FIELD REPORT
Date Project Name Project No. Report No.
2021-04-15 Bethany Corner 20160674E002 015
Location Municipality AESI Project Manager AESI Field Rep
16451 111th Ave SE Renton
Matthew A. Miller, P.E. Alex Ybarra, Staff
Geologist
Permit No. Client/Owner Attn Requested By
Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Grading Contractor Weather
D.R. Strong Tiger Mountain Homes / Mark Fury Site Works/Dan Sunny, 60’s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences, Inc. (AESI) arrived on site in the PM in order to observe earthwork activities. Upon arrival we
met with Mark and Dan.
Site Fill:
While we were onsite we observed Fury fill for SE 165th St (Fig 1). They filled approximately 1’ thick with fill comprised of
imported gravelly sand with silt. Fill was placed in lifts 6” thick compacted utilizing a vibratory roller. AESI completed
compaction tests at various depths below final grade and achieved results which meet minimum compaction
specifications (Table 1).
Prior to our arrival Fury had partially backfilled for temporary sediment pond located at the southwest corner of the site
(Fig 1). Pond was stripped of loose, unconsolidated material from the bottom prior to backfill. Strippings were seen along
the edges of the pond. Fury filled backfilled approximately 2’ thick. We were informed that backfill material and methods
were consistent with those referenced above. AESI completed compaction tests at various depths below final grade and
achieved results which meet minimum compaction specifications (Table 1).
While we were onsite we observed Fury over-excavate and backfill for Lots 6/7 shared driveway (Fig 1). They removed
approximately 4’ thick of pre-existing fill until native silty sand with gravel was encountered. Base was firm and unyielding
as assessed by AESI utilizing a 1/2” diameter steel soil probe. Backfill material and methods were consisted with those
referenced above. AESI completed compaction tests at various depths below final grade and achieved results which meet
minimum compaction specifications (Table 1).
AESI departed the site in the PM and will upon request.
Date Project Name Project No. Report No.
2021-04-15 Bethany Corner 20160674E002 015
Page 2 of 2
FIELD REPORT
*Minimum 95% compaction required for passing result
Test Location
Apprx. Depth
Below Final
Grade (ft)
Dry Density
(psf)
Moisture
%
Proctor (pcf)
(ASTMD: 1557) Opt. M% %Compaction Pass/Fail*
1 Fig 1 2 134.8 7.9 140.6 6.6 96 Pass
2 Fig 1 2 135.1 8.5 140.6 6.6 96 Pass
3 Fig 1 2 135 8.3 140.6 6.6 96 Pass
4 Fig 1 2 136.4 7.1 140.6 6.6 97 Pass
5 Fig 1 6 135.8 7.4 140.6 6.6 97 Pass
6 Fig 1 6 133.8 9.1 140.6 6.6 95 Pass
7 Fig 1 4 135.1 9.5 140.6 6.6 96 Pass
8 Fig 1 3 134 8.2 140.6 6.6 95 Pass
9 Fig 1 2 136.9 8.5 140.6 6.6 97 Pass
Table 1: Values for compaction tests completed.
Figure 1: Red outlined area shows the approximate location of fill observed. Shaded area shows the approximate location
of over-excavation observed. Boxed numbers show the approximate location of compaction tests completed.