Loading...
HomeMy WebLinkAboutM_Specialized Billing Contact_20210416_v11 Nathan Janders From:Labreche, Henrik <HLabreche@FlatironLaneJV.com> Sent:Friday, April 16, 2021 8:39 AM To:Nathan Janders Subject:RE: C21000235 44th Street yard- Approved Civil Construction Plans Attachments:I-405 FLJV Contract Bond.pdf; 2021.01.31 City of Renton 2021 - 2022 Business License.pdf; FLJV Contractor License.pdf; KM_13369750_39960 - City of Renton - I-405 - FLATRENTON - CORXS5PRO1POL1.pdf Hi Nathan, Thank you for the prompt response. See attached documents. As required. Check was deposited at the City Hall as requested below. Contact information: CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. continued --> 2 Moore, Kendra KMoore@FlatironLaneJV.com Business Manager 530-200-0335 1400 Talbot Road S, Suite #500, Renton, WA. 98055. Can you give me the contact for the maintenance shop? Or will that come with the permits? Thank you, Henrik Labreche, EIT Field Engineer I-405, Renton to Bellevue Widening & Express Toll Lanes Project Flatiron-Lane, a Joint Venture 1400 Talbot Road South, Suite 500, Renton, WA 98055 Cell: 781-315-3663 |Office: 425.420.9900 Email: hlabreche@flatironlanejv.com From: Nathan Janders <NJanders@Rentonwa.gov> Sent: Tuesday, April 13, 2021 4:42 PM To: Labreche, Henrik <HLabreche@FlatironLaneJV.com> Subject: RE: C21000235 44th Street yard- Approved Civil Construction Plans CAUTION: This email came from outside of the organization. Think before clicking on links and attachments. Henrik, The sewer permit for the cut/cap (SS20005996) and the sewer discharge permit (SS20004735) both reference manhole MH4779, the civil permit isn’t giving an ability to connect but instead the side sewer permit will (this side sewer permit will be issued concurrently with the civil construction permit). On this permit I defined the connection as being to the stub at MH4779. As long as the connection is made at MH4779 then it will be ok, which it seems you are, then no update will be needed. For the water you will have to call the maintenance shops and schedule the installation once the permit is issued. It will be issued concurrently with the civil construction permit for which I need all of the items listed below. I do not see that a payment has been processed, how did you pay? Nathan Janders | Civil Engineer II Community & Economic Development Department | Planning Division City of Renton | 1055 S. Grady Way | Renton WA 98057 NJanders@Rentonwa.gov COVID-19 UPDATE City Hall is currently closed to the public but we are still available to assist you. · Pay Invoice and Apply for Over-the-Counter Permit: Permitting Portal · Schedule an Inspection: Permitting Portal -OR- Building: 425-430-7202; Civil/Site: 425-430-7203 · Contact Staff: o Staff Hours: Monday through Friday 8 a.m. to 4 p.m. o Building or General Permitting: permittech@rentonwa.gov or 425-430-7200 o Planning: planningcustomerservice@rentonwa.gov or 425-430-7294