Loading...
HomeMy WebLinkAboutR-40833800 I O Nt w 20 MIL PE IMPERMEABLE LIN' rii�o TOF (IF RE TYPICAL SECTION VIEW NOT TO SCALE NOTE: IF SALTING AGENTS FOR SNOW AND ICE REMOVAL ARE USED ON OR NEAR THE PROJECT, A GEOMEMBRANE BARRIER IS RECOMMENDED WITH THE SYSTEM. THE GEOMEMBRANE LINER IS INTENDED TO HELP PROTECT THE SYSTEM FROM THE POTENTIAL ADVERSE EFFECTS THAT MAY RESULT FROM A CHANGE IN THE SURROUNDING ENVIRONMENT OVER A PERIOD OF TIME. PLEASE REFER TO THE CORRUGATED METAL PIPE DETENTION DESIGN GUIDE FOR ADDITIONAL INFORMATION. EXFILTRATION AREA STANDARD PERFORATION PATTERNS APPROXIMATE AREA PER LINEAR FOOT OF PIPE CORRUGATION PATTERN PIPE 2 2/3" x 1 /2" 3" x 1" 5" x 1" ULTRA FLO 30"0 30.5 SQ. IN. 32.3 SQ. IN. NOTES: • GAGE AND COATING LIMITATIONS APPLY. 5" x 1" IS NOT AVAILABLE IN ALUMINUM. TYPICAL PERFORATION DETAIL The design and information shown on this drawing is provided as a service to the project owner, engineer and contractor by Contech Engineered Solutions LLC ("Contech"). Neither this drawing, nor any part thereof, may be used, reproduced or modified in any manner without the prior written consent of Contech. Failure to comply is done at the user's own risk and Contech expressly disclaims any liability or responsibility for such use. If discrepancies between the supplied information upon wh the drawing is based and actual field conditions are encounter as site work progresses, these discrepancies must be report to Contech immediately for re-evaluation of the design. Contc accepts no liability for designs based on missing, incomplete inaccurate information supplied by others. NOT TO SCALE DATE I REVISION DESCRIPTION BASE MAP/TOPOGRAPHY PROVIDED BY OTHERS. ABOSSEIN ENGINEERING (AE) CANNOT BE HELD LIABLE FOR ACCURACY. CONTRACTOR SHALL FIELD VERIFY GRADES, UTILITIES AND ALL OTHER EX FEATURES & CONDITIONS. IF CONDITIONS ARE NOT AS SHOWN &/OR PLANS CANNOT BE CONSTRUCTED AS SHOWN, CONTACT AE PRIOR TO CONSTRUCTION. 081 2 2/3" x 1 /2" CO EDGE NOTES: 1. PERFORATION 2. PERFORATION ON THE NOMIf 3. DIMENSIONS 4. ALL HOLES 3/E IMPERMEABLE LINER SUPPLIED BY OTHERS 6-11 C —J L- LP —J PLAN FRONT 48" O to 90" O FITTING REINFORCEMENT MAY BE REQUIRED BASED ON HEIGHT OF COVER AND LIVE LOAD CONDITION TYPICAL MANWAY DETAIL NOT TO SCALE C721IONTECH@ ENGINEERED SOLUTIONS LLC www.ContechES.com 11815 NE Glenn Widing Drive, Portland, OR 97220 BY 800-548-4667 503-240-3393 800-561-1271 FAX PERMIT SUBMITTAL REVISION 0 TR N EMB ON FINAL BACKFILL v INITIAL BACKFILL 4 a LIVE LOADS NOT TO EXCEED CONVENTIONAL HIGHWAY LOADS. MINIMUM TRENCH WIDTH MUST ALLOW ROOM FOR PROPER COMPACTION OF HAUNCH MATERIALS UNDER THE PIPE ARCH. THE TRENCH WIDTH IS THE MINIMUM AMOUNT REQUIRED FOR PROPER INSTALLATION AND TO SUPPORT HORIZONTAL PRESSURE FROM THE PIPE. THE MANUFACTURER'S SUGGESTED MINIMUM VALUE IS: 1.5S + 12". 1a MINIMUM EMBANKMENT WIDTH (IN FEET) FOR INITIAL FILL ENVELOPE: 3.OS BUT NO LESS THAN S + 4'-0". 82"-112" 24" 3" x 1" 2 FOUNDATION SHALL BE WELL CONSOLIDATED. STABLE & CAPABLE OF SUPPORTING FILL MATERIAL LOAD. 3 OPEN -GRADED GRANULAR BEDDING MATERIAL SHALL BE A RELATIVELY LOOSE MATERIAL THAT IS ROUGHLY SHAPED TO FIT THE BOTTOM OF THE PIPE ARCH, 4" TO 6" IN DEPTH. SUGGESTED PARTICLE SIZE IS 1/2 CORRUGATION DEPTH. THE WIDTH OF BEDDING SHOULD BE THE EXTENTS OF THE INVERT OF THE PIPE ARCH. 4 CORRUGATED ALUMINUM PIPE ARCH (CAPA) [CORLIX PIPE ARCH]. 