000 0.015 0.001 0.001 0.000
0.1500 0.015 0.002 0.002 0.000
0.2000 0.015 0.003 0.002 0.000
0.2500 0.016 0.003 0.002 0.000
0.3000 0.016 0.004 0.003 0.000
0.3500 0.016 0.005 0.003 0.000
0.4000 0.017 0.006 0.003 0.000
0.4500 0.017 0.007 0.003 0.000
0.5000 0.018 0.008 0.003 0.000
0.5500 0.018 0.009 0.004 0.000
0.6000 0.018 0.009 0.004 0.000
0.6500 0.019 0.010 0.004 0.000
0.7000 0.019 0.011 0.004 0.000
0.7500 0.020 0.012 0.004 0.000
0.8000 0.020 0.013 0.004 0.000
0.8500 0.020 0.014 0.005 0.000
0.9000 0.021 0.015 0.005 0.000
0.9500 0.021 0.017 0.005 0.000
1.0000 0.022 0.018 0.005 0.000
1.0500 0.022 0.019 0.005 0.000
1.1000 0.022 0.020 0.005 0.000
1.1500 0.023 0.021 0.005 0.000
1.2000 0.023 0.022 0.006 0.000
1.2500 0.024 0.023 0.006 0.000
1.3000 0.024 0.025 0.006 0.000
1.3500 0.025 0.026 0.006 0.000
1.4000 0.025 0.027 0.006 0.000
1.4500 0.026 0.028 0.006 0.000
1.5000 0.026 0.030 0.006 0.000
1.5500 0.027 0.031 0.006 0.000
1.6000 0.027 0.032 0.007 0.000
1.6500 0.028 0.034 0.007 0.000
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 11
1.7000 0.028 0.035 0.007 0.000
1.7500 0.028 0.037 0.007 0.000
1.8000 0.029 0.038 0.007 0.000
1.8500 0.029 0.040 0.007 0.000
1.9000 0.030 0.041 0.007 0.000
1.9500 0.030 0.043 0.007 0.000
2.0000 0.031 0.044 0.007 0.000
2.0500 0.031 0.046 0.007 0.000
2.1000 0.032 0.047 0.008 0.000
2.1500 0.033 0.049 0.008 0.000
2.2000 0.033 0.051 0.008 0.000
2.2500 0.034 0.052 0.008 0.000
2.3000 0.034 0.054 0.008 0.000
2.3500 0.035 0.056 0.008 0.000
2.4000 0.035 0.058 0.008 0.000
2.4500 0.036 0.059 0.008 0.000
2.5000 0.036 0.061 0.008 0.000
2.5500 0.037 0.063 0.016 0.000
2.6000 0.037 0.065 0.019 0.000
2.6500 0.038 0.067 0.021 0.000
2.7000 0.039 0.069 0.023 0.000
2.7500 0.039 0.071 0.025 0.000
2.8000 0.040 0.073 0.027 0.000
2.8500 0.040 0.075 0.028 0.000
2.9000 0.041 0.077 0.030 0.000
2.9500 0.041 0.079 0.031 0.000
3.0000 0.042 0.081 0.032 0.000
3.0500 0.043 0.083 0.033 0.000
3.1000 0.043 0.085 0.035 0.000
3.1500 0.044 0.088 0.036 0.000
3.2000 0.044 0.090 0.037 0.000
3.2500 0.045 0.092 0.038 0.000
3.3000 0.046 0.094 0.039 0.000
3.3500 0.046 0.097 0.040 0.000
3.4000 0.047 0.099 0.041 0.000
3.4500 0.047 0.101 0.042 0.000
3.5000 0.048 0.104 0.043 0.000
3.5500 0.049 0.106 0.162 0.000
3.6000 0.049 0.109 0.378 0.000
3.6500 0.050 0.111 0.650 0.000
3.7000 0.051 0.114 0.954 0.000
3.7500 0.051 0.116 1.264 0.000
3.8000 0.052 0.119 1.557 0.000
3.8500 0.053 0.122 1.811 0.000
3.9000 0.053 0.124 2.009 0.000
3.9500 0.054 0.127 2.151 0.000
4.0000 0.055 0.130 2.254 0.000
4.0500 0.055 0.132 2.387 0.000
4.1000 0.056 0.135 2.492 0.000
4.1500 0.057 0.138 2.592 0.000
4.2000 0.057 0.141 2.689 0.000
4.2500 0.058 0.144 2.782 0.000
4.3000 0.059 0.147 2.872 0.000
4.3500 0.059 0.150 2.959 0.000
4.4000 0.060 0.153 3.044 0.000
4.4500 0.061 0.156 3.127 0.000
4.5000 0.062 0.159 3.207 0.000
4.5500 0.062 0.162 3.286 0.000
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 12
17884-Full Site Analysis-2020-11-03 11/3/2020 4:27:52 PM Page 13
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.66
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:1.4343
Total Impervious Area:0.2257
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.087679
5 year 0.143626
10 year 0.185896
25 year 0.244763
50 year 0.292366
100 year 0.343044
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.100488
5 year 0.154157
10 year 0.19555
25 year 0.254772
50 year 0.304095
100 year 0.358038
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.113 0.140
1950 0.128 0.142
1951 0.162 0.170
1952 0.060 0.071
1953 0.048 0.056
1954 0.064 0.075
1955 0.116 0.113
1956 0.093 0.101
1957 0.089 0.112
1958 0.081 0.083
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:25 PM Page 14
1959 0.067 0.070
1960 0.135 0.154
1961 0.066 0.083
1962 0.048 0.055
1963 0.065 0.079
1964 0.084 0.092
1965 0.065 0.089
1966 0.053 0.069
1967 0.147 0.163
1968 0.074 0.091
1969 0.076 0.088
1970 0.065 0.089
1971 0.078 0.099
1972 0.130 0.136
1973 0.064 0.069
1974 0.075 0.096
1975 0.110 0.129
1976 0.075 0.092
1977 0.035 0.050
1978 0.067 0.078
1979 0.036 0.051
1980 0.206 0.216
1981 0.053 0.084
1982 0.144 0.172
1983 0.091 0.094
1984 0.059 0.069
1985 0.035 0.056
1986 0.144 0.138
1987 0.133 0.138
1988 0.057 0.062
1989 0.035 0.046
1990 0.366 0.361
1991 0.184 0.206
1992 0.073 0.086
1993 0.066 0.070
1994 0.027 0.040
1995 0.083 0.090
1996 0.202 0.212
1997 0.164 0.166
1998 0.066 0.088
1999 0.207 0.211
2000 0.066 0.083
2001 0.019 0.042
2002 0.099 0.121
2003 0.127 0.142
2004 0.165 0.186
2005 0.103 0.114
2006 0.096 0.102
2007 0.274 0.284
2008 0.300 0.303
2009 0.133 0.145
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.3660 0.3614
2 0.3001 0.3026
3 0.2737 0.2840
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:25 PM Page 15
4 0.2068 0.2160
5 0.2055 0.2121
6 0.2016 0.2107
7 0.1838 0.2055
8 0.1648 0.1857
9 0.1638 0.1720
10 0.1617 0.1700
11 0.1469 0.1655
12 0.1444 0.1627
13 0.1436 0.1544
14 0.1346 0.1453
15 0.1330 0.1423
16 0.1329 0.1419
17 0.1300 0.1405
18 0.1277 0.1382
19 0.1271 0.1377
20 0.1157 0.1365
21 0.1128 0.1289
22 0.1101 0.1214
23 0.1026 0.1137
24 0.0989 0.1134
25 0.0960 0.1122
26 0.0926 0.1017
27 0.0906 0.1014
28 0.0895 0.0987
29 0.0842 0.0957
30 0.0830 0.0943
31 0.0808 0.0924
32 0.0776 0.0916
33 0.0764 0.0914
34 0.0755 0.0905
35 0.0748 0.0891
36 0.0741 0.0887
37 0.0729 0.0884
38 0.0667 0.0876
39 0.0665 0.0861
40 0.0664 0.0843
41 0.0662 0.0830
42 0.0661 0.0827
43 0.0660 0.0827
44 0.0651 0.0794
45 0.0649 0.0779
46 0.0646 0.0751
47 0.0644 0.0715
48 0.0641 0.0698
49 0.0603 0.0695
50 0.0595 0.0693
51 0.0571 0.0693
52 0.0530 0.0685
53 0.0528 0.0619
54 0.0479 0.0560
55 0.0476 0.0557
56 0.0364 0.0548
57 0.0352 0.0512
58 0.0351 0.0502
59 0.0349 0.0456
60 0.0265 0.0421
61 0.0185 0.0397
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:25 PM Page 16
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:25 PM Page 17
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0438 12339 12414 100 Pass
0.0463 10812 10797 99 Pass
0.0489 9567 9430 98 Pass
0.0514 8425 8305 98 Pass
0.0539 7463 7313 97 Pass
0.0564 6675 6470 96 Pass
0.0589 5987 5736 95 Pass
0.0614 5366 5155 96 Pass
0.0639 4800 4605 95 Pass
0.0664 4299 4179 97 Pass
0.0689 3953 3788 95 Pass
0.0715 3610 3429 94 Pass
0.0740 3302 3125 94 Pass
0.0765 3018 2832 93 Pass
0.0790 2748 2558 93 Pass
0.0815 2481 2304 92 Pass
0.0840 2231 2117 94 Pass
0.0865 1986 1906 95 Pass
0.0890 1796 1713 95 Pass
0.0915 1630 1554 95 Pass
0.0940 1474 1414 95 Pass
0.0966 1353 1288 95 Pass
0.0991 1229 1188 96 Pass
0.1016 1110 1081 97 Pass
0.1041 1021 1002 98 Pass
0.1066 937 943 100 Pass
0.1091 878 870 99 Pass
0.1116 816 806 98 Pass
0.1141 748 738 98 Pass
0.1166 698 676 96 Pass
0.1192 639 621 97 Pass
0.1217 591 566 95 Pass
0.1242 544 528 97 Pass
0.1267 495 474 95 Pass
0.1292 439 416 94 Pass
0.1317 386 369 95 Pass
0.1342 338 326 96 Pass
0.1367 288 294 102 Pass
0.1392 246 264 107 Pass
0.1417 210 237 112 Fail
0.1443 175 208 118 Fail
0.1468 159 184 115 Fail
0.1493 131 164 125 Fail
0.1518 112 149 133 Fail
0.1543 96 132 137 Fail
0.1568 76 114 150 Fail
0.1593 64 94 146 Fail
0.1618 55 79 143 Fail
0.1643 53 66 124 Fail
0.1668 49 56 114 Fail
0.1694 47 52 110 Pass
0.1719 46 48 104 Pass
0.1744 45 44 97 Pass
0.1769 41 43 104 Pass
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:25 PM Page 18
0.1794 38 43 113 Fail
0.1819 33 40 121 Fail
0.1844 31 36 116 Fail
0.1869 28 28 100 Pass
0.1894 23 24 104 Pass
0.1920 20 24 120 Fail
0.1945 18 22 122 Fail
0.1970 16 19 118 Fail
0.1995 14 17 121 Fail
0.2020 9 15 166 Fail
0.2045 9 12 133 Fail
0.2070 6 11 183 Fail
0.2095 6 10 166 Fail
0.2120 6 9 150 Fail
0.2145 6 8 133 Fail
0.2171 6 7 116 Fail
0.2196 6 6 100 Pass
0.2221 6 6 100 Pass
0.2246 6 6 100 Pass
0.2271 6 6 100 Pass
0.2296 6 6 100 Pass
0.2321 6 6 100 Pass
0.2346 6 6 100 Pass
0.2371 5 6 120 Fail
0.2396 5 6 120 Fail
0.2422 5 5 100 Pass
0.2447 4 5 125 Fail
0.2472 4 5 125 Fail
0.2497 4 5 125 Fail
0.2522 4 4 100 Pass
0.2547 4 4 100 Pass
0.2572 4 4 100 Pass
0.2597 4 4 100 Pass
0.2622 4 4 100 Pass
0.2648 4 4 100 Pass
0.2673 4 4 100 Pass
0.2698 4 4 100 Pass
0.2723 4 4 100 Pass
0.2748 3 4 133 Fail
0.2773 3 4 133 Fail
0.2798 3 4 133 Fail
0.2823 3 4 133 Fail
0.2848 3 3 100 Pass
0.2873 2 2 100 Pass
0.2899 2 2 100 Pass
0.2924 2 2 100 Pass
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:25 PM Page 19
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:25 PM Page 20
LID Report
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:49 PM Page 21
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:49 PM Page 22
Appendix
Predeveloped Schematic
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:49 PM Page 23
Mitigated Schematic
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:50 PM Page 24
Predeveloped UCI File
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:50 PM Page 25
Mitigated UCI File
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:50 PM Page 26
Predeveloped HSPF Message File
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:50 PM Page 27
Mitigated HSPF Message File
17884-Full Site Analysis-2020-11-03 11/3/2020 4:28:50 PM Page 28
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2020; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Tab 5.0
17884.007.doc
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
This section contains the typical calculations necessary for the sizing of the pipe facilities
proposed on this project. The Rational Method and Manning's Formula will be used for sizing
purposes. Conveyance pipes were sized to accommodate the 100-year storm event at a flowing
full condition.
