Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRS_Traffic Study_210416_v1.pdf16932 Woodinville-Redmond Road NE, Suite A206, Woodinville, WA 98072
425-883-4134 | tsinw.com
Sunset Gardens
Traffic Impact Analysis
PRE20-000244
Renton, WA
April 2021
Prepared for:
Anderson Construction,
Renton Housing Authority,
SMR Architects,
and
City of Renton
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions i April 2021
Table of Contents
Executive Summary ........................................................................................................................................1
Introduction ..................................................................................................................................................2
Development Description ......................................................................................................................................2
Study Area ..............................................................................................................................................................2
Methods and Assumptions ....................................................................................................................................2
Trip Generation, Distribution and Assignment ................................................................................................5
Trip Generation ......................................................................................................................................................5
Trip Distribution and Peak Hour Travel Assignment ..............................................................................................5
Existing Conditions .........................................................................................................................................7
Primary Roadways ..................................................................................................................................................7
Traffic Volumes ......................................................................................................................................................7
Transit Conditions ..................................................................................................................................................7
Crash Analysis ........................................................................................................................................................7
2022 Future Traffic Conditions ........................................................................................................................9
Future Without-Development ...............................................................................................................................9
Future With-Development .................................................................................................................................. 10
Traffic Operations ........................................................................................................................................ 10
Site Access Operations ........................................................................................................................................ 13
Parking ........................................................................................................................................................ 13
Parking Required ................................................................................................................................................. 13
Mitigation .................................................................................................................................................... 14
Offsite Mitigation ................................................................................................................................................ 14
Frontage Improvements ..................................................................................................................................... 14
City of Renton Traffic Impact Fee ....................................................................................................................... 14
Conclusions ................................................................................................................................................. 14
Appendix ..................................................................................................................................................... 15
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions ii April 2021
List of Tables
Table 1: Intersection V/C, LOS, and Delay Categories ............................................................................................. 2
Table 2: Trip Generation .......................................................................................................................................... 5
Table 3: Collision History ......................................................................................................................................... 9
Table 4: AM Peak Hour Intersection LOS Analysis ................................................................................................ 10
Table 5: PM Peak Hour Intersection LOS Analysis ................................................................................................. 10
Table 6: Future With-Development Vehicle Queues............................................................................................. 13
Table 7: Parking Required and Proposed .............................................................................................................. 14
List of Figures
Figure 1: Vicinity Map .............................................................................................................................................. 3
Figure 2: Conceptual Site Plan ................................................................................................................................. 4
Figure 3: AM and PM Peak Hour Trip Distribution and Travel Assignment ............................................................ 6
Figure 4: 2020 Existing AM and PM Peak Hour Volumes ........................................................................................ 8
Figure 5: 2022 Without-Development AM and PM Peak Hour Volumes .............................................................. 11
Figure 6: 2022 With-Development AM and PM Peak Hour Volumes ................................................................... 12
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 1 April 2021
EXECUTIVE SUMMARY
This Traffic Impact Analysis summarizes the traffic impacts associated with build-out of Sunset Gardens, a mixed-
use development at 2900 NE 10th Street.
The development program includes 76 affordable residential units and up to 11,000 sq. ft. of new office space
for the Renton Housing Authority (RHA). Build-out and full occupancy is anticipated by 2022.
Sunset Gardens is forecast to generate 181 new weekday daily trips, 31 new AM peak hour trips, and 19 new PM
peak hour trips.
With the development, study intersections are forecast to operate at LOS A or B in the AM and PM peak hours,
and no offsite mitigation is necessary.
Site access is proposed off Jefferson Ave West and the access is forecast to operate well, at LOS A, during the
AM and PM peak hours.
Vehicle queues with the development are not forecast to adversely impact site access or local circulation.
There are 55 onsite parking spaces proposed.
The year 2021 transportation impact fee for the development is estimated at $135,771.15.
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 2 April 2021
INTRODUCTION
This Traffic Impact Analysis documents the traffic impacts associated with Sunset Gardens, a mixed-use
development in the City of Renton. The purpose of this report is to identify potentially significant and adverse
traffic impacts resulting from the proposal and, where appropriate, outline programmatic and/or physical
improvements to minimize or eliminate those impacts.
This report is organized to generally follow the traffic impact analysis outline from the City of Renton.
Development Description
The Renton Housing Authority (RHA), the Applicant, is proposing to develop a mixed-use site to the northeast of
NE 10th Street and Jefferson Ave NE the City of Renton. The site is on land parcel 722790-0075 and is zoned
Center Village. A vicinity map highlighting the site location is attached as Figure 1.
The existing site includes 13,416 square feet of RHA office.
The Applicant proposes to replace the existing office space with up to 76 affordable one-bedroom studio units
and up to 11,000 square feet new office space for RHA. Site access is proposed off Jefferson Ave NE. Full build-
out is anticipated by 2022. A site plan is attached as Figure 2.
Study Area
The study area was reviewed with City staff and includes the following intersections: (1) NE 10th Street and NE
Sunset Blvd (SR 900); (2) NE 10th Street and Jefferson Ave West; (3) NE 10th Street and Jefferson Ave East; (4)
NE 10th Street and Kirkland Ave NE; and (5) Site Access and Jefferson Ave West.
Study intersections are evaluated for both AM and PM peak hour traffic operations. The peak hour is defined as
the highest four consecutive 15-minute traffic volume intervals between 7 and 9 AM (AM peak hour) and
between 4 and 6 PM (PM peak hour).
Methods and Assumptions
For this analysis, traffic operations are evaluated using Synchro, version 10, and HCM 6 methodology.
Intersection level-of-service (LOS), volume-to-capacity (V/C), and control delays are summarized in Table 1.
Table 1: Intersection V/C, LOS, and Delay Categories
LOS by V/C Ratio Control Delay (seconds/vehicle)
V/C ≤ 1.0 V/C > 1.0 Signalized Intersections Unsignalized Intersections
A F ≤ 10 ≤ 10
B F > 10-20 > 10-15
C F > 20-35 > 15-25
D F > 35-55 > 25-35
E F > 55-80 > 35-50
F F > 80 > 50
The LOS standard in the Center Village zone and on NE Sunset Blvd is LOS E mitigated.
Vehicle queues are evaluated using HCM6 methodology at key intersections around the site accesses. For this
analysis, 95th-percentile queues are reported. The 95th-percentile queue is a statistic calculation based on 95th-
percentile traffic volumes and represents the calculated vehicle queue that may occur during 3-minutes of the
peak hour period. 95th-percentile queues are typically used for design.
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 3 April 2021
Figure 1: Vicinity Map
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 4 April 2021
Figure 2: Conceptual Site Plan
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 5 April 2021
TRIP GENERATION, DISTRIBUTION AND ASSIGNMENT
This section describes the trip generation and PM peak hour trip distribution and travel assignment forecasts for
Sunset Gardens. A trip generation and scoping memorandum was submitted to the City of Renton on December
17, 2020. The following is consistent with that memorandum.
Trip Generation
The ITE Trip Generation Manual, 10th Edition was used to forecast the weekday daily and peak hour trip
generation for Sunset Gardens.
The ITE manual includes limited data for affordable housing uses. Review of the findings from the Affordable
Housing Trip Generation Strategies and Rates, from Caltrans and published September 13, 2018, shows similar
trip rate findings to those reported by the ITE.
Table 2 summarizes the trip generation forecast.
Table 2: Trip Generation
Land Use (ITE LU) Size Trip Rate Distribution Trips Generated 3
%-In %-Out In Out Total
Proposed Multifamily (223) 76 bedrooms 2.70 / bedroom 1 50% 50% 103 102 205
Proposed Office (710) 11,000 SF 0.00974 / SF 50% 50% 54 53 107
Existing Office (710) (13,416 SF) 0.00974 / SF 50% 50% (66) (66) (131)
Weekday Daily Trips 91 90 181
Proposed Multifamily (223) 76 bedrooms 0.45 / bedroom 70% 30% 24 10 34
Proposed Office (710) 11,000 SF 0.00116 / SF 86% 14% 11 2 13
Existing Office (710) (13,416 SF) 0.00116 / SF 86% 14% (14) (2) (16)
AM Peak Hour Trips 21 10 31
Proposed Multifamily (223) 76 bedrooms 0.27 / bedroom 30% 2 70% 6 15 21
Proposed Office (710) 11,000 SF 0.00115 / SF 16% 84% 2 11 13
Existing Office (710) (13,416 SF) 0.00115 / SF 16% 84% (2) (13) (15)
PM Peak Hour Trips 6 13 19
1. No ITE data available, assumed as ten times the PM peak hour rate.
2. No ITE data available, assumed equivalent to the AM outbound distribution percentage.
3. Output includes rounding.
Sunset Gardens is forecast to generate 181 new weekday daily trips, 31 new AM peak hour trips, and 19 new PM
peak hour trips.
Trip Distribution and Peak Hour Travel Assignment
City standards generally require intersections impacted by more than 20 new peak hour trips to be evaluated for
traffic operations. Trips were assigned to the local road network based on review of the road classifications,
work centers and amenities.
Figure 3 illustrates the AM and PM peak hour trip distribution and travel assignment for the proposed
development.
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 6 April 2021
Figure 3: AM and PM Peak Hour Trip Distribution and Travel Assignment
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 7 April 2021
EXISTING CONDITIONS
Primary Roadways
• NE Sunset Blvd (SR 900) is classified as a Principal Arterial. Near the site, the posted speed is 35-mph,
and the roadway has a five-lane cross-section. The road is lined with curb, gutter, and sidewalk.
• Kirkland Ave NE is classified as a Minor Arterial. Near the site, the posted speed is 25-mph, and the
roadway has a two-lane cross-section. The road is lined with curb, gutter, and sidewalk and includes
sections of on-street parking.
• 10th Street NE is classified as a Collector Arterial. Near the site, the posted speed is 25-mph, and the
roadway has a two-lane cross-section. The road includes sections of curb, gutter, and sidewalk and on-
street parking.
• Jefferson Ave NE is a two-lane public road with curb, gutter, and sidewalk. Jefferson Ave West extends
between a commercial center and NE 10th Street and includes on-street parking fronting the RHA site.
Jefferson Ave East extends from NE 10th Street to a private driveway about 180 feet north of NE 10th
Street. Jefferson Ave East includes parking fronting the RHA site.
Traffic Volumes
AM and PM peak hour vehicle volumes were collected at the study intersections on December 15, 2020. Due to
COVID-19 impacts, an “existing” condition was developed by comparing the 2020 volumes to a PM peak hour in
intersection turning movement count was compiled at NE 10th Street and NE Sunset Blvd in 2018. Intersection
turning movement volumes are included in the Appendix.
Figure 4 illustrates the existing AM and PM peak hour traffic volumes at the study intersections. For this study,
all non-development volumes are rounded to the nearest multiple of 5 to account for the normal day-to-day
fluctuations in traffic volumes.
Transit Conditions
King County Metro Route 111 provides weekday morning service from the Renton Highlands to downtown
Seattle and weekday afternoon service from downtown Seattle to the Renton Highlands. Headways are about 30
minutes. The nearest transit stop is at NE 10th Street and Jefferson Ave West. This route also provides service on
NE Sunset Blvd.
King County Metro Route 240 provides weekday and weekend service between the Bellevue and Renton Transit
Centers. Headways are about 30 minutes. Route 240 provides services on NE Sunset Blvd with stops in the
vicinity or NE 10th Street.
Crash Analysis
Crash data was compiled from the WSDOT between 2015 and 2019 within the study area. Table 3 summarizes
the crash history.
During this five-year period 37 total collisions were reported, with no fatalities and 62% of the collisions
resulting in property damage only. The majority of crashes occurred at NE 10th Street and NE Sunset Blvd, with
3.6 collisions per year. Review of the trends showed annual collisions declining, with 14 total collisions occurring
in 2015, and 6 total occurring in 2019.
Typically, intersection crash rates of 1.00 or higher and roadway segment crash rates of 10.00 or higher are
considered high crash locations. The collision history shows no high crash locations in the study area.
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 8 April 2021
Figure 4: 2020 Existing AM and PM Peak Hour Volumes
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 9 April 2021
Table 3: Collision History
Annual Crash Collision Type, by Percentage
Average Rate 1 Left Turn Rear End At Angle Object Sideswipe Ped/Bike
Intersection per MEV
10th St / Sunset Blvd 3.6 0.33 11% 56% 11% 0% 6% 17%
10th St / Jefferson West 1.2 0.41 33% 0% 67% 0% 0% 0%
10th St / Jefferson East 0.2 0.08 0% 0% 100% 0% 0% 0%
10th St / Kirkland Ave 0.4 0.14 0% 0% 100% 0% 0% 0%
Road Segments per MVM
10th St from Sunset Blvd
to Jefferson West 1.4 5.26 29% 0% 57% 14% 0% 0%
10th St from Jefferson
West to Jefferson East 0.0 0.00 0% 0% 0% 0% 0% 0%
10th St from Jefferson
East to Kirkland Ave 0.6 3.43 0% 0% 0% 100% 0% 0%
Jefferson West from
10th St to North End 0.0 0.00 0% 0% 0% 0% 0% 0%
Jefferson East from 10th
St to private driveway 0.0 0.00 0% 0% 0% 0% 0% 0%
1. Crash rate per Million Entering Vehicles (MEV) at intersections and per Million Vehicles Miles Traveled (MVM) on road segments.
Angle crashes were the most common crash type, with 13 total, followed by rear end crashes, with 10 total.
Angle crashes are typical from vehicles entering the road from a driveway. The development’s site accesses will
be off of 10th Street, reducing vehicle conflicts.
2022 FUTURE TRAFFIC CONDITIONS
This section describes the future traffic conditions without and with Sunset Gardens between now and 2022.
Future Without-Development
Future without-development conditions serve as the future baseline conditions used to evaluate development-
specific impacts.
Transportation Facility Improvements
The City of Renton’s 2021-2026 Six Year Transportation Improvement Program (TIP) includes the following
planned improvement in the study area:
• TIP 20: NE Sunset Boulevard (SR 900) Corridor Improvements from Sunset Blvd NE to Monroe Ave NE.
This project addresses pedestrian, transit and bicycle needs through key improvements such as
channelization, traffic signal modifications, signal treatments, possible queue jumps, access
management through installation of medians. Construction will be implemented in phases. This project
is not fully funded and not expected to be complete prior to 2026.
The NE Sunset Blvd improvement is not fully funded or anticipated to be complete by year 2022; and thus, is not
incorporated into this analysis.
Non-Development Growth Forecast
Background traffic growth between now and 2022 includes both regional and local increases in traffic volumes
through the study area. Local growth includes pipeline development. Local pipeline developments include:
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 10 April 2021
• Solera Master Plan. Master Plan between NE Sunset Blvd, Kirkland Ave NE, NE 10th Street and
Harrington Place NE.
• Sunset Terrace. 108 apartments over retail at NE Sunset Blvd and Harrington Ave NE.
• Sunset Oaks. 10 multifamily apartments at NE 10th Street and Harrington Ave NE.
A 3% annual growth rate was applied to the existing traffic volumes to forecast future traffic growth generated
by both regional and local growth. In addition to the growth rate, pipeline trips were added at the intersection
of NE Sunset Blvd and NE 10th Street to account for these projects.
Based on historic count data by WSDOT along Sunset Boulevard, cumulative traffic growth has been below 1%
since 2012. The proposed 3% growth rate is anticipated to more than account for localized traffic growth from
outside the study area.
Figure 5 illustrates the AM and PM peak hour without-development traffic volumes.
Future With-Development
Year 2022 with-development traffic volumes are forecast by adding the development-generated trips (Figure 3)
to the without-development traffic volumes (Figure 5). Figure 6 illustrates the future AM and PM peak hour
traffic volumes with the development.
TRAFFIC OPERATIONS
Tables 4 and 5 summarize the AM and PM peak hour study intersection LOS for the year 2020 existing, year
2023 without-development, and year 2023 with-development traffic conditions.
Table 4: AM Peak Hour Intersection LOS Analysis
Intersection Control Existing Without-Development With-Development
LOS Delay 1 V/C 2 LOS Delay 1 V/C 2 LOS Delay 1 V/C 2
10th St / Sunset Blvd Signal B 10.6 0.61 B 12.0 0.63 B 12.2 0.63
10th St / Jefferson West Stop A 9.9 0.02 B 10.0 0.02 B 10.3 0.04
10th St / Jefferson East Stop A 9.2 0.01 A 9.3 0.01 A 9.3 0.01
10th St / Kirkland Ave All Stop A 8.3 0.23 A 8.4 0.24 A 8.4 0.24
Site Access / Jefferson West Stop - - - - - - A 8.9 0.02
1. Seconds of Average Delay per Vehicle.
2. Maximum V/C ratio.
Table 5: PM Peak Hour Intersection LOS Analysis
Intersection Control Existing Without-Development With-Development
LOS Delay 1 V/C 2 LOS Delay 1 V/C 2 LOS Delay 1 V/C 2
10th St / Sunset Blvd Signal B 11.7 0.66 B 12.8 0.68 B 14.0 0.76
10th St / Jefferson West Stop B 12.7 0.21 B 13.3 0.23 B 13.7 0.28
10th St / Jefferson East Stop B 12.0 0.03 B 12.6 0.03 B 12.4 0.03
10th St / Kirkland Ave All Stop A 9.3 0.35 A 9.5 0.37 A 9.6 0.38
Site Access / Jefferson West Stop - - - - - - A 9.8 0.04
1. Seconds of Average Delay per Vehicle.
2. Maximum V/C ratio.
The study intersections are forecast to operate at LOS B or better in year 2022 with the proposed development
and meet the City’s LOS standards. All vehicle movements are also computed with V/C ratios less than 0.80,
which is also acceptable. No offsite mitigation is required.