5 HAUNCH ZONE MATERIAL SHALL BE HAND SHOVELED OR SHOVEL SLICED INTO PLACE TO ALLOW FOR PROPER COMPACTION. REFER TO AASHTO 26.5.2, 26.5.4 OR ASTM B788 10.3 TO PROPERLY ADDRESS CORNER BEARING PRESSURE. 5a THE BACKFILL MATERIAL SHALL BE A FREE -DRAINING, ANGULAR, WASHED -STONE PER AASHTO M 43 SIZE #3 WITH A'/z" - 2" PARTICLE SIZE OR APPROVED EQUAL. MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS AND SHALL BE WORKED INTO THE PIPE HAUNCHES BY MEANS OF SHOVEL -SLICING, RODDING, AIR -TAMPER, VIBRATORY PLATE OR OTHER EFFECTIVE METHODS. COMPACTION IS CONSIDERED ADEQUATE WHEN A DENSITY EQUIVALENT TO 90% STANDARD PROCTOR IS ACHIEVED OR WHEN NO FURTHER YIELDING OF THE MATERIAL IS OBSERVED UNDER THE COMPACTOR OR UNDER FOOT. THE PROJECT ENGINEER OR HIS REPRESENTATIVE MUST BE SATISFIED WITH THE LEVEL OF COMPACTION. INADEQUATE COMPACTION CAN LEAD TO EXCESSIVE PIPE DEFLECTIONS AND SETTLEMENT OF THE SOILS OVER THE SYSTEM. BACKFILL SHALL BE PLACED SUCH THAT THERE IS NO MORE THAN A TWO -LIFT DIFFERENTIAL BETWEEN THE SIDES OF ANY PIPE IN THE SYSTEM AT ALL TIMES DURING THE BACKFILL PROCESS. BACKFILL SHALL BE ADVANCED ALONG THE LENGTH OF THE SYSTEM AT THE SAME RATE TO AVOID DIFFERENTIAL LOADING ON ANY PIPES IN THE SYSTEM. 6 INITIAL OPEN GRADED GRANULAR BACKFILL ABOVE PIPE ARCH MAY INCLUDE ROAD BASE MATERIAL (AND RIGID PAVEMENT IF APPLICABLE). SEE TABLE ABOVE. INITIAL BACKFILL OF 6" PER ENGINEER OF RECORD. 6a TOTAL HEIGHT OF COMPACTED COVER IS MEASURED FROM TOP OF PIPE ARCH TO BOTTOM OF FLEXIBLE PAVEMENT OR TOP OF RIGID PAVEMENT. 7 FINAL BACKFILL MATERIAL SELECTION AND COMPACTION REQUIREMENTS SHALL FOLLOW THE PROJECT PLANS AND SPECIFICATIONS PER THE ENGINEER OF RECORD. PER ENGINEER OF RECORD. 2" CLEAN ROCK WITH 40% POROSITY. NOTES: • GEOTEXTILE SHALL BE USED AS REQUIRED TO PREVENT SOIL MIGRATION. • FOR MULTIPLE BARREL INSTALLATIONS THE RECOMMENDED STANDARD SPACING BETWEEN PARALLEL PIPE ARCH RUNS SHALL BE SPAN/2 BUT NO LESS THAN 12", OR 36" FOR PIPE SPANS 108" AND LARGER. CONTACT YOUR CONTECH REPRESENTATIVE FOR NONSTANDARD SPACING. V^L�E M_ = = CMP DETENTION SYSTEMS CONTECH PROPOSAL DRAWING BY I DATE TYPICAL BACKFILL DETAIL NOT TO SCALE R-408338 PROJECT No.: SEC. No.: DATE: 35" x 24" PERFORATED UNDERGROUND RETENTION SYSTEM - 62472M20 624723 020 3/2/2020 DESIGNED: DRAWN: FUPC (FUNDAMENTALIST UKRANIAN PENTECOSTALIST CHURCH) KET JPC/DJB RENTON, WA CHECKEJMD APPROVED MD SITE DESIGNATION: FUPC BASIN #2 SHEET NO 51 OF 65 / O 1 ��, Call before you dig SURVEYED: GEODETIC SURVEYING SERVICE DESIGNED: DRAWN: CHECKED: P R APPROVED: SCALE: AS INDICATED ON DRAWING ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 19W/1991 DATUM CALL 811 (2) BUSINESS DAYS BEFORE YOU DIG (UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE) CITY OF RENTON Planning/Building/Public Works Dept. R-408338 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING Nathan Janders 03/19/2020 ' FIRST UKRAINIAN PENTECOSTAL CHURCH 3811 NE 21 ST ST RENTON, WA 98056 SITE DESIGNATION: FUPC BASIN #2 DATE: 02-25-20 FIELDBOOK: PAGE: DRAWING NO: SHEET: OF: 51 65 H H 77 U OC D U J Q U) O U LU Z LU 0— Z Q Z_ Q V Ir—n ) H