Loading...
HomeMy WebLinkAboutR-414031CD O W H LLI 0 U) Q LU I w N_ U W Z W MProject Corridor Q Potential Stringing Site ^^r^- Stream Parcel MAP EXTENT O Proposed Pole Location Recommended Access- Proposed Pole Wetland i---, City Jurisdiction Boundary 0 0 I I25 5I () ) Newcastle Existing Pole Location- Olympic Underground Wetland or Stream Buffer L - Profile View Feet 1 inch = 50 feet • To Be Removed Pipline (Approx. Location) Landslide Hazard Structure SOURCES: Roads and Parcels - King County (2015), Aerial Transmission Line - Proposed Wastewater Utility Line Landslide Hazard 50ft Buffer Conductor King County (2015); Streams, Wetlands and Buffers, Landslide Hazard and Buffers, and Steep Slopes and d Transmission Line - Existing ---' Water Utility Line ® Steep Slope Ground Line Buffers from Watershed Company (2017). For �& 517 Proposed Pole Number p Underground Gas Utility Line O Steep Slope 50ft Buffer Major Elevation Grid cartographic purposes only. Renton C-16 Al Structure Type (See Appx. A) Construction Scenario — — — Underground Phone/TV Utility Line — — — Underground Power Utility Line Erosion Hazard — — — Major Station Grid Note:Note: Underground utility lines are surveyed in the vicinity of poles only. Existing Lake Tradition poles aren't represented by new conductors because they are an ` _ d Key (See App B x. ) Unknown Underground Utility Line Minor Station Grid existing line, and are being represented due to the poles being replaced. ^' SITE PLAN BASED ON PSE ENGINEERING DESIGN REVISION N R-414031 Page 30 of 30 Date: Dec 2020 rn N H W W S N W Z J S U a