CITY OF RENTON EROSION CONTROL NOTES
1.13EFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON,
HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S
CONTRACTOR .
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE
DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL
PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE
CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED
WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING
THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION
COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC
REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR
BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS
PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND
PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF
RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START
OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND
THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE
MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF
CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING
OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH
PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN
AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION
OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE
CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING
WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF
THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN
DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE
TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE
DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE
WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO
LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES.
ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH
TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR
ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER
CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE
POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION,
MAINTENANCE, REPLACEMENT, ENHANCEMENT,AND REMOVAL OF ESC BMPS SHALL BE
THE RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO
POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT
SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE
COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF
CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE
ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN
APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER
FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL
NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST
THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST
THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE
APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING,
ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN
OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE
ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A
MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY
THE CITY.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS
PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN
INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION
POURAZARI #39659
MECHANICAL - ELECTRICAL
Ab o s s e in
CIVIL - LEED
FIRE PROTECTION
Engineering,
18465 NE 68TH ST
REDMOINDD, TA. 98052
PH: (425) 462-9441
L•�'�'
FAX: (425) 462-9451
E-Vail: cservice®abossein.com
www.abossein.com
AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A
SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY
INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING
CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF
THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY
SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO
ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE
TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES
ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER
FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE
PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS
TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION .
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED
AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR
SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE
SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO
REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE , THE PROJECT SITE SHALL BE
STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT
SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE
SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY
FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE
VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED
AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT
COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL MULCH WITHOUT SEEDING
IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND
EROSION CONTROL ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS
RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF
ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
INTERNATIONAL BUILDING CODE.
BASE MAP/TOPOGRAPHY PROVIDED BY
PQU
❑dSBj
OTHERS. ABOSSEIN ENGINEERING (AE)
CANNOT BE HELD LIABLE FOR
OF
ACCURACY. CONTRACTOR SHALL FIELD
VERIFY GRADES, UTILITIES AND ALL
•OTHER EX FEATURES & CONDITIONS. IF
CONDITIONS ARE NOT AS SHOWN &/OR
�eee
�0 ISTE�
PLANS CANNOT BE CONSTRUCTED AS
SSr�NAL ''
SHOWN, CONTACT AE PRIOR TO
CONSTRUCTION.
CITY OF RENTON SURFACE WATER STANDARD PLAN
NOTES
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION
MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE
CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE,
AND FEDERAL PERMITS PRIOR TO CONSTRUCTION.
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN
ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON SURFACE WATER
DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE (RMC), AND THE STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY
WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA). IT SHALL BE THE
SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, OMISSION OR
VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS
SHALL BE AT NO ADDITIONAL COST TO THE CITY.
4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT
CONSTITUTE AS APPROVAL OF ANY OTHER CONSTRUCTION (E.G. WATER, SEWER, GAS,
ELECTRICAL ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING
WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO
CONSTRUCTION. THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED
ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLANS
WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY.
5. A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
6. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED
BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE
CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE
RESPONSIBILITY OF THE APPLICANT AND THE APPLICANT'S CONTRACTOR TO
INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO
FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY
BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD
ON THE AS -BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY
CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELY NOTIFY THE
ENGINEER OF RECORD IF A CONFLICT EXISTS.
7. VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA
STATE PLANE, NORTH), UNLESS OTHERWISE APPROVED BY THE CITY. REFERENCE
BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS.
8. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95%
MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)0 - COMPACTION AND MOISTURE
CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLE PAVEMENT
AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND
UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92% OF MAXIMUM
DRY DENSITY.
9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED
UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED
PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH
RESTORATION STANDARDS.
10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO
THE START OF CONSTRUCTION. WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY
THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO
THE GRADE AS STAKED.
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR
IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY
THE CITY.
12. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD
SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY
LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS
WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM
GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A
UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS
SHOWN ON THE CITY STANDARD PLAN 220.00, 220.10, AND 220.20.
13. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR
5 INSIDE AND OUTSIDE.
14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED
WITH DUCTILE IRON, BOLT -LOCKING LIDS PER THE CITY STANDARD PLAN 204.10,
204.20, 204.30, AND 204.50. STRUCTURES SHALL HAVE:
• RECTANGULAR OR ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE
OF THE ROADWAY.
