HomeMy WebLinkAbout20200428-20121-FR-SapphireonTalbot-B19004817-TMS042820B-RCDAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection Date
04/28/2020
Report Number
TMS042820B
Inspectors Signature
Inspectors Name
Teddy Seybold
Report Date
04/28/2020
Reviewers Signature Reviewed By
Teajalam (TJ) Gounden
Reviewed Date
04/29/2020
1895BCDD-3F54-47EA-84F1-3C5CA01F8D1A
CLIENT INFORMATION PROJECT INFORMATION
Contact Troy Schmeil Project No.20-121
Company Sapphire Homes, Inc.Project Name Sapphire on Talbot
Address 16805 SE 43rd Court Address 4827 Talbot Road S
City Bellevue City Renton
Contractor Permit No.B19004817
INSPECTION TYPE(S)STRUCTURE(S) / LOCATION(S)
Reinforced Concrete Retention vault walls - perimeter & interior
Weather
Overcast
Temperature (°F)
52
Start Time
10:00 AM
End Time
DRAWINGS / DOCUMENTS REFERENCED
INSPECTION OBSERVATION / REMARKS
On-site for concrete inspection of walls at Sapphire on Talbot. Concrete placed by boom truck and mechanically consolidated. One set of five
cylinders created: 7 day, 28 day (3) and hold. See report #SAT042020B1 for reinforcement. Concrete placement maintained reinforcement
clearances.
Items inspected are in conformance with approved plans, specifications and jurisdictional requirements
DAILY FIELD REPORT
AAR TESTING AND INSPECTION, INC.
7126 180th Ave NE, Suite C101
Redmond, WA 98052
425-881-5812
Inspection Date
04/28/2020
Report Number
TMS042820B
Inspectors Signature
Inspectors Name
Teddy Seybold
Report Date
04/28/2020
Reviewers Signature Reviewed By
Teajalam (TJ) Gounden
Reviewed Date
04/29/2020
1895BCDD-3F54-47EA-84F1-3C5CA01F8D1A
PHOTOS