17884-100-year-conv.xlsBARGHAUSEN CONSULTING ENGINEERS - PIPE FLOW CALCULATORusing the Rational Method & Manning FormulaKING COUNTY DESIGN FOR 100YEAR STORMJOB NAME:Dalpay Short Plat NOTE: ENTER DEFAULTS AND STORM DATA BEFORE BEGINNING JOB#:17884 DEFAULTS C=0.6n=0.012FILE NO.:17884-100-year-conv d=12Tc=6.3A= Contributing Area (Ac)Qd= Design Flow (cfs)COEFFICIENTS FOR THE RATIONAL METHOD "Ir"-EQUATIONC= Runoff Coefficient Qf= Full Capacity Flow (cfs)STORMAr BrTc= Time of Concentration (min)Vd= Velocity at Design Flow (fps)2YR1.580.58I= Intensity at Tc (in/hr) Vf= Velocity at Full Flow (fps)10YR 2.44 0.64PRECIP=4d= Diameter of Pipe (in) s= Slope of pipe (%)25YR 2.66 0.65Ar=2.61L= Length of Pipe (ft)n= Manning Roughness Coefficient50YR2.750.65Br=0.63D= Water Depth at Qd (in)Tt= Travel Time at Vd (min)100YR2.610.63FROM TO A s Ld Tc n CSUM AA*CSUM A*C I Qd QfQd/QfD/d D Vf VdTt====== ====== ====== ====== ================== ====== ============ ===================== ====== ====== ====== ====== ====== ====== ====== ======CB4 CB3 0.43 11.19 418 6.3 0.012 0.60.4340.260.26 3.27 0.85 4.380.1950.296 2.37 12.55 9.660.07CB3 POND 0.00 4.56 228 6.4 0.012 0.60.4340.000.26 3.25 0.85 2.790.3030.376 3.01 8.01 7.010.05POND CB2 0.00 0.50 118 6.4 0.012 0.60.4340.000.26 3.23 0.84 0.930.9100.743 5.95 2.65 3.000.06CB2 CB1 0.00 0.50 98 6.5 0.012 0.60.4340.000.26 3.22 0.84 0.930.9050.740 5.92 2.65 3.000.05CB1 DAYLIGHT 0.00 0.50 648 6.5 0.012 0.60.4340.000.26 3.20 0.83 0.930.9000.737 5.90 2.65 3.000.36DAYLIGHT 0.00 33.00 158 6.9 0.012 0.60.4340.000.26 3.09 0.81 7.520.1070.222 1.78 21.55 13.970.020.00 45.00 108 6.9 0.012 0.60.4340.000.26 3.09 0.80 8.780.0920.202 1.62 25.17 15.340.01OUTLET 0.00 57.00 158 6.9 0.012 0.60.4340.000.26 3.09 0.80 9.880.0810.191 1.53 28.33 16.150.02Page 1
SECTION 5.1 DETENTION FACILITIES
Riser Overflow
The nomograph in Figure 5.1.4.H may be used to determine the head (in feet) above a riser of given
diameter and for a given flow (usually the 100-year peak flow for developed conditions).
FIGURE 5.1.4.H RISER INFLOW CURVES
1
10
100
0.1 1 10HEAD IN FEET (measured from crest of riser)
Qweir=9.739 DH3/2
Qorifice=3.782 D2H1/2
Q in cfs, D and H in feet
Slope change occurs at weir-orifice transition Q (cubic feet per second)18
21
24
27
30
42
487254
10
12
15
33
36
RISER DIAMETER (inches)
4/24/2016 2016 Surface Water Design Manual 5-34
Developed 100yr
Peak Flow to
Tract B=0.19 CFS
DALPAY SHORT PLAT - BCE # 17884
CB#1A - 12" RISER OVERFLOW CALCULATIONS
0.35' Head
SECTION 5.1 DETENTION FACILITIES
Riser Overflow
The nomograph in Figure 5.1.4.H may be used to determine the head (in feet) above a riser of given
diameter and for a given flow (usually the 100-year peak flow for developed conditions).
FIGURE 5.1.4.H RISER INFLOW CURVES
1
10
100
0.1 1 10HEAD IN FEET (measured from crest of riser)
Qweir=9.739 DH3/2
Qorifice=3.782 D2H1/2
Q in cfs, D and H in feet
Slope change occurs at weir-orifice transition Q (cubic feet per second)18
21
24
27
30
42
487254
10
12
15
33
36
RISER DIAMETER (inches)
4/24/2016 2016 Surface Water Design Manual 5-34
Developed 100yr
Peak Flow to
Tract B=0.19 CFS
DALPAY SHORT PLAT - BCE # 17884
CB#1 - RISER OVERFLOW CALCULATIONS
0.13' Head
Tab 6.0
17884.007.doc
6.0 SPECIAL REPORTS AND STUDIES
The following special reports and studies are included:
6.1 Geotechnical Engineering Study for Dalpay Short Plat prepared by Earth Solutions NW,
LLC dated December 23, 2015
6.2 Geotechnical Addendum for Dalpay Short Plat prepared by Earth Solutions NW, LLC
dated February 13, 2017
6.3 Response to Review Comments for Dalpay Short Plat prepared by Earth Solutions NW,
LLC dated February 21, 2018
6.4 Response to Review Comments for Proposed Dalpay Short Plat by Earth Solutions NW,
LLC dated October 8, 2019
Geotechnical Engineering
Study by Earth Solutions
NW, LLC dated
December 13, 2015
6.1
EarthSolutionsNWLLC
EarthSolutionsNWLLC
Geotechnical Engineering
Geology
Environmental Scientists
Construction Monitoring
1805 -136th Place N.E.,Suite 201 Bellevue,WA 98005
(425)449-4704 Fax (425)449-4711
www.earthsolutionsnw.com
GEOTECHNICAL ENGINEERING STUDY
DALPAY SHORT PLAT
REDMOND COURT NORTHEAST
RENTON,WASHINGTON
ES-4208
2005 2015
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutionsNWLLC and Environmental Sciences
Vicinity Map
Dalpay Short Plat
Renton,Washington
MRS
TJM
12/09/2015
Dec.2015
4208
1
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
Reference:
King County,Washington
Map 626
By The Thomas Guide
Rand McNally
32nd Edition
SITE
Plate
Proj.No.
Date
Checked By
Drwn.ByEarthSolutionsNWLLCGeotechnicalEngineering,ConstructionMonitoringandEnvironmentalSciencesEarthSolutionsNWLLCEarthSolutionsNWLLCTestPitLocationPlanDalpayShortPlatRenton,WashingtonMRS
TJM
12/09/2015
4208
2NORTH03060120
Scale in Feet1"=60'
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
NOTE:The graphics shown on this plate are not intended for design
purposes or precise scale measurements,but only to illustrate the
approximate test locations relative to the approximate locations of
existing and /or proposed site features.The information illustrated
is largely based on data provided by the client at the time of our
study.ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
LEGEND
Approximate Location of
ESNW Test Pit,Proj.No.
ES-4208,Nov.2015
Subject Site
REDMOND COURT N.E.
TP-1
TP-2
TP-3
TP-4
RE
DMOND PLACE N.E.N.E.19THSTREETVeldyke II Short Plat
Lot 1
Lot 2
Lot 3
Lot 4
380
390
400
410
420
380390 400 410 420
390
390
410
410
Rockery
TP-1
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction MonitoringandEnvironmentalSciences
EarthSolutionsNWLLC
EarthSolutionsNWLLC
RETAINING WALL DRAINAGE DETAIL
Dalpay Short Plat
Renton,Washington
MRS
TJM
12/10/2015
Dec.2015
4208
3
NOTES:
Free Draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing #4 should be 25 to
75 percent.
