Loading...
HomeMy WebLinkAboutR-414013LLI 0 U) Q LU I LU N_ U W Z W 1-- LU W 2 U) Project Corridor O Proposed Pole Location Existing Pole Location - To Be Removed Transmission Line - Proposed Transmission Line - Existing 517 Proposed Pole Number C-16 Structure Type (See Appx. A) Al Construction Scenario Key (SeeAppx. B) Q Potential Stringing Site Recommended Access- Proposed Pole Olympic Underground Pipline (Approx. Location) Wastewater Utility Line - • Water Utility Line Underground Gas Utility Line - - - Underground Phone/TV Utility Line - - - Underground Power Utility Line Unknown Underground Utility Line -^ - Stream Wetland OWetland or Stream Buffer Landslide Hazard Landslide Hazard 50ft Buffer ® Steep Slope Steep Slope 50ft Buffer Erosion Hazard Parcel L _ j City Jurisdiction Boundary Profile View Structure Conductor Ground Line Major Elevation Grid - - - Major Station Grid Minor Station Grid 0 25 50 I I I Feet 1 inch = 50 feet SOURCES: Roads and Parcels - King County (2015), Aerial - King County (2015); Streams, Wetlands and Buffers, Landslide Hazard and Buffers, and Steep Slopes and Buffers from Watershed Company (2017). For cartographic purposes only Note:Note: Underground utility lines are surveyed in the vicinity of poles only. Existing Lake Tradition poles aren't represented by new conductors because they are an existing line, and are being represented due to the poles being replaced. MAP EXTENT Newcastle d Renton d SITE PLAN BASED ON PSE ENGINEERING DESIGN REVISION N R-414013 Page 12 of 30 Date: Dec 2020 T T W W ISI^ V! W Z J 2 0 a