HomeMy WebLinkAboutR-40834800 I O Nt Ii w I- 20 MIL PE IMPERMEABLE LIN riNi�o TOF (IF RE TYPICAL SECTION VIEW NOT TO SCALE NOTE: IF SALTING AGENTS FOR SNOW AND ICE REMOVAL ARE USED ON OR NEAR THE PROJECT, A GEOMEMBRANE BARRIER IS RECOMMENDED WITH THE SYSTEM. THE GEOMEMBRANE LINER IS INTENDED TO HELP PROTECT THE SYSTEM FROM THE POTENTIAL ADVERSE EFFECTS THAT MAY RESULT FROM A CHANGE IN THE SURROUNDING ENVIRONMENT OVER A PERIOD OF TIME. PLEASE REFER TO THE CORRUGATED METAL PIPE DETENTION DESIGN GUIDE FOR ADDITIONAL INFORMATION. EDGE SPACING EQUAL ON BOTH SIDES 0 0 0 a 0/ 0 0 0 o _� o // -0 0 0 0 0 0 0 0 0 COIL WID OP = 3.76 SQ IN/SQ FT NOTES: 1. PERFORATIONS MEET AASHTO AND ASTM SPECIFICATIONS. 2. PERFORATION OPEN AREA PER SQUARE FOOT OF PIPE IS BASED ON THE NOMINAL DIAMETER AND LENGTH OF PIPE- 3. DIMENSIONS SUBJECT TO MANUFACTURER'S TOLERANCES. 4. ALL HOLES 3/8" O. EXFILTRATION AREA STANDARD PERFORATION PATTERNS APPROXIMATE AREA PER LINEAR FOOT OF PIPE CORRUGATION PATTERN PIPE 2 2/3" x 1/2" 3" x 1" 5" x 1" ULTRA FLO 30"0 30.5 SQ.IN. 32.3 SQ.IN. The design and information shown on this drawing is provided as a service to the project owner, engineer and contractor by Contech Engineered Solutions LLC ("Contech"). Neither this drawing, nor any part thereof, may be used, reproduced or modified in any manner without the prior written consent of Contech. Failure to comply is done at the user's own risk and Contech expressly disclaims any liability or responsibility for such use. If discrepancies between the supplied information upon which the drawing is based and actual field conditions are encountered as site work progresses, these discrepancies must be reported Cori Conimmediately for re-evaluation of the design. Contech accepts no liability for designs based on missing, incomplete or inaccurate information supplied by others. NOTES: • GAGE AND COATING LIMITATIONS APPLY. 5" x 1" IS NOT AVAILABLE IN ALUMINUM. • DIMENSIONS SUBJECT TO MANUFACTURER'S TOLERANCES. TYPICAL PERFORATION DETAIL NOT TO SCALE DATE I REVISION DESCRIPTION I BY BASE MAP/TOPOGRAPHY PROVIDED BY OTHERS. ABOSSEIN ENGINEERING (AE) CANNOT BE HELD LIABLE FOR ACCURACY. CONTRACTOR SHALL FIELD VERIFY GRADES, UTILITIES AND ALL OTHER EX FEATURES & CONDITIONS. IF CONDITIONS ARE NOT AS SHOWN &/OR PLANS CANNOT BE CONSTRUCTED AS SHOWN, CONTACT AE PRIOR TO CONSTRUCTION. \►G L PLAN FRONT 48" O to 90" O FITTING REINFORCEMENT MAY BE REQUIRED BASED ON HEIGHT OF COVER AND LIVE LOAD CONDITION TYPICAL MANWAY DETAIL 2 TR N EMBAON �j FINAL BACKFILL Z����� IN SITU MINIMUM HEIGHT OF COVER FOR PIPE ARCHES IS SPAN/8 BUT NOT LESS THAN 12" FOR CORRUGATIONS: • 2 2/3" x 1/2" • 3"x1" (SEE NOTE 6) BACKFILL REQUIREMENTS FOLLOW THE GUIDELINES OF AASHTO LRFD BRIDGE DESIGN (SEC 12) AND CONSTRUCTION (SEC 26) 1 MINIMUM TRENCH WIDTH MUST ALLOW ROOM FOR PROPER COMPACTION OF HAUNCH MATERIALS UNDER THE PIPE ARCH. THE MINIMUM TRENCH WIDTH (12.6.6.1): SPAN > 12": 1.5S + 12" 1a MINIMUM EMBANKMENT WIDTH (IN FEET) FOR INITIAL FILL ENVELOPE (12.6.6.2): • SPAN < 24": 3.OS • SPAN 24" - 112": S + 4'-0" 2 THE FOUNDATION UNDER THE PIPE ARCH AND SIDE BACKFILL SHALL BE ADEQUATE TO SUPPORT THE LOADS ACTING UPON IT (26.5.2). 