Proposed Construction Dates (begin and end dates): Start of construction is proposed for the
Winter/Spring of 2022 with the demolition of the existing structures (house and outbuilding) and
installation of utilities. Completion of construction improvements is proposed for summer 2022.
Hours and days of operation: 8:00 am to 5:30 pm, Monday through Friday or as otherwise
allowed by City of Renton.
Proposed Hauling/ Transportation routes: Materials and labor to the site are proposed from
NE 4th Street and Field Ave NE. Transportation access will be from Field Ave NE with on-site
parking and material storage within the existing driveway and house footprint area at the front
of the property.
Measures to minimize construction activities: The minimal construction activity will be
necessary to provide the required public and private improvements for this project. City required
frontage improvements, per PRE 20-000160 will include ripping out existing improvements from
the curb and gutter to the back of walk and replacing with the existing City standard. It is
planned to minimize public disturbance and as much as is feasible, provide adequate pedestrian
access during the new construction.
Special hours: No special hours are necessary to complete construction. Weekend work may be
necessary to complete the project on schedule; this will be determined by owner, contractor, and
City of Renton.
Preliminary Traffic Control Plan: Coordination with the City of Renton staff will be
necessary to minimize disruption to vehicle and pedestrian traffic on Field Ave NE. Once a
contractor is selected, a traffic control plan will be submitted and approved prior to the pre-
construction meeting with the City of Renton. This plan will be implemented prior to any
construction activities.