Sheet Drain may be feasible in lieu
of Free Draining Backfill,per ESNW
recommendations.
Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1"
Drain Rock.
LEGEND:
Free Draining Structural Backfill
1 inch Drain Rock
18"Min.
Structural
Fill
Perforated Drain Pipe
(Surround In Drain Rock)
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
and Environmental Sciences
EarthSolutionsNWLLC
EarthSolutionsNWLLC
FOOTING DRAIN DETAIL
Slope
Perforated Rigid Drain Pipe
(Surround with 1"Rock)
18"(Min.)
NOTES:
Do NOT tie roof downspouts
to Footing Drain.
Surface Seal to consist of
12"of less permeable,suitable
soil.Slope away from building.
LEGEND:
Surface Seal;native soil or
other low permeability material.
1"Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Dalpay Short Plat
Renton,Washington
MRS
TJM
12/10/2015
Dec.2015
4208
4
Geotechnical Addendum
by Earth Solutions NW, LLC
dated February 13, 2017
6.2
Response to Review
Comments by Earth
Solutions NW, LLC
dated February 21, 2018
6.3
Response to Review
Comments by Earth
Solutions NW, LLC
dated October 8, 2018
6.4
Tab 7.0
17884.007.doc
7.0 OTHER PERMITS
The City of Renton will be the governing body for the roadway, grading, and storm drainage
construction of the project. A building permit and grading permit will be required for the
construction of the proposed improvements. Other anticipated permits and information that will
be required for the project are listed below:
Postmaster / Mailbox Location Approval
Fire Marshal / Fire Hydrant Location Approval
Water Availability Certificate
Sewer Availability Certificate
Construction Stormwater General Permit (Department of Ecology)
Forest Practices Permit (Department of Natural Resources)
Tab 8.0
17884.007.doc
8.0 CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ANALYSIS AND
DESIGN
A. Erosion and Sediment Control (ESC) Plan Analysis and Design
The erosion and sediment control plans for the Dalpay Short Plat were prepared in
accordance with the 2017 RSWDM and will comply with standard industry practices
throughout the construction process to limit the amount of sediment traveling into the
downstream storm drainage systems. Temporary sediment traps will be constructed to
provide sediment retention on site before discharging into the ground. The site's runoff
will be conveyed from the roads and lot areas via temporary V-ditches with rock
checkdams or sheet flow to the temporary sediment traps. Additional BMPs will be
proposed as necessary and will include rocked construction entrances, silt fencing where
needed, straw mulch for the areas that reach final grade in the lot areas, and
hydroseeding. Clearing limits will be established per the final construction plans.
The temporary sediment traps will trap sediment prior to any discharge off site.
Due to site topography and soil type, there is a risk for erosion. Standard erosion control
measures noted in this section should be sufficient to control erosion and prevent
sediment from leaving the site.
Silt fence will be installed at all locations where sediment-laden runoff may potentially
leave the site.
Cover measures shall be provided by the contractor when necessary on stockpiled
material and all disturbed areas. Temporary cover shall be installed if an area is to
remain unworked for more than seven (7) days during the dry season (May 1 to
September 30) or for more than two (2) days during the wet season (October 1 to April
30). During the wet season the contractor shall stockpile material necessary to cover all
disturbed areas. Slopes and stockpiles 3H:1V or steeper with more than 10 feet of
vertical relief shall be covered if they are to remain unworked for more than 12 hours.
All disturbed areas will be paved, covered with a house, or landscaped with grass,
shrubbery, or trees pursuant to the development plans to provide permanent erosion
control.
17884.007.doc
B. Stormwater Pollution Prevention and Spill Control (SWPPS) Plan
The Temporary Erosion and Sedimentation Control (TESC) analysis and design complies
with the 2017 RSWDM. The TESC elements are addressed as follows:
Clearing Limits: The clearing limits will be shown on the final engineering plans and will
be flagged in the field. The project is proposing to save existing trees where possible on
the site.
Cover Measures: Cover measures will be added in the TESC notes and on the final
engineering plans.
Perimeter Protection: Perimeter protection will be shown on the engineering plans (silt
fencing).
Traffic Area Stabilization: A stabilized gravel construction entrance will be shown on
the engineering plans.
Sediment Retention: Temporary sediment ponds will be proposed on the final
construction plans to retain sediment on site.
Surface Water Control: Interceptor ditches will be shown on the final engineering plans
and will be implemented if needed.
Dust Control: Dust will be controlled by water trucks if necessary.
Wet Season Construction: Construction will be conducted according to the City of
Renton standards during the wet season.
Construction within Sensitive Areas and Buffers: There is an existing Native Growth
Protection Easement (NGPE) on the site for steep slopes and a creek. The project is not
proposing any construction in this area.
Maintenance: Maintenance requirements will be detailed in the TESC notes on the final
engineering plans.
Final Stabilization: Upon completion of the project, all disturbed areas will be stabilized
and Best Management Practices removed if appropriate.
IN COMPLIANCE WITH CITY OF RENTON STANDARDSDALPAY SHORT PLATDALPAY PROPERTIES, LLC.4033 N.E. SUNSET BOULEVARDRENTON, WA 98059DALPAY SHORT PLAT
DALPAY SHORT PLAT DALPAY SHORT PLATTED-40-4097
TESC AND SWPPS PLANC3
“” “” R-409703
Tab 9.0
17884.007.doc
9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
This section contains the following items:
9.1 Bond Quantity Worksheet
9.2 Stormwater Facility Summary Sheet
9.3 Declaration of Covenant for Inspection and Maintenance of Drainage Facilities and On-
Site BMPs
Bond Quantity Worksheet9.1
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200••Section I: Project Information•••Section II: Bond Quantities Worksheets••Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))•Section II.b TRANSPORTATION (Street and Site Improvements)•Section II.c DRAINAGE (Drainage and Stormwater Facilities): •Section II.d WATER - ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON•Section II.e SANITARY SEWER - ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON••••••Section III. Bond Worksheet• This section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close-out submittals to release the permit bond on a project. All unit prices include labor, equipment, materials, overhead and profit. Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right-of-Way (ROW), Future Public Improvements and Private Improvements.The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the project with the exception of the maintenance period reduction.Excel will auto-calculate and auto-populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need completing.Additional items not included in the lists can be added under the "write-in" sections. Provide a complete description, cost estimate and unit of measure for each write-in item. Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the form. Stormwater facilities (public and private) are required to be included in the bond amount.BOND QUANTITY WORKSHEET INSTRUCTIONSThis worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial submittal to project close-out approval. Submit this workbook, in its entirety, as follows:The following forms are to be completed by the engineer/developer/applicant as applicable to the project: The Bond Worksheet form will auto-calculate and auto-populate from the information provided in Section I and Section II.This section includes all pertinent information for the projectSection II contains a separate spreadsheet TAB for each of the following specialties: (1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as part of the Technical Information Report (TIR).(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close-out submittal.This section must be completed in its entiretyInformation from this section auto-populates to all other relevant areas of the workbookPage 1 of 14Ref 8-H Bond Quantity WorksheetINSTRUCTIONSUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200Date Prepared: Name:PE Registration No:Firm Name:Firm Address:Phone No.Email Address:Project Name: Project Owner:CED Plan # (LUA):Phone:CED Permit # (U):Address: Site Address:Street Intersection:Addt'l Project Owner:Parcel #(s):Phone:Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NOWater Service Provided by:If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: SITE IMPROVEMENT BOND QUANTITY WORKSHEETPROJECT INFORMATIONCITY OF RENTONCITY OF RENTON1 Select the current project status/phase from the following options: For Approval - Preliminary Data Enclosed, pending approval from the City; For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout - Final Costs and Quantities Enclosed for Project Close-out SubmittalEngineer Stamp Required (all cost estimates must have original wet stamp Clearing and GradingUtility ProvidersN/AProject Location and DescriptionProject Owner InformationDalpay Short PlatRenton, WA 98056042305-9032Dalpay and AssociatesLUA-17000234206-399-6302Date 2-11-20Prepared by:FOR APPROVALProject Phase 1ddawes@barghausen.comDon E. Dawes, P.E, Senior Project EngineerPE Registration No. 42009Barghausen Consulting Engineers, Inc.18215 72nd Avenue South, Kent, WA 98032425-251-622218XX Redmond Place N.E.PO Box 2436N.E. 19th StreetAbbreviated Legal Description:A portion of the NE quarter of the SE 1/4 of Section 4, Township 23 North, Range 5 East, Willamette Meridian, City of Renton, King County, Washington.Page 2 of 14Ref 8-H Bond Quantity WorksheetSECTION I PROJECT INFORMATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/20202-11-20
CED Permit #:UnitReference #PriceUnitQuantity CostBackfill & compaction-embankmentESC-16.50$ CY Check dams, 4" minus rockESC-2SWDM 5.4.6.380.00$ Each7560.00Catch Basin ProtectionESC-335.50$ Each271.00Crushed surfacing 1 1/4" minusESC-4WSDOT 9-03.9(3)95.00$ CY DitchingESC-59.00$ CY Excavation-bulkESC-62.00$ CY Fence, siltESC-7SWDM 5.4.3.11.50$ LF450675.00Fence, Temporary (NGPE)ESC-81.50$ LF500750.00Geotextile FabricESC-92.50$ SY Hay Bale Silt TrapESC-100.50$ Each HydroseedingESC-11SWDM 5.4.2.40.80$ SY19911,592.80Interceptor Swale / DikeESC-121.00$ LF230230.00Jute MeshESC-13SWDM 5.4.2.23.50$ SY Level SpreaderESC-141.75$ LF Mulch, by hand, straw, 3" deepESC-15SWDM 5.4.2.12.50$ SY Mulch, by machine, straw, 2" deepESC-16SWDM 5.4.2.12.00$ SY19913,982.00Piping, temporary, CPP, 6"ESC-1712.00$ LF Piping, temporary, CPP, 8"ESC-1814.00$ LF Piping, temporary, CPP, 12"ESC-1918.00$ LF Plastic covering, 6mm thick, sandbaggedESC-20SWDM 5.4.2.34.00$ SY Rip Rap, machine placed; slopesESC-21WSDOT 9-13.1(2)45.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22SWDM 5.4.4.11,800.00$ Each11,800.00Rock Construction Entrance, 100'x15'x1'ESC-23SWDM 5.4.4.13,200.00$ Each Sediment pond riser assemblyESC-24SWDM 5.4.5.22,200.00$ Each Sediment trap, 5' high berm ESC-25SWDM 5.4.5.119.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-26SWDM 5.4.5.170.00$ LF Seeding, by handESC-27SWDM 5.4.2.41.00$ SY Sodding, 1" deep, level groundESC-28SWDM 5.4.2.58.00$ SY Sodding, 1" deep, sloped groundESC-29SWDM 5.4.2.510.00$ SY TESC SupervisorESC-30110.00$ HR8880.00Water truck, dust controlESC-31SWDM 5.4.7140.00$ HR81,120.00UnitReference #PriceUnitQuantity Cost EROSION/SEDIMENT SUBTOTAL:11,660.80SALES TAX @ 10%1,166.08EROSION/SEDIMENT TOTAL:12,826.88(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescription No.(A)WRITE-IN-ITEMS Page 3 of 14Ref 8-H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostGENERAL ITEMS Backfill & Compaction- embankmentGI-16.00$ CY80480.00Backfill & Compaction- trenchGI-29.00$ CYClear/Remove Brush, by hand (SY)GI-31.00$ SYBollards - fixedGI-4240.74$ EachBollards - removableGI-5452.34$ EachClearing/Grubbing/Tree RemovalGI-610,000.00$ AcreExcavation - bulkGI-72.00$ CY13002,600.00Excavation - TrenchGI-85.00$ CYFencing, cedar, 6' highGI-920.00$ LFFencing, chain link, 4'GI-1038.31$ LF2509,577.50Fencing, chain link, vinyl coated, 6' highGI-1120.00$ LFFencing, chain link, gate, vinyl coated, 20' GI-121,400.00$ EachFill & compact - common barrowGI-1325.00$ CYFill & compact - gravel baseGI-1427.00$ CYFill & compact - screened topsoilGI-1539.00$ CYGabion, 12" deep, stone filled mesh GI-1665.00$ SYGabion, 18" deep, stone filled mesh GI-1790.00$ SYGabion, 36" deep, stone filled meshGI-18150.00$ SYGrading, fine, by handGI-192.50$ SYGrading, fine, with graderGI-202.00$ SY320640.00Monuments, 3' LongGI-21250.00$ EachSensitive Areas SignGI-227.00$ EachSodding, 1" deep, sloped groundGI-238.00$ SYSurveying, line & gradeGI-24850.00$ DaySurveying, lot location/linesGI-251,800.00$ AcreTopsoil Type A (imported)GI-2628.50$ CYTraffic control crew ( 2 flaggers )GI-27120.00$ HRTrail, 4" chipped woodGI-288.00$ SYTrail, 4" crushed cinderGI-299.00$ SYTrail, 4" top courseGI-3012.00$ SYConduit, 2"GI-315.00$ LFWall, retaining, concreteGI-3255.00$ SFWall, rockeryGI-3315.00$ SFSUBTOTAL THIS PAGE:13,297.50(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)Page 4 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000syRI-130.00$ SYAC Grinding, 4' wide machine 1000-2000syRI-216.00$ SYAC Grinding, 4' wide machine > 2000syRI-310.00$ SYAC Removal/DisposalRI-435.00$ SY10350.00Barricade, Type III ( Permanent )RI-556.00$ LFGuard RailRI-630.00$ LFCurb & Gutter, rolledRI-717.00$ LFCurb & Gutter, verticalRI-812.50$ LFCurb and Gutter, demolition and disposalRI-918.00$ LFCurb, extruded asphaltRI-105.50$ LFCurb, extruded concreteRI-117.00$ LFSawcut, asphalt, 3" depthRI-121.85$ LF2037.00Sawcut, concrete, per 1" depthRI-133.00$ LFSealant, asphaltRI-142.00$ LF2040.00Shoulder, gravel, 4" thickRI-1515.00$ SYSidewalk, 4" thickRI-1638.00$ SYSidewalk, 4" thick, demolition and disposalRI-1732.00$ SYSidewalk, 5" thickRI-1841.00$ SYSidewalk, 5" thick, demolition and disposalRI-1940.00$ SYSign, Handicap RI-2085.00$ EachStriping, per stallRI-217.00$ EachStriping, thermoplastic, ( for crosswalk )RI-223.00$ SFStriping, 4" reflectorized lineRI-230.50$ LFAdditional 2.5" Crushed SurfacingRI-243.60$ SYHMA 1/2" Overlay 1.5" RI-2514.00$ SYHMA 1/2" Overlay 2"RI-2618.00$ SYHMA Road, 2", 4" rock, First 2500 SYRI-2728.00$ SY3208,960.00HMA Road, 2", 4" rock, Qty. over 2500SYRI-2821.00$ SYHMA Road, 4", 6" rock, First 2500 SYRI-2945.00$ SYHMA Road, 4", 6" rock, Qty. over 2500 SYRI-3037.00$ SYHMA Road, 4", 4.5" ATBRI-3138.00$ SYGravel Road, 4" rock, First 2500 SYRI-3215.00$ SYGravel Road, 4" rock, Qty. over 2500 SYRI-3310.00$ SYThickened EdgeRI-348.60$ LF50430.00SUBTOTAL THIS PAGE:9,817.00(B)(C)(D)(E)Page 5 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)PARKING LOT SURFACINGNo.2" AC, 2" top course rock & 4" borrowPL-121.00$ SY2" AC, 1.5" top course & 2.5" base coursePL-228.00$ SY4" select borrowPL-35.00$ SY1.5" top course rock & 2.5" base coursePL-414.00$ SYSUBTOTAL PARKING LOT SURFACING:(B)(C)(D)(E)LANDSCAPING & VEGETATIONNo.Street TreesLA-1Median LandscapingLA-2Right-of-Way LandscapingLA-3Wetland LandscapingLA-4SUBTOTAL LANDSCAPING & VEGETATION:(B)(C)(D)(E)TRAFFIC & LIGHTINGNo.SignsTR-1Street Light System ( # of Poles)TR-2Traffic SignalTR-3Traffic Signal ModificationTR-4SUBTOTAL TRAFFIC & LIGHTING:(B)(C)(D)(E)WRITE-IN-ITEMSSUBTOTAL WRITE-IN ITEMS:STREET AND SITE IMPROVEMENTS SUBTOTAL:23,114.50SALES TAX @ 10%2,311.45STREET AND SITE IMPROVEMENTS TOTAL:25,425.95(B)(C)(D)(E)Page 6 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/DD-126.00$ SY1303,380.00* (CBs include frame and lid)BeehiveD-290.00$ Each190.00Through-curb Inlet FrameworkD-3400.00$ EachCB Type ID-41,500.00$ Each11,500.00CB Type ILD-51,750.00$ EachCB Type II, 48" diameterD-62,300.00$ Each36,900.00 for additional depth over 4' D-7480.00$ FTCB Type II, 54" diameterD-82,500.00$ Each for additional depth over 4'D-9495.00$ FTCB Type II, 60" diameterD-102,800.00$ Each for additional depth over 4'D-11600.00$ FTCB Type II, 72" diameterD-126,000.00$ Each for additional depth over 4'D-13850.00$ FTCB Type II, 96" diameterD-1414,000.00$ Each for additional depth over 4'D-15925.00$ FTTrash Rack, 12"D-16350.00$ EachTrash Rack, 15"D-17410.00$ EachTrash Rack, 18"D-18480.00$ EachTrash Rack, 21"D-19550.00$ EachCleanout, PVC, 4"D-20150.00$ EachCleanout, PVC, 6"D-21170.00$ EachCleanout, PVC, 8"D-22200.00$ EachCulvert, PVC, 4" D-2310.00$ LFCulvert, PVC, 6" D-2413.00$ LF42546.00Culvert, PVC, 8" D-2515.00$ LF721,080.00Culvert, PVC, 12" D-2623.00$ LFCulvert, PVC, 15" D-2735.00$ LFCulvert, PVC, 18" D-2841.00$ LFCulvert, PVC, 24"D-2956.00$ LFCulvert, PVC, 30" D-3078.00$ LFCulvert, PVC, 36" D-31130.00$ LFCulvert, CMP, 8"D-3219.00$ LFCulvert, CMP, 12"D-3329.00$ LFSUBTOTAL THIS PAGE:13,496.