HomeMy WebLinkAboutM_HEX_Exhibit Page_VEK on Aberdeen TownhomesCITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
HEARING EXAMINER DECISION
EXHIBITS
Project Name:
VEK on Aberdeen Townhomes Plat
Project Number:
LUA19-000280, PP, SA-A, ECF, MOD, MOD, MOD
Date of Hearing
May 11, 2021
Staff Contact
Angelea Weihs
Associate Planner
Project Contact/Applicant
Nicole Mecum, PE
Encompass Engineering and Surveying
165 NE Juniper St., Suite 201
Issaquah, WA 98027
Project Location
957 Aberdeen Ave NE
The following exhibits are included with the Hearing Examiner Decision:
Exhibits 1-19: As shown in the Environmental Review Committee (ERC) Report
Exhibits 20-27 As shown in the Staff Report to the Hearing Examiner
Exhibit 28: Staff PowerPoint
Exhibit 29: Google Earth, https://www.google.com/earth/
Exhibit 30: COR Maps, http://rp.rentonwa.gov/Html5Public/Index.html?viewer=CORMaps
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
HEARING EXAMINER DECISION
EXHIBITS
The following exhibits are included with the ERC Report:
The following exhibits are included with the Staff Report to the Hearing Examiner:
Exhibits 1-19: As shown in the Environmental Review Committee (ERC) Report
Exhibit 20: Staff Report to the Hearing Examiner
Exhibit 21: Environmental “SEPA” Determination and ERC Mitigation Measures
Exhibit 22: Project Public Meeting Notice
Exhibit 23: Unit Lot Drive Modification Justification
Exhibit 24: Open Space Modification Justification
Exhibit 25: Density Worksheet
Exhibit 26: Townhome Color Rendering
Exhibit 27: Traffic Concurrency Test dated April 27, 2021
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Neighborhood Detail Map
Exhibit 4: Unit Lot Subdivision Plat Map
Exhibit 5: Landscape Plan and Tree Retention Worksheet, prepared by Cramer Design Consultants, Inc., dated June, 13,
2019
Exhibit 6: Tree Retention Plan, prepared by Cramer Design Consultants, Inc., dated December 11, 2020
Exhibit 7: Arborist Report, prepared by Shoffner Consulting, dated January 11, 2021
Exhibit 8: Design Review Package with Floor Plans and Building Elevations, pr epared by Monsef Design Studio, dated
December 11, 2020
Exhibit 9: Preliminary Technical Information Report, prepared by Encompass Engineering & Surveying, dated December
11, 2020
Exhibit 10: Civil Plan Set (Cover Sheet, Preliminary Grading & Drainage, Preliminary Sewer & Water Plan, Street Profile and
Cross Sections), prepared by Encompass Engineering & Surveying, dated December 11, 2020
Exhibit 11: Geotechnical Engineering Report, prepared by The Riley Group, Inc., dated September 2, 2020
Exhibit 12: Environmental Checklist
Exhibit 13: Construction Mitigation Description
Exhibit 14: Supplemental letter from The Riley Group, Inc., dated April 23, 2020
Exhibit 15: Secondary Geotechnical Engineering Review letters, prepared by GeoEngineers, dated October 15, 2020 and
October 30, 2020
Exhibit 16: Critical Area Designation, prepared by Beaver Creek Environmental Services, Inc., dated October 16, 2020, and
Wetland Buffer Mitigation Plan prepared by Beaver Creek Environmental Services, Inc., dated February 22, 2021
Exhibit 17: Street Modification Request
Exhibit 18: Traffic Technical Memo
Exhibit 19: Advisory Notes