Loading...
HomeMy WebLinkAbout0895.06 DFR 302 rev.pdfEarth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. AES 0895.06 1 of 1 302 Time On Site Time Off Site Date Day of Week 1:05 2:20 4/1/21 Thursday Travel Time Weather 1 hr. RT 58°F, Partly Cloudy Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd S, Renton RJ Development, LLC General Contractor Contact Field Supervisor Reviewed Accrete Construction, LLC Joe LAC/MTK Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site?Project No.Permit No. As requested by the client, ESNW representative was on-site to observe and test the stormwater discharge to the sewer. Erosion Control – Temporary Upon arrival, ESNW rep. tested the pH and conducted an Imhoff Cone test to measure settleable solids of the stormwater in the western baker tank. ESNW rep. measured a pH of 10 and 0.0 mL/L of settleable solids were observed, which is suitable for discharge into the sewer system. Daily discharge amount shown on the monthly Industrial Waste Program Self-Monitoring Report. ESNW rep. will return as requested. Alexandra Shaner Senior Field Technician (206) 355-877