Loading...
HomeMy WebLinkAboutNOA_Project_Acceptance_210601DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR21-000001 Long Range Wastewater Management Plan Environmental Review / LUA21-000116, ECF NAME: MAILING ADDRESS: CITY/STATE/ZIP: EMAIL: ______ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: June 1, 2021 PROJECT NAME/NUMBER: PR21-000001 Long Range Wastewater Management Plan Environmental Review / LUA21-000116, ECF PROJECT LOCATION: City-Wide APPLICANT/PROJECