FIELD REPORT
Date Project Name Project No. Report No.
2021-04-06 Bethany Corner 20160674E002 009
Location Municipality AESI Project Manager AESI Field Rep
16451 111th Ave SE Renton
Matthew A. Miller, P.E. Alex Ybarra, Staff
Geologist | G.I.T.
Permit No. Client/Owner Attn Requested By
Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Grading Contractor Weather
D.R. Strong Tiger Mountain Homes / Mark Fury Site Works P. Cloudy 50’s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences, Inc. (AESI) arrived on site in the PM in order to observe earthwork activities. Upon arrival we
met with representatives of Tiger Mountain Homes.
Site Fill:
Prior to our arrival Fury had filled for sidewalk subgrade at the northeast side of the site (Fig 1). We were informed by the
contractor that prior to filling they had stripped the area of deleterious material. Fill was approximately 8-12” thick
comprised of imported very gravelly sand with some silt. Compaction was achieved utilizing a vibratory ho-pac. AESI
observed and assessed the area utilizing a ½” diameter steel soil probe. In our opinion this fill was compacted to a firm
and unyielding condition.
AESU departed the site in the PM and will return upon request.
Figure 1: Red outlined area shows the approximate location of fill observed.