HomeMy WebLinkAboutCO 4CAG-20-101 Amendment 1 DES Energy Program COP -FA Coversheet Change Order 4 Client Name Project Number COP/FA Number Project Title Date City of Renton Renton City Hall Phase 2 4/1 /2021 Construction IT Room Wall Structure Modifications $ 1,958.00 Subtotal $ 1,958.00 Bond 1.10% $ 21.54 Subtotal $ 1,979.54 Sales Tax 10.10% $ 199.93 Construction Subtotal $ 2,179.47 Professional Services Percent M&V $ _ Design 8.0% CM 6.0% $ 117.48 OH&P 18.0% $ 352.44 Subtotal $ 469.92 Sales Tax 10.10% $ 47.46 PS Subtotal $ 517.38 Total Cost of Change F $ 2,696.-] 85 Use contingency funds 7 Use additional owner funds ❑ I Acknowledgement of Total Cost of Chanae n0fall Client Dave Robinaugh ESCO 'y°""°°'° ° 4/6/2021 Energy Project Manager 04108/2021 Washington State Department of Enterprise Services FACILITIES DIVISION ENGINEERING & ARCHITECTURAL SERVICES (E&AS) ENERGY CONTRACT CHANGE ORDER PROPOSAL (COP) R of Renton Renton City Hall Phase 2 PROJECT TITLE CONTRACT 2018-027 H NO. 2-1 COP No. 4 TO: McKinstry Essention, LLC (ESCO) PROPOSAL REQUEST DATE: 4/1/2021 You are directed to prepare a cost proposal for the work described below and/or detailed on the attachments referred to. - The existing North IT Room walls do not have sufficient framing to support the two wall hung units. Extend wall framing in Data Center for (2) wall hung units. Assumes 4' wide x 32" tall, includes plywood and paint h N w OT w a: J a 0 A O 0: n REASON FOR CHANGED DESIGN ERRORS Q DESIGN OMMISSIONS O AGENCY @) LATENT CONDITIONS O CODE REQUIREMENTS p VALUE ENGINEERING J y 00. # 0 W 0. W 0 �a F Z O V EXPLANATION: Insufficient existing struacture DATE PROPOSAL REQUIRED: 3/28/2021 (14 days from Request Date, unless other date agreed to) CHANGE ORIGINATED BY: PROPOSAL REQUESTED BY: McKinstry TO: McKinstry Essention, LLC (ESCO) TO: Doug Kilpatrick PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: ❑ NO CHANGE ❑r INCREASE ❑ DECREASE i CONTRACT TIME: OF One Thousand, Nine Hundred Seventy-nine and 54/100 $ 1,979.54 (WASHINGTON STATE SALES TAX NOT INCLUDED) ❑� NO CHANGE ❑ INCREASE OF 0 CALENDAR DAYS ❑ DECREASE The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the Department of Enterprise Services. =. McKinstry Essention, LLC BY Dave Robinaugh _ 4/6/2021 ESCO SIGNATURE DATE TO: The Department of Enterprise Services' Authorizing Signator We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance. v.Y .M.. h M.. 7 Dave Robinaugha:.'"eV a � 4/6/2021 Ns',vSiaail u!>m9p ESCO N =�Y, c1d 11 W�Z =" !; D.A'TE'�, 7� 911;J DATE E&AS COST VERIFICATION E S J T MANAGER DATE 04/08/2021 DATE FORM DES-EA-099 (Revised 112512013) Subcontractor Cost Breakdown Client Name Project Number COP/FA Number Project Title Name of Subcontractor City of Renton 4 Ity Hall Phase DATE 3/31/2021 Short Description Material Cost Labor Cost I Cost IT Room Wall Structure Modificaitons Quanti Cost per unit Subtotal Labor Hours Hourly Rate I Subtotal 1 $ 15000 $ 150.00 16.0 $ 113.00 $ 1.Bo8.DD $ 1.958.D0 Subtotal $ $ - $ $ - $ $ 150.001 $ 1.808.00 $ 1,958.00 Total Cost $ $ 1,958.00 SryNdliy ORIGINATED BY: Scott Woodfield REQUEST FOR INFORMATION City of Renton Phase 2 — City Hall HVAC Upgrades McKinstry Job Number: 202707-003 RFI TITLE: Split System Mounting & Ducting REFERENCE Dwg/Spec: M-400 QUESTION McKinstry RFI No. 008 Subcontractor RFI No. - COMPANY: McKinstry 1. North wall is about 8' high with about 3' of foam infill wall to ceiling with no structural members available for mounting equipment. Alternatives proposed will be providing backing behind wall, lowering units, or requesting ceiling mounted equipment and suspend equipment from ceiling. Please confirm acceptable alternative(s) or propose a recommendation. 2. IDU-1 will likely need to be installed above electrical panel or IT equipment. Is a secondary drain pan required? Is a fill alarm required? 3. The drawings call for 24" round supply ductwork from the louver to the new supply fan. Between the cable tray and conduits there is not enough room for a 24" round duct. We will need to either go to a rectangular duct do that we can reduce to 20" in that dimension or oval ductwork. Confirm this is acceptable. DATE SENT: 2/19/2021 RESPONSE DUE DATE: 2/26/2021 SUBMITTED BY: Scott Woodfield COMPANY: McKinstry POTENTIAL COST IMPACT: MAYBE ROM COST: $ n/a POTENTIAL SCHEDULE IMPACT: MAYBE EST. DELAY: n/a RESPONSE 1. Wall backing and lowering the units both appear to be acceptable solutions. 2. Shift the location of IDU-1 as needed to avoid being installed above electrical equipment. 3. Rectangular duct is acceptable so long as it is equivalently sized. Jeff Hardwick BCE Engineers 02/19/2021 ATTACHMENTS: RESPONSE BY: Click to enter person's name. TITLE: Click to enter title. DATE: CC: Click to list people. 5005 3rd Ave S ■ Seattle, WA 98134 ■ PHONE 206.762.3311 • FAX 206.762.2624 Colorado ■ California ■ Idaho • Kansas • Minnesota • Montana ■ Oregon ■ Texas ■ Washington ■ Wisconsin