DES Energy Program COP -FA Coversheet Change Order 4
Client Name
Project Number
COP/FA Number
Project Title
Date
City of Renton
Renton City Hall Phase 2
4/1 /2021
Construction
IT Room Wall Structure Modifications
$
1,958.00
Subtotal
$
1,958.00
Bond
1.10% $
21.54
Subtotal
$
1,979.54
Sales Tax
10.10% $
199.93
Construction Subtotal
$
2,179.47
Professional Services
Percent
M&V
$
_
Design
8.0%
CM
6.0%
$
117.48
OH&P
18.0%
$
352.44
Subtotal
$
469.92
Sales Tax
10.10%
$
47.46
PS Subtotal
$
517.38
Total Cost of Change
F
$ 2,696.-]
85
Use contingency funds 7 Use additional owner funds ❑ I
Acknowledgement of Total Cost of Chanae n0fall
Client
Dave Robinaugh
ESCO 'y°""°°'° ° 4/6/2021
Energy Project Manager 04108/2021
Washington State Department of
Enterprise Services
FACILITIES DIVISION
ENGINEERING & ARCHITECTURAL SERVICES (E&AS)
ENERGY CONTRACT CHANGE ORDER
PROPOSAL (COP)
R
of Renton
Renton City Hall Phase 2
PROJECT TITLE
CONTRACT 2018-027 H
NO. 2-1
COP No. 4
TO: McKinstry Essention, LLC (ESCO) PROPOSAL REQUEST DATE: 4/1/2021
You are directed to prepare a cost proposal for the work described below and/or detailed on the attachments referred to. -
The existing North IT Room walls do not have sufficient framing to support the two wall hung units.
Extend wall framing in Data Center for (2) wall hung units. Assumes 4' wide x 32" tall, includes plywood and paint
h
N
w
OT
w
a:
J
a
0
A
O
0:
n
REASON FOR CHANGED DESIGN ERRORS Q DESIGN OMMISSIONS O AGENCY @) LATENT CONDITIONS O CODE REQUIREMENTS p VALUE ENGINEERING
J
y
00. #
0
W
0.
W
0
�a
F
Z
O
V
EXPLANATION: Insufficient existing struacture
DATE PROPOSAL REQUIRED: 3/28/2021
(14 days from Request Date, unless other date agreed to)
CHANGE ORIGINATED BY:
PROPOSAL REQUESTED BY:
McKinstry
TO: McKinstry Essention, LLC (ESCO) TO: Doug Kilpatrick PM
WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR:
CONTRACT SUM:
❑ NO CHANGE
❑r INCREASE
❑ DECREASE
i
CONTRACT TIME:
OF One Thousand, Nine Hundred Seventy-nine and 54/100 $ 1,979.54
(WASHINGTON STATE SALES TAX NOT INCLUDED)
❑� NO CHANGE
❑ INCREASE OF 0 CALENDAR DAYS
❑ DECREASE
The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain
in full force and effect.
We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until
incorporation of this COP into a Change Order by the Department of Enterprise Services.
=.
McKinstry Essention, LLC BY Dave Robinaugh _ 4/6/2021
ESCO SIGNATURE DATE
TO: The Department of Enterprise Services' Authorizing Signator
We have carefully examined this proposal and find the cost to be reasonable. Therefore, we recommend acceptance.
v.Y .M.. h M.. 7
Dave Robinaugha:.'"eV a � 4/6/2021
Ns',vSiaail u!>m9p
ESCO
N =�Y, c1d 11 W�Z =" !;
D.A'TE'�,
7� 911;J
DATE
E&AS COST VERIFICATION
E S J T MANAGER
DATE
04/08/2021
DATE
FORM DES-EA-099 (Revised 112512013)
Subcontractor Cost Breakdown
Client Name
Project Number
COP/FA Number
Project Title
Name of Subcontractor
City of Renton
4
Ity Hall Phase
DATE 3/31/2021
Short Description
Material Cost
Labor Cost
I Cost
IT Room Wall Structure Modificaitons
Quanti
Cost per unit Subtotal
Labor Hours Hourly Rate
I Subtotal
1 $
15000 $ 150.00
16.0 $ 113.00
$ 1.Bo8.DD
$ 1.958.D0
Subtotal
$
$ -
$
$ -
$
$ 150.001
$ 1.808.00
$ 1,958.00
Total Cost
$
$ 1,958.00
SryNdliy
ORIGINATED BY: Scott Woodfield
REQUEST FOR INFORMATION
City of Renton Phase 2 — City Hall HVAC Upgrades
McKinstry Job Number: 202707-003
RFI TITLE: Split System Mounting & Ducting
REFERENCE Dwg/Spec: M-400
QUESTION
McKinstry RFI No. 008
Subcontractor RFI No. -
COMPANY: McKinstry
1. North wall is about 8' high with about 3' of foam infill wall to ceiling with no structural members available for
mounting equipment. Alternatives proposed will be providing backing behind wall, lowering units, or requesting
ceiling mounted equipment and suspend equipment from ceiling. Please confirm acceptable alternative(s) or
propose a recommendation.
2. IDU-1 will likely need to be installed above electrical panel or IT equipment. Is a secondary drain pan required?
Is a fill alarm required?
3. The drawings call for 24" round supply ductwork from the louver to the new supply fan. Between the cable tray
and conduits there is not enough room for a 24" round duct. We will need to either go to a rectangular duct do
that we can reduce to 20" in that dimension or oval ductwork.
Confirm this is acceptable.
DATE SENT: 2/19/2021 RESPONSE DUE DATE: 2/26/2021
SUBMITTED BY: Scott Woodfield COMPANY: McKinstry
POTENTIAL COST IMPACT: MAYBE ROM COST: $ n/a
POTENTIAL SCHEDULE IMPACT: MAYBE EST. DELAY: n/a
RESPONSE
1. Wall backing and lowering the units both appear to be acceptable solutions.
2. Shift the location of IDU-1 as needed to avoid being installed above electrical equipment.
3. Rectangular duct is acceptable so long as it is equivalently sized.
Jeff Hardwick
BCE Engineers
02/19/2021
ATTACHMENTS:
RESPONSE BY: Click to enter person's name. TITLE: Click to enter title. DATE:
CC: Click to list people.
5005 3rd Ave S ■ Seattle, WA 98134 ■ PHONE 206.762.3311 • FAX 206.762.2624
Colorado ■ California ■ Idaho • Kansas • Minnesota • Montana ■ Oregon ■ Texas ■ Washington ■ Wisconsin