FIELD REPORT
Date Project Name Project No. Report No.
2021-04-05 Bethany Corner 20160674E002 008
Location Municipality AESI Project Manager AESI Field Rep
16451 111th Ave SE Renton
Matthew A. Miller, P.E. Alex Ybarra, Staff
Geologist | G.I.T.
Permit No. Client/Owner Attn Requested By
Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Grading Contractor Weather
D.R. Strong Tiger Mountain Homes / Mark Fury Site Works P. Cloudy 50’s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences, Inc. (AESI) arrived on site in the AM in order to observe earthwork activities. Upon arrival we
met with representatives of Tiger Mountain Homes.
Storm Drain Trench Backfill:
Prior to our arrival Fury had installed and backfilled for storm drain trench from CB #1 toward CB #2A (Fig 1). Backfill was
approximately 3-4’ thick over the pipe comprised of imported 5/8” minus crushed rock. Backfill was placed in multiple lifts
and compacted utilizing a vibratory ho-pac. AESI completed compaction tests on the surface and achieved results which
meet minimum compaction specifications (Table 1).
Site Fill:
Prior to our arrival Fury had filled for roadway (Fig 2). We were informed that fill was approximately 1’ thick comprised of
imported sand with gravel and some silt. We were informed that fill was placed in lifts 6” thick and compacted utilizing a
smooth-drummed vibratory roller. AESI completed compaction tests at depth and achieved results which meet minimum
compaction specifications (Table 1).
AESI departed the site in the PM and will return upon request.
*Minimum 95% compaction required for passing result
Test Location
Apprx. Depth
Below Final
Grade (ft)
Dry Density
(psf)
Moisture
%
Proctor (pcf)
(ASTMD: 1557) Opt. M% %Compaction Pass/Fail*
1 Fig 1 0 126.8 5.7 130.8 5.8 97 Pass
2 Fig 2 7 120.9 9.1 126.4 8.5 96 Pass
3 Fig 2 7 119.7 9.2 126.4 8.5 95 Pass
4 Fig 2 7 120.6 9.5 126.4 8.5 95 Pass
Table 1: Values for compaction tests completed.
Date Project Name Project No. Report No.
2021-04-05 Bethany Corner 20160674E002 008
Page 2 of 2
FIELD REPORT
Figure 1: Red outlined area shows the approximate location of storm drain trench backfill observed. Boxed number shows
the approximate location of compaction test completed.
Figure 2: Red outlined area shows the approximate location of road fill observed. Boxed numbers show the approximate
location of compaction tests completed.