• ROUND, SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND LOCATED WITHIN THE
ROADWAY, BUT OUTSIDE OF THE CURB/GUTTER LINE.
• ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC
RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDE
PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY
LOGO.
15. 15. BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH
TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM.
16. LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE
ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANHOLE/CATCH BASIN RIMS
SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE
SHOWN.
17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF
SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE
DRIVEWAY TO THE BOTTOM OF THE DITCH.
18. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE
OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT AND SHALL
MEET THE FOLLOWING SPECIFICATIONS:
• 4 - 8 INCH ROCK / 40 - 70% PASSING;
• 2 - 4 INCH ROCK / 30 - 40% PASSING; AND
• LESS THAN 2 INCH ROCK / 10 - 20% PASSING.
19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE
INTERCONNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE
CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY
THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS.
20. THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH
A BOLT -LOCKING LID MARKED "STORM" SHALL BE LOCATED AT THE PROPERTY LINE OR
AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM
PER THE CITY STANDARD PLAN 227.00.
21. ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A
SURVEYOR LICENSED IN WASHINGTON STATE, AND CUT SHEETS SHALL BE PROVIDED TO
THE CITY PRIOR TO CONSTRUCTION.
22. ALL NEWLY INSTALLED AND NEWLY REHABILITATED (PUBLIC AND PRIVATE) STORM
CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING
TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BE
SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS,
GUTTERS AND/OR PAVEMENT.
23. ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN
ACCORDANCE WITH SECTION 7-04.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND
IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BE
TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED.
24. FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF
THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER
STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR
AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264.00.
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT
RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY
CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATION
FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED
DURING CONSTRUCTION.
26. ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY
OTHER ACTIONS NEEDED TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC,
AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL
BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT
NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE
CITY. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1-10 TEMPORARY
TRAFFIC CONTROL SHALL APPLY
27. PROJECTS LOCATED WITHIN THE CITY'S AQUIFER PROTECTION AREA (APA) SHALL
COMPLY WITH SPECIAL REQUIREMENT #6 OF THE RENTON SWDM AND AQUIFER
PROTECTION REGULATIONS (RMC 4-3-050).
28. PLACEMENT OF SURFACE APPURTENANCES (CATCH BASIN/MANHOLE LIDS, CLEANOUTS,
INLETS, ETC.) IN THE STREET TRAVEL LANE WHEEL PATH, INTERSECTIONS OF STREET
TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED
WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR
CROSSWALK SHALL BE FITTED WITH A NON -SLIP OR NON-SKID LID PER ADA
REQUIREMENTS.
29. CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS
SHALL BE MAINTAINED BY THE APPLICANT.
30. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF
THE RENTON SWDM.
31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB
WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE
PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES.
COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION
APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET
TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE PAVEMENT SURFACE ALL
AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE,
THEN THE PAVEMENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT
LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEET OF PERMEABLE
PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701
SHALL BE CONDUCTED. FOR LARGE AREAS (E.G., PARKING AREAS), TESTING
OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLY MOVING WATER
TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE
PAVERS SHALL
CALL 811 (2) BUSINESS DAYS
BEFORE YOU DIG
(UNDERGROUND UTILITY
LOCATIONS ARE APPROXIMATE)
PERMIT SUBMITTAL SURVEYED: GEODETIC SURVEYING SCALE:
SERVICE VERTICAL NAVD 1988
AS INDICATED HORIZONTAL-NAD 1983/1991
DESIGNED: CITY O
SP ON DRAWING ®
DRAWN: SP JW RENTON
ONE INCH DATUM
CHECKED: SP AT FULL SCALE Planning/Building/Public Works Dept.
IF NOT ONE INCH
NO. REVISION BY DATE APPR APPROVED: SCALE ACCORDINGLY
R-408302
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
Nathan Janders 03/19/2020 '
DATE:
FIRST UKRAINIAN PENTECOSTAL CHURCH 02-25-20
3811 NE 21 ST ST FIELDBOOK:
PAGE
RENTON, WA 98056 DRAWING NO.
CIVIL NOTES C1.1
SHEET: OF.
2 65
(
O
0�
All
L0
N
O
O
I
DD
T
a
J