Loading...
HomeMy WebLinkAboutM_HEX_Exhibit Page_VEK on Aberdeen TownhomesCITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT HEARING EXAMINER DECISION EXHIBITS Project Name: VEK on Aberdeen Townhomes Plat Project Number: LUA19-000280, PP, SA-A, ECF, MOD, MOD, MOD Date of Hearing May 11, 2021 Staff Contact Angelea Weihs Associate Planner Project Contact/Applicant Nicole Mecum, PE Encompass Engineering and Surveying 165 NE Juniper St., Suite 201 Issaquah, WA 98027 Project Location 957 Aberdeen Ave NE The following exhibits are included with the Hearing Examiner Decision: Exhibits 1-19: As shown in the Environmental Review Committee (ERC) Report Exhibits 20-27 As shown in the Staff Report to the Hearing Examiner Exhibit 28: Staff PowerPoint Exhibit 29: Google Earth, https://www.google.com/earth/ Exhibit 30: COR Maps, http://rp.rentonwa.gov/Html5Public/Index.html?viewer=CORMaps CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT HEARING EXAMINER DECISION EXHIBITS The following exhibits are included with the ERC Report: The following exhibits are included with the Staff Report to the Hearing Examiner: Exhibits 1-19: As shown in the Environmental Review Committee (ERC) Report Exhibit 20: Staff Report to the Hearing Examiner Exhibit 21: Environmental “SEPA” Determination and ERC Mitigation Measures Exhibit 22: Project Public Meeting Notice Exhibit 23: Unit Lot Drive Modification Justification Exhibit 24: Open Space Modification Justification Exhibit 25: Density Worksheet Exhibit 26: Townhome Color Rendering Exhibit 27: Traffic Concurrency Test dated April 27, 2021 Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Site Plan Exhibit 3: Neighborhood Detail Map Exhibit 4: Unit Lot Subdivision Plat Map Exhibit 5: Landscape Plan and Tree Retention Worksheet, prepared by Cramer Design Consultants, Inc., dated June, 13, 2019 Exhibit 6: Tree Retention Plan, prepared by Cramer Design Consultants, Inc., dated December 11, 2020 Exhibit 7: Arborist Report, prepared by Shoffner Consulting, dated January 11, 2021 Exhibit 8: Design Review Package with Floor Plans and Building Elevations, pr epared by Monsef Design Studio, dated December 11, 2020 Exhibit 9: Preliminary Technical Information Report, prepared by Encompass Engineering & Surveying, dated December 11, 2020 Exhibit 10: Civil Plan Set (Cover Sheet, Preliminary Grading & Drainage, Preliminary Sewer & Water Plan, Street Profile and Cross Sections), prepared by Encompass Engineering & Surveying, dated December 11, 2020 Exhibit 11: Geotechnical Engineering Report, prepared by The Riley Group, Inc., dated September 2, 2020 Exhibit 12: Environmental Checklist Exhibit 13: Construction Mitigation Description Exhibit 14: Supplemental letter from The Riley Group, Inc., dated April 23, 2020 Exhibit 15: Secondary Geotechnical Engineering Review letters, prepared by GeoEngineers, dated October 15, 2020 and October 30, 2020 Exhibit 16: Critical Area Designation, prepared by Beaver Creek Environmental Services, Inc., dated October 16, 2020, and Wetland Buffer Mitigation Plan prepared by Beaver Creek Environmental Services, Inc., dated February 22, 2021 Exhibit 17: Street Modification Request Exhibit 18: Traffic Technical Memo Exhibit 19: Advisory Notes