Loading...
HomeMy WebLinkAbout20200428-20121-MR-SapphireOnTalbot-B19004817-TMS042820B11/1 4000 @ 28 Days 22 65 52 63 Design 6 10:10 AM Shotcrete CDF Grout Nonshrink Grout C138 C1140 D4832 C109 C109 C172 C1019 C231 C31 C1611 C1758 Date Tested Age (days) Diameter / Width (in.) Length (in.) Height (in.) Correction Factor Area (in2) Max Load (lbs.) Strength (psi) Fracture Type Tested By C01272 A 5/5/2020 7 4.01 8.0 1.00 12.62 51,920 4,110 1 Chris London C01272 B 5/26/2020 28 C01272 C 5/26/2020 28 C01272 D 5/26/2020 28 C01272 E H Date Sample ID 4X8 Nominal Size (In.) Added Water (Gal) Allowed Water (Gal) 09:32 AM Load Size Slag / Fly Ash Sand Sample Time Aggregate Water Admixture Admixture Admixture Aggregate Box Slump (In.) Min. Temp. (°F) Lab Remarks Reviewed By: Truck No. Ticket No. Air Spec. (%) Slump Spec. (In.) Curing Method Batch Time C31 C143 Concrete C1621 C1064 FIELD TESTS PERFORMED (ASTM) Field Cures AEA Capping Method C173 17 Contractor Compressive Strength Method Other CONFORMING NON-CONFORMING Nick Averill Average Strength Max Temp. (°F) Aggregate Product Info. Specified Strength (f'c) Mix Design Approved C-39 Unit Weight C-1231 By Whom 4000 Yes 0164 308591 11 4-6 Total Yardage Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD Cement Air Content (%) Concrete Temp. (°F)Actual Project No. Project Name Address Supplier Plant No. Mix No. Contact Company Address City Contractor Retention Vault walls - perimeter & interior Set No. Sample Yardage Troy Schmeil Sapphire Homes, Inc. 16805 SE 43rd Court Corliss 001 J15500 Mix Design Strength CONCRETE MATERIALS REPORT 04/28/2020 TMS042820B1 Teddy Seybold B19004817 Inspection Date Report No. Inspectors Name AAR TESTING AND INSPECTION, INC. 7126 180th Ave NE, Suite C101 Redmond, WA 98052 425-881-5812 CLIENT INFORMATION PROJECT INFORMATION 20-121 Sapphire on Talbot 4827 Talbot Road S Renton City Permit No. On-site for concrete inspection of walls at Sapphire on Talbot. Concrete placed by boom truck and mechanically consolidated. One set of five cylinders created: 7 day, 28 day (3), hold. See report #SAT042020B for grids & reinforcement. Concrete placement maintained reinforcement clearances. Gridlines Bellevue Location Field Remarks STRENGTH REQUIREMENTSFIELD TEST DATA 05/10/2020 2:55:13 PM