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 11 April 2021
Figure 5: 2022 Without-Development AM and PM Peak Hour Volumes
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 12 April 2021
Figure 6: 2022 With-Development AM and PM Peak Hour Volumes
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 13 April 2021
Site Access Operations
Table 6 summarizes the vehicle queues computed at the site accesses and at key intersection movements using
the HCM 6 output. The table shows that movement V/C ratio are within an acceptable ranges and development-
generated queues are not forecast to adversely impact the study intersections.
Table 6: Future With-Development Vehicle Queues
Intersection App. or AM Peak Hour PM Peak Hour
Mvmt.1 V/C 95-Q 2 V/C 95-Q 2
10th St / Sunset Blvd SB Lt 0.11 0.3 0.58 1.3
WB 0.47 2.9 0.52 3.8
10th St / Jefferson West SB 0.04 0.1 0.28 1.1
EB 0.02 0.1 0.03 0.1
WB 0.00 0.0 0.00 0.0
10th St / Jefferson East SB 0.01 0.0 0.03 0.1
EB 0.00 0.0 0.00 0.0
WB 0.00 0.0 0.00 0.0
10th St / Kirkland Ave EB 0.13 0.5 0.38 1.8
WB 0.24 1.0 0.28 1.1
NB 0.11 0.4 0.10 0.3
SB 0.05 0.2 0.10 0.3
Site Access / Jefferson West WB 0.02 0.1 0.04 0.1
NB 0.00 0.0 0.00 0.0
SB 0.00 0.0 0.00 0.0
1. Approach or Movement
2. 95th-percentile queue, expressed as vehicles per lane
Vehicle queues at the site access are computed to be less than 1 vehicle. The site access is forecast to operate
well at LOS A. With the development, vehicle queues are not forecast to be significant. Vehicle queues at the
site access are computed to be less than 1 vehicle.
Westbound vehicle queues on 10th Street approaching Sunset Blvd are forecast to extend to less than 4
vehicles, and do not block Jefferson Ave West.
Vehicle queues both Jefferson Aves are not forecast to block access to adjacent intersections.
The movement V/C ratios are acceptable and suggest no capacity impacts are generated with the development;
and thus, not mitigation is required.
The collision analysis finds no significant trends on NE 10th Street.
Sight distance will be provided at the site driveways and at NE 10th Street and Jefferson Aves intersections.
Refer to the civil engineering plans.
PARKING
Parking Required
Table 7 summarizes the number of parking spaces required, per Renton Municipal Code 4-4-080-10-d, and the
number of onsite parking spaces proposed.
The Renton Municipal Code requires the site to provide 52 parking spaces. The proposal includes 55 onsite
parking spaces and satisfies the parking requirements.
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions 14 April 2021
Table 7: Parking Required and Proposed
Component Size Parking Rate Required Proposed Okay?
Affordable Housing 76 units 1 space / 4 units 19 spaces 22 spaces Yes
RHA Office 11,000 SF 3 spaces / 1000 SF 33 spaces 33 spaces Yes
Total 52 spaces 55 spaces Yes
MITIGATION
This section describes the Applicant’s traffic mitigation responsibilities.
Offsite Mitigation
No traffic mitigation is warranted for the development.
Frontage Improvements
The Applicant will be responsible for frontage improvements along NE 10th Street and Jefferson Aves. These
improvements include new sidewalks, curb, gutter, and street lighting.
City of Renton Traffic Impact Fee
Year 2021 transportation impact fees for the development are estimated at $135,771.15 (=$7,145.85 X 19 new
PM peak hour vehicle trips). The City will compute the final fee which is due at time of building permit issuance.
CONCLUSIONS
Sunset Gardens is a proposed with 76 affordable housing one-bedroom studio units and up to 11,000 sq. ft. of
office space for the RHA. The development will replace the existing RHA building and consolidate existing site
accesses to Jefferson Ave West.
The development is forecast to generate:
• 181 new weekday daily trips, split 50/50 in and out.
• 31 new AM peak hour trips, split 21 in and 10 out.
• 19 new PM peak hour trips, split 6 in and 13 out.
With the development, study intersections are forecast to operate at LOS B or better in both the AM and PM
peak hours. The study intersections satisfy the agency LOS thresholds, and no offsite mitigation is required.
The site access is forecast to operate well at LOS A.
Vehicle queues are not significantly anticipated to impact access to and from the site and traffic circulation in
the area. There were also no collision trends to suggest a safety concern near the site.
The development includes 55 onsite parking spaces: 22 spaces for the affordable housing and 33 spaces for the
RHA office components of the development. Parking for affordable housing satisfies Renton’s parking
requirement. Parking for the RHA office also satisfies the City’s parking requirements.
The Applicant will be required to provide frontage improvements per the City of Renton requirements. The site
access and Jefferson Aves intersections will be designed to satisfy sight distance standards.
Traffic impacts fees are estimated at $135,771.15 (2021 dollars).
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions, Inc. March 2021
APPENDIX
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions, Inc. March 2021
Scoping Memorandum
Trip Generatoin and Project Scoping
December 17, 2020
To: Jonathan Chavez, Civil Engineer III, City of Renton
From: Sam Garcia, EIT, Transportation Solutions, Inc.
Subject: Sunset Gardens
PRE20-000244
This trip generation memorandum is for the proposed development of Sunset Gardens, at 2900 NE 10th Street.
The following presents the preliminary trip generation, trip distribution, and AM and PM peak hour travel
assignments forecasts and proposed study area.
Project Description
The Renton Housing Authority (RHA), the Applicant, is proposing to develop a mixed-use site to the northeast of
NE 10th Street and Jefferson Ave NE the City of Renton. The site is on land parcel 722790-0075 and is zoned
Center Village.
A vicinity map highlighting the site location is attached as Figure 1.
The existing site includes 13,416 square feet of RHA office.
The Applicant proposes to redevelop the existing site with up to 76 affordable housing units with a mix of
studios and bedrooms, and up to 10,000 sq. ft. new office space for RHA. Two site accesses are proposed: one
off Jefferson Ave NE (Jefferson West) for the residential component and another off a private road (referred to
as Jefferson East) to the office component. Full build-out is anticipated by 2022.
A site plan is attached as Figure 2.
Trip Generation
The ITE Trip Generation Manual, 10th Edition, was used to forecast the weekday daily and peak hour trip
generation for Sunset Gardens.
The ITE manual includes limited data for affordable housing uses. Review of the findings from the Affordable
Housing Trip Generation Strategies and Rates, from Caltrans and published September 13, 2018, shows similar
trip rate findings to those reported by the ITE.
Table 1 summarizes the trip generation forecast.
Sunset Gardens is forecast to generate:
• 171 new weekday daily trips, split 86 trips in and 85 out
• 30 new AM peak hour trips, spilt 20 in and 10 out
• 18 new PM peak hour trips, spilt 6 in and 12 out
Johnathon Chavez, City of Renton
Sunset Gardens
December 10, 2020
Page 2 of 2
Table 1: Sunset Gardens Trip Generation
Land Use (ITE LU) Size Trip Rate %-In %-Out In3 Out3 Total3
Multifamily (223) 76 bedrooms 2.70 / bedroom1 50% 50% 103 102 205
Proposed Office (710) 10,000 sq. ft. 0.00974 / sq. ft. 50% 50% 49 48 97
Existing Office (710) (13,416) sq. ft. 0.00974 / sq. ft. 50% 50% (66) (65) (131)
Weekday Daily Trips 86 85 171
Multifamily (223) 76 bedrooms 0.45 / bedroom 70% 30% 24 10 34
Proposed Office (710) 10,000 sq. ft. 0.00116 / sq. ft. 86% 14% 10 2 12
Existing Office (710) (13,416) sq. ft. 0.00116 / sq. ft. 86% 14% (14) (2) (16)
AM Peak Hour Trips 20 10 30
Multifamily (223) 76 bedrooms 0.27 / bedroom 30%2 70% 6 15 21
Proposed Office (710) 10,000 sq. ft. 0.00115 / sq. ft. 16% 84% 2 10 12
Existing Office (710) (13,416) sq. ft. 0.00115 / sq. ft. 16% 84% (2) (13) (15)
PM Peak Hour Trips 6 12 18
1. No ITE data available, assumed as ten times the PM peak hour rate
2. No ITE data available, assumed equivalent to the AM outbound distribution percentage
3. Output includes rounding
Peak Hour Trip Assignment
Trips were assigned to the local road network review of the road classifications, work centers and amenities.
Figure 3 illustrates the AM and PM peak hour trip distribution and travel assignment for the residential
component of the proposal. Figure 4 illustrates the AM and PM peak hour trip distribution and travel assignment
for the office component of the proposal. Figure 5 illustrates the AM and PM peak hour net new travel
assignment for the proposal.
Table 2 summarizes peak hour trip assignments to the local intersections.
Table 2: Sunset Gardens Trip Generation
Intersection AM Peak Hour Sunset Gardens Trips PM Peak Hour Sunset Gardens Trips
Approach Volume > NB SB EB WB Total NB SB EB WB Total
Sunset Blvd. / 10th St 11 1 0 7 18 3 0 0 8 11
Jefferson West / 10th St 0 10 12 10 32 0 15 3 0 18
Jefferson East / 10th St 0 1 10 8 19 0 5 7 3 15
Kirkland Ave / 10th St 4 2 4 2 12 1 1 4 1 7
Jefferson W / Res. Drwy. 24 0 10 0 34 6 0 0 15 21
Jefferson E / Office Drwy. 10 0 2 0 12 2 0 10 0 12
I trust that the information presented above will assist you in verifying the scope of the traffic analysis for the
proposed development. I look forward to your feedback. If you have any questions or comments, please contact
me at your earliest convenience
Trip Generatoin and Project Scoping
Attachments
Attachments
Figure 1:
VICINITY MAPKIRKLAND AVE NENE SUNSET BLVD (SR 900)N
E
1
0
T
H
S
T
PROJECT
SITE
1(1)
0(0)
6(8)
1
(0)0(0)0(3)130(0)0(0)1(0)Figure 3:
RESIDENTIAL TRIP DISTRIBUTION AND ASSIGNMENTKIRKLAND AVE NENE SUNSET BLVD (SR 900)N
E
1
0
T
H
S
T JEFFERSON AVE WPROJECT SITE
JEFFERSON AVE E2
4
5
10(2)
0(0)
0(0)
2
(4)14
(0)0
(0)0 6(9)0(0)4(6)4
0(0)
0(0)
10(15)
5
(0)0(0)0(6)246
6
11
2
3
6
4
65
55%5%10%20%10%
6
0
%
40%
AM (PM) TRIPS
0(0)
10(2)
0(0)
3
(0)0
(6)4
(0)0
0(0)
2(1)
0(0)
(2)1
(2)1
(3)2
(1)5(0)0(0)02(1)0(0)0(0)RESIDENTIAL ACCESS OFFICE ACCESS
TRIPS IN OUT TOTAL
AM
TRIPS
24 10 34
PM
TRIPS
6 15 21
(0)0
(0)0
(0)0
(0)0
(0)0
(0)0 0(0)0(0)0(0)0(0)
0(0)
0(0)
(0)0
(0)0
(0)0
(0)0(0)0(0)00(0)0(0)0(0)(0)0(0)0(0)00(0)0(0)0(0)(0)0(0)0(0)0
1
(0)0(0)0(0)-2Figure 4:
OFFICE TRIP DISTRIBUTION AND ASSIGNMENTKIRKLAND AVE NENE SUNSET BLVD (SR 900)N
E
1
0
T
H
S
T JEFFERSON AVE WPROJECT SITE
JEFFERSON AVE E2
4
5
2
(-1)-8
(1)6
(0)0
4
(0)0
(0)0
(10)25
(2)10(0)0(0)06
6
11
2
3
6
4
65
55%5%10%20%10%
6
0
%
40%
AM (PM) TRIPS
4(1)
-6(-1)
0(0)
3
(1)6
(0)0
(0)0 (-1)0(0)0(6)1RESIDENTIAL ACCESS OFFICE ACCESS
TRIPS IN OUT TOTAL
AM
EXISTING
-14 -2 -16
AM
PROPOSED
10 2 12
AM NEW -4 0 -4
TRIPS IN OUT TOTAL
PM
EXISTING
-2 -13 -15
PM
PROPOSED
2 10 12
PM NEW 0 -3 -3
0(0)
0(0)
0(0)
(0)0
(0)0
(-1)0
(0)-1(0)0(0)00(0)0(0)0(0)0(0)
0(0)
0(0)
(0)0
(0)0
(0)0
(0)0(0)0(0)00(0)0(0)0(0)0(0)
0(0)
0(-2)
(0)0
(0)0
(0)0 0(0)0(0)0(0)0(0)
0(-2)
0(0)0(0)0(0)0(0)0(0)
0(0)
0(0)0(0)0(0)0(0)(0)0(0)0(0)0(0)0(0)0(0)0
1(1)
0(0)
6(7)
1
(0)0(0)0(3)110(0)0(0)1(0)Figure 5:
TRIP DISTRIBUTION AND ASSIGNMENTKIRKLAND AVE NENE SUNSET BLVD (SR 900)N
E
1
0
T
H
S
T JEFFERSON AVE WPROJECT SITE
JEFFERSON AVE E2
4
5
10(2)
0(-2)
0(0)
2(2)6
(1)6
(0)0 6(9)0(0)4(6)4 0(0)
0(0)
10(15)
5
(0)0(0)0(6)24(0)0
(0)0
(10)2
6
(2)10(0)0(0)06
11
2
3
6
4
65
55%5%10%20%10%
6
0
%
40%
AM (PM) TRIPS
4(1)
4(2)
0(0)
3(1)6
(6)4
(0)0 1(6)0(0)0(-1)0(0)
2(1)
0(0)
(1)1
(1)1
(2)2
(1)4(0)0(0)02(1)0(0)0(0)RESIDENTIAL ACCESS OFFICE ACCESS
(0)0
(0)0
(0)0
(0)0
(0)0
(0)0
0(0)
0(0)
0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0)
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION ADA Notice TECHNICAL REPORT DOCUMENTATION PAGE For individuals with sensory disabilities, this document is available in alternate
formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write TR0003 (REV 10/98) Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
1. REPORT NUMBER 2. GOVERNMENT ASSOCIATION NUMBER 3. RECIPIENT'S CATALOG NUMBER
CA18-2465 NA NA
4. TITLE AND SUBTITLE 5. REPORT DATE
September 13, 2018
Affordable Housing Trip Generation Strategies and Rates 6. PERFORMING ORGANIZATION CODE
NA
7. AUTHOR 8. PERFORMING ORGANIZATION REPORT NO.
Dr. Kelly J. Clifton (PI); Dr. Kristina M. Currans; Dr. Robert Schneider; Dr. Susan Handy NA
9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. W ORK UNIT NUMBER
Maseeh College of Engineering & Computer Science
Portland State University NA
1930 SW 5th Ave #500 11. CONTRACT OR GRANT NUMBER
Portland, OR 97201 65A0564, Task Order 2465
12. SPONSORING AGENCY AND ADDRESS 13. TYPE OF REPORT AND PERIOD COVERED
California Department of Transportation Final Report, 06/15/2015-09/14/2018
1120 N Street 14. SPONSORING AGENCY CODE
Sacramento, CA 95814
NA
15. SUPPLEMENTARY NOTES
16. ABSTRACT
Assessment and mitigation of transportation impacts based on travel demand is required by state, federal, and local laws in California.
Determining trip generation is typically the first step in preparing these transportation impact analyses, and current industry standard practice
relies on trip rates published by the Institute of Transportation Engineers (ITE). However, ITE protocols emphasize vehicle trip rates without
sensitivity to urban context or socioeconomic characteristics, which can exaggerate the impact of certain land uses like affordable housing
developments, ultimately increasing mitigation fees. Updating trip generation methodologies is critical given the increasing demand for
affordable housing, especially in urban contexts.
This study builds on previous trip generation research in California and elsewhere, and examines trip generation rates for affordable housing
locations in Los Angeles and San Francisco Bay Area regions using a multi-method research design. Data were collected, assembled, and
analyzed to provide a robust picture of trip making, vehicle ownership, and mode use as a function of development characteristics, household
demographics, and urban setting. Results show a strong association between these factors and trip generation, and reiterate the need to revise
current industry standard practices. A discussion of policy implications, as well as suggested next steps in research and development, are
provided with this in mind.
