Loading...
HomeMy WebLinkAboutCM_Constrction Mitigation_Vaughn SP_210403_f1.pdfCONSTRUCTION MITIGATION DESCRIPTION for Short Plat of Vaughn Trust Property 1. Haul Routes: A construction plan indicating haul routes and hours, construction hours, and a traffic control plan must be submitted to the Development Services Division for approval prior to a construction permit being issued. 2. Haul Hours: Haul hours shall be restricted to the hours between eight-thirty (8:30) a.m. and three- thirty (3:30) p.m., Monday through Friday unless otherwise approved in advance by the Development Services Division. 3. Permitted Work Hours in or Near Residential Areas: Construction activities that require construction or building permits and that are conducted in residential areas or within three hundred feet (300') of residential areas shall be restricted to the following hours: a. Single Family Remodel or Single Family Addition Construction Activities: Single family remodel or single family addition construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and ten o’clock (10:00) p.m., Monday through Friday. Work on Saturdays and Sundays shall be restricted to the hours between nine o’clock (9:00) a.m. and ten o’clock (10:00) p.m. b. Commercial, Multi-Family, New Single Family and Other Nonresidential Construction Activities: Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 4. Emergency Extensions to Permitted Work Hours: The Development Services Division Director is authorized to grant an extension of working time during an emergency. An emergency shall include but is not limited to natural and manmade disasters. 5. Temporary Erosion Control: Temporary erosion control must be installed and maintained for the duration of the project. This work must comply with the Surface Water Design Manual and must be approved by the Renton Development Services Division.