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)Page 7 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)DRAINAGE (Continued)Culvert, CMP, 15"D-3435.00$ LFCulvert, CMP, 18"D-3541.00$ LFCulvert, CMP, 24"D-3656.00$ LFCulvert, CMP, 30"D-3778.00$ LFCulvert, CMP, 36"D-38130.00$ LFCulvert, CMP, 48"D-39190.00$ LFCulvert, CMP, 60"D-40270.00$ LFCulvert, CMP, 72"D-41350.00$ LFCulvert, Concrete, 8"D-4242.00$ LFCulvert, Concrete, 12"D-4348.00$ LFCulvert, Concrete, 15"D-4478.00$ LFCulvert, Concrete, 18"D-4548.00$ LFCulvert, Concrete, 24"D-4678.00$ LFCulvert, Concrete, 30"D-47125.00$ LFCulvert, Concrete, 36"D-48150.00$ LFCulvert, Concrete, 42"D-49175.00$ LFCulvert, Concrete, 48"D-50205.00$ LFCulvert, CPE Triple Wall, 6" D-5114.00$ LFCulvert, CPE Triple Wall, 8" D-5216.00$ LFCulvert, CPE Triple Wall, 12" D-5324.00$ LFCulvert, CPE Triple Wall, 15" D-5435.00$ LFCulvert, CPE Triple Wall, 18" D-5541.00$ LFCulvert, CPE Triple Wall, 24" D-5656.00$ LFCulvert, CPE Triple Wall, 30" D-5778.00$ LFCulvert, CPE Triple Wall, 36" D-58130.00$ LFCulvert, LCPE, 6"D-5960.00$ LFCulvert, LCPE, 8"D-6072.00$ LFCulvert, LCPE, 12"D-6184.00$ LFCulvert, LCPE, 15"D-6296.00$ LFCulvert, LCPE, 18"D-63108.00$ LFCulvert, LCPE, 24"D-64120.00$ LFCulvert, LCPE, 30"D-65132.00$ LFCulvert, LCPE, 36"D-66144.00$ LFCulvert, LCPE, 48"D-67156.00$ LFCulvert, LCPE, 54"D-68168.00$ LFSUBTOTAL THIS PAGE:(B)(C)(D)(E)Page 8 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)DRAINAGE (Continued)Culvert, LCPE, 60"D-69180.00$ LFCulvert, LCPE, 72"D-70192.00$ LFCulvert, HDPE, 6"D-7142.00$ LFCulvert, HDPE, 8"D-7242.00$ LF1024,284.00Culvert, HDPE, 12"D-7374.00$ LFCulvert, HDPE, 15"D-74106.00$ LFCulvert, HDPE, 18"D-75138.00$ LFCulvert, HDPE, 24"D-76221.00$ LFCulvert, HDPE, 30"D-77276.00$ LFCulvert, HDPE, 36"D-78331.00$ LFCulvert, HDPE, 48"D-79386.00$ LFCulvert, HDPE, 54"D-80441.00$ LFCulvert, HDPE, 60"D-81496.00$ LFCulvert, HDPE, 72"D-82551.00$ LFPipe, Polypropylene, 6"D-8384.00$ LFPipe, Polypropylene, 8"D-8489.00$ LFPipe, Polypropylene, 12"D-8595.00$ LFPipe, Polypropylene, 15"D-86100.00$ LFPipe, Polypropylene, 18"D-87106.00$ LFPipe, Polypropylene, 24"D-88111.00$ LFPipe, Polypropylene, 30"D-89119.00$ LFPipe, Polypropylene, 36"D-90154.00$ LFPipe, Polypropylene, 48"D-91226.00$ LFPipe, Polypropylene, 54"D-92332.00$ LFPipe, Polypropylene, 60"D-93439.00$ LFPipe, Polypropylene, 72"D-94545.00$ LFCulvert, DI, 6"D-9561.00$ LFCulvert, DI, 8"D-9684.00$ LFCulvert, DI, 12"D-97106.00$ LFCulvert, DI, 15"D-98129.00$ LFCulvert, DI, 18"D-99152.00$ LFCulvert, DI, 24"D-100175.00$ LFCulvert, DI, 30"D-101198.00$ LFCulvert, DI, 36"D-102220.00$ LFCulvert, DI, 48"D-103243.00$ LFCulvert, DI, 54"D-104266.00$ LFCulvert, DI, 60"D-105289.00$ LFCulvert, DI, 72"D-106311.00$ LFSUBTOTAL THIS PAGE:4,284.00(B)(C)(D)(E)Page 9 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)Specialty Drainage ItemsDitching SD-19.50$ CYFlow Dispersal Trench (1,436 base+)SD-328.00$ LF French Drain (3' depth)SD-426.00$ LFGeotextile, laid in trench, polypropyleneSD-53.00$ SYMid-tank Access Riser, 48" dia, 6' deepSD-62,000.00$ EachPond Overflow SpillwaySD-716.00$ SYRestrictor/Oil Separator, 12"SD-81,150.00$ Each11,150.00Restrictor/Oil Separator, 15"SD-91,350.00$ EachRestrictor/Oil Separator, 18"SD-101,700.00$ EachRiprap, placedSD-1142.00$ CY10420.00Tank End Reducer (36" diameter)SD-121,200.00$ EachInfiltration pond testingSD-13125.00$ HRPermeable PavementSD-14Permeable Concrete SidewalkSD-15Culvert, Box __ ft x __ ftSD-16SUBTOTAL SPECIALTY DRAINAGE ITEMS:1,570.00(B)(C)(D)(E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention PondSF-120,000.00$ Each 120,000.00Detention TankSF-2Each Detention VaultSF-3Each Infiltration PondSF-4Each Infiltration TankSF-5Each Infiltration VaultSF-6Each Infiltration TrenchesSF-7Each Basic Biofiltration SwaleSF-8Each Wet Biofiltration SwaleSF-9Each WetpondSF-10Each WetvaultSF-11Each Sand FilterSF-12Each Sand Filter VaultSF-13Each Linear Sand FilterSF-14Each Proprietary FacilitySF-15Each Bioretention FacilitySF-16Each SUBTOTAL STORMWATER FACILITIES:20,000.00(B)(C)(D)(E)Page 10 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)WI-1WI-2WI-3WI-4WI-5WI-6WI-7WI-8WI-9WI-10WI-11WI-12WI-13WI-14WI-15SUBTOTAL WRITE-IN ITEMS:DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:39,350.00SALES TAX @ 10%3,935.00DRAINAGE AND STORMWATER FACILITIES TOTAL:43,285.00(B) (C) (D) (E)Page 11 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostConnection to Existing WatermainW-12,000.00$ Each12,000.00Ductile Iron Watermain, CL 52, 4 Inch DiameterW-250.00$ LFDuctile Iron Watermain, CL 52, 6 Inch DiameterW-356.00$ LFDuctile Iron Watermain, CL 52, 8 Inch DiameterW-460.00$ LF10600.00Ductile Iron Watermain, CL 52, 10 Inch DiameterW-570.00$ LFDuctile Iron Watermain, CL 52, 12 Inch DiameterW-680.00$ LFGate Valve, 4 inch DiameterW-7500.00$ EachGate Valve, 6 inch DiameterW-8700.00$ EachGate Valve, 8 Inch DiameterW-9800.00$ EachGate Valve, 10 Inch DiameterW-101,000.00$ EachGate Valve, 12 Inch DiameterW-111,200.00$ EachFire Hydrant AssemblyW-124,000.00$ EachPermanent Blow-Off AssemblyW-131,800.00$ Each11,800.00Air-Vac Assembly, 2-Inch DiameterW-142,000.00$ EachAir-Vac Assembly, 1-Inch DiameterW-151,500.00$ EachCompound Meter Assembly 3-inch DiameterW-168,000.00$ EachCompound Meter Assembly 4-inch DiameterW-179,000.00$ EachCompound Meter Assembly 6-inch DiameterW-1810,000.00$ EachPressure Reducing Valve Station 8-inch to 10-inchW-1920,000.00$ EachWATER SUBTOTAL:4,400.00SALES TAX @ 10%440.00WATER TOTAL:4,840.00(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B)(C)Page 12 of 14Ref 8-H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
CED Permit #:ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostClean OutsSS-11,000.00$ EachGrease Interceptor, 500 gallonSS-28,000.00$ EachGrease Interceptor, 1000 gallonSS-310,000.00$ EachGrease Interceptor, 1500 gallonSS-415,000.00$ EachSide Sewer Pipe, PVC. 4 Inch DiameterSS-580.00$ LFSide Sewer Pipe, PVC. 6 Inch DiameterSS-695.00$ LF464,370.00Sewer Pipe, PVC, 8 inch DiameterSS-7105.00$ LF222,310.00Sewer Pipe, PVC, 12 Inch DiameterSS-8120.00$ LFSewer Pipe, DI, 8 inch DiameterSS-9115.00$ LFSewer Pipe, DI, 12 Inch DiameterSS-10130.00$ LFManhole, 48 Inch DiameterSS-116,000.00$ Each16,000.00Manhole, 54 Inch DiameterSS-136,500.00$ EachManhole, 60 Inch DiameterSS-157,500.00$ EachManhole, 72 Inch DiameterSS-178,500.00$ EachManhole, 96 Inch DiameterSS-1914,000.00$ EachPipe, C-900, 12 Inch DiameterSS-21180.00$ LFOutside DropSS-241,500.00$ LSInside DropSS-251,000.00$ LSSewer Pipe, PVC, ____ Inch DiameterSS-26Lift Station (Entire System)SS-27LSSANITARY SEWER SUBTOTAL:8,310.004,370.00SALES TAX @ 10%831.00437.00SANITARY SEWER TOTAL:9,141.004,807.00(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B)(C)Page 13 of 14Ref 8-H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a)Existing Right-of-Way Improvements Subtotal (b)(b)-$ Future Public Improvements Subtotal(c)13,981.00$ Stormwater & Drainage Facilities (Public & Private) Subtotal(d)(d)43,285.00$ (e)(f)Site RestorationCivil Construction PermitMaintenance Bond11,453.20$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. 425-251-6222ddawes@barghausen.comDalpay Short PlatLUA-1700023418XX Redmond Place N.E.042305-9032FOR APPROVAL 18215 72nd Avenue South, Kent, WA 9803256,111.88$ P (a) x 100%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONSDate 2-11-20Don E. Dawes, P.E, Senior Project EngineerPE Registration No. 42009Barghausen Consulting Engineers, Inc.R((b x 150%) + (d x 100%))S(e) x 150% + (f) x 100%Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2T(P +R - S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)EST1((b) + (c) + (d)) x 20%-$ MAINTENANCE BOND */**(after final acceptance of construction)12,826.88$ -$ 43,285.00$ 12,826.88$ -$ 43,285.00$ -$ Page 14 of 14Ref 8-H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 2/11/2020
Stormwater Facility
Summary Sheet
9.2
2016 KING COUNTY SURFACE WATER DESIGN MANUAL, REFERENCE D
4/24/2016
Page 1
STORMWATER FACILITY SUMMARY SHEET DPER Permit No.___________________
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)Date ___________________
OVERVIEW:NPDES Permit No.___________________
Project Name
Parcel No.____________________________
Project Location Retired Parcel No.____________________________
Downstream Drainage Basins:Project includes Landscape Management Plan?yes
Major Basin Name ______________________________________________(include copy with TIR as Appendix)no
Immediate Basin Name ______________________________________________
GENERAL FACILITY INFORMATION: Leachable Metals
Infiltration Impervious Surface Limit
Type # of Type # of Type # of facilities Flow Control BMPs
Ponds ______ Ponds ______ Ponds ______ Basic Clearing Limit
Vaults ______ Tanks ______ Vaults ______ Conservation Drainage Facility
Tanks ______ Trenches _____ Tanks ______ Flood Problem Landscape Management Plan
If no flow control facility, check one:
Project qualifies for KCSWDM Exemption (KCSWDM 1.2.3):
Basic Exemption (Applies to Commercial parcels only)Area % of Total
Redevelopment projects
Cost Exemption for Parcel Redevelopment projects
Direct Discharge Exemption
Other _____________________ Total impervious surface served by
Project qualifies for 0.1 cfs Exception per KCSWDM 1.2.3 flow control facility(ies) (sq ft)
Impervious surface served by flow
KCSWDM Adjustment No. ___________________control facility(ies) designed
1990 or later (sq ft)
approved KCSWDM Adjustment No. __________________ Impervious surface served by
Shared Facility Name/Location: _________________________ pervious surface absorption (sq ft)
No flow control required (other, provide justification): Impervious surface served by approved
____________________________________________________ water quality facility(ies) (sq ft)
Flow Control
Performance Std
Declarations of Covenant Recording No.