17. KEY W ORDS
trip generation, transportation impact analysis, automobile trips,
person trips, affordable subsidized housing, parking supply, household
travel survey, travel behavior, transportation policy, Institute of
Transportation Engineers, transportation impact studies
18. DISTRIBUTION STATEMENT
No restrictions
19. SECURITY CLASSIFICATION (of this report)
Unclassified
20. NUMBER OF PAGES
170
21. COST OF REPORT CHARGED
Reproduction of completed page authorized.
to the motorized vehicle rate, the person trip rate for the affordable housing sites is significantly
higher than those for the smart growth and TDM sites. The AM Peak person trip rate was as
much as 175% higher than the other studies, and 119% higher for the PM Peak.
The pattern for affordable housing was similar to those for motorized trips -the AM Peak had a
higher person trip rate than the PM. However, for sites with smart growth or TDM characteristics
and policies, the person trip rates for the PM peak were slightly higher. These large differences
may be due to more families with children or larger numbers of people per unit living in the
affordable units, just more people per trip. Many of the affordable sites had 3-bedroom units, for
example. Without comparable data on numbers of bedrooms for the smart growth sites, we
cannot examine the potential causes for this difference further.
Table 5 Comparison of motorized vehicle trip rates to other studies
AM Peak Hour PM Peak Hour
Average Standard
Deviation Min Max N Average Standard
Deviation Min Max N
Caltrans Affordable
Housing Trip 0.53 0.24 0.10 1.35 26 0.40 0.18 0.11 0.78 26
Generation Study**, a
Los Angeles Affordable
Housing Trip 0.52 0.22 0.24 1.10 14 0.38 0.19 0.14 0.87 14
Generation Study*,b
Smart Growth Trip
Generation 0.24 0.20 0.00 0.99 25 0.25 0.18 0.03 0.86 25
Study Phase I**,c
Smart Growth Trip
Generation Study Phase 0.33 0.10 0.21 0.57 16 0.32 0.06 0.22 0.44 16
II**,d
San Francisco TDM
Framework for Growth 0.25 0.16 0.11 0.69 16 0.24 0.19 0.10 0.81 16
Study**,e
ITE -220 Apartment *,f 0.51 0.17 0.10 1.02 78 0.62 0.23 0.10 1.64 90
Notes: *Trip rates by dwelling units; **Trip rates by occupied dwelling units
22
44 Trip Generation Manual, 10th Edition Supplement
Land Use: 223
Affordable Housing
Description
Affordable housing includes all multifamily housing that is rented at below market rate to households
that include at least one employed member. Eligibility to live in affordable housing can be a function
of limited household income and resident age. Multifamily housing (low-rise) (Land Use 220),
multifamily housing (mid-rise) (Land Use 221), and multifamily housing (high-rise) (Land Use 222)
are related land uses.
Additional Data
For the majority of study sites in this land use code, 100 percent of the dwelling units are considered
affordable. For residential study sites that provide a mix of market value and affordable units, the
study sites with at least 75 percent of the dwelling units designated as affordable are also included in
this land use database.
Separate data plots and statistics are presented for two subsets of the affordable housing database:
(1) sites with income limitations for its tenants and (2) sites with both minimum age thresholds and
income limitations for its tenants (i.e., senior housing).
The sites were surveyed in the 2010s in California and New Jersey.
It is expected that the number of bedrooms and number of residents are likely correlated to the trips
generated by a residential site. Trip generation studies of all multifamily housing should attempt to
obtain information on occupancy rate and on the mix of residential unit sizes (i.e., number of units by
number of bedrooms at the site complex). Future studies should also indicate the number of levels
contained in the residential building.
Source Numbers
1003, 1004
11/19/2020 https://itetripgen.org/PrintGraph.htm?code=223&ivlabel=UNITS223&timeperiod=TASIDE&x=&edition=544&locationCode=General Urba…
https://itetripgen.org/PrintGraph.htm?code=223&ivlabel=UNITS223&timeperiod=TASIDE&x=&edition=544&locationCode=General Urban/Suburban&c…1/1
Affordable Housing - Income Limits
(223)
Vehicle Trip Ends vs: Dwelling Units
On a: Weekday,
Peak Hour of Adjacent Street Traffic,
One Hour Between 7 and 9 a.m.
Setting/Location: General Urban/Suburban
Number of Studies: 2
Avg. Num. of Dwelling Units: 97
Directional Distribution: 70% entering, 30% exiting
Vehicle Trip Generation per Dwelling Unit
Average Rate Range of Rates Standard Deviation
1.02 0.52 - 1.32 *
Data Plot and Equation Caution – Small Sample Size
T = Trip EndsX = Number of Dwelling Units
Study Site Average Rate
Fitted Curve Equation: Not Given R²= ****
Trip Gen Manual,10th Ed + Supplement Institute of Transportation Engineers
0 50 100 150 2000
50
100
150
200
11/19/2020 https://itetripgen.org/PrintGraph.htm?code=223&ivlabel=UNITS223&timeperiod=TPSIDE&x=&edition=544&locationCode=General Urba…
https://itetripgen.org/PrintGraph.htm?code=223&ivlabel=UNITS223&timeperiod=TPSIDE&x=&edition=544&locationCode=General Urban/Suburban&c…1/1
Affordable Housing - Income Limits
(223)
Vehicle Trip Ends vs: Dwelling Units
On a: Weekday,
Peak Hour of Adjacent Street Traffic,
One Hour Between 4 and 6 p.m.
Setting/Location: General Urban/Suburban
Number of Studies: 2
Avg. Num. of Dwelling Units: 97
Directional Distribution: Not Available
Vehicle Trip Generation per Dwelling Unit
Average Rate Range of Rates Standard Deviation
0.62 0.42 - 0.74 *
Data Plot and Equation Caution – Small Sample Size
T = Trip EndsX = Number of Dwelling Units
Study Site Average Rate
Fitted Curve Equation: Not Given R²= ****
Trip Gen Manual,10th Ed + Supplement Institute of Transportation Engineers
0 50 100 150 2000
20
40
60
80
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions, Inc. March 2021
Intersection Turning Movement Counts
www.idaxdata.com 56
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
2
3
3
2
4
3
4
4
25
121000317
12 3
Peak Hour 0 6 26 23 55 0 0
0 0 0 0 3 7Count Total 0 12 51 47 110 0
3 1 00000008:45 AM 0 1 4 8 13
0 0 0 2 0 2
0
8:30 AM 0 1 11 6 18 0 0 0
0 0 0 1 0 2
3 0
8:15 AM 0 2 9 7 18 0 0
0 0 0 0 1 0
0 1 0
8:00 AM 0 1 5 9 15 0
0 0 0 0 0 1
1 1 1
0
7:30 AM 0 2 8 3 13 0 0 0
0 0 0 0 0 3651300
5 11 0
EB WB NB SB Total East
7:45 AM 0 1 4 4 9
0 0 0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
1 0
7:15 AM 0 2
0 0 0 0 0 1
West North South
7:00 AM 0 2 4
0 0 6
60 0 6 1,067 89 0
4 1,652 02501500288891101283300
Count Total 0 0 7 22 0 237 9 41 1,624 6 3,168 0
364 1,562141120417000222704
4 185 2 415 1,611
8:45 AM 0 0 1 1
9 0 0 173 7 0
396 1,652
8:30 AM 0 0 0 7 0 27 1
133 11 0 7 195 20350801
8 198 0 387 1,627
8:15 AM 0 0 1 3
4 0 1 122 13 0
413 1,606
8:00 AM 0 0 1 4 0 35 1
133 16 0 9 219 00231800
4 277 2 456 0
7:45 AM 0 0 2 2
10 0 0 113 10 0
371 0
7:30 AM 0 0 2 2 0 35 1
115 10 0 2 201 0
0
7:15 AM 0 0 0 1
6 0 0 137 10 07:00 AM 0 0 0 2 0 28 1
Interval
Start
NE 10th St NE 10th St NE Sunset Blvd (SR-900)NE Sunset Blvd (SR-900)15-min
TotalUTLTTHRT
0 32 2 8 0 0
3 179 0 366
0.85
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Peak Hour
Date: Thu, Feb 08, 2018
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 2.5%0.81
TOTAL 3.3%0.91
TH RT
WB 3.7%0.88
NB 4.7%0.93
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 0.0%
0 0007
11 3N
NE Sunset Blvd (SR-900)
NE 10th St
NE 10th St
NE Sunset Blvd (SR-900)NE 10th StNE Sunset Blvd (SR-900)1,652TEV:
0.91PHF:488928921531030
3
128
161
840
5050125531,028011
6
0
17
9 0
Mark Skaggs: (425) 250-0777 mark.skaggs@idaxdata.com
www.idaxdata.com 56
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
8
19
19
10
15
11
20
12
114
581800091021
33 36
Peak Hour 0 0 10 8 18 0 0
0 0 0 0 26 19Count Total 0 2 20 37 59 0
0 1 90000025:45 PM 0 0 2 3 5
0 0 1 8 8 3
2
5:30 PM 0 0 2 1 3 0 0 0
0 0 0 2 2 5
7 4
5:15 PM 0 0 2 3 5 0 0
0 0 0 0 4 0
2 2 5
5:00 PM 0 0 4 1 5 0
0 0 0 0 0 1
3 5 6
5
4:30 PM 0 0 3 8 11 0 0 0
0 0 0 9 1 436900
9 12 0
EB WB NB SB Total East
4:45 PM 0 1 2 6 9
0 0 5
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
1 2
4:15 PM 0 0
0 0 0 0 2 3
West North South
4:00 PM 0 1 2
0 7 28
86 0 36 1,985 261 0
14 2,319 0191,024 139 0 62 82818011618460
Count Total 0 33 57 31 0 235 36 138 1,672 30 4,600 0
610 2,31927941012206402861305
11 223 2 566 2,313
5:45 PM 0 3 9 4
11 0 8 238 25 0
618 2,305
5:30 PM 0 0 6 6 0 33 3
298 37 0 20 207 501931402
19 192 3 525 2,299
5:15 PM 0 2 5 6
8 0 4 209 36 0
604 2,281
5:00 PM 0 2 8 2 0 36 6
263 40 0 23 213 30257603
19 213 5 558 0
4:45 PM 0 12 5 4
10 0 7 225 19 0
612 0
4:30 PM 0 6 4 2 0 41 7
258 40 0 14 222 4
0
4:15 PM 0 5 12 5
8 0 3 215 23 04:00 PM 0 3 8 2 0 24 1
Interval
Start
NE 10th St NE 10th St NE Sunset Blvd (SR-900)NE Sunset Blvd (SR-900)15-min
TotalUTLTTHRT
0 29 3 16 0 4
20 196 4 507
0.83
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Peak Hour
Date: Thu, Feb 08, 2018
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.9%0.96
TOTAL 0.8%0.94
TH RT
WB 0.0%0.90
NB 0.8%0.88
Peak Hour: 5:00 PM 6:00 PM
HV %:PHF
EB 0.0%
0 00021
1810 9N
NE Sunset Blvd (SR-900)
NE 10th St
NE 10th St
NE Sunset Blvd (SR-900)NE 10th StNE Sunset Blvd (SR-900)2,319TEV:
0.94PHF:14828629041,077046
18
116
180
2290
1391,024191,182962018
28
7
53
51 0
Mark Skaggs: (425) 250-0777 mark.skaggs@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
3
0
1
1
1
0
0
0
6
30000111
1 1
Peak Hour 0 8 23 17 48 0 0
0 0 0 0 2 2Count Total 0 10 39 30 79 0
0 0 00000008:45 AM 0 1 6 3 10
0 0 0 0 0 0
0
8:30 AM 0 0 2 2 4 0 0 0
0 0 0 0 0 0
0 0
8:15 AM 0 2 7 4 13 0 0
0 0 0 0 1 0
0 1 0
8:00 AM 0 2 7 3 12 0
0 0 0 0 0 0
1 0 0
0
7:30 AM 0 4 5 8 17 0 0 0
0 0 0 0 0 0
1 5 0
EB WB NB SB Total East
7:45 AM 0 0 4 2 6
0 0 0
-0%5%HV%-0%0%0%-
0 1
7:15 AM 0 1 4 7 12 0 0
0 0 0 0 1 1
West North South
7:00 AM 0 0 4
2
14 365 41 0 11 39180587240
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
7%-18%4%0%5%3%0%25%
Peak
Hour
All 0 2 8
35 0 31 678 68 0
0 2 15 0 48 00600203
2 931 0
HV 0 0 0 0 0
Count Total 0 3 12 17 0 131 12 23 740 6 1,756 0
226 9149210058520210402
5 96 1 241 927
8:45 AM 0 1 0 4
1 0 3 98 8 0
212 931
8:30 AM 0 0 2 4 0 22 1
89 4 0 2 86 10140702
5 102 0 235 907
8:15 AM 0 0 4 3
7 0 1 87 13 0
239 842
8:00 AM 0 1 1 2 0 14 2
92 18 0 2 94 10151505
2 109 0 245 0
7:45 AM 0 1 2 3
5 0 6 97 6 0
188 0
7:30 AM 0 0 1 0 0 15 4
69 7 0 1 85 00142305
1 83 1 170 0
7:15 AM 0 0 1 1
3 0 7 54 2 07:00 AM 0 0 1 0 0 16 2
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
NE 10th St NE 10th St Sunset Blvd Sunset Blvd 15-min
TotalUTLTTHRT
Date: 12-15-2020
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 4.2%0.91
TOTAL 5.2%0.95
TH RT
WB 9.0%0.93
NB 5.5%0.91
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 0.0%0.64
0
0
0 0000000
0
0
1
01 1N
Sunset Blvd
NE 10th St
NE 10th St
Sunset BlvdNE 10th St Sunset Blvd931TEV:
0.95PHF:239111404391024
7
58
89
600
413651442045708
8
2
18
23 0
project.manager.wa@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
48 0
Interval
Start
NE 10th St NE 10th St Sunset Blvd Sunset Blvd 15-min
Total
Rolling
One Hour
20 3 0 2 15 0020600
RTTHLT RTTHLTRT
2 28 0 79 0
Peak Hour 0 0 0 0
7 0 1 34 4 0Count Total 0 0 0 0 0 3 0
10 39510030010000
0 2 0 4 35
8:45 AM 0 0 0 0
0 0 0 2 0 0
13 48
8:30 AM 0 0 0 0 0 0 0
7 0 0 0 4 0000200
0 3 0 12 47
8:15 AM 0 0 0 0
2 0 0 6 1 0
6 40
8:00 AM 0 0 0 0 0 0 0
3 1 0 0 2 0000000
2 6 0 17 0
7:45 AM 0 0 0 0
2 0 0 4 1 0
12 0
7:30 AM 0 0 0 0 0 2 0
3 0 0 0 7 0000101
0 1 0 5 0
7:15 AM 0 0 0 0
0 0 0 4 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
NE 10th St NE 10th St Sunset Blvd Sunset Blvd 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
project.manager.wa@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
5
8
2
2
11
8
2
5
43
172000618
18 9
Peak Hour 0 1 9 16 26 0 0
0 0 0 1 12 4Count Total 0 1 18 33 52 1
0 3 01000125:45 PM 0 0 2 3 5
0 0 0 0 2 0
3
5:30 PM 0 0 2 2 4 0 0 0
0 0 0 2 1 2
3 4
5:15 PM 0 0 2 8 10 0 0
0 0 0 0 2 2
0 1 0
5:00 PM 0 0 3 4 7 0
0 0 0 0 0 1
0 2 0
2
4:30 PM 0 0 4 4 8 0 0 0
0 0 0 1 1 4
5 8 0
EB WB NB SB Total East
4:45 PM 0 1 2 3 6
0 0 0
-0%1%HV%-0%0%0%-
1 0
4:15 PM 0 0 0 4 4 0 0
0 0 0 0 4 0
West North South
4:00 PM 0 0 3
1
6 708 102 0 45 76129011629290
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
1%-7%2%0%1%1%0%0%
Peak
Hour
All 0 13 29
57 0 23 1,456 221 0
0 3 13 0 26 0000081
12 1,879 0
HV 0 0 0 0 0
Count Total 0 20 46 47 0 221 48 92 1,452 19 3,702 0
447 1,823207340514220364207
18 172 1 439 1,828
5:45 PM 0 2 3 3
7 0 3 176 32 0
453 1,872
5:30 PM 0 2 6 3 0 14 5
165 25 0 12 188 302371203
