Loading...
HomeMy WebLinkAboutW_Waiver_RSD_Elementary_16_210425 (2).pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE APPICATIONS Planning Division - 1055 South Grady way - Renton, WA 98057 - Phone: 425-430-7200 - www.rentonwa.gov LAND USE PERMIT SUBMITTAL REQUIREMENT COMMENTSCHANGED BYTYPE RequiredAffidavit - Public Information Signs Installation WaivedAffidavit - Public Outreach Signs Installation RequiredArborist Report RequiredArchitectural Elevations WaivedBiological Assessment / Critical Areas Study RequiredColored Rendering RequiredConstruction Mitigation Description RequiredConstruction Mitigation Description Included in submittal (checked by MSS 4-14-21) RequiredCovenants, Existing WaivedDensity Worksheet RequiredDraft Deed of Dedication of Land - Public Purposes Provide draft dedication document for street frontage WaivedDraft Homeowners’ Association Documents ModifiedDraft Legal Documents Provide draft REETA WaivedDraft Restrictive Covenants RequiredDrainage Control Plan Included in submittal (checked by MSS 4-14-21) RequiredDrainage Report Included in submittal (checked by MSS 4-14-21) RequiredEasements, Existing Provide copies of easement in-lieu of links RequiredEnvironmental Checklist WaivedFlood Hazard Data RequiredFloor Plans RequiredGeotechnical Report Included in submittal (checked by MSS 4-14-21) RequiredGrading Elevations and Plan, Conceptual Included in submittal (checked by MSS 4-14-21) WaivedHabitat Data Report WaivedHazardous Materials Management Statement RequiredJustification for Modification Request RequiredLand Use Master Application Form RequiredLandscape Analysis, Lot Coverage, Parking Analysis RequiredLandscape Plan, Conceptual WaivedLandscape Plan, Detailed RequiredLegal Description RequiredLetter of Understanding - Geologic Risk RequiredNeighborhood Detail Map WaivedPlat Certificate LAND USE PERMIT SUBMITTAL REQUIREMENT COMMENTSCHANGED BYTYPE RequiredPre-Application Meeting Summary RequiredProject Narrative WaivedProof of Neighborhood Meeting RequiredRezone, Var/Mod/Conditional Use Justification RequiredScreening Detail, Refuse/Recycling RequiredSite Plan WaivedSiting Process Report WaivedStream and Lake Mitigation Plan WaivedStream or Lake Study RequiredSurvey RequiredTitle Report RequiredTopography Map RequiredTraffic Study Included in submittal (checked by MSS 4-14-21) RequiredTree Retention Worksheet RequiredTree Retention/Land Clearing Plan WaivedUrban Design Regulations Review Packet RequiredUtilities Plan, Generalized Included in submittal (checked by MSS 4-14-21) RequiredWaiver Form RequiredWetland Assessment ModifiedWetland Mitigation Plan - Preliminary Matt H Wetland buffer mitigation plan RequiredWetlands Delineation Map PROJECT NAME:RSD Elementary #16 DATE: 4/25/2021