HomeMy WebLinkAboutCM_Hardy Short Plat_Construction Mitigation_210406_v1Hardy Short Plat 857 Field Ave NE, Renton, WA Single Family Residence CONSTRUCTION MITIGATION Proposed Construction Dates (begin and end dates): Start of construction is proposed for the Winter/Spring of 2022 with the demolition of the existing structures (house and outbuilding) and installation of utilities. Completion of construction improvements is proposed for summer 2022. Hours and days of operation: 8:00 am to 5:30 pm, Monday through Friday or as otherwise allowed by City of Renton. Proposed Hauling/ Transportation routes: Materials and labor to the site are proposed from NE 4th Street and Field Ave NE. Transportation access will be from Field Ave NE with on-site parking and material storage within the existing driveway and house footprint area at the front of the property. Measures to minimize construction activities: The minimal construction activity will be necessary to provide the required public and private improvements for this project. City required frontage improvements, per PRE 20-000160 will include ripping out existing improvements from the curb and gutter to the back of walk and replacing with the existing City standard. It is planned to minimize public disturbance and as much as is feasible, provide adequate pedestrian access during the new construction. Special hours: No special hours are necessary to complete construction. Weekend work may be necessary to complete the project on schedule; this will be determined by owner, contractor, and City of Renton. Preliminary Traffic Control Plan: Coordination with the City of Renton staff will be necessary to minimize disruption to vehicle and pedestrian traffic on Field Ave NE. Once a contractor is selected, a traffic control plan will be submitted and approved prior to the pre- construction meeting with the City of Renton. This plan will be implemented prior to any construction activities.