Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_210428DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: April 28, 2021 PROJECT NAME/NUMBER: PR21-000001 Madsen Creek Flood Control Improvement Project / LUA21-000147, ECF, CAE PROJECT LOCATION: 15711 152nd Ave SE & 14937 Maple Valley Hwy (APN's 2323059021, 2323059020, 2323059028, 2323059070, 2323059118) APPLICANT/PROJECT CONTACT PERSON: Amanda Pierce, City of Renton / 1055 S Grady Way, Renton, WA 98057 / apierce@rentonwa.gov LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/Ebi2HiA PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Critical Areas Exemption for the Madsen Creek Flood Improvement Project. The proposed project consists of four (4) sites requiring improvements to restore and increase the lower Madsen Creek network flood protection and capacity, as well as provide routine maintenance measures. Site 1 work consists of raising the berm surrounding the sediment basin and adding an emergency spillway that discharges to the high flow bypass channel. Site 2 work consists of widening the high flow bypass channel and removing accumulated sediments, as well as raising the right (east) bank of the upper high flow bypass channel to eliminate the low spot acting as a weir diverting flows to the low flow channel. Site 3 work would raise the elevation of the left (south) bank from the private property (14937 Maple Valley Hwy) through Wonderland Estates to the low flow culvert under SR 169. The banks would be raised through a shallow floodwall and flood control berm. Site 4 work would remove the existing Eco Block wall along the right (north) bank of the low flow channel between the outlet of the SR 169 culvert to the 149th Ave SE culvert entrance and replace it with a flood control berm. In addition to these improvements, the high flow bypass capacity will be increased, and maintenance actions and agreements will be implemented. The project site is mapped with a Type F stream, flood hazard area, seismic hazard area, wetlands, wellhead protection area, zone 2, sensitive slopes, and protected slopes. DATE OF APPLICATION: April 26, 2021 NOTICE OF COMPLETE APPLICATION: April 28, 2021 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give no tice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS. PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Critical Areas Exemption Review OTHER PERMITS WHICH MAY BE REQUIRED: Construction Permit REQUESTED STUDIES: Wetland Report, Stream Study, Flood Hazard Data, Habitat Data Report, Geotechnical Report CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Residential High Density (RHD), Residential Low Density (RLD) on the City of Renton Comprehensive Land Use Map and Residential-14 (R-14), Resource Conservation (RC) on the City’s Zoning Map. NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR21-000001 Madsen Creek Flood Control Improvement Project / LUA21-000147, ECF, CAE NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-050 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting. Comments on the above application must be submitted in writing to Jill Ding, Senior Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on May 12, 2021. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request. CONTACT PERSON: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov