Loading...
HomeMy WebLinkAbout20200415-20121-MR-SapphireOnTalbot-B1994817-JCC041529A1/1 3000 @ 28 Days 11 45 52 64 Design 1.8 5.25 08:30 AM Shotcrete CDF Grout Nonshrink Grout C138 C1140 D4832 C109 C109 C172 C1019 C231 C31 C1611 C1758 Date Tested Age (days) Diameter / Width (in.) Length (in.) Height (in.) Correction Factor Area (in2) Max Load (lbs.) Strength (psi) Fracture Type Tested By C01232 A 4/22/2020 7 4.00 8.0 1.00 12.56 29,582 2,360 2 Chris London C01232 B 5/13/2020 28 4.01 8.0 1.00 12.62 46,460 3,680 2 Chris London C01232 C 5/13/2020 28 4.01 8.0 1.00 12.62 47,030 3,730 1 Chris London C01232 D 5/13/2020 28 4.01 8.0 1.00 12.62 47,850 3,790 5 Chris London C01232 E H 3,730 Y Date Sample ID 4X8 Nominal Size (In.) Added Water (Gal) Allowed Water (Gal) 07:10 AM Load Size Slag / Fly Ash Sand Sample Time Aggregate Water Admixture Admixture Admixture Aggregate Slump (In.) Min. Temp. (°F) Lab Remarks Reviewed By: Truck No. Ticket No. Air Spec. (%) Slump Spec. (In.) Curing Method Batch Time C31 C143 Concrete C1621 C1064 FIELD TESTS PERFORMED (ASTM) Field Cures AEA Capping Method C173 10 Contractor Compressive Strength Method Other CONFORMING NON-CONFORMING Nick Averill Average Strength Max Temp. (°F) Aggregate Product Info. Specified Strength (f'c) Mix Design Approved C-39 Unit Weight C-1231 By Whom 3000 Yes 0167 308185 11.0 Natural air Not to exceed W/C Total Yardage Ambient Temp. (°F)REPORTED BATCH WEIGHTS PER CUBIC YARD Cement Air Content (%) Concrete Temp. (°F)Actual Project No. Project Name Address Supplier Plant No. Mix No. Contact Company Address City Contractor Vault footings, cells 1 and 2 NA Set No. Sample Yardage Troy Schmeil Sapphire Homes, Inc. 16805 SE 43rd Court Corliss Resources 1 - Sumner P13010 Mix Design Strength CONCRETE MATERIALS REPORT 04/15/2020 JCC041529A Jeremy Christensen B1994817 Inspection Date Report No. Inspectors Name AAR TESTING AND INSPECTION, INC. 7126 180th Ave NE, Suite C101 Redmond, WA 98052 425-881-5812 CLIENT INFORMATION PROJECT INFORMATION 20-121 Sapphire on Talbot 4827 Talbot Road S Renton City Permit No. See daily field report number JCC041520A for detailed observations. Gridlines Bellevue Location Field Remarks STRENGTH REQUIREMENTSFIELD TEST DATA 05/17/2020 9:26:34 AM