3 ENGINEER TO DETERMINE IF BEDDING IS REQUIRED. BEDDING MATERIAL SHALL BE A RELATIVELY LOOSE MATERIAL THAT IS ROUGHLY SHAPED TO FIT THE BOTTOM OF THE PIPE ARCH, AND A MINIMUM OF TWICE THE CORRUGATION DEPTH IN THICKNESS, WITH THE MAXIMUM PARTICLE SIZE OF ONE-HALF OF THE CORRUGATION DEPTH (26.3.8.1). WIDTH OF BEDDING TO BE EXTENTS OF THE INVERT OF THE PIPE ARCH (26.5.3, FIG. 26.5.3-1). 4 CORRUGATED ALUMINUM PIPE ARCH (CAPA) [CORLIX PIPE ARCH]. 5 HAUNCH ZONE MATERIAL SHALL BE HAND SHOVELED OR SHOVEL SLICED INTO PLACE TO ALLOW FOR PROPER COMPACTION (26.5.2 & 26.5.4). 5a INITIAL BACKFILL FOR PIPE EMBEDMENT TO MEET AASHTO A-1, A-2 OR A-3 CLASSIFICATION, OR APPROVED EQUAL, COMPACTED TO 90% STANDARD PROCTOR (T 99). MAXIMUM PARTICLE SIZE NOT TO EXCEED 3" (12.4.1.2). ALL LIFTS SHALL BE PLACED IN A CONTROLLED MANNER. IT IS RECOMMENDED THAT LIFTS NOT EXCEED AN 8" UNCOMPACTED LIFT HEIGHT TO PREVENT UNEVEN LOADING, AND THE LESSER OF 1/3 THE SPAN OR 24" AS THE MAXIMUM DIFFERENTIAL SIDE -TO -SIDE (26.5.4). 6 INITIAL BACKFILL ABOVE PIPE ARCH MAY INCLUDE ROAD BASE MATERIAL (AND RIGID PAVEMENT IF APPLICABLE).SEE TABLE ABOVE. INITIAL BACKFILL OF 7.50" PER ENGINEER OF RECORD 6a TOTAL HEIGHT OF COMPACTED COVER FOR CONVENTIONAL HIGHWAY LOADS IS MEASURED FROM TOP OF PIPE ARCH TO BOTTOM OF FLEXIBLE PAVEMENT OR TOP OF RIGID PAVEMENT (12.6.6.3). 7 FINAL BACKFILL MATERIAL SELECTION AND COMPACTION REQUIREMENTS SHALL FOLLOW THE PROJECT PLANS AND SPECIFICATIONS PER THE ENGINEER OF RECORD (26.5.4.1). PER ENGINEER OF RECORD, 10.5" CLEAN ROCK WITH 40% POROSITY. NOT TO SCALE NOTES: • ENGINEER TO DETERMINE IF GEOTEXTILE SHOULD BE CONSIDERED FOR USE TO PREVENT SOIL MIGRATION INTO VARYING SOIL TYPES (PROJECT ENGINEER). • FOR MULTIPLE BARREL INSTALLATIONS THE RECOMMENDED STANDARD SPACING BETWEEN PARALLEL PIPE ARCH RUNS SHALL BE SPAN/3 BUT NO LESS THAN 12", OR 36" FOR PIPE ARCH SPANS 108" AND LARGER. CONTACT YOUR CONTECH REPRESENTATIVE FOR NONSTANDARD SPACING (SEE TABLE C12.6.7-1). TYPICAL BACKFILL DETAIL NOT TO SCALE R-408348 C721IONTECH ® A� uTCA�J® ��,,,1` 11 1R 35 x24 PERFORATED UNDERGROUND RETENTION SYSTEM-624723.040 PROJECT No.: 624723 SEC. No.: 040 DATE 3/3/2020 DESIGNED: DRAWN. `IMLOW C = ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS FUPC (FUNDAMENTALIST UKRANIAN PENTECOSTALIST CHURCH) KET JPC/DJB CHECKED: JSD/JMD APPROVED: JSD/JMD www.ContechES.com CONTECH RENTON, WA 11815 NE Glenn Widing Drive, Portland, OR 97220 PROPOSAL SITE DESIGNATION: FUCP BASIN #4 SHEET NO.: 800-548-4667 503-240-3393 800-561-1271 FAX DRAWING 61 of 65 PERMIT SUBMITTAL REVISION BY I DATE / O 1 �U00001) Call before you dig SURVEYED: GEODETIC SURVEYING SERVICE DESIGNED: DRAWN: CHECKED: P RI APPROVED: SCALE: AS INDICATED ON DRAWING ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM CALL 811 (2) BUSINESS DAYS BEFORE YOU DIG (UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE) CITY OF RENTON Planning/Building/Public Works Dept. R-408348 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING % Nathan Janders 03/19/2020 ' FIRST UKRAINIAN PENTECOSTAL CHURCH 3811 NE 21 ST ST RENTON, WA 98056 SITE DESIGNATION: FUPC BASIN #4 DATE: 02-25-20 FIELDBOOK: PAGE: DRAWING NO: SHEET: OF: 61 65 H H 00 Q J 2 U OC D U J Q U) O U LU Z LU 0— Z Q Z_ Q Irn — V ) H