Loading...
HomeMy WebLinkAbout0895.06 SWFR 305A.pdfEarth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 1 of 3 Report No. 305A Time On Site 1:55 Time Off Site 2:30 Date 4/6/21 Day of Week Tuesday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1.Preserve Vegetation; Mark Clearing Limits •Buffer Zones around Sensitive Areas •Silt Fence G N -Chain link and silt fences installed at perimeter 2.Establish Construction Access •Fabric; Quarry Spalls •Wheel Wash •Sweeper Truck F Y -Flip or refresh quarry spalls to reduce track out -Continue to street sweep during trucking ops and whenever track out is observed -Wheel wash onsite 3.Control Flow Rates •Stormwater Vault or Facility •Straw Wattles •Check Dams G N -Onsite stormwater vault plugged 4.Install Sediment Controls •Silt Fence •Straw Bale Barriers •Vegetation •Straw •Sediment Ponds, Traps & Filters •Treatment •Sediment Pond (Temp. or Perm.) •Water Truck G N -Damaged silt fence observed in northwest perimeter of site, recommend maintain or remove if unnecessary -Silt fence installed around majority of perimeter 5. Stabilize Soils •Nets & Blankets •Mulch, Bark & Rock •Hydroseeding; Grass •Plastic Sheeting •Straw Stockpiles •Stockpiles •PAM G N -Cover stockpiles unworked for 2 days and before weekends 6.Protect Slopes •Benching; Track-Walking •Pipe Slope Drains •Plastic Sheeting; Anchors G N -Straw wattles in place to divert water away from western slopes and construction entrance 7.Protect Drain Inlets •Catch Basin Inserts •Gutter; Road G N -CB inserts installed in catch basins on offsite roads 8.Stabilize Channels and Outlets •Channel Lining •Check Dam •Outlet Protection •Nets and Blankets - - N/A 9. Control Pollutants •Chemical Storage Area Covered •Concrete Handling F N -Continue to treat stormwater with dry ice to lower the pH 10. Control Dewatering G N -Via KC Sewer Discharge permit as needed 11. Maintain BMPs F Y -See action items below 12.Maintain SWPPP & Site Logbook G N Available upon request 13. Protect Low-Impact Development (LID BMPs) •Bioretention Rain Garden Facilities •Permeable Pavement - - N/A Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 2 of 3 Report No. Time On Site 1:55 Time Off Site 2:30 Date 4/6/21 Day of Week Tuesday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No List the completed, not-yet-completed, or ongoing action items in the table below: Actions Items Completed? (Yes; No; Ongoing) Date (If Completed) Sweep site entrance when soil is seen on roadway O 4/6/21 Clean sidewalk near construction entrance O 4/6/21 Flip or refresh quarry spalls at construction entrance N Current Weather: 55°F, Clear Precipitation since last inspection (approximate): 0.03 inches Precipitation in the last 24 hours (approximate): 0.00 inches Was water quality sampling part of this inspection?  Yes No If “Yes”: •Record results in the table below. •Characterize the stormwater discharge, e.g., the presence of suspended sediment, “cloudiness”, discoloration, or oil sheen, if present: •Hanna Turbidity Meter #: ESNW #10 Monitoring Location Turbidity (NTU) pH Notes Is the site in compliance with the SWPPP and the permit requirements? Yes No If “No”: •Indicate the tasks necessary to bring the site into compliance in the table above. •Has the non-compliance been reported to the Department of Ecology?Yes No •Should the SWPPP be modified?Yes No “This report is true, accurate, and complete to the best of my knowledge and belief.” Inspector Name: Alexandra Shaner CESCL Number: ECO-3-9272007 Inspection Date: April 6th, 2021 305A Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 3 of 3 Report No. 305A Time On Site 1:55 Time Off Site 2:30 Date 4/6/21 Day of Week Tuesday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC w BMP LEGEND SILT FENCE STOCKPILES QUARRY SPALL ENTRANCE BAKER TANK WHEEL WASH SWALE SEDIMENT TRAP WATTLE MONITORING POINT