HomeMy WebLinkAboutR-414002W
0
U)
Q
W
I
W
N_
0
W
W
Z
W
M
W
W
2
fn
MProject Corridor
OProposed Pole Location
Existing Pole Location —
To Be Removed
Transmission Line - Proposed
Transmission Line - Existing
517 Proposed Pole Number
C-16 Structure Type (See Appx. A)
Al Construction Scenario
Key (See Appx. B)
- Potential Stringing Site
Recommended Access- Proposed Pole
Olympic Underground
Pipline (Approx. Location)
- • Wastewater Utility Line
- • Water Utility Line
Underground Gas Utility Line
- - - Underground Phone/TV Utility Line
- - - Underground Power Utility Line
- - Unknown Underground Utility Line
^M^- Stream
Wetland
OWetland or Stream Buffer
Landslide Hazard
Landslide Hazard 50ft Buffer
® Steep Slope
Steep Slope 50ft Buffer
Erosion Hazard
Parcel
L - City Jurisdiction Boundary
Profile View
Structure
Conductor
Ground Line
Major Elevation Grid
- - - Major Station Grid
- Minor Station Grid
0 25 50
I I I Feet
1 inch = 50 feet
SOURCES: Roads and Parcels - King County (2015), Aerial
- King County (2015); Streams, Wetlands and Buffers,
Landslide Hazard and Buffers, and Steep Slopes and
Buffers from Watershed Company (2017).
For cartographic purposes only.
Note: Note: Underground utility lines are surveyed in the
vicinity of poles only. Existing Lake Tradition poles aren't
represented by new conductors because they are an
existing line, and are being represented due to the poles
being replaced.
MAP EXTENT
N c a st/
era
L d
SITE PLAN
BASED ON PSE ENGINEERING
DESIGN REVISION N
Page 1 of 30
R-414002 Date: Dec 2020