HomeMy WebLinkAbout20160674E003 Bethany Corner 2021-05-04 TESC 014.pdfCONSTRUCTION ENTRANCE: SITE RESTRICTED ACCESS:
WHEEL WASH: SEDIMENT TRACK OUT:
ROADWAY SURFACE: CATCH BASIN:
LIMITS: BUFFER AREA STABILIZATION
SILT FENCING CONCRETE WORK:
(sidewalks, curbing, foundation)
COVER MEASURES OVERALL: STRAW:
PLASTIC SHEETING: HYDROSEED:
CONVEYENCE CHANNEL: CHECK DAMS:
STOCKPILE COVER: PIPE SLOPE DRAINS:
LEVEL SPREADER: LANDSCAPING/MULCH:
SEDIMENT POND TRAP: SEDIMENT POND INLET/OUTLET:
SEDIMENT POND SIDE
SLOPES:
SURFACE WATER OBSERVATION:
(creek, wetland, or lake)
(clear, turbid, sheen)
WATER QUALITY SAMPLE: TURBIDITY (NTU) CORRECTIVE ACTIONS:
SAMPLE LOCATION pH:
OVERALL: CONFIRMATIONS OF PAST CORRECTIONS:
AREAS OF CONCERN:
TEMPORARY EROSION AND SEDIMENT CONTROL MONITORING CSWGP: TESC REPORT NO:
DATE: PREVIOUS VISIT DATE:
TIME: WEATHER:
PROJECT NAME:
PROJECT LOCATION:
AESI PROJECT NO:
CLIENT NAME:
CITY: MUNICIPALITY:
AESI PROJECT MANAGER:
RAINFALL (inches):
24 HOURS
PAST WEEK
QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS)
Associated Earth Sciences, Inc.
911 5TH AVE | KIRKLAND WA 98033 www.aesgeo.com
This site ☐ is in compliance ☐ is not in compliance with the terms and conditions of the SWPPP and the NPDES discharge permit.
v. 1/21
INSPECTOR: Josh Greer DATE: AESI PM: DATE:
I certify that this report is true, accurate and complete, to the best of my knowledge. This form to be filed in a weekly site logbook and copies sent to the contractor and client manager.
ADDITIONAL COMMENTS:
SAMPLE LOCATION APPROXIMATE FLOW TURBIDITY NTU/ TRANSPARENCY PH COMPLIANCE
DATE: CSWGP: AESI PROJECT NO: TESC REPORT NO:
TEMPORARY EROSION AND SEDIMENT CONTROL MONITORING
Associated Earth Sciences, Inc.
911 5TH AVE | KIRKLAND WA 98033 www.aesgeo.com
Page 2
v. 1/21