FIELD REPORT
Date Project Name Project No. Report No.
2021-04-14 Bethany Corner 20160674E002 014
Location Municipality AESI Project Manager AESI Field Rep
16451 111th Ave SE Renton
Matthew A. Miller, P.E. Alex Ybarra, Staff
Geologist
Permit No. Client/Owner Attn Requested By
Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Grading Contractor Weather
D.R. Strong Tiger Mountain Homes / Mark Fury Site Works/Dan Sunny, 60’s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences, Inc. (AESI) arrived on site in the PM in order to observe earthwork activities. Upon arrival we
met with Mark and Dan.
Site Fill:
While we were onsite we observed Fury fill for SE 165th St (Fig 1). They filled approximately 2’ thick with fill comprised of
imported gravelly sand with silt. Fill was placed in lifts 6” thick compacted utilizing a vibratory roller. AESI completed
compaction tests at various depths below final grade and achieved results which meet minimum compaction
specifications (Table 1).
AESI departed the site in the PM and will upon request.
*Minimum 95% compaction required for passing result
Test Location
Apprx. Depth
Below Final
Grade (ft)
Dry Density
(psf)
Moisture
%
Proctor (pcf)
(ASTMD: 1557) Opt. M% %Compaction Pass/Fail*
1 Fig 1 4 136.5 8.1 140.6 6.6 97 Pass
2 Fig 1 4 134.5 9.4 140.6 6.6 96 Pass
3 Fig 1 4 135.5 8.1 140.6 6.6 96 Pass
4 Fig 1 4 133.7 8.8 140.6 6.6 95 Pass
5 Fig 1 3 136.1 8.2 140.6 6.6 97 Pass
6 Fig 1 3 137.7 6.7 140.6 6.6 98 Pass
7 Fig 1 3 134.4 7.7 140.6 6.6 96 Pass
8 Fig 1 3 135.8 6.9 140.6 6.6 97 Pass
Table 1: Values for compaction tests completed.
Date Project Name Project No. Report No.
2021-04-14 Bethany Corner 20160674E002 014
Page 2 of 2
FIELD REPORT
Figure 1: Red outlined area shows the approximate location of fill observed. Boxed numbers show the approximate
location of compaction tests completed.