Water QualityDetention
TREATMENT SUMMARY FOR TOTAL IMPERVIOUS SURFACES
-----
Total Impervious Acreage (ac)
No flow control required per approved
Flow control provided in regional/shared facility per approved
PROVIDE FACILITY DETAILS AND FACILITY SKETCH FOR EACH FACILITY ON REVERSE. USE ADDITIONAL SHEETS AS NEEDED FOR ADDITIONAL FACILITIES
Impervious Surface Exemption for Transportation Total Acreage (ac)
Dalpay Short Plat
18XX Redmond Place NE, Renton, WA
1 x
042305-9032
N/A
Cedar River/Lake Washington
May Creek
x
2016 KING COUNTY SURFACE WATER DESIGN MANUAL, REFERENCE D
4/24/2016
Page 2
STORMWATER FACILITY SUMMARY SHEET DPER Permit No.___________________
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)
Project Name Downstream Drainage Basins:
Major Basin Name _______________________________
Project Location Immediate Basin Name ___________________________
FLOW CONTROL FACILITY:Basin:
Facility Name/Number _______________________________________ New Facility Project Impervious
Facility Location ____________________________________________ Existing Facility Acres Served ________
UIC? □ yes □ no UIC Site ID:% of Total Project Impervious
cu.ft.Volume Factor Acres Served ________
_____________ ac.ft.____________of Safety _______No. of Lots Served ________
Control Structure location: _______________________________________________
Type of Control Structure:No. of Orifices/Restrictions __________
Riser in vault Size of Orifice/Restriction (in.) No.1 ______ cu.ft.
Riser in Type II CB (numbered starting with lowest No.2 ______ ac.ft.
Weir in Type II CB orifice): No.3 ______
(inches in decimal format)No.4 ______
WATER QUALITY FACILITIES Design Information
Indicate no. of water quality facilities/BMPs for each type:Water Quality design flow (cfs)
_______Flow dispersion Water Quality treated volume (sandfilter) (cu.ft.)
_______Filter strip Water Quality storage volume (wetpool) (cu.ft.)
_______Biofiltration swale regular, wet or Landscape management plan Farm management plan
continuous inflow
_______Wetvault combined w/detention ______High flow bypass structure (e.g., flow-splitter catch basin)
_______Wetpond basic large combined w/detention ______Oil/water separator baffle coalescing plate
_______Pre-settling pond ______Storm filter
_______Stormwater wetland ______Pre-settling structure (Manufacturer:______________________)
_______Sand filter basic large Sand bed depth ______Catch basin inserts (Manufacturer:________________________)
regular linear vault (inches)______________Source controls _________________________________________
● Is facility lined? yes no If so, what marker is used above liner?_____________________________________________________
Facility Summary Sheet Sketch: All detention, infiltration and water quality facilities must include a detailed sketch (11"x17" reduced size plan sheets preferred).
Dam Safety Regulations (WA State Dept of
Ecology):
Reservoir Volume
above natural grade
Depth of Reservoir
above natural grade (ft)
Live Storage
Volume
Live Storage
Depth (ft)
x
6,202 x 3.5
Dalpay Short Plat
18XX Redmond Place NE, Renton, WA
Cedar River/Lake Washington
May Creek
1Pond
Pond
Tract A
x
2
0.15
Tract A
1.37
0.67
0
0
2
0.40
1.00
IN COMPLIANCE WITH CITY OF RENTON STANDARDSDALPAY SHORT PLATDALPAY PROPERTIES, LLC.4033 N.E. SUNSET BOULEVARDRENTON, WA 98059DALPAY SHORT PLAT
DALPAY SHORT PLAT DALPAY SHORT PLATTED-40-4097
DETENTION POND PLAN AND SECTIONSC7
R-409707
Declaration of
Covenant
9.3
Tab 10.0
17884.007.doc
10.0 OPERATIONS AND MAINTENANCE MANUAL
The drainage facilities on this project will be private facilities owned and maintained by the
Homeowners Association. Therefore, an Operation and Maintenance Manual is included in this
section.
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL, APPENDIX A
APPENDIX A
MAINTENANCE REQUIREMENTS FOR FLOW CONTROL,
CONVEYANCE, AND WATER QUALITY FACILITIES
This appendix contains the maintenance requirements for the following typical stormwater control and water quality facilities and components (ctrl/click ► to follow the link):
► No. 1 – Detention Ponds (p. A-2)
► No. 2 – Infiltration Facilities (p. A-3)
► No. 3 – Detention Tanks and Vaults (p. A-5)
► No. 4 – Control Structure/Flow Restrictor (p. A-7)
► No. 5 – Catch Basins and Manholes (p. A-9)
► No. 6 – Conveyance Pipes and Ditches (p. A-11)
► No. 7 – Debris Barriers (e.g., Trash Racks) (p. A-12)
► No. 8 – Energy Dissipaters (p. A- 13)
► No. 9 – Fencing (p. A-14)
► No. 10 – Gates/Bollards/Access Barriers (p. A-15)
► No. 11 – Grounds (Landscaping) (p. A-16)
► No. 12 – Access Roads (p. A-17)
► No. 13 – Basic Bioswale (grass) (p. A-18)
► No. 14 – Wet Bioswale (p. A-19)
► No. 15 – Filter Strip (p. A-20)
► No. 16 – Wetpond (p. A-21)
► No. 17 – Wetvault (p. A-23)
► No. 18 – Stormwater Wetland (p. A-24)
► No. 19 – Sand Filter Pond (p. A-26)
► No. 20 – Sand Filter Vault (p. A-28)
► No. 21 – Stormfilter (Cartridge Type) (p. A-30)
► No. 22 – Baffle Oil/Water Separator (p. A-32)
► No. 23 – Coalescing Plate Oil/Water Separator (p. A-33)
► No. 24 – Catch Basin Insert (p. A-34)
► No. 25 – Drywell BMP (p. A-35)
► No. 26 – Gravel Filled Infiltration Trench BMP (p. A-35)
► No. 27 – Gravel Filled Dispersion Trench BMP (p. A-36)
► No. 28 – Native Vegetated Surface / Native Vegetated Landscape BMP (p. A-37)
► No. 29 – Perforated Pipe Connections BMP (p. A-37)
► No. 30 – Permeable Pavement BMP (p. A-38)
► No. 31 – Bioretention BMP (p. A-39)
► No. 32 – RainWater Harvesting BMP (p. A- 40)
► No. 33 – Rock Pad BMP (p. A-40)
► No. 34 – Sheet Flow BMP (p. A-40)
► No. 35 – Splash Block BMP (p. A-41)
► No. 36 – Vegetated Roof BMP (p. A-42)
2016 Surface Water Design Manual – Appendix A 4/24/2016 A-1
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 1 – DETENTION PONDS
Maintenance Component Defect or Problem Conditions When Maintenance Is Needed Results Expected When Maintenance Is Performed
Site Trash and debris Any trash and debris which exceed 1 cubic foot per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to County personnel or the public.
Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious
vegetation where County personnel or the public might normally be.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in
height.
Grass or groundcover mowed to a
height no greater than 6 inches.
Top or Side Slopes of Dam, Berm or Embankment
Rodent holes Any evidence of rodent holes if facility is acting as a dam or berm, or any evidence of water piping through dam or berm via rodent holes.
Rodents removed or destroyed and dam or berm repaired.
Tree growth Tree growth threatens integrity of slopes, does not allow maintenance access, or interferes with maintenance activity. If trees are not a threat or not interfering with access or maintenance, they do not need to be removed.
Trees do not hinder facility performance or maintenance activities.
Erosion Eroded damage over 2 inches deep where cause of damage is still present or where there is
potential for continued erosion. Any erosion observed on a compacted slope.
Slopes stabilized using appropriate erosion control measures. If erosion
is occurring on compacted slope, a licensed civil engineer should be consulted to resolve source of erosion.
Settlement Any part of a dam, berm or embankment that has settled 4 inches lower than the design
elevation.
Top or side slope restored to design dimensions. If settlement is
significant, a licensed civil engineer should be consulted to determine the cause of the settlement.
Storage Area Sediment accumulation Accumulated sediment that exceeds 10% of the designed pond depth. Sediment cleaned out to designed pond shape and depth; pond reseeded if necessary to control erosion.
Liner damaged (If Applicable) Liner is visible or pond does not hold water as designed. Liner repaired or replaced.
Inlet/Outlet Pipe. Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering
at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
Emergency Overflow/Spillway Tree growth Tree growth impedes flow or threatens stability of spillway. Trees removed.
Rock missing Only one layer of rock exists above native soil in area five square feet or larger or any exposure of native soil on the spillway.
Spillway restored to design standards.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-2
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance is Performed
Structure Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the structure opening or is blocking capacity of the structure by more than 10%.
No Trash or debris blocking or potentially blocking entrance to structure.
Trash or debris in the structure that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin.
No trash or debris in the structure.
Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents.
Sediment Sediment exceeds 60% of the depth from the bottom of the structure to the invert of the lowest
pipe into or out of the structure or the bottom of the FROP-T section or is within 6 inches of the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section.
Sump of structure contains no sediment.
Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable). Frame is even with curb.
Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab.
Frame is sitting flush on top slab.
Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering structure
through cracks, or maintenance person judges that structure is unsound.
Structure is sealed and structurally sound.
Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering structure through cracks.
No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe.
Settlement/ misalignment Structure has settled more than 1 inch or has rotated more than 2 inches out of alignment. Basin replaced or repaired to design standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the structure at the joint of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of inlet/outlet pipes.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.
Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Ladder rungs missing or unsafe Ladder is unsafe due to missing rungs, misalignment, rust, cracks, or sharp edges. Ladder meets design standards and allows maintenance person safe access.
FROP-T Section Damage T section is not securely attached to structure wall and outlet pipe structure should support at
least 1,000 lbs of up or down pressure.
T section securely attached to wall and outlet pipe.
Structure is not in upright position (allow up to 10% from plumb). Structure in correct position.
Connections to outlet pipe are not watertight or show signs of deteriorated grout. Connections to outlet pipe are water tight; structure repaired or replaced and works as designed.
Any holes—other than designed holes—in the
structure.
Structure has no holes other than
designed holes.
2016 Surface Water Design Manual – Appendix A 4/24/2016 A-7
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance is Performed
Cleanout Gate Damaged or missing Cleanout gate is missing. Replace cleanout gate.
Cleanout gate is not watertight. Gate is watertight and works as designed.
Gate cannot be moved up and down by one maintenance person. Gate moves up and down easily and is watertight.
