M Project Corridor - Potential Stringing Site
OProposed Pole Location Recommended Access- Proposed Pole
Existing Pole Location—
Olympic Underground
+�
To Be Removed
Pipline (Approx. Location)
Transmission Line - Proposed
— — —' Wastewater Utility Line
Transmission Line - Existing
---' Water Utility Line
517
Proposed Pole Number
Underground Gas Utility Line
C-16
Structure Type (SeeAppx. A)
- - - Underground Phone/TV Utility Line
Al
Construction Scenario
- - - Underground Power Utility Line
Key (SeeAppx. B)
- - Unknown Underground Utility Line
^M^- Stream
Wetland
OWetland or Stream Buffer
Landslide Hazard
Landslide Hazard 50ft Buffer
® Steep Slope
Steep Slope 50ft Buffer
Erosion Hazard
Parcel
L - City Jurisdiction Boundary
Profile View
Structure
Conductor
Ground Line
Major Elevation Grid
- - - Major Station Grid
- Minor Station Grid
0 0 25 50
1 I I Feet
1 inch = 50 feet
SOURCES: Roads and Parcels - King County (2015), Aerial
- King County (2015); Streams, Wetlands and Buffers,
Landslide Hazard and Buffers, and Steep Slopes and
Buffers from Watershed Company (2017).
For cartographic purposes only.
Note: Note: Underground utility lines are surveyed in the
vicinity of poles only. Existing Lake Tradition poles aren't
represented by new conductors because they are an
existing line, and are being represented due to the poles
being replaced.
MAP EXTENT
Newcastlb-.--�
d
Renton
� d
SITE PLAN
BASED ON PSE ENGINEERING
DESIGN REVISION N
R-414012 Page 11 of 30
Date: Dec 2020