HomeMy WebLinkAbout20200513-20121-FR-SapphireonTalbot-B19004817-JAH051320A-RCDAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection Date
05/13/2020
Report Number
JAH051320A
Inspectors Signature
Inspectors Name
James Huggins
Report Date
05/13/2020
Reviewers Signature Reviewed By
Teajalam (TJ) Gounden
Reviewed Date
05/14/2020
BDAE35A0-A757-47B6-B213-0ED06DBE912E
CLIENT INFORMATION PROJECT INFORMATION
Contact Troy Schmeil Project No.20-121
Company Sapphire Homes, Inc.Project Name Sapphire on Talbot
Address 16805 SE 43rd Court Address 4827 Talbot Road S
City Bellevue City Renton
Contractor ARH Permit No.B19004817
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Concrete Placement Infiltration vault lid.
Weather
Overcast
Temperature (°F)
55
Start Time
09:00 AM
End Time
12:00 PM
DRAWINGS / DOCUMENTS REFERENCED
INSPECTION OBSERVATION / REMARKS
Concrete Sampling and Testing:
As requested I was on site to conduct concrete sampling and testing. The contractor placed concrete for the infiltration vault lid. I performed
slump, temperature, air testing on the fresh concrete. In addition, I cast a total of one set of five 4x8 for the concrete, and one set of five for
the grout for concrete cylinders specimens for concrete compressive strength testing. The cylinder samples will be kept on site overnight for the
initial curing and then transported to the laboratory for further curing and testing.
The test results are as follows for the Corliss approved concrete mix number P13010:
Sample 1: Truck No. 166, Ticket No. 152800, Slump 5.50”, Concrete Temp. 64 F.
The test results are as follows for the Corliss approved grout mix number J41010:
Sample 1: Truck No. 148, Ticket No. 152803, grout Temp. 65 F.
Items inspected are in conformance with approved plans, specifications and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection Date
05/13/2020
Report Number
JAH051320A
Inspectors Signature
Inspectors Name
James Huggins
Report Date
05/13/2020
Reviewers Signature Reviewed By
Teajalam (TJ) Gounden
Reviewed Date
05/14/2020
BDAE35A0-A757-47B6-B213-0ED06DBE912E
PHOTOS
Infiltration vault lid concrete placement.Concrete ticket for the concrete that was sampled and placed.
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection Date
05/13/2020
Report Number
JAH051320A
Inspectors Signature
Inspectors Name
James Huggins
Report Date
05/13/2020
Reviewers Signature Reviewed By
Teajalam (TJ) Gounden
Reviewed Date
05/14/2020
BDAE35A0-A757-47B6-B213-0ED06DBE912E
Grout ticket for the grout that was sampled and placed.