HomeMy WebLinkAbout20200428-20121-MR-SapphireOnTalbot-B19004817-TMS042820B11/1 4000 @ 28 Days
22
65
52
63 Design
6
10:10 AM
Shotcrete CDF Grout Nonshrink
Grout
C138 C1140 D4832 C109 C109
C172 C1019
C231 C31
C1611
C1758
Date
Tested
Age
(days)
Diameter /
Width (in.)
Length
(in.)
Height
(in.)
Correction
Factor
Area
(in2)
Max Load
(lbs.)
Strength
(psi)
Fracture
Type Tested By
C01272 A 5/5/2020 7 4.01 8.0 1.00 12.62 51,920 4,110 1 Chris London
C01272 B 5/26/2020 28
C01272 C 5/26/2020 28
C01272 D 5/26/2020 28
C01272 E H
Date
Sample ID
4X8 Nominal Size (In.)
Added Water (Gal)
Allowed Water (Gal)
09:32 AM
Load Size
Slag / Fly Ash
Sand
Sample Time
Aggregate
Water
Admixture
Admixture
Admixture
Aggregate
Box
Slump (In.)
Min. Temp. (°F)
Lab Remarks
Reviewed By:
Truck No.
Ticket No.
Air Spec. (%)
Slump Spec. (In.)
Curing Method
Batch Time
C31
C143
Concrete
C1621
C1064
FIELD TESTS PERFORMED (ASTM)
Field Cures
AEA
Capping
Method
C173
17
Contractor
Compressive
Strength
Method
Other
CONFORMING
NON-CONFORMING Nick Averill
Average Strength
Max Temp. (°F) Aggregate
Product Info.
Specified Strength (f'c)
Mix Design Approved
C-39
Unit
Weight
C-1231
By Whom
4000
Yes
0164
308591
11
4-6
Total Yardage
Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD
Cement Air Content (%)
Concrete Temp. (°F)Actual
Project No.
Project Name
Address
Supplier
Plant No.
Mix No.
Contact
Company
Address
City
Contractor
Retention Vault walls - perimeter & interior
Set No.
Sample Yardage
Troy Schmeil
Sapphire Homes, Inc.
16805 SE 43rd Court
Corliss
001
J15500
Mix Design Strength
CONCRETE MATERIALS REPORT
04/28/2020
TMS042820B1
Teddy Seybold
B19004817
Inspection Date
Report No.
Inspectors Name
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
CLIENT INFORMATION PROJECT INFORMATION
20-121
Sapphire on Talbot
4827 Talbot Road S
Renton City
Permit No.
On-site for concrete inspection of walls at Sapphire on Talbot. Concrete placed by boom truck and mechanically consolidated. One set of five cylinders created: 7 day, 28 day (3), hold. See report
#SAT042020B for grids & reinforcement. Concrete placement maintained reinforcement clearances.
Gridlines
Bellevue
Location
Field Remarks
STRENGTH REQUIREMENTSFIELD TEST DATA
05/10/2020
2:55:13 PM