Chain/rod leading to gate is missing or damaged. Chain is in place and works as designed.
Orifice Plate Damaged or missing Control device is not working properly due to missing, out of place, or bent orifice plate. Plate is in place and works as designed.
Obstructions Any trash, debris, sediment, or vegetation blocking the plate. Plate is free of all obstructions and works as designed.
Overflow Pipe Obstructions Any trash or debris blocking (or having the potential of blocking) the overflow pipe. Pipe is free of all obstructions and works as designed.
Deformed or damaged lip Lip of overflow pipe is bent or deformed. Overflow pipe does not allow overflow at an elevation lower than design
Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
Metal Grates (If Applicable) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards.
Trash and debris Trash and debris that is blocking more than 20% of grate surface. Grate free of trash and debris. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent
maintenance.
Cover/lid protects opening to structure.
Locking mechanism Not Working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not
work.
Mechanism opens with proper tools.
Cover/lid difficult to
Remove
One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift.
Cover/lid can be removed and
reinstalled by one maintenance person.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-8
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 – CATCH BASINS AND MANHOLES
Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance is Performed
Structure Sediment Sediment exceeds 60% of the depth from the bottom of the catch basin to the invert of the lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin.
Sump of catch basin contains no sediment.
Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the catch basin
by more than 10%.
No Trash or debris blocking or potentially blocking entrance to catch basin.
Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin.
No trash or debris in the catch
basin.
Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane).
No dead animals or vegetation present within catch basin.
Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents.
Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable). Frame is even with curb.
Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab.
Frame is sitting flush on top slab.
Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering catch
basin through cracks, or maintenance person judges that catch basin is unsound.
Catch basin is sealed and is structurally sound.
Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks.
No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe.
Settlement/ misalignment Catch basin has settled more than 1 inch or has rotated more than 2 inches out of alignment. Basin replaced or repaired to design standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the catch basin at the joint of the inlet/outlet
pipes.
No cracks more than ¼-inch wide at the joint of inlet/outlet pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
2016 Surface Water Design Manual – Appendix A 4/24/2016 A-9
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 5 – CATCH BASINS AND MANHOLES
Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance is Performed
Metal Grates (Catch Basins) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards.
Trash and debris Trash and debris that is blocking more than 20% of grate surface. Grate free of trash and debris. footnote to guidelines for disposal
Damaged or missing Grate missing or broken member(s) of the grate.
Any open structure requires urgent maintenance.
Grate is in place and meets design standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent maintenance.
Cover/lid protects opening to structure.
Locking mechanism Not Working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to Remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-10
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 6 – CONVEYANCE PIPES AND DITCHES
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed
Pipes Sediment & debris accumulation Accumulated sediment or debris that exceeds 20% of the diameter of the pipe. Water flows freely through pipes.
Vegetation/roots Vegetation/roots that reduce free movement of water through pipes. Water flows freely through pipes.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.
Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Damage to protective coating or corrosion Protective coating is damaged; rust or corrosion is weakening the structural integrity of any part of pipe.
Pipe repaired or replaced.
Damaged Any dent that decreases the cross section area of pipe by more than 20% or is determined to
have weakened structural integrity of the pipe.
Pipe repaired or replaced.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet of ditch and slopes. Trash and debris cleared from ditches.
Sediment accumulation Accumulated sediment that exceeds 20% of the design depth. Ditch cleaned/flushed of all sediment and debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which may
constitute a hazard to County personnel or the public.
Noxious and nuisance vegetation
removed according to applicable regulations. No danger of noxious vegetation where County personnel or the public might normally be.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations.
Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Vegetation Vegetation that reduces free movement of water through ditches. Water flows freely through ditches.
Erosion damage to slopes Any erosion observed on a ditch slope. Slopes are not eroding.
Rock lining out of place or missing (If Applicable)
One layer or less of rock exists above native soil area 5 square feet or more, any exposed native soil.
Replace rocks to design standards.
2016 Surface Water Design Manual – Appendix A 4/24/2016 A-11
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 7 – DEBRIS BARRIERS (E.G., TRASH RACKS)
Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance is Performed.
Site Trash and debris Trash or debris plugging more than 20% of the area of the barrier. Barrier clear to receive capacity flow.
Sediment accumulation Sediment accumulation of greater than 20% of the area of the barrier Barrier clear to receive capacity flow.
Structure Cracked broken or loose Structure which bars attached to is damaged - pipe is loose or cracked or concrete structure is
cracked, broken of loose.
Structure barrier attached to is sound.
Bars Bar spacing Bar spacing exceeds 6 inches. Bars have at most 6 inches spacing.
Damaged or missing bars Bars are bent out of shape more than 3 inches. Bars in place with no bends more than ¾ inch.
Bars are missing or entire barrier missing. Bars in place according to design.
Bars are loose and rust is causing 50% deterioration to any part of barrier. Repair or replace barrier to design standards.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-12
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 8 – ENERGY DISSIPATERS
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed.
Site Trash and debris Trash and/or debris accumulation. Dissipater clear of trash and/or debris.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Rock Pad Missing or moved Rock Only one layer of rock exists above native soil in area five square feet or larger or any exposure of native soil.
Rock pad prevents erosion.
Dispersion Trench Pipe plugged with sediment Accumulated sediment that exceeds 20% of the design depth. Pipe cleaned/flushed so that it matches design.
Not discharging water properly Visual evidence of water discharging at concentrated points along trench (normal
condition is a “sheet flow” of water along trench).
Water discharges from feature by sheet flow.
Perforations plugged. Over 1/4 of perforations in pipe are plugged with debris or sediment. Perforations freely discharge flow.
Water flows out top of “distributor” catch basin.
Water flows out of distributor catch basin during any storm less than the design storm. No flow discharges from distributor catch basin.
Receiving area over-
saturated
Water in receiving area is causing or has
potential of causing landslide problems.
No danger of landslides.
Gabions Damaged mesh Mesh of gabion broken, twisted or deformed so
structure is weakened or rock may fall out.
Mesh is intact, no rock missing.
Corrosion Gabion mesh shows corrosion through more
than ¼ of its gage.
All gabion mesh capable of
containing rock and retaining designed form.
Collapsed or deformed baskets Gabion basket shape deformed due to any cause. All gabion baskets intact, structure stands as designed.
Missing rock Any rock missing that could cause gabion to loose structural integrity. No rock missing.
Manhole/Chamber Worn or damaged post, baffles or side of chamber
Structure dissipating flow deteriorates to ½ or original size or any concentrated worn spot exceeding one square foot which would make structure unsound.
Structure is in no danger of failing.
Damage to wall, frame, bottom, and/or top slab
Cracks wider than ½-inch or any evidence of soil entering the structure through cracks, or maintenance inspection personnel determines that the structure is not structurally sound.
Manhole/chamber is sealed and structurally sound.
Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the structure at the joint of the inlet/outlet pipes.
No soil or water enters and no water
discharges at the joint of inlet/outlet pipes.
2016 Surface Water Design Manual – Appendix A 4/24/2016 A-13
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 9 – FENCING
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed
Site Erosion or holes under fence Erosion or holes more than 4 inches high and 12-18 inches wide permitting access through an opening under a fence.
No access under the fence.
Wood Posts, Boards and Cross Members Missing or damaged parts Missing or broken boards, post out of plumb by more than 6 inches or cross members broken No gaps on fence due to missing or broken boards, post plumb to within 1½ inches, cross members sound.
Weakened by rotting or insects Any part showing structural deterioration due to rotting or insect damage All parts of fence are structurally sound.
Damaged or failed post foundation Concrete or metal attachments deteriorated or unable to support posts. Post foundation capable of supporting posts even in strong wind.
Metal Posts, Rails and Fabric Damaged parts Post out of plumb more than 6 inches. Post plumb to within 1½ inches.
Top rails bent more than 6 inches. Top rail free of bends greater than 1 inch.
Any part of fence (including post, top rails, and fabric) more than 1 foot out of design alignment. Fence is aligned and meets design standards.
Missing or loose tension wire. Tension wire in place and holding fabric.
Deteriorated paint or
protective coating
Part or parts that have a rusting or scaling
condition that has affected structural adequacy.
Structurally adequate posts or parts
with a uniform protective coating.
Openings in fabric Openings in fabric are such that an 8-inch
diameter ball could fit through.
Fabric mesh openings within 50% of
grid size.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-14
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 10 – GATES/BOLLARDS/ACCESS BARRIERS
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed
Chain Link Fencing Gate Damaged or missing members Missing gate. Gates in place.
Broken or missing hinges such that gate cannot be easily opened and closed by a maintenance person.
Hinges intact and lubed. Gate is working freely.
Gate is out of plumb more than 6 inches and more than 1 foot out of design alignment. Gate is aligned and vertical.
Missing stretcher bar, stretcher bands, and ties. Stretcher bar, bands, and ties in place.
Locking mechanism does not lock gate Locking device missing, no-functioning or does not link to all parts. Locking mechanism prevents opening of gate.
Openings in fabric Openings in fabric are such that an 8-inch diameter ball could fit through. Fabric mesh openings within 50% of grid size.
Bar Gate Damaged or missing cross bar Cross bar does not swing open or closed, is missing or is bent to where it does not prevent vehicle access.
Cross bar swings fully open and closed and prevents vehicle access.
Locking mechanism does not lock gate Locking device missing, no-functioning or does not link to all parts. Locking mechanism prevents opening of gate.
Support post damaged Support post does not hold cross bar up. Cross bar held up preventing vehicle access into facility.
Bollards Damaged or missing Bollard broken, missing, does not fit into support hole or hinge broken or missing. No access for motorized vehicles to get into facility.
Does not lock Locking assembly or lock missing or cannot be attached to lock bollard in place. No access for motorized vehicles to get into facility.
Boulders Dislodged Boulders not located to prevent motorized vehicle access. No access for motorized vehicles to get into facility.
Circumvented Motorized vehicles going around or between boulders. No access for motorized vehicles to get into facility.
2016 Surface Water Design Manual – Appendix A 4/24/2016 A-15
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 11 – GROUNDS (LANDSCAPING)
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed
Site Trash or litter Any trash and debris which exceed 1 cubic foot per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to County personnel or the public.
Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious
vegetation where County personnel or the public might normally be.
Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants
present other than a surface oil film.
Grass/groundcover Grass or groundcover exceeds 18 inches in
height.
Grass or groundcover mowed to a
height no greater than 6 inches.