12 189 1 484 1,876
5:15 PM 0 2 5 8
7 0 4 200 28 0
452 1,879
5:00 PM 0 1 3 4 0 32 3
169 25 0 10 182 20395403
14 186 3 483 0
4:45 PM 0 2 5 6
11 0 1 187 33 0
457 0
4:30 PM 0 2 8 4 0 24 10
156 22 0 13 196 30318800
8 197 4 487 0
4:15 PM 0 4 10 6
6 0 2 196 22 04:00 PM 0 5 6 13 0 22 6
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
NE 10th St NE 10th St Sunset Blvd Sunset Blvd 15-min
TotalUTLTTHRT
Date: 12-15-2020
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 2.0%0.96
TOTAL 1.4%0.96
TH RT
WB 0.6%0.91
NB 1.1%0.92
Peak Hour: 4:00 PM 5:00 PM
HV %:PHF
EB 0.0%0.74
0
0
0 0000000
0
0
8
21 6N
Sunset Blvd
NE 10th St
NE 10th St
Sunset BlvdNE 10th St Sunset Blvd1,879TEV:
0.96PHF:1276145818750029
29
116
174
1760
1027086816906029
29
13
71
47 0
project.manager.wa@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
010 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
1 00000
0 0
0 0
Peak Hour
0 0Count Total
0
110000100
0 0
5:45 PM
0 0 0 0
0
5:30 PM
0000000
0 0
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0
4:30 PM
00000004:15 PM 0
0 0
0 0 0
0 04:00 PM
RT
26 0
Interval
Start
NE 10th St NE 10th St Sunset Blvd Sunset Blvd 15-min
Total
Rolling
One Hour
8 1 0 3 13 0010000
RTTHLT RTTHLTRT
6 27 0 52 0
Peak Hour 0 0 0 0
0 0 0 17 1 0Count Total 0 0 0 0 0 1 0
5 26200030000000
1 1 0 4 27
5:45 PM 0 0 0 0
0 0 0 2 0 0
10 31
5:30 PM 0 0 0 0 0 0 0
2 0 0 1 7 0000000
1 3 0 7 25
5:15 PM 0 0 0 0
0 0 0 3 0 0
6 26
5:00 PM 0 0 0 0 0 0 0
1 1 0 0 3 0010000
2 2 0 8 0
4:45 PM 0 0 0 0
0 0 0 4 0 0
4 0
4:30 PM 0 0 0 0 0 0 0
0 0 0 1 3 0000000
0 5 0 8 0
4:15 PM 0 0 0 0
0 0 0 3 0 0
TH RT
4:00 PM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
NE 10th St NE 10th St Sunset Blvd Sunset Blvd 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
project.manager.wa@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
0
0
1
1
0
1
1
4
30000120
0 1
Peak Hour 2 3 0 0 5 0 0
0 0 0 0 1 2Count Total 5 7 0 1 13 0
0 0 10000008:45 AM 1 0 0 1 2
0 0 1 0 0 0
0
8:30 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
8:15 AM 0 1 0 0 1 0 0
0 0 0 0 0 1
1 0 0
8:00 AM 1 2 0 0 3 0
0 0 0 0 0 0
0 0 0
0
7:30 AM 1 3 0 0 4 0 0 0
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
7:45 AM 1 0 0 0 1
0 0 0
-0%0%HV%-0%3%--
0 0
7:15 AM 1 1 0 0 2 0 0
0 0 0 0 0 0
West North South
7:00 AM 0 0 0
0
1 1 1 0 3 100190100
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%0%0%3%0%3%0%
Peak
Hour
All 0 5 63
15 0 1 1 1 0
0 0 0 0 5 0300000
5 181 0
HV 0 0 2 0 0
Count Total 0 10 91 3 0 4 175 6 1 14 322 0
49 1800002060121500
0 0 2 42 181
8:45 AM 0 2 10 2
3 0 0 0 0 0
39 176
8:30 AM 0 1 15 0 0 0 21
0 0 0 3 1 00019301
0 0 1 50 169
8:15 AM 0 1 11 0
2 0 0 1 0 0
50 142
8:00 AM 0 2 19 0 0 1 24
0 1 0 0 0 20026200
1 0 1 37 0
7:45 AM 0 1 18 0
0 0 0 0 0 0
32 0
7:30 AM 0 1 7 0 0 1 26
0 0 0 0 0 20019000
0 0 0 23 0
7:15 AM 0 1 9 1
0 0 0 0 0 07:00 AM 0 1 2 0 0 1 19
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
NE 10th St NE 10th St Jefferson Ave W Jefferson Ave W 15-min
TotalUTLTTHRT
Date: 12-15-2020
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0%0.56
TOTAL 2.8%0.91
TH RT
WB 3.0%0.90
NB 0.0%0.75
Peak Hour: 7:45 AM 8:45 AM
HV %:PHF
EB 2.9%0.81
0
0
0 0000000
0
0
0
02 1N
Jefferson Ave W
NE 10th St
NE 10th St
Jefferson Ave WNE 10th StJefferson Ave W181TEV:
0.91PHF:513916010
90
1
101
670
1113200
63
5
68
96 0
project.manager.wa@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
5 0
Interval
Start
NE 10th St NE 10th St Jefferson Ave W Jefferson Ave W 15-min
Total
Rolling
One Hour
0 0 0 0 0 0003000
RTTHLT RTTHLTRT
0 0 1 13 0
Peak Hour 0 0 2 0
0 0 0 0 0 0Count Total 0 1 4 0 0 0 7
2 6000001000000
0 0 0 0 5
8:45 AM 0 0 1 0
0 0 0 0 0 0
1 9
8:30 AM 0 0 0 0 0 0 0
0 0 0 0 0 0001000
0 0 0 3 10
8:15 AM 0 0 0 0
0 0 0 0 0 0
1 7
8:00 AM 0 0 1 0 0 0 2
0 0 0 0 0 0000000
0 0 0 4 0
7:45 AM 0 0 1 0
0 0 0 0 0 0
2 0
7:30 AM 0 1 0 0 0 0 3
0 0 0 0 0 0001000
0 0 0 0 0
7:15 AM 0 0 1 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
NE 10th St NE 10th St Jefferson Ave W Jefferson Ave W 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
project.manager.wa@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
9
2
1
1
1
2
1
4
21
52000012
8 6
Peak Hour 4 0 0 0 4 0 0
0 0 0 1 3 4Count Total 6 0 0 0 6 1
0 2 21000105:45 PM 0 0 0 0 0
0 0 0 1 0 0
0
5:30 PM 1 0 0 0 1 0 0 0
0 0 0 1 0 1
1 0
5:15 PM 1 0 0 0 1 0 0
0 0 0 0 0 0
1 0 0
5:00 PM 1 0 0 0 1 0
0 0 0 0 0 0
0 1 0
2
4:30 PM 1 0 0 0 1 0 0 0
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
4:45 PM 1 0 0 0 1
0 0 0
-0%0%HV%-0%2%0%-
3 2
4:15 PM 1 0 0 0 1 0 0
0 0 0 0 2 2
West North South
4:00 PM 0 0 0
0
4 1 3 0 41 2600149360
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%0%0%1%-0%0%
Peak
Hour
All 0 22 166
72 0 7 2 3 0
0 0 0 0 4 0000000
46 476 0
HV 0 0 4 0 0
Count Total 0 31 343 9 0 0 242 80 4 99 892 0
97 43900061160020501
9 0 10 114 456
5:45 PM 0 3 45 0
14 0 0 0 0 0
101 466
5:30 PM 0 2 54 1 0 0 24
0 0 0 10 1 150022601
11 0 8 127 476
5:15 PM 0 1 44 1
9 0 3 1 2 0
114 453
5:00 PM 0 5 45 3 0 0 40
0 0 0 11 1 120039901
10 0 11 124 0
4:45 PM 0 5 35 1
10 0 0 0 0 0
111 0
4:30 PM 0 7 47 1 0 0 38
0 1 0 9 1 150032800
14 0 12 104 0
4:15 PM 0 5 39 1
11 0 1 1 0 04:00 PM 0 3 34 1 0 0 27
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
NE 10th St NE 10th St Jefferson Ave W Jefferson Ave W 15-min
TotalUTLTTHRT
Date: 12-15-2020
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0%0.89
TOTAL 0.8%0.94
TH RT
WB 0.0%0.94
NB 0.0%0.33
Peak Hour: 4:15 PM 5:15 PM
HV %:PHF
EB 2.1%0.88
0
0
0 0000000
0
0
2
21 0N
Jefferson Ave W
NE 10th St
NE 10th St
Jefferson Ave WNE 10th StJefferson Ave W476TEV:
0.94PHF:462418959036
149
0
185
2100
3148806
166
22
194
199 0
project.manager.wa@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
010 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
1 00000
0 0
0 0
Peak Hour
0 0Count Total
0
110000100
0 0
5:45 PM
0 0 0 0
0
5:30 PM
0000000
0 0
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0
4:30 PM
00000004:15 PM 0
0 0
0 0 0
0 04:00 PM
RT
4 0
Interval
Start
NE 10th St NE 10th St Jefferson Ave W Jefferson Ave W 15-min
Total
Rolling
One Hour
0 0 0 0 0 0000000
RTTHLT RTTHLTRT
0 0 0 6 0
Peak Hour 0 0 4 0
0 0 0 0 0 0Count Total 0 0 6 0 0 0 0
0 3000000000000
0 0 0 1 4
5:45 PM 0 0 0 0
0 0 0 0 0 0
1 4
5:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 4
5:15 PM 0 0 1 0
0 0 0 0 0 0
1 3
5:00 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 0
4:45 PM 0 0 1 0
0 0 0 0 0 0
1 0
4:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 0
4:15 PM 0 0 1 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
NE 10th St NE 10th St Jefferson Ave W Jefferson Ave W 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
project.manager.wa@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
2
2
0
0
0
0
2
0
6
0
Date: 12-15-2020
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0%0.25
TOTAL 6.5%0.96
TH RT
WB 5.9%0.90
NB --
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 8.0%0.69
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
NE 10th St NE 10th St Dwy Jefferson Ave E 15-min
TotalUTLTTHRT
0 0 20 0 0 0
1 0 0 42 0
7:15 AM 0 0 9 0
0 0 0 0 0 07:00 AM 0 0 13 0 0 0 28
0 0 0 40 0
7:45 AM 0 0 8 0
0 0 0 0 0 0
30 0
7:30 AM 0 0 12 0 0 0 28
0 0 0 0 0 1
35 147
8:00 AM 0 0 18 0 0 0 22
0 0 0 0 0 00027000
0 0 24 0 0 0
0 0 0 40 145
8:15 AM 0 0 12 0
0 0 0 0 0 0
0 0 0 35 149
8:45 AM 0 0 13 0
0 0 0 0 0 0
39 154
8:30 AM 0 0 9 0 0 0 26
0 0 0 0 0 3
36 1500000000023000
Count Total 0 0 94 0 0 0 198 1 0 4 297 0
Peak
Hour
All 0 0 50
0 0 0 0 0 0
0 0 0 0 10 0600000
3 154 0
HV 0 0 4 0 0 0
0 0 0 0 0 000010100
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
----0%6%-6%----HV%--8%--
0 0
7:15 AM 0 1 0 0 1 0 0
0 0 0 0 2 0
West North South
7:00 AM 1 1 0 0 2 0
EB WB NB SB Total East
7:45 AM 1 2 0 0 3
0 0 0 0 0 0
1
7:30 AM 1 1 0 0 2 0 0 0
0 0 0 0 0 1
0 0
8:15 AM 1 2 0 0 3 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 1 1 0 0 2 0
0 0 0 0 0 0
8:45 AM 0 1 0 0 1
0 0 0 0 0 2
0
8:30 AM 1 1 0 0 2 0 0 0
0 0 0 0 0 0
0 0 0000000
1 3
Peak Hour 4 6 0 0 10 0 0
0 0 0 0 2 0Count Total 6 10 0 0 16 0
0000000
0
0
0 0000000
0
0
0
00 0N
Jefferson Ave E
NE 10th St
NE 10th St
DwyNE 10th StJefferson Ave E154TEV:
0.96PHF:3003000
101
0
101
500
0000000
50
0
50
104 0
project.manager.wa@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
SouthboundNorthboundWestboundEastbound
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
NE 10th St NE 10th St Dwy Jefferson Ave E 15-min
Total
Rolling
One HourEastboundWestbound
0 0 0 2 0
7:15 AM 0 0 0 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 1 0 0 0 1
UT LT TH RT UT LT
1 0
7:30 AM 0 0 1 0 0 0 1
0 0 0 0 0 0001000
0 0 2 0 0 0
0 0 0 2 0
7:45 AM 0 0 1 0
0 0 0 0 0 0
0 0 0 2 8
8:15 AM 0 0 1 0
0 0 0 0 0 0
3 8
8:00 AM 0 0 1 0 0 0 1
0 0 0 0 0 0
3 10
8:30 AM 0 0 1 0 0 0 1
0 0 0 0 0 0002000
0 0 1 0 0 0
0 0 0 2 10
8:45 AM 0 0 0 0
0 0 0 0 0 0
1 8000000
0 0 0 16 0
Peak Hour 0 0 4 0
0 0 0 0 0 0Count Total 0 0 6 0 0 0 10
0 07:00 AM
RT
10 0
Interval
Start
NE 10th St NE 10th St Dwy Jefferson Ave E 15-min
Total
Rolling
One Hour
0 0 0 0 0 0006000
RTTHLT RTTHLTRT
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
000000000
Peak Hour
0 0Count Total
0
THLT
0000000
0 00000
0 0
0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
000 0 0 0
000 0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
project.manager.wa@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
3
3
3
2
4
5
1
4
25
14
Date: 12-15-2020
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0%0.50
TOTAL 0.8%0.92
TH RT
WB 0.0%0.89
NB 0.0%0.38
Peak Hour: 4:30 PM 5:30 PM
HV %:PHF
EB 1.3%0.92
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
NE 10th St NE 10th St Dwy Jefferson Ave E 15-min
TotalUTLTTHRT
0 0 36 0 0 0
1 0 0 87 0
4:15 PM 0 1 44 0
1 0 0 0 0 04:00 PM 0 0 46 0 0 0 39
3 0 0 93 0
4:45 PM 0 0 60 0
0 0 0 0 0 0
82 0
4:30 PM 0 0 54 1 0 0 35
0 0 0 0 0 1
96 358
5:00 PM 0 0 54 0 0 0 41
0 0 0 1 0 00034001
0 2 41 0 0 0
2 0 2 99 370
5:15 PM 0 0 62 1
0 0 0 0 0 0
1 0 0 85 388
5:45 PM 0 0 56 0
0 0 0 0 0 0
108 396
5:30 PM 0 0 54 0 0 0 30
0 2 0 0 0 0
94 3860100000037000
Count Total 0 1 430 2 0 2 293 8 0 3 744 0
Peak
Hour
All 0 0 230
1 0 1 0 3 0
0 0 0 0 3 0000000
2 396 0
HV 0 0 3 0 0 0
1 0 2 0 6 020215100
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%-0%1%0%0%--0%-HV%--1%0%-
0 1
4:15 PM 1 0 0 0 1 1 0
0 0 0 0 0 2
West North South
4:00 PM 0 0 0 0 0 0
EB WB NB SB Total East
4:45 PM 0 0 0 0 0
0 0 0 1 1 1
1
4:30 PM 1 0 0 0 1 0 0 0
0 0 1 0 1 1
1 0
5:15 PM 1 0 0 0 1 0 0
0 0 0 0 3 0
0 1 1
5:00 PM 1 0 0 0 1 0
1 0 0 0 1 0
5:45 PM 1 0 0 0 1
0 0 0 0 0 1
0
5:30 PM 1 0 0 0 1 0 0 0
0 0 0 0 0 5
0 0 4000000
9 9
Peak Hour 3 0 0 0 3 1 0
0 0 0 2 3 4Count Total 6 0 0 0 6 2
2001318
0
1
0 0000000
0
0
8
21 3N
Jefferson Ave E
NE 10th St
NE 10th St
DwyNE 10th StJefferson Ave E396TEV:
0.92PHF:2068000
151
2
153
2380
2013402
230
0
232
154 0
project.manager.wa@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
SouthboundNorthboundWestboundEastbound
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
NE 10th St NE 10th St Dwy Jefferson Ave E 15-min
Total
Rolling
One HourEastboundWestbound
0 0 0 0 0
4:15 PM 0 0 1 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 0 0 0 0 0
UT LT TH RT UT LT
1 0
4:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 0 0
0 0 0 1 0
4:45 PM 0 0 0 0
0 0 0 0 0 0
0 0 0 1 3
5:15 PM 0 0 1 0
0 0 0 0 0 0
0 2
5:00 PM 0 0 1 0 0 0 0
0 0 0 0 0 0
1 3
5:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 0 0
0 0 0 1 3
5:45 PM 0 0 1 0
0 0 0 0 0 0
1 4000000
0 0 0 6 0
Peak Hour 0 0 3 0
0 0 0 0 0 0Count Total 0 0 6 0 0 0 0
0 04:00 PM
RT
3 0
Interval
Start
NE 10th St NE 10th St Dwy Jefferson Ave E 15-min
Total
Rolling
One Hour
0 0 0 0 0 0000000
RTTHLT RTTHLTRT
2
5:00 PM
1000
0 0
4:45 PM
0 0 0 0
0
4:30 PM
10000004:15 PM 0
0 0
0 0 0
0 1
5:45 PM
0 0 0 0
1
5:30 PM
0000000
0 2
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
000000000
Peak Hour
0 0Count Total
0
THLT
1000000
2 00000
0 0
0 0
0000
0
0
0
01
0
THLT
00000000
1
00
0
0
0 0 0
0 0 0
0
010 0 0 0
020 0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
project.manager.wa@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
1
2
0
0
2
0
1
1
7
21000010
0 4
Peak Hour 3 5 2 0 10 0 0
0 0 0 0 2 1Count Total 5 6 2 0 13 0
0 0 10000008:45 AM 1 0 0 0 1
0 0 0 0 0 1
0
8:30 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 1
8:15 AM 1 1 0 0 2 0 0
0 0 0 0 0 1
0 0 0
8:00 AM 1 1 1 0 3 0
0 0 0 0 0 0
0 0 0
1
7:30 AM 0 3 1 0 4 0 0 0
0 0 0 1 0 0
0 0 0
EB WB NB SB Total East
7:45 AM 1 0 0 0 1
0 0 0
