HomeMy WebLinkAbout0895.06 SWFR 311.pdf CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
AES 0895.06 1 of 3 311
Time On Site Time Off Site Date Day of Week
9:15 9:45 5/6/21 Thursday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
• Silt Fence
G N -Chain link fence installed along site perimeter
2. Establish Construction Access
• Fabric; Quarry Spalls
• Wheel Wash
• Sweeper Truck
F N
-Wheel wash onsite
-Quarry spall construction entrance
- Light track out observed, continue to sweep
offsite roads during trucking ops
3. Control Flow Rates
• Stormwater Vault or Facility
• Straw Wattles
• Check Dams
G N -Onsite stormwater vault plugged
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
• Straw
• Sediment Ponds, Traps & Filters
• Treatment
• Sediment Pond (Temp. or Perm.)
• Water Truck
F Y
-Silt fence installed around majority of site perimeter
-Stormwater sump SE of construction entrance
-Subsurface drain installed under construction
entrance to divert water to sump
-Straw wattles N of entrance to divert water to sump
-Damaged silt fence observed north of
construction entrance and in the northwest
corner of site, recommend repair
5. Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock
• Hydroseeding; Grass
• Plastic Sheeting
• Straw Stockpiles
• Stockpiles
• PAM
F N -Exposed soils in active use throughout site
6. Protect Slopes
• Benching; Track-Walking
• Pipe Slope Drains
• Plastic Sheeting; Anchors
G N -Straw wattles in place to divert water away from
slopes along western perimeter
-Slopes covered in straw
7. Protect Drain Inlets
• Catch Basin Inserts
• Gutter; Road
G N -CB inserts installed in offsite catch basins
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
- - N/A
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling
G N -Stormwater treated with dry ice to lower pH to
suitable levels
-Chemical/material storage onsite
10. Control Dewatering G N -Via KC Sewer Discharge Permit as needed
11. Maintain BMPs F Y -See Action Items below
12. Maintain SWPPP & Site Logbook G N -Available upon request
13. Protect Low-Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
- - N/A
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
AES 0895.06 2 of 3 311
Time On Site Time Off Site Date Day of Week
9:15 9:45 5/6/21 Thursday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No
List the completed, not-yet-completed, or ongoing action items in the table below:
Actions Items Completed?
(Yes; No; Ongoing)
Date
(If Completed)
Sweep offsite roads O 5/30/21
Repair silt fence north of construction entrance N
Repair silt fence at northwestern corner N
Current Weather: 61°F, Overcast
Precipitation since last inspection (approximate): 0.41 inches
Precipitation in the last 24 hours (approximate): 0.00 inches
Type of Visit: Weekly Post–Storm Event
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Characterize the stormwater discharge, e.g., the presence of suspended sediment, “cloudiness”, discoloration, or oil sheen, if
present: ____________________________________________________________________________________________
• Hanna Turbidity Meter # ESNW 10
Monitoring Location Turbidity
(NTU) pH Notes
Is the site in compliance with the SWPPP and the permit requirements? Yes No
If “No”:
• Indicate the tasks necessary to bring the site into compliance in the table above.
• Has the non-compliance been reported to the Department of Ecology? Yes No
• Should the SWPPP be modified? Yes No
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Inspector Name: Alexandra Shaner CESCL Number: ECO-3-9272007 Inspection Date: May 6, 2021
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
AES 0895.06 3 of 3 311
Time On Site Time Off Site Date Day of Week
9:15 9:45 5/6/21 Thursday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
BMP LEGEND
MONITORING POINT
JOB SHACK
WHEEL WASH
STORMWATER VAULT
TEMPORARY SEDIMENT POND/TRAP
WATTLE
SILT FENCE
CONSTRUCTION ENTRANCE
SUBSURFACE DRAIN
CHEMICAL/MATERIAL STORAGE
CATCH BASIN INSERT
Damaged sections
of silt fence