Trees and Shrubs Hazard Any tree or limb of a tree identified as having a potential to fall and cause property damage or threaten human life. A hazard tree identified by a qualified arborist must be removed as soon as possible.
No hazard trees in facility.
Damaged Limbs or parts of trees or shrubs that are split or broken which affect more than 25% of the total foliage of the tree or shrub.
Trees and shrubs with less than 5% of total foliage with split or broken limbs.
Trees or shrubs that have been blown down or knocked over. No blown down vegetation or knocked over vegetation. Trees or shrubs free of injury.
Trees or shrubs which are not adequately
supported or are leaning over, causing exposure of the roots.
Tree or shrub in place and
adequately supported; dead or diseased trees removed.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-16
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 12 – ACCESS ROADS
Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance is Performed
Site Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet (i.e., trash and debris would fill up one standards size garbage can).
Roadway drivable by maintenance vehicles.
Debris which could damage vehicle tires or prohibit use of road. Roadway drivable by maintenance vehicles.
Contaminants and
pollution
Any evidence of contaminants or pollution such
as oil, gasoline, concrete slurries or paint.
Materials removed and disposed of
according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film.
Blocked roadway Any obstruction which reduces clearance above road surface to less than 14 feet. Roadway overhead clear to 14 feet high.
Any obstruction restricting the access to a 10- to 12 foot width for a distance of more than 12 feet
or any point restricting access to less than a 10 foot width.
At least 12-foot of width on access road.
Road Surface Erosion, settlement, potholes, soft spots, ruts
Any surface defect which hinders or prevents maintenance access. Road drivable by maintenance vehicles.
Vegetation on road surface Trees or other vegetation prevent access to facility by maintenance vehicles. Maintenance vehicles can access facility.
Shoulders and Ditches Erosion Erosion within 1 foot of the roadway more than 8 inches wide and 6 inches deep. Shoulder free of erosion and matching the surrounding road.
Weeds and brush Weeds and brush exceed 18 inches in height or hinder maintenance access. Weeds and brush cut to 2 inches in height or cleared in such a way as to allow maintenance access.
Modular Grid Pavement Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if
appropriate. No contaminants present other than a surface oil film.
Damaged or missing Access surface compacted because of broken on missing modular block. Access road surface restored so road infiltrates.
2016 Surface Water Design Manual – Appendix A 4/24/2016 A-17
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 22 – BAFFLE OIL/WATER SEPARATOR
Maintenance Component Defect Condition When Maintenance is Needed Results Expected When Maintenance is Performed
Site Trash and debris Any trash or debris which impairs the function of the facility. Trash and debris removed from facility.
Contaminants and pollution Floating oil in excess of 1 inch in first chamber, any oil in other chambers or other contaminants of any type in any chamber.
No contaminants present other than a surface oil film.
Vault Treatment
Area
Sediment
accumulation
Sediment accumulates exceeds 6 inches in the
vault.
No sediment in the vault.
Discharge water not
clear
Inspection of discharge water shows obvious
signs of poor water quality- effluent discharge from vault shows thick visible sheen.
Effluent discharge is clear.
Trash or debris accumulation Any trash and debris accumulation in vault (floatables and non-floatables). Vault is clear of trash and debris.
Oil accumulation Oil accumulations that exceed 1 inch, at the surface of the water in the oil/water separator chamber.
No visible oil depth on water.
Vault Structure Damage to Wall, Frame, Bottom, and/or Top Slab
Cracks wider than ½-inch or evidence of soil particles entering the structure through the cracks, or maintenance/inspection personnel determines that the vault is not structurally sound.
Vault replaced or repaired to design specifications.
Baffles damaged Baffles corroding, cracking, warping and/or
showing signs of failure as determined by maintenance inspection personnel.
Repair or replace baffles to
specifications.
Gravity Drain Inoperable valve Valve will not open and close. Valve opens and closes normally.
Valve won’t seal Valve does not seal completely. Valve completely seals closed.
Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes.
Damaged Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes.
No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in place.
Any open manhole requires immediate maintenance.
Manhole access covered.
Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts
cannot be seated. Self-locking cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs of lift. Cover/lid can be removed and reinstalled by one maintenance person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or cracks. Ladder meets design standards. Allows maintenance person safe access.
Large access doors/plate Damaged or difficult to open Large access doors or plates cannot be opened/removed using normal equipment. Replace or repair access door so it can opened as designed.
Gaps, doesn't cover completely Large access doors not flat and/or access opening not completely covered. Doors close flat and cover access opening completely.
Lifting Rings missing, rusted Lifting rings not capable of lifting weight of door or cover/lid. Lifting rings sufficient to lift or remove cover/lid.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-32
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 23 – COALESCING PLATE OIL/WATER SEPARATOR
Maintenance Component Defect Condition When Maintenance is Needed Results Expected When Maintenance is Performed
Large access doors/plate Damaged or difficult to open Large access doors or plates cannot be opened/removed using normal equipment. Replace or repair access door so it can opened as designed.
Gaps, doesn't cover completely Large access doors not flat and/or access opening not completely covered. Doors close flat and cover access opening completely.
Lifting Rings missing, rusted Lifting rings not capable of lifting weight of door or plate. Lifting rings sufficient to lift or remove door or plate.
NO. 24 – CATCH BASIN INSERT
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed
Media Insert Visible Oil Visible oil sheen passing through media Media inset replaced.
Insert does not fit catch basin properly Flow gets into catch basin without going through media. All flow goes through media.
Filter media plugged Filter media plugged. Flow through filter media is normal.
Oil absorbent media
saturated
Media oil saturated. Oil absorbent media replaced.
Water saturated Catch basin insert is saturated with water, which
no longer has the capacity to absorb.
Insert replaced.
Service life exceeded Regular interval replacement due to typical average life of media insert product, typically one month.
Media replaced at manufacturer’s recommended interval.
Seasonal maintenance When storms occur and during the wet season. Remove, clean and replace or install new insert after major storms, monthly during the wet season or at manufacturer’s recommended interval.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-34
APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 28 – NATIVE VEGETATED SURFACE / NATIVE VEGETATED LANDSCAPE BMP
Maintenance Component Defect or Problem Condition When Maintenance is Needed Results Expected When Maintenance Is Performed
Site Trash and debris Trash and debris accumulated on the native vegetated surface/native vegetated landscape site.
Native vegetated surface site free of any trash or debris.
Vegetation Native vegetation type Less than two species each of native trees, shrubs, and groundcover occur in the design area.
A minimum of two species each of native trees, shrubs, and groundcover is established and healthy.
Native vegetated area Less than 90% if the required vegetated area has healthy growth. A minimum of 90% of the required vegetated area has healthy growth.
Undesirable vegetation Weeds, blackberry, and other undesirable plants are invading more than 10% of vegetated area. Less than 10% undesirable vegetation occurs in the required native vegetated surface area.
Vegetated Area Soil compaction Soil in the native vegetation area compacted. Less than 8% of native vegetation area is compacted.
Insufficient area Less than 3.5 square feet of native vegetation area for every 1 square foot of impervious surface.
A minimum of 3.5 square feet of native vegetation area for every 1 square foot of impervious surface.
Excess slope Slope of native vegetation area greater than 15%. Slope of native growth area does not exceed 15%.
Inspection Frequency Annually Inspect native vegetation area for any defects of deficiencies
NO. 29 – PERFORATED PIPE CONNECTIONS BMP
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed
Preventative Blocking, obstructions Debris or trash limiting flow into perforated pipe system or outfall of BMP is plugged or otherwise nonfunctioning.
Outfall of BMP is receiving designed flows from perforated pipe connection.
Inflow Inflow impeded Inflow into the perforated pipe is partially or fully blocked or altered to prevent flow from getting
into the pipe.
Inflow to the perforated pipe is unimpeded.
Pipe Trench Area Surface compacted Ground surface over the perforated pipe trench is
compacted or covered with impermeable material.
Ground surface over the perforated
pipe is not compacted and free of any impervious cover.
Outflow Outflow impeded Outflow from the perforated pipe into the public drainage system is blocked. Outflow to the public drainage system is unimpeded.
Outfall Area Erosion or landslides Existence of the perforated pipe is causing or exasperating erosion or landslides. Perforated pipe system is sealed off and an alternative BMP is implemented.
Inspection Frequency Annually and prior to and following significant storms. Perforated pipe system is operating as designed.
2016 Surface Water Design Manual – Appendix A 4/24/2016 A-37
APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES
NO. 32 – RAINWATER HARVESTING BMP
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed
Preventative Storage volume No rain water in storage unit at the beginning of the rain season. Maximum storage available at the beginning of the rain season (Oct. 1st).
Collection Area Trash and debris Trash of debris on collection area may plug filter system Collection area clear of trash and debris.
Filter Restricted or plugged Filter is partially or fully plugged preventing water
from getting in to the storage unit.
Filter is allowing collection water
into storage unit.
Inspection Frequency Annually and after large storms Rain harvesting equipment is
functioning normally.
Maintenance log A Maintenance log must be kept and available for
review by KC staff.
Maintenance log is kept and is
available to KC staff.
NO. 33 – ROCK PAD BMP
Maintenance Component Defect or Problem Conditions When Maintenance is Needed Results Expected When Maintenance is Performed
Site Trash and debris Trash and debris accumulated on rock pad site. Rock pad site free of any trash or debris.
Rock Pad Area Rock pad size Rock pad is not 2 feet by 3 feet by 6 inches thick or as designed. Rock pad is 2 feet by 3 feet by 6 inches thick or as designed.
Vegetation Vegetation is seen growing in or through rock pad. No vegetation within rock pad area.
Rock Exposed soil Soil can be seen through the rock pad. Full thickness of the rock pad is in place, no soil visible through rock pad.
Inspection Frequency Annually and after large storms Rock pad is functioning normally.
NO. 34 – SHEET FLOW BMP
Maintenance
Component
Defect or Problem Conditions When Maintenance is Needed Results Expected When
Maintenance is Performed
Site Trash and debris Trash and debris accumulated on the sheet flow site. Sheet flow site free of any trash or debris.
Sheet flow area Erosion Soil erosion occurring in sheet flow zone. Soil erosion is not occurring and rills and channels have been repaired.
Concentrated flow Sheet flow is not occurring in the sheet flow zone. Sheet flow area is regraded to provide sheet flow.
Inspection Frequency Annually and after large storms Rain harvesting equipment is functioning normally.
4/24/2016 2016 Surface Water Design Manual – Appendix A A-40