-17%0%HV%-50%5%0%-
0 0
7:15 AM 1 1 0 0 2 0 0
0 0 0 0 1 0
West North South
7:00 AM 0 0 0
1
12 21 5 0 5 79068260
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%0%0%5%17%5%0%
Peak
Hour
All 0 2 40
9 0 18 43 11 0
0 0 0 0 10 0400200
6 201 0
HV 0 1 2 0 0
Count Total 0 5 67 18 0 14 154 8 12 9 368 0
52 1958101110222103
1 2 2 47 198
8:45 AM 0 1 8 3
0 0 2 5 2 0
42 201
8:30 AM 0 2 10 1 0 2 18
5 0 0 0 2 30116003
2 0 2 54 198
8:15 AM 0 1 10 1
0 0 2 4 3 0
55 173
8:00 AM 0 1 14 1 0 2 23
3 2 0 1 2 00121205
2 3 1 50 0
7:45 AM 0 0 13 5
4 0 2 9 0 0
39 0
7:30 AM 0 0 3 2 0 2 22
7 3 0 1 1 00116101
0 1 0 29 0
7:15 AM 0 0 6 2
1 0 0 2 0 07:00 AM 0 0 3 3 0 3 16
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
NE 10th St NE 10th St Kirkland Ave NE Kirkland Ave NE 15-min
TotalUTLTTHRT
Date: 12-15-2020
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0%0.75
TOTAL 5.0%0.91
TH RT
WB 5.3%0.84
NB 5.3%0.86
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 5.9%0.71
0
0
0 0000000
0
0
0
11 0N
Kirkland Ave NE
NE 10th St
NE 10th St
Kirkland Ave NENE 10th StKirkland Ave NE201TEV:
0.91PHF:675182906
82
6
94
500
52112382209
40
2
51
100 0
project.manager.wa@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
10 0
Interval
Start
NE 10th St NE 10th St Kirkland Ave NE Kirkland Ave NE 15-min
Total
Rolling
One Hour
0 0 0 0 0 0014002
RTTHLT RTTHLTRT
0 0 0 13 0
Peak Hour 0 1 2 0
0 0 2 0 0 0Count Total 0 1 3 1 0 1 5
1 6000000000000
0 0 0 0 6
8:45 AM 0 0 1 0
0 0 0 0 0 0
2 10
8:30 AM 0 0 0 0 0 0 0
0 0 0 0 0 0001000
0 0 0 3 10
8:15 AM 0 0 1 0
0 0 1 0 0 0
1 7
8:00 AM 0 1 0 0 0 0 1
0 0 0 0 0 0000000
0 0 0 4 0
7:45 AM 0 0 1 0
0 0 1 0 0 0
2 0
7:30 AM 0 0 0 0 0 1 2
0 0 0 0 0 0001000
0 0 0 0 0
7:15 AM 0 0 0 1
0 0 0 0 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
NE 10th St NE 10th St Kirkland Ave NE Kirkland Ave NE 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
project.manager.wa@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
2
0
0
3
1
0
4
10
54000100
1 5
Peak Hour 4 0 0 0 4 0 0
0 0 0 1 1 3Count Total 6 0 0 0 6 1
3 0 11000105:45 PM 0 0 0 0 0
0 0 0 0 0 0
0
5:30 PM 1 0 0 0 1 0 0 0
0 0 0 0 0 1
0 2
5:15 PM 1 0 0 0 1 0 0
0 0 0 0 1 0
0 0 0
5:00 PM 1 0 0 0 1 0
0 0 0 0 0 0
0 0 0
2
4:30 PM 1 0 0 0 1 0 0 0
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
4:45 PM 1 0 0 0 1
0 0 0
-0%0%HV%-0%2%0%-
0 0
4:15 PM 1 0 0 0 1 0 0
0 0 0 0 0 0
West North South
4:00 PM 0 0 0
0
24 19 9 0 9 253901513670
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%0%0%1%0%0%0%
Peak
Hour
All 0 6 170
9 0 48 40 21 0
0 0 0 0 4 0000000
20 479 0
HV 0 0 4 0 0
Count Total 0 13 330 81 0 28 234 14 55 25 898 0
96 4283301720419005
2 8 0 118 448
5:45 PM 0 1 45 6
0 0 7 4 4 0
95 454
5:30 PM 0 2 41 15 0 4 31
5 3 0 0 4 00219107
0 2 2 119 479
5:15 PM 0 1 40 13
1 0 5 4 1 0
116 470
5:00 PM 0 2 48 12 0 4 38
6 5 0 0 7 60136205
4 6 6 124 0
4:45 PM 0 2 37 9
1 0 5 5 3 0
120 0
4:30 PM 0 1 45 9 0 4 35
4 0 0 5 10 60627309
2 11 3 110 0
4:15 PM 0 1 40 9
1 0 5 9 2 04:00 PM 0 3 34 8 0 3 29
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
NE 10th St NE 10th St Kirkland Ave NE Kirkland Ave NE 15-min
TotalUTLTTHRT
Date: 12-15-2020
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0%0.64
TOTAL 0.8%0.97
TH RT
WB 0.0%0.92
NB 0.0%0.81
Peak Hour: 4:15 PM 5:15 PM
HV %:PHF
EB 1.9%0.87
0
0
0 0000000
0
0
0
40 1N
Kirkland Ave NE
NE 10th St
NE 10th St
Kirkland Ave NENE 10th StKirkland Ave NE479TEV:
0.97PHF:20259543207
136
15
158
1880
919245279039
170
6
215
180 0
project.manager.wa@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
010 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
1 00000
0 0
0 0
Peak Hour
0 0Count Total
0
110000100
0 0
5:45 PM
0 0 0 0
0
5:30 PM
0000000
0 0
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0
4:30 PM
00000004:15 PM 0
0 0
0 0 0
0 04:00 PM
RT
4 0
Interval
Start
NE 10th St NE 10th St Kirkland Ave NE Kirkland Ave NE 15-min
Total
Rolling
One Hour
0 0 0 0 0 0000000
RTTHLT RTTHLTRT
0 0 0 6 0
Peak Hour 0 0 4 0
0 0 0 0 0 0Count Total 0 0 6 0 0 0 0
0 3000000000000
0 0 0 1 4
5:45 PM 0 0 0 0
0 0 0 0 0 0
1 4
5:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 4
5:15 PM 0 0 1 0
0 0 0 0 0 0
1 3
5:00 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 0
4:45 PM 0 0 1 0
0 0 0 0 0 0
1 0
4:30 PM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 0
4:15 PM 0 0 1 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
NE 10th St NE 10th St Kirkland Ave NE Kirkland Ave NE 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
project.manager.wa@idaxdata.com
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions, Inc. March 2021
Traffic Volume Forecast
Volume Forecast
AM TRIPS AM TRIPS AM TRIPS AM TRIPS 2020 GROWTH 2022 2022
EXISTING OFFICE NEW OFFICE NEW RESIDENTIAL Figure 5 EXISTING WITHOUT WITH
IN OUT TOT IN OUT TOT IN OUT TOT TOTAL AM PK HR AM PK HR AM PK HR
-14 -2 -16 11 2 13 24 10 34 31
EB L 0 0 0 0 5 13.3 20 20
EB T 0 0 0 0 15 0.9 15 15
EB R 0 0 0 0 15 58.9 75 75
WB L 55%-1 55%1 55%6 6 105 6.4 110 116
1 WB T 0 0 0 0 15 0.9 15 15
Sunset Blvd WB R 5%0 5%0 5%1 1 45 2.7 50 51
NE 10th St NB L 0 0 0 0 25 45.5 70 70
NB T 0 0 0 0 660 47.2 705 705
NB R 55%-8 55%6 55%13 12 75 4.6 80 92
SB L 5%-1 5%1 5%1 1 20 1.2 20 21
SB T 0 0 0 0 710 50.2 760 760
SB R 0 0 0 0 5 13.3 20 20
TOT 60%60%-10 60%60%8 60%60%20 19 1695 245.2 1940 1959
EB L 60%-8 60%7 60%14 13 10 0.6 10 23
EB T 0 0 0 0 115 7.0 120 120
EB R 0 0 0 0 0 0.0 0 0
WB L 0 0 0 0 0 0.0 0 0
2 WB T 60%-1 0 0 -1 165 10.0 175 174
W Jefferson WB R 0 40%4 40%10 14 20 1.2 20 34
NE 10th St NB L 0 0 0 0 0 0.0 0 0
NB T 0 0 0 0 0 0.0 0 0
NB R 0 0 0 0 0 0.0 0 0
SB L 0 40%1 40%4 5 5 0.3 5 10
SB T 0 0 0 0 0 0.0 0 0
SB R 0 60%1 60%6 7 10 0.6 10 17
TOT 60%60%-10 100%100%13 100%100%34 37 325 19.8 340 377
EB L 0 0%0 0 0 0 0.0 0 0
EB T 40%-1 40%1 40%4 4 90 5.5 95 99
EB R 0 0 0 0 0 0.0 0 0
WB L 0 0 0 0 0 0.0 0 0
3 WB T 40%-6 40%4 40%10 8 185 11.3 195 203
E Jefferson WB R 0 0 0 0 0 0.0 0 0
NE 10th St NB L 0 0 0 0 0 0.0 0 0
NB T 0 0 0 0 0 0.0 0 0
NB R 0 0 0 0 0 0.0 0 0
SB L 0 0 0 0 0 0.0 0 0
SB T 0 0 0 0 0 0.0 0 0
SB R 0 0%0 0 0 5 0.3 5 5
TOT 40%40%-6 40%40%5 40%40%14 12 280 17.1 295 307
Volume Forecast
AM TRIPS AM TRIPS AM TRIPS AM TRIPS 2020 GROWTH 2022 2022
EXISTING OFFICE NEW OFFICE NEW RESIDENTIAL Figure 5 EXISTING WITHOUT WITH
IN OUT TOT IN OUT TOT IN OUT TOT TOTAL AM PK HR AM PK HR AM PK HR
-14 -2 -16 11 2 13 24 10 34 31
EB L 10%0 10%0 10%1 1 5 0.3 5 6
EB T 10%0 10%0 10%1 1 70 4.3 75 76
EB R 20%0 20%0 20%2 2 15 0.9 15 17
WB L 0 0 0 0 10 0.6 10 10
4 WB T 10%-1 10%1 10%2 2 150 9.1 160 162
Kirkland Ave NE WB R 0 0 0 0 10 0.6 10 10
NE 10th St NB L 20%-3 20%2 20%5 4 20 1.2 20 24
NB T 0 0 0 0 40 2.4 40 40
NB R 0 0 0 0 10 0.6 10 10
SB L 0 0 0 0 10 0.6 10 10
SB T 0 0 0 0 15 0.9 15 15
SB R 10%-1 10%1 10%2 2 10 0.6 10 12
TOT 40%40%-6 40%40%5 40%40%14 12 365 22.2 380 392
EB L 0 0 0 0 0.0 0 0
EB T 0 0 0 0 0.0 0 0
EB R 0 0 0 0 0.0 0 0
WB L 0 100%2 100%10 12 0.0 0 12
5 WB T 0 0 0 0 0.0 0 0
Jefferson W WB R 0 0 0 0 0.0 0 0
Site Access NB L 0 0 0 0 0.0 0 0
NB T 0 0 0 0 30 1.8 30 30
NB R 0 100%11 100%24 35 0.0 0 35
SB L 0 0 0%0 0 0.0 0 0
SB T 0 0 0 0 15 0.9 15 15
SB R 0 0 0 0 0.0 0 0
TOT 0%0%0 100%100%13 100%100%34 47 45 2.7 45 92
Volume Forecast
EB L
EB T
EB R
WB L
1 WB T
Sunset Blvd WB R
NE 10th St NB L
NB T
NB R
SB L
SB T
SB R
TOT
EB L
EB T
EB R
WB L
2 WB T
W Jefferson WB R
NE 10th St NB L
NB T
NB R
SB L
SB T
SB R
TOT
EB L
EB T
EB R
WB L
3 WB T
E Jefferson WB R
NE 10th St NB L
NB T
NB R
SB L
SB T
SB R
TOT
PM TRIPS PM TRIPS PM TRIPS PM TRIPS 2020 GROWTH 2022 2022
EXISTING OFFICE NEW OFFICE NEW RESIDENTIAL Figure 5 EXISTING WITHOUT WITH
IN OUT TOT IN OUT TOT IN OUT TOT TOTAL PM PK HR PM PK HR
-2 -13 -15 2 11 13 6 15 21 19
0%0%0 0%0%0 0%0%0 0 15 6.9 20 20
0%0%0 0%0%0 0%0%0 0 35 2.1 35 35
0%0%0 0%0%0 0%0%0 0 35 31.1 65 65
0%55%-7 0%55%6 0%55%8 7 145 8.8 155 162
0%0%0 0%0%0 0%0%0 0 35 2.1 35 35
0%5%-1 0%5%1 0%5%1 1 35 2.1 35 36
0%0%0 0%0%0 0%0%0 0 10 25.6 35 35
0%0%0 0%0%0 0%0%0 0 890 61.2 950 950
55%0%-1 55%0%1 55%0%3 3 130 7.9 140 143
5%0%0 5%0%0 5%0%0 0 55 3.3 60 60
0%0%0 0%0%0 0%0%0 0 960 65.5 1025 1025
0%0%0 0%0%0 0%0%0 0 15 7.9 25 25
60%60%-9 60%60%8 60%60%13 11 2360 224.7 2580 2591
60%0%-1 60%0%1 60%0%4 4 30 1.8 30 34
0%0%0 0%0%0 0%0%0 0 210 12.8 225 225
0%0%0 0%0%0 0%0%0 0 10 0.6 10 10
0%0%0 0%0%0 0%0%0 0 0 0.0 0 0
0%60%-8 0%0%0 0%0%0 -8 190 11.6 200 192
0%0%0 40%0%1 40%0%2 3 45 2.7 50 53
0%0%0 0%0%0 0%0%0 0 5 0.3 5 5
0%0%0 0%0%0 0%0%0 0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 5 0.3 5 5
0%0%0 0%40%4 0%40%6 10 50 3.0 55 65
0%0%0 0%0%0 0%0%0 0 5 0.3 5 5
0%0%0 0%60%7 0%60%9 16 60 3.7 65 81
60%60%-9 100%100%13 100%100%21 25 610 37.1 650 675
0%0%0 0%0%0 0%0%0 0 0 0.0 0 0
0%40%-5 0%40%4 0%40%6 5 290 17.7 310 315
0%0%0 0%0%0 0%0%0 0 5 0.3 5 5
0%0%0 0%0%0 0%0%0 0 0 0.0 0 0
40%0%-1 40%0%1 40%0%2 2 190 11.6 200 202
0%0%0 0%0%0 0%0%0 0 5 0.3 5 5
0%0%0 0%0%0 0%0%0 0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 5 0.3 5 5
0%0%0 0%0%0 0%0%0 0 10 0.6 10 10
0%0%0 0%0%0 0%0%0 0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 5 0.3 5 5
40%40%-6 40%40%5 40%40%8 8 510 31.1 540 548
Volume Forecast
EB LEB L
EB T
EB R
WB L
4 WB T
Kirkland Ave NE WB R
NE 10th St NB L
NB T
NB R
SB L
SB T
SB R
TOT
EB L
EB T
EB R
WB L
5 WB T
Jefferson W WB R
Site Access NB L
NB T
NB R
SB L
SB T
SB R
TOT
PM TRIPS PM TRIPS PM TRIPS PM TRIPS 2020 GROWTH 2022 2022
EXISTING OFFICE NEW OFFICE NEW RESIDENTIAL Figure 5 EXISTING WITHOUT WITH
IN OUT TOT IN OUT TOT IN OUT TOT TOTAL PM PK HR PM PK HR
-2 -13 -15 2 11 13 6 15 21 19
0%10%-1 0%10%1 0%10%2 1 10 0.6 10 11
0%10%-1 0%10%1 0%10%2 1 215 13.1 230 231
0%20%-3 0%20%2 0%20%3 3 50 3.0 55 58
0%0%0 0%0%0 0%0%0 0 20 1.2 20 20
10%0%0 10%0%0 10%0%1 1 170 10.4 180 181
0%0%0 0%0%0 0%0%0 0 10 0.6 10 10
20%0%0 20%0%0 20%0%1 1 30 1.8 30 31
0%0%0 0%0%0 0%0%0 0 25 1.5 25 25
0%0%0 0%0%0 0%0%0 0 10 0.6 10 10
0%0%0 0%0%0 0%0%0 0 10 0.6 10 10
0%0%0 0%0%0 0%0%0 0 30 1.8 30 30
10%0%0 10%0%0 10%0%1 1 25 1.5 25 26
40%40%-6 40%40%5 40%40%8 8 605 36.8 635 643
0%0%0 0%0%0 0%0%0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 0.0 0 0
0%0%0 0%100%11 0%100%15 26 0.0 0 26
0%0%0 0%0%0 0%0%0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 75 4.6 80 80
0%0%0 100%0%2 100%0%6 8 0.0 0 8
0%0%0 0%0%0 0%0%0 0 0.0 0 0
0%0%0 0%0%0 0%0%0 0 110 6.7 115 115
0%0%0 0%0%0 0%0%0 0 0.0 0 0
0%0%0 100%100%13 100%100%21 34 185 11.3 195 229
Sunset Gardens Traffic Impact Analysis Renton, WA
Transportation Solutions, Inc. March 2021
Level-of-service
HCM 6th Signalized Intersection Summary RHA Sunset Gardens
1: NE SUNSET BLVD & NE 10TH ST Existing Conditions AM
Timing Plan: AM Synchro 10 Report
TSI 02/02/2021
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 5 15 15 105 15 45 25 660 75 20 710 5
Future Volume (veh/h) 5 15 15 105 15 45 25 660 75 20 710 5
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1767 1767 1767 1811 1811 1811 1841 1841 1841
Adj Flow Rate, veh/h 5 16 16 111 16 47 26 695 79 21 747 5
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 0 0 0 9 9 9 6 6 6 4 4 4
Cap, veh/h 118 155 131 286 39 66 54 1150 131 217 1644 11
Arrive On Green 0.17 0.17 0.17 0.17 0.17 0.17 0.03 0.37 0.37 0.12 0.46 0.46
Sat Flow, veh/h 97 893 754 808 223 382 1725 3114 354 1753 3561 24
Grp Volume(v), veh/h 37 0 0 174 0 0 26 384 390 21 367 385
Grp Sat Flow(s),veh/h/ln 1743 0 0 1413 0 0 1725 1721 1747 1753 1749 1836
Q Serve(g_s), s 0.0 0.0 0.0 3.9 0.0 0.0 0.6 7.3 7.3 0.4 5.8 5.8
Cycle Q Clear(g_c), s 0.7 0.0 0.0 4.6 0.0 0.0 0.6 7.3 7.3 0.4 5.8 5.8
Prop In Lane 0.14 0.43 0.64 0.27 1.00 0.20 1.00 0.01
Lane Grp Cap(c), veh/h 403 0 0 391 0 0 54 635 645 217 807 848
V/C Ratio(X)0.09 0.00 0.00 0.45 0.00 0.00 0.48 0.60 0.61 0.10 0.45 0.45
Avail Cap(c_a), veh/h 1295 0 0 1125 0 0 363 1723 1750 325 1708 1794
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 14.1 0.0 0.0 15.7 0.0 0.0 19.3 10.4 10.4 15.7 7.4 7.4
Incr Delay (d2), s/veh 0.1 0.0 0.0 0.8 0.0 0.0 6.5 0.9 0.9 0.2 0.4 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(95%),veh/ln 0.5 0.0 0.0 2.4 0.0 0.0 0.6 4.0 4.1 0.3 2.8 2.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 14.2 0.0 0.0 16.5 0.0 0.0 25.8 11.3 11.3 15.9 7.8 7.8
LnGrp LOS B A A B A A C B B B A A
Approach Vol, veh/h 37 174 800 773
Approach Delay, s/veh 14.2 16.5 11.8 8.0
Approach LOS B B B A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.5 19.4 11.5 5.8 23.2 11.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 7.5 40.5 28.5 8.5 39.5 28.5
Max Q Clear Time (g_c+I1), s 2.4 9.3 2.7 2.6 7.8 6.6
Green Ext Time (p_c), s 0.0 5.6 0.1 0.0 5.3 1.0
Intersection Summary
HCM 6th Ctrl Delay 10.6
HCM 6th LOS B
HCM 6th TWSC RHA Sunset Gardens
2: JEFFERSON AVE W & NE 10TH ST Existing Conditions AM
Timing Plan: AM Synchro 10 Report
TSI 02/02/2021
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 115 0 0 165 20 0 0 0 5 0 10
Future Vol, veh/h 10 115 0 0 165 20 0 0 0 5 0 10
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 1 1 0 2
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 3 3 3 3 3 3 0 0 0 0 0 0
Mvmt Flow 11 126 0 0 181 22 0 0 0 5 0 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 203 0 0 126 0 0 348 351 127 341 340 194
Stage 1 - - - - - - 148 148 - 192 192 -
Stage 2 - - - - - - 200 203 - 149 148 -
Critical Hdwy 4.13 - - 4.13 - - 7.1 6.5 6.2 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 -
Follow-up Hdwy 2.227 - - 2.227 - - 3.5 4 3.3 3.5 4 3.3
Pot Cap-1 Maneuver 1363 - - 1454 - - 610 577 929 617 585 853
Stage 1 - - - - - - 859 779 - 814 745 -
Stage 2 - - - - - - 806 737 - 858 779 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1363 - - 1454 - - 597 572 928 612 580 851
Mov Cap-2 Maneuver - - - - - - 597 572 - 612 580 -
Stage 1 - - - - - - 851 772 - 807 745 -
Stage 2 - - - - - - 794 737 - 849 772 -
Approach EB WB NB SB
HCM Control Delay, s 0.6 0 0 9.9
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)- 1363 - - 1454 - - 753
HCM Lane V/C Ratio - 0.008 - - - - - 0.022
HCM Control Delay (s) 0 7.7 0 - 0 - - 9.9
HCM Lane LOS A A A - A - - A
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.1
HCM 6th TWSC RHA Sunset Gardens
3: Driveway/JEFFERSON AVE E & NE 10TH ST Existing Conditions AM
Timing Plan: AM Synchro 10 Report
TSI 02/02/2021
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 90 0 0 185 0 0 0 0 0 0 5
Future Vol, veh/h 0 90 0 0 185 0 0 0 0 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 92 92 96 96 92 92 92 96 92 96
Heavy Vehicles, % 8 8 2 2 6 6 2 2 2 0 2 0
Mvmt Flow 0 94 0 0 193 0 0 0 0 0 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 193 0 0 94 0 0 290 287 94 287 287 193
Stage 1 - - - - - - 94 94 - 193 193 -
Stage 2 - - - - - - 196 193 - 94 94 -
Critical Hdwy 4.18 - - 4.12 - - 7.12 6.52 6.22 7.1 6.52 6.2
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.1 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.1 5.52 -
Follow-up Hdwy 2.272 - - 2.218 - - 3.518 4.018 3.318 3.5 4.018 3.3
Pot Cap-1 Maneuver 1345 - - 1500 - - 662 623 963 669 623 854
Stage 1 - - - - - - 913 817 - 813 741 -
Stage 2 - - - - - - 806 741 - 918 817 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1345 - - 1500 - - 658 623 963 669 623 854
Mov Cap-2 Maneuver - - - - - - 658 623 - 669 623 -
Stage 1 - - - - - - 913 817 - 813 741 -
Stage 2 - - - - - - 801 741 - 918 817 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 0 9.2
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)- 1345 - - 1500 - - 854
HCM Lane V/C Ratio - - - - - - - 0.006
HCM Control Delay (s) 0 0 - - 0 - - 9.2
HCM Lane LOS A A - - A - - A
HCM 95th %tile Q(veh) - 0 - - 0 - - 0
HCM 6th AWSC RHA Sunset Gardens
4: KIRKLAND AVE NE & NE 10TH ST Existing Conditions AM
Timing Plan: AM Synchro 10 Report
TSI 02/02/2021
Intersection
Intersection Delay, s/veh 8.3
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 70 15 10 150 10 20 40 10 10 15 10
Future Vol, veh/h 5 70 15 10 150 10 20 40 10 10 15 10
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles, %6 6 6 5 5 5 5 5 5 0 0 0
Mvmt Flow 5 77 16 11 165 11 22 44 11 11 16 11
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 8 8.6 8.2 7.8
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %29% 6% 6% 29%
Vol Thru, %57% 78% 88% 43%
Vol Right, %14% 17% 6% 29%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 70 90 170 35
LT Vol 20 5 10 10
Through Vol 40 70 150 15
RT Vol 10 15 10 10
Lane Flow Rate 77 99 187 38
Geometry Grp 1 1 1 1
Degree of Util (X)0.099 0.12 0.225 0.048
Departure Headway (Hd)4.646 4.386 4.342 4.524
Convergence, Y/N Yes Yes Yes Yes
Cap 773 820 829 793
Service Time 2.663 2.401 2.355 2.542
HCM Lane V/C Ratio 0.1 0.121 0.226 0.048
HCM Control Delay 8.2 8 8.6 7.8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.3 0.4 0.9 0.2
HCM 6th Signalized Intersection Summary RHA Sunset Gardens
1: NE SUNSET BLVD & NE 10TH ST Existing Conditions PM
Timing Plan: PM Synchro 10 Report
TSI 02/02/2021
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 15 35 35 145 35 35 10 890 130 55 960 15
Future Volume (veh/h) 15 35 35 145 35 35 10 890 130 55 960 15
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1885 1885 1885 1885 1885 1885 1870 1870 1870
Adj Flow Rate, veh/h 16 36 36 151 36 36 10 927 135 57 1000 16
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 0 0 0 1 1 1 1 1 1 2 2 2
Cap, veh/h 120 188 151 327 70 52 23 1402 204 99 1753 28
Arrive On Green 0.21 0.21 0.21 0.21 0.21 0.21 0.01 0.45 0.45 0.06 0.49 0.49
Sat Flow, veh/h 145 875 706 935 328 243 1795 3134 456 1781 3579 57
Grp Volume(v), veh/h 88 0 0 223 0 0 10 530 532 57 496 520
Grp Sat Flow(s),veh/h/ln 1726 0 0 1506 0 0 1795 1791 1799 1781 1777 1860
Q Serve(g_s), s 0.0 0.0 0.0 4.3 0.0 0.0 0.3 11.1 11.1 1.5 9.4 9.4
Cycle Q Clear(g_c), s 2.0 0.0 0.0 6.3 0.0 0.0 0.3 11.1 11.1 1.5 9.4 9.4
Prop In Lane 0.18 0.41 0.68 0.16 1.00 0.25 1.00 0.03
Lane Grp Cap(c), veh/h 459 0 0 449 0 0 23 801 805 99 870 911
V/C Ratio(X)0.19 0.00 0.00 0.50 0.00 0.00 0.43 0.66 0.66 0.58 0.57 0.57
Avail Cap(c_a), veh/h 1020 0 0 937 0 0 320 1557 1565 317 1545 1617
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 15.5 0.0 0.0 17.0 0.0 0.0 23.4 10.4 10.4 22.0 8.6 8.6
Incr Delay (d2), s/veh 0.2 0.0 0.0 0.8 0.0 0.0 11.9 0.9 0.9 5.2 0.6 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(95%),veh/ln 1.3 0.0 0.0 3.7 0.0 0.0 0.3 6.4 6.4 1.3 5.1 5.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 15.7 0.0 0.0 17.9 0.0 0.0 35.3 11.3 11.3 27.2 9.2 9.2
LnGrp LOS B A A B A A D B B C A A
Approach Vol, veh/h 88 223 1072 1073
Approach Delay, s/veh 15.7 17.9 11.5 10.2
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.2 25.8 14.7 5.1 27.9 14.7
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 8.5 41.5 26.5 8.5 41.5 26.5
Max Q Clear Time (g_c+I1), s 3.5 13.1 4.0 2.3 11.4 8.3
Green Ext Time (p_c), s 0.0 8.3 0.4 0.0 7.8 1.2
Intersection Summary
HCM 6th Ctrl Delay 11.7
HCM 6th LOS B
HCM 6th TWSC RHA Sunset Gardens
2: JEFFERSON AVE W & NE 10TH ST Existing Conditions PM
Timing Plan: PM Synchro 10 Report
TSI 02/02/2021
Intersection
Int Delay, s/veh 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 30 210 10 0 190 45 5 0 5 50 5 60
Future Vol, veh/h 30 210 10 0 190 45 5 0 5 50 5 60
Conflicting Peds, #/hr 2 0 2 2 0 2 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 2 2 0 0 0 0 0 0 0 0 0
Mvmt Flow 32 223 11 0 202 48 5 0 5 53 5 64
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 252 0 0 236 0 0 557 547 231 523 528 229
Stage 1 - - - - - - 295 295 - 228 228 -
Stage 2 - - - - - - 262 252 - 295 300 -
Critical Hdwy 4.12 - - 4.1 - - 7.1 6.5 6.2 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 -
Follow-up Hdwy 2.218 - - 2.2 - - 3.5 4 3.3 3.5 4 3.3
Pot Cap-1 Maneuver 1313 - - 1343 - - 444 447 813 468 459 815
Stage 1 - - - - - - 718 673 - 779 719 -
Stage 2 - - - - - - 747 702 - 718 669 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1310 - - 1340 - - 396 433 811 454 444 813
Mov Cap-2 Maneuver - - - - - - 396 433 - 454 444 -
Stage 1 - - - - - - 696 653 - 756 718 -
Stage 2 - - - - - - 683 701 - 693 649 -
Approach EB WB NB SB
HCM Control Delay, s 0.9 0 11.9 12.7
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)532 1310 - - 1340 - - 589
HCM Lane V/C Ratio 0.02 0.024 - - - - - 0.208
HCM Control Delay (s) 11.9 7.8 0 - 0 - - 12.7
HCM Lane LOS B A A - A - - B
HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 0.8
HCM 6th TWSC RHA Sunset Gardens
3: Driveway/JEFFERSON AVE E & NE 10TH ST Existing Conditions PM
Timing Plan: PM Synchro 10 Report
TSI 02/02/2021
Intersection
Int Delay, s/veh 0.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 290 5 0 190 5 0 0 5 10 0 5
Future Vol, veh/h 0 290 5 0 190 5 0 0 5 10 0 5
Conflicting Peds, #/hr 8 0 0 0 0 8 0 0 0 3 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 1 1 2 2 0 0 2 2 2 0 2 0
Mvmt Flow 0 315 5 0 207 5 0 0 5 11 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 220 0 0 320 0 0 531 538 321 541 538 219
Stage 1 - - - - - - 318 318 - 218 218 -
Stage 2 - - - - - - 213 220 - 323 320 -
Critical Hdwy 4.11 - - 4.12 - - 7.12 6.52 6.22 7.1 6.52 6.2
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.1 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.1 5.52 -
Follow-up Hdwy 2.209 - - 2.218 - - 3.518 4.018 3.318 3.5 4.018 3.3
Pot Cap-1 Maneuver 1355 - - 1240 - - 459 450 720 455 450 826
Stage 1 - - - - - - 693 654 - 789 723 -
Stage 2 - - - - - - 789 721 - 693 652 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1345 - - 1240 - - 455 446 718 447 446 819
Mov Cap-2 Maneuver - - - - - - 455 446 - 447 446 -
Stage 1 - - - - - - 693 654 - 783 717 -
Stage 2 - - - - - - 783 715 - 686 652 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 10.1 12
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)718 1345 - - 1240 - - 527
HCM Lane V/C Ratio 0.008 - - - - - - 0.031
HCM Control Delay (s) 10.1 0 - - 0 - - 12
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0.1
HCM 6th AWSC RHA Sunset Gardens
4: KIRKLAND AVE NE & NE 10TH ST Existing Conditions PM
Timing Plan: PM Synchro 10 Report
TSI 02/02/2021
Intersection
Intersection Delay, s/veh 9.3
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 215 50 20 170 10 30 25 10 10 30 25
Future Vol, veh/h 10 215 50 20 170 10 30 25 10 10 30 25
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %2 2 2 0 0 0 0 0 0 0 0 0
Mvmt Flow 10 222 52 21 175 10 31 26 10 10 31 26
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 9.8 9.2 8.7 8.4
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %46% 4% 10% 15%
Vol Thru, %38% 78% 85% 46%
Vol Right, %15% 18% 5% 38%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 65 275 200 65
LT Vol 30 10 20 10
Through Vol 25 215 170 30
RT Vol 10 50 10 25
Lane Flow Rate 67 284 206 67
Geometry Grp 1 1 1 1
Degree of Util (X)0.095 0.346 0.26 0.091
Departure Headway (Hd)5.083 4.396 4.531 4.885
Convergence, Y/N Yes Yes Yes Yes
Cap 702 816 792 730
Service Time 3.133 2.43 2.568 2.936
HCM Lane V/C Ratio 0.095 0.348 0.26 0.092
HCM Control Delay 8.7 9.8 9.2 8.4
HCM Lane LOS A A A A
HCM 95th-tile Q 0.3 1.6 1 0.3
HCM 6th Signalized Intersection Summary RHA Sunset Gardens
1: NE SUNSET BLVD & NE 10TH ST 2022 without Project AM
Timing Plan: AM Synchro 10 Report
TSI 02/02/2021
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 20 15 75 110 15 50 70 705 80 20 760 20
Future Volume (veh/h) 20 15 75 110 15 50 70 705 80 20 760 20
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1767 1767 1767 1811 1811 1811 1841 1841 1841
Adj Flow Rate, veh/h 21 16 79 116 16 53 74 742 84 21 800 21
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 0 0 0 9 9 9 6 6 6 4 4 4
Cap, veh/h 131 67 209 286 41 76 118 1191 135 206 1502 39
Arrive On Green 0.18 0.18 0.18 0.18 0.18 0.18 0.07 0.38 0.38 0.12 0.43 0.43
Sat Flow, veh/h 170 367 1147 814 223 416 1725 3115 352 1753 3481 91
Grp Volume(v), veh/h 116 0 0 185 0 0 74 410 416 21 402 419
Grp Sat Flow(s),veh/h/ln 1685 0 0 1454 0 0 1725 1721 1747 1753 1749 1824
Q Serve(g_s), s 0.0 0.0 0.0 2.2 0.0 0.0 1.8 8.2 8.2 0.5 7.2 7.2
Cycle Q Clear(g_c), s 2.6 0.0 0.0 4.8 0.0 0.0 1.8 8.2 8.2 0.5 7.2 7.2
Prop In Lane 0.18 0.68 0.63 0.29 1.00 0.20 1.00 0.05
Lane Grp Cap(c), veh/h 407 0 0 403 0 0 118 658 668 206 754 787
V/C Ratio(X)0.28 0.00 0.00 0.46 0.00 0.00 0.63 0.62 0.62 0.10 0.53 0.53
Avail Cap(c_a), veh/h 1182 0 0 1053 0 0 345 1640 1665 309 1626 1696
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 15.3 0.0 0.0 16.0 0.0 0.0 19.3 10.6 10.6 16.7 8.9 8.9
Incr Delay (d2), s/veh 0.4 0.0 0.0 0.8 0.0 0.0 5.3 1.0 1.0 0.2 0.6 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(95%),veh/ln 1.6 0.0 0.0 2.7 0.0 0.0 1.4 4.6 4.6 0.3 3.8 4.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 15.6 0.0 0.0 16.8 0.0 0.0 24.6 11.6 11.6 17.0 9.5 9.5
LnGrp LOS B A A B A A C B B B A A
Approach Vol, veh/h 116 185 900 842
Approach Delay, s/veh 15.6 16.8 12.7 9.7
Approach LOS B B B A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.5 20.7 12.2 7.4 22.8 12.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 7.5 40.5 28.5 8.5 39.5 28.5
Max Q Clear Time (g_c+I1), s 2.5 10.2 4.6 3.8 9.2 6.8
Green Ext Time (p_c), s 0.0 6.0 0.6 0.1 5.9 1.1
Intersection Summary
HCM 6th Ctrl Delay 12.0
HCM 6th LOS B
HCM 6th TWSC RHA Sunset Gardens
2: JEFFERSON AVE W & NE 10TH ST 2022 without Project AM
Timing Plan: AM Synchro 10 Report
TSI 02/02/2021
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 120 0 0 175 20 0 0 0 5 0 10
Future Vol, veh/h 10 120 0 0 175 20 0 0 0 5 0 10
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 1 1 0 2
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 3 3 3 3 3 3 0 0 0 0 0 0
Mvmt Flow 11 132 0 0 192 22 0 0 0 5 0 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 214 0 0 132 0 0 365 368 133 358 357 205
Stage 1 - - - - - - 154 154 - 203 203 -
Stage 2 - - - - - - 211 214 - 155 154 -
Critical Hdwy 4.13 - - 4.13 - - 7.1 6.5 6.2 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 -
Follow-up Hdwy 2.227 - - 2.227 - - 3.5 4 3.3 3.5 4 3.3
Pot Cap-1 Maneuver 1350 - - 1447 - - 595 564 922 601 572 841
Stage 1 - - - - - - 853 774 - 804 737 -
Stage 2 - - - - - - 796 729 - 852 774 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1350 - - 1447 - - 582 559 921 596 567 839
Mov Cap-2 Maneuver - - - - - - 582 559 - 596 567 -
Stage 1 - - - - - - 845 767 - 797 737 -
Stage 2 - - - - - - 784 729 - 844 767 -
Approach EB WB NB SB
HCM Control Delay, s 0.6 0 0 10
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)- 1350 - - 1447 - - 739
HCM Lane V/C Ratio - 0.008 - - - - - 0.022
HCM Control Delay (s) 0 7.7 0 - 0 - - 10
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.1
HCM 6th TWSC RHA Sunset Gardens
3: Driveway/JEFFERSON AVE E & NE 10TH ST 2022 without Project AM
Timing Plan: AM Synchro 10 Report
TSI 02/02/2021
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 95 0 0 195 0 0 0 0 0 0 5
Future Vol, veh/h 0 95 0 0 195 0 0 0 0 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 92 92 96 96 92 92 92 96 92 96
Heavy Vehicles, % 8 8 2 2 6 6 2 2 2 0 2 0
Mvmt Flow 0 99 0 0 203 0 0 0 0 0 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 203 0 0 99 0 0 305 302 99 302 302 203
Stage 1 - - - - - - 99 99 - 203 203 -
Stage 2 - - - - - - 206 203 - 99 99 -
Critical Hdwy 4.18 - - 4.12 - - 7.12 6.52 6.22 7.1 6.52 6.2
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.1 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.1 5.52 -
Follow-up Hdwy 2.272 - - 2.218 - - 3.518 4.018 3.318 3.5 4.018 3.3
Pot Cap-1 Maneuver 1334 - - 1494 - - 647 611 957 654 611 843
Stage 1 - - - - - - 907 813 - 804 733 -
Stage 2 - - - - - - 796 733 - 912 813 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1334 - - 1494 - - 643 611 957 654 611 843
Mov Cap-2 Maneuver - - - - - - 643 611 - 654 611 -
Stage 1 - - - - - - 907 813 - 804 733 -
Stage 2 - - - - - - 791 733 - 912 813 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 0 9.3
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)- 1334 - - 1494 - - 843
HCM Lane V/C Ratio - - - - - - - 0.006
HCM Control Delay (s) 0 0 - - 0 - - 9.3
HCM Lane LOS A A - - A - - A
HCM 95th %tile Q(veh) - 0 - - 0 - - 0
HCM 6th AWSC RHA Sunset Gardens
4: KIRKLAND AVE NE & NE 10TH ST 2022 without Project AM
Timing Plan: AM Synchro 10 Report
TSI 02/02/2021
Intersection
Intersection Delay, s/veh 8.4
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 75 15 10 160 10 20 40 10 10 15 10
Future Vol, veh/h 5 75 15 10 160 10 20 40 10 10 15 10
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles, %6 6 6 5 5 5 5 5 5 0 0 0
Mvmt Flow 5 82 16 11 176 11 22 44 11 11 16 11
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 8.1 8.7 8.2 7.8
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %29% 5% 6% 29%
Vol Thru, %57% 79% 89% 43%
Vol Right, %14% 16% 6% 29%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 70 95 180 35
LT Vol 20 5 10 10
Through Vol 40 75 160 15
RT Vol 10 15 10 10
Lane Flow Rate 77 104 198 38
Geometry Grp 1 1 1 1
Degree of Util (X)0.1 0.128 0.239 0.049
Departure Headway (Hd)4.684 4.405 4.352 4.562
Convergence, Y/N Yes Yes Yes Yes
Cap 766 815 827 786
Service Time 2.705 2.422 2.367 2.585
HCM Lane V/C Ratio 0.101 0.128 0.239 0.048
HCM Control Delay 8.2 8.1 8.7 7.8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.3 0.4 0.9 0.2
HCM 6th Signalized Intersection Summary RHA Sunset Gardens
1: NE SUNSET BLVD & NE 10TH ST 2022 without Project PM
Timing Plan: PM Synchro 10 Report
TSI 02/02/2021
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 20 35 65 155 35 35 35 950 140 60 1025 25
Future Volume (veh/h) 20 35 65 155 35 35 35 950 140 60 1025 25
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1885 1885 1885 1885 1885 1885 1870 1870 1870
Adj Flow Rate, veh/h 21 36 68 161 36 36 36 990 146 62 1068 26
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 0 0 0 1 1 1 1 1 1 2 2 2
Cap, veh/h 114 136 199 330 65 50 70 1448 213 102 1705 42
Arrive On Green 0.22 0.22 0.22 0.22 0.22 0.22 0.04 0.46 0.46 0.06 0.48 0.48
Sat Flow, veh/h 146 631 927 981 302 234 1795 3129 461 1781 3545 86
Grp Volume(v), veh/h 125 0 0 233 0 0 36 566 570 62 535 559
Grp Sat Flow(s),veh/h/ln 1704 0 0 1517 0 0 1795 1791 1799 1781 1777 1854
Q Serve(g_s), s 0.0 0.0 0.0 3.7 0.0 0.0 1.0 12.7 12.7 1.7 11.4 11.4
Cycle Q Clear(g_c), s 3.1 0.0 0.0 6.9 0.0 0.0 1.0 12.7 12.7 1.7 11.4 11.4
Prop In Lane 0.17 0.54 0.69 0.15 1.00 0.26 1.00 0.05
Lane Grp Cap(c), veh/h 449 0 0 446 0 0 70 829 833 102 855 892
V/C Ratio(X)0.28 0.00 0.00 0.52 0.00 0.00 0.51 0.68 0.68 0.61 0.63 0.63
Avail Cap(c_a), veh/h 942 0 0 872 0 0 299 1458 1464 297 1446 1509
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 16.9 0.0 0.0 18.2 0.0 0.0 24.0 10.8 10.8 23.5 9.8 9.8
Incr Delay (d2), s/veh 0.3 0.0 0.0 1.0 0.0 0.0 5.7 1.0 1.0 5.7 0.8 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(95%),veh/ln 2.1 0.0 0.0 4.2 0.0 0.0 0.9 7.4 7.5 1.5 6.5 6.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 17.3 0.0 0.0 19.2 0.0 0.0 29.7 11.8 11.8 29.2 10.6 10.6
LnGrp LOS B A A B A A C B B C B B
Approach Vol, veh/h 125 233 1172 1156
Approach Delay, s/veh 17.3 19.2 12.3 11.6
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.4 28.1 15.5 6.5 29.0 15.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 8.5 41.5 26.5 8.5 41.5 26.5
Max Q Clear Time (g_c+I1), s 3.7 14.7 5.1 3.0 13.4 8.9
Green Ext Time (p_c), s 0.0 8.9 0.6 0.0 8.5 1.3
Intersection Summary
HCM 6th Ctrl Delay 12.8
HCM 6th LOS B
HCM 6th TWSC RHA Sunset Gardens
2: JEFFERSON AVE W & NE 10TH ST 2022 without Project PM
Timing Plan: PM Synchro 10 Report
TSI 02/02/2021
Intersection
Int Delay, s/veh 3.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 30 225 10 0 200 50 5 0 5 55 5 65
Future Vol, veh/h 30 225 10 0 200 50 5 0 5 55 5 65
Conflicting Peds, #/hr 2 0 2 2 0 2 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 2 2 0 0 0 0 0 0 0 0 0
Mvmt Flow 32 239 11 0 213 53 5 0 5 59 5 69
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 268 0 0 252 0 0 589 579 247 553 558 243
Stage 1 - - - - - - 311 311 - 242 242 -
Stage 2 - - - - - - 278 268 - 311 316 -
Critical Hdwy 4.12 - - 4.1 - - 7.1 6.5 6.2 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 -
Follow-up Hdwy 2.218 - - 2.2 - - 3.5 4 3.3 3.5 4 3.3
Pot Cap-1 Maneuver 1296 - - 1325 - - 423 429 797 447 441 801
Stage 1 - - - - - - 704 662 - 766 709 -
Stage 2 - - - - - - 733 691 - 704 659 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1294 - - 1322 - - 373 415 795 433 426 799
Mov Cap-2 Maneuver - - - - - - 373 415 - 433 426 -
Stage 1 - - - - - - 682 641 - 742 708 -
Stage 2 - - - - - - 664 690 - 679 639 -
Approach EB WB NB SB
HCM Control Delay, s 0.9 0 12.2 13.3
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)508 1294 - - 1322 - - 568
HCM Lane V/C Ratio 0.021 0.025 - - - - - 0.234
HCM Control Delay (s) 12.2 7.9 0 - 0 - - 13.3
HCM Lane LOS B A A - A - - B
HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 0.9
HCM 6th TWSC RHA Sunset Gardens
3: Driveway/JEFFERSON AVE E & NE 10TH ST 2022 without Project PM
Timing Plan: PM Synchro 10 Report
TSI 02/02/2021
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 310 5 0 200 50 0 0 5 10 0 5
Future Vol, veh/h 0 310 5 0 200 50 0 0 5 10 0 5
Conflicting Peds, #/hr 8 0 0 0 0 8 0 0 0 3 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 1 1 2 2 0 0 2 2 2 0 2 0
Mvmt Flow 0 337 5 0 217 54 0 0 5 11 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 279 0 0 342 0 0 588 619 343 597 594 253
Stage 1 - - - - - - 340 340 - 252 252 -
Stage 2 - - - - - - 248 279 - 345 342 -
Critical Hdwy 4.11 - - 4.12 - - 7.12 6.52 6.22 7.1 6.52 6.2
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.1 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.1 5.52 -
Follow-up Hdwy 2.209 - - 2.218 - - 3.518 4.018 3.318 3.5 4.018 3.3
Pot Cap-1 Maneuver 1289 - - 1217 - - 421 404 700 418 418 791
Stage 1 - - - - - - 675 639 - 757 698 -
Stage 2 - - - - - - 756 680 - 675 638 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1279 - - 1217 - - 418 401 698 410 415 784
Mov Cap-2 Maneuver - - - - - - 418 401 - 410 415 -
Stage 1 - - - - - - 675 639 - 751 692 -
Stage 2 - - - - - - 750 675 - 668 638 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 10.2 12.6
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)698 1279 - - 1217 - - 488
HCM Lane V/C Ratio 0.008 - - - - - - 0.033
HCM Control Delay (s) 10.2 0 - - 0 - - 12.6
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0.1
HCM 6th AWSC RHA Sunset Gardens
4: KIRKLAND AVE NE & NE 10TH ST 2022 without Project PM
Timing Plan: PM Synchro 10 Report
TSI 02/02/2021
Intersection
Intersection Delay, s/veh 9.5
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 230 55 20 180 10 30 25 10 10 30 25
Future Vol, veh/h 10 230 55 20 180 10 30 25 10 10 30 25
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %2 2 2 0 0 0 0 0 0 0 0 0
Mvmt Flow 10 237 57 21 186 10 31 26 10 10 31 26
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 10.1 9.3 8.8 8.5
HCM LOS B A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %46% 3% 10% 15%
Vol Thru, %38% 78% 86% 46%
Vol Right, %15% 19% 5% 38%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 65 295 210 65
LT Vol 30 10 20 10
Through Vol 25 230 180 30
RT Vol 10 55 10 25
Lane Flow Rate 67 304 216 67
Geometry Grp 1 1 1 1
Degree of Util (X)0.096 0.372 0.274 0.092
Departure Headway (Hd)5.153 4.408 4.558 4.955
Convergence, Y/N Yes Yes Yes Yes
Cap 692 815 786 720
Service Time 3.207 2.444 2.596 3.01
HCM Lane V/C Ratio 0.097 0.373 0.275 0.093
HCM Control Delay 8.8 10.1 9.3 8.5
HCM Lane LOS A B A A
HCM 95th-tile Q 0.3 1.7 1.1 0.3
HCM 6th Signalized Intersection Summary RHA Sunset Gardens
1: NE SUNSET BLVD & NE 10TH ST 2022 with Project AM
Timing Plan: AM Synchro 10 Report
TSI 03/29/2021
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 20 15 75 116 15 51 70 705 92 21 760 20
Future Volume (veh/h) 20 15 75 116 15 51 70 705 92 21 760 20
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1767 1767 1767 1811 1811 1811 1841 1841 1841
Adj Flow Rate, veh/h 21 16 79 122 16 54 74 742 97 22 800 21
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 0 0 0 9 9 9 6 6 6 4 4 4
Cap, veh/h 130 69 215 291 40 76 117 1178 154 202 1506 40
Arrive On Green 0.19 0.19 0.19 0.19 0.19 0.19 0.07 0.39 0.39 0.12 0.43 0.43
Sat Flow, veh/h 167 370 1148 825 215 407 1725 3059 400 1753 3481 91
Grp Volume(v), veh/h 116 0 0 192 0 0 74 417 422 22 402 419
Grp Sat Flow(s),veh/h/ln 1686 0 0 1447 0 0 1725 1721 1739 1753 1749 1824
Q Serve(g_s), s 0.0 0.0 0.0 2.5 0.0 0.0 1.8 8.5 8.5 0.5 7.3 7.3
Cycle Q Clear(g_c), s 2.6 0.0 0.0 5.1 0.0 0.0 1.8 8.5 8.5 0.5 7.3 7.3
Prop In Lane 0.18 0.68 0.64 0.28 1.00 0.23 1.00 0.05
Lane Grp Cap(c), veh/h 414 0 0 407 0 0 117 663 670 202 757 789
V/C Ratio(X)0.28 0.00 0.00 0.47 0.00 0.00 0.63 0.63 0.63 0.11 0.53 0.53
Avail Cap(c_a), veh/h 1161 0 0 1032 0 0 299 1609 1626 304 1636 1706
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 15.3 0.0 0.0 16.2 0.0 0.0 19.6 10.8 10.8 17.2 9.0 9.0
Incr Delay (d2), s/veh 0.4 0.0 0.0 0.8 0.0 0.0 5.5 1.0 1.0 0.2 0.6 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(95%),veh/ln 1.6 0.0 0.0 2.9 0.0 0.0 1.5 4.8 4.9 0.3 3.9 4.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 15.7 0.0 0.0 17.1 0.0 0.0 25.1 11.8 11.8 17.4 9.6 9.6
LnGrp LOS B A A B A A C B B B A A
Approach Vol, veh/h 116 192 913 843
Approach Delay, s/veh 15.7 17.1 12.9 9.8
Approach LOS B B B A
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.5 21.2 12.6 7.4 23.2 12.6
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 7.5 40.5 28.5 7.5 40.5 28.5
Max Q Clear Time (g_c+I1), s 2.5 10.5 4.6 3.8 9.3 7.1
Green Ext Time (p_c), s 0.0 6.1 0.6 0.0 5.9 1.1
Intersection Summary
HCM 6th Ctrl Delay 12.2
HCM 6th LOS B
HCM 6th TWSC RHA Sunset Gardens
2: JEFFERSON AVE W & NE 10TH ST 2022 with Project AM
Timing Plan: AM Synchro 10 Report
TSI 03/29/2021
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 23 120 0 0 174 34 0 0 0 10 0 17
Future Vol, veh/h 23 120 0 0 174 34 0 0 0 10 0 17
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 1 1 0 2
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 3 3 3 3 3 3 0 0 0 0 0 0
Mvmt Flow 25 132 0 0 191 37 0 0 0 11 0 19
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 228 0 0 132 0 0 403 410 133 393 392 212
Stage 1 - - - - - - 182 182 - 210 210 -
Stage 2 - - - - - - 221 228 - 183 182 -
Critical Hdwy 4.13 - - 4.13 - - 7.1 6.5 6.2 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 -
Follow-up Hdwy 2.227 - - 2.227 - - 3.5 4 3.3 3.5 4 3.3
Pot Cap-1 Maneuver 1334 - - 1447 - - 562 534 922 570 547 833
Stage 1 - - - - - - 824 753 - 797 732 -
Stage 2 - - - - - - 786 719 - 823 753 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1334 - - 1447 - - 540 523 921 561 536 831
Mov Cap-2 Maneuver - - - - - - 540 523 - 561 536 -
Stage 1 - - - - - - 808 738 - 781 732 -
Stage 2 - - - - - - 767 719 - 806 738 -
Approach EB WB NB SB
HCM Control Delay, s 1.2 0 0 10.3
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)- 1334 - - 1447 - - 705
HCM Lane V/C Ratio - 0.019 - - - - - 0.042
HCM Control Delay (s) 0 7.8 0 - 0 - - 10.3
HCM Lane LOS A A A - A - - B
HCM 95th %tile Q(veh) - 0.1 - - 0 - - 0.1
HCM 6th TWSC RHA Sunset Gardens
3: Driveway/JEFFERSON AVE E & NE 10TH ST 2022 with Project AM
Timing Plan: AM Synchro 10 Report
TSI 03/29/2021
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 99 0 0 203 0 0 0 0 0 0 5
Future Vol, veh/h 0 99 0 0 203 0 0 0 0 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 92 92 96 96 92 92 92 96 92 96
Heavy Vehicles, % 8 8 2 2 6 6 2 2 2 0 2 0
Mvmt Flow 0 103 0 0 211 0 0 0 0 0 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 211 0 0 103 0 0 317 314 103 314 314 211
Stage 1 - - - - - - 103 103 - 211 211 -
Stage 2 - - - - - - 214 211 - 103 103 -
Critical Hdwy 4.18 - - 4.12 - - 7.12 6.52 6.22 7.1 6.52 6.2
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.1 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.1 5.52 -
Follow-up Hdwy 2.272 - - 2.218 - - 3.518 4.018 3.318 3.5 4.018 3.3
Pot Cap-1 Maneuver 1325 - - 1489 - - 636 601 952 643 601 834
Stage 1 - - - - - - 903 810 - 796 728 -
Stage 2 - - - - - - 788 728 - 908 810 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1325 - - 1489 - - 632 601 952 643 601 834
Mov Cap-2 Maneuver - - - - - - 632 601 - 643 601 -
Stage 1 - - - - - - 903 810 - 796 728 -
Stage 2 - - - - - - 783 728 - 908 810 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 0 9.3
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)- 1325 - - 1489 - - 834
HCM Lane V/C Ratio - - - - - - - 0.006
HCM Control Delay (s) 0 0 - - 0 - - 9.3
HCM Lane LOS A A - - A - - A
HCM 95th %tile Q(veh) - 0 - - 0 - - 0
HCM 6th AWSC RHA Sunset Gardens
4: KIRKLAND AVE NE & NE 10TH ST 2022 with Project AM
Timing Plan: AM Synchro 10 Report
TSI 03/29/2021
Intersection
Intersection Delay, s/veh 8.4
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 6 76 17 10 162 10 24 40 10 10 15 12
Future Vol, veh/h 6 76 17 10 162 10 24 40 10 10 15 12
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles, %6 6 6 5 5 5 5 5 5 0 0 0
Mvmt Flow 7 84 19 11 178 11 26 44 11 11 16 13
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 8.1 8.8 8.3 7.8
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %32% 6% 5% 27%
Vol Thru, %54% 77% 89% 41%
Vol Right, %14% 17% 5% 32%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 74 99 182 37
LT Vol 24 6 10 10
Through Vol 40 76 162 15
RT Vol 10 17 10 12
Lane Flow Rate 81 109 200 41
Geometry Grp 1 1 1 1
Degree of Util (X)0.107 0.134 0.243 0.051
Departure Headway (Hd)4.716 4.418 4.372 4.559
Convergence, Y/N Yes Yes Yes Yes
Cap 761 813 822 786
Service Time 2.738 2.437 2.391 2.585
HCM Lane V/C Ratio 0.106 0.134 0.243 0.052
HCM Control Delay 8.3 8.1 8.8 7.8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.4 0.5 1 0.2
HCM 6th TWSC RHA Sunset Gardens
5: JEFFERSON AVE W & RESIDENTIAL DRWY 2022 with Project AM
Timing Plan: AM Synchro 10 Report
TSI 03/29/2021
Intersection
Int Delay, s/veh 2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 15 5 30 35 5 15
Future Vol, veh/h 15 5 30 35 5 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, %0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 5 33 38 5 16
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 78 52 0 0 71 0
Stage 1 52 - - - - -
Stage 2 26 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 925 1016 - - 1529 -
Stage 1 970 - - - - -
Stage 2 997 - - - - -
Platoon blocked, %- --
Mov Cap-1 Maneuver 922 1016 - - 1529 -
Mov Cap-2 Maneuver 922 - - - - -
Stage 1 970 - - - - -
Stage 2 994 - - - - -
Approach WB NB SB
HCM Control Delay, s 8.9 0 1.8
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 944 1529 -
HCM Lane V/C Ratio - - 0.023 0.004 -
HCM Control Delay (s) - - 8.9 7.4 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 6th Signalized Intersection Summary RHA Sunset Gardens
1: NE SUNSET BLVD & NE 10TH ST 2022 with Project PM
Timing Plan: PM Synchro 10 Report
TSI 03/29/2021
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 20 35 65 162 35 36 35 950 143 60 1025 25
Future Volume (veh/h) 20 35 65 162 35 36 35 950 143 60 1025 25
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 0.99 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1885 1885 1885 1885 1885 1885 1870 1870 1870
Adj Flow Rate, veh/h 21 36 68 169 36 38 36 990 149 62 1068 26
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 0 0 0 1 1 1 1 1 1 2 2 2
Cap, veh/h 125 141 207 353 65 53 72 1312 197 106 1560 38
Arrive On Green 0.22 0.22 0.22 0.22 0.22 0.22 0.04 0.42 0.42 0.06 0.44 0.44
Sat Flow, veh/h 144 633 927 982 291 236 1795 3119 469 1781 3545 86
Grp Volume(v), veh/h 125 0 0 243 0 0 36 568 571 62 535 559
Grp Sat Flow(s),veh/h/ln 1705 0 0 1510 0 0 1795 1791 1797 1781 1777 1854
Q Serve(g_s), s 0.0 0.0 0.0 3.7 0.0 0.0 0.9 12.3 12.3 1.5 11.0 11.0
Cycle Q Clear(g_c), s 2.8 0.0 0.0 6.5 0.0 0.0 0.9 12.3 12.3 1.5 11.0 11.0
Prop In Lane 0.17 0.54 0.70 0.16 1.00 0.26 1.00 0.05
Lane Grp Cap(c), veh/h 473 0 0 471 0 0 72 753 756 106 782 816
V/C Ratio(X)0.26 0.00 0.00 0.52 0.00 0.00 0.50 0.75 0.76 0.58 0.68 0.68
Avail Cap(c_a), veh/h 754 0 0 714 0 0 201 916 919 199 908 948
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 14.8 0.0 0.0 16.1 0.0 0.0 21.4 11.2 11.2 20.9 10.2 10.2
Incr Delay (d2), s/veh 0.3 0.0 0.0 0.9 0.0 0.0 5.3 2.9 2.9 5.0 1.8 1.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(95%),veh/ln 1.8 0.0 0.0 3.8 0.0 0.0 0.8 7.7 7.8 1.3 6.5 6.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 15.1 0.0 0.0 16.9 0.0 0.0 26.7 14.1 14.1 25.9 12.0 11.9
LnGrp LOS B A A B A A C B B C B B
Approach Vol, veh/h 125 243 1175 1156
Approach Delay, s/veh 15.1 16.9 14.5 12.7
Approach LOS B B B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.2 23.7 14.7 6.3 24.6 14.7
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 5.1 23.3 18.1 5.1 23.3 18.1
Max Q Clear Time (g_c+I1), s 3.5 14.3 4.8 2.9 13.0 8.5
Green Ext Time (p_c), s 0.0 4.9 0.5 0.0 5.1 1.0
Intersection Summary
HCM 6th Ctrl Delay 14.0
HCM 6th LOS B
HCM 6th TWSC RHA Sunset Gardens
2: JEFFERSON AVE W & NE 10TH ST 2022 with Project PM
Timing Plan: PM Synchro 10 Report
TSI 03/29/2021
Intersection
Int Delay, s/veh 3.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 34 225 10 0 192 53 5 0 5 65 5 81
Future Vol, veh/h 34 225 10 0 192 53 5 0 5 65 5 81
Conflicting Peds, #/hr 2 0 2 2 0 2 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 2 2 0 0 0 0 0 0 0 0 0
Mvmt Flow 36 239 11 0 204 56 5 0 5 69 5 86
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 262 0 0 252 0 0 598 581 247 553 558 235
Stage 1 - - - - - - 319 319 - 234 234 -
Stage 2 - - - - - - 279 262 - 319 324 -
Critical Hdwy 4.12 - - 4.1 - - 7.1 6.5 6.2 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 -
Follow-up Hdwy 2.218 - - 2.2 - - 3.5 4 3.3 3.5 4 3.3
Pot Cap-1 Maneuver 1302 - - 1325 - - 417 428 797 447 441 809
Stage 1 - - - - - - 697 657 - 774 715 -
Stage 2 - - - - - - 732 695 - 697 653 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1300 - - 1322 - - 359 413 795 432 425 807
Mov Cap-2 Maneuver - - - - - - 359 413 - 432 425 -
Stage 1 - - - - - - 673 635 - 748 714 -
Stage 2 - - - - - - 648 694 - 670 631 -
Approach EB WB NB SB
HCM Control Delay, s 1 0 12.4 13.7
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)495 1300 - - 1322 - - 575
HCM Lane V/C Ratio 0.021 0.028 - - - - - 0.279
HCM Control Delay (s) 12.4 7.8 0 - 0 - - 13.7
HCM Lane LOS B A A - A - - B
HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 1.1
HCM 6th TWSC RHA Sunset Gardens
3: Driveway/JEFFERSON AVE E & NE 10TH ST 2022 with Project PM
Timing Plan: PM Synchro 10 Report
TSI 03/29/2021
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 315 5 0 202 5 0 0 5 10 0 5
Future Vol, veh/h 0 315 5 0 202 5 0 0 5 10 0 5
Conflicting Peds, #/hr 8 0 0 0 0 8 0 0 0 3 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 1 1 2 2 0 0 2 2 2 0 2 0
Mvmt Flow 0 342 5 0 220 5 0 0 5 11 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 233 0 0 347 0 0 571 578 348 581 578 232
Stage 1 - - - - - - 345 345 - 231 231 -
Stage 2 - - - - - - 226 233 - 350 347 -
Critical Hdwy 4.11 - - 4.12 - - 7.12 6.52 6.22 7.1 6.52 6.2
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.1 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.1 5.52 -
Follow-up Hdwy 2.209 - - 2.218 - - 3.518 4.018 3.318 3.5 4.018 3.3
Pot Cap-1 Maneuver 1340 - - 1212 - - 432 427 695 428 427 812
Stage 1 - - - - - - 671 636 - 776 713 -
Stage 2 - - - - - - 777 712 - 671 635 -
Platoon blocked, %- -- -
Mov Cap-1 Maneuver 1330 - - 1212 - - 429 424 693 420 424 805
Mov Cap-2 Maneuver - - - - - - 429 424 - 420 424 -
Stage 1 - - - - - - 671 636 - 770 707 -
Stage 2 - - - - - - 771 706 - 664 635 -
Approach EB WB NB SB
HCM Control Delay, s 0 0 10.2 12.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h)693 1330 - - 1212 - - 500
HCM Lane V/C Ratio 0.008 - - - - - - 0.033
HCM Control Delay (s) 10.2 0 - - 0 - - 12.4
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0.1
HCM 6th AWSC RHA Sunset Gardens
4: KIRKLAND AVE NE & NE 10TH ST 2022 with Project PM
Timing Plan: PM Synchro 10 Report
TSI 03/29/2021
Intersection
Intersection Delay, s/veh 9.6
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 11 231 58 20 181 10 31 25 10 10 30 26
Future Vol, veh/h 11 231 58 20 181 10 31 25 10 10 30 26
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %2 2 2 0 0 0 0 0 0 0 0 0
Mvmt Flow 11 238 60 21 187 10 32 26 10 10 31 27
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 10.1 9.4 8.8 8.5
HCM LOS B A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %47% 4% 9% 15%
Vol Thru, %38% 77% 86% 45%
Vol Right, %15% 19% 5% 39%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 66 300 211 66
LT Vol 31 11 20 10
Through Vol 25 231 181 30
RT Vol 10 58 10 26
Lane Flow Rate 68 309 218 68
Geometry Grp 1 1 1 1
Degree of Util (X)0.098 0.379 0.276 0.094
Departure Headway (Hd)5.171 4.415 4.571 4.965
Convergence, Y/N Yes Yes Yes Yes
Cap 689 813 783 718
Service Time 3.229 2.45 2.611 3.022
HCM Lane V/C Ratio 0.099 0.38 0.278 0.095
HCM Control Delay 8.8 10.1 9.4 8.5
HCM Lane LOS A B A A
HCM 95th-tile Q 0.3 1.8 1.1 0.3
HCM 6th TWSC RHA Sunset Gardens
5: JEFFERSON AVE W & RESIDENTIAL DRWY 2022 with Project PM
Timing Plan: PM Synchro 10 Report
TSI 03/29/2021
Intersection
Int Delay, s/veh 1.4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 26 5 80 8 5 115
Future Vol, veh/h 26 5 80 8 5 115
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, %0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 28 5 87 9 5 125
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 227 92 0 0 96 0
Stage 1 92 - - - - -
Stage 2 135 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 761 965 - - 1498 -
Stage 1 932 - - - - -
Stage 2 891 - - - - -
Platoon blocked, %- --
Mov Cap-1 Maneuver 758 965 - - 1498 -
Mov Cap-2 Maneuver 758 - - - - -
Stage 1 932 - - - - -
Stage 2 887 - - - - -
Approach WB NB SB
HCM Control Delay, s 9.8 0 0.3
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 785 1498 -
HCM Lane V/C Ratio - - 0.043 0.004 -
HCM Control Delay (s) - - 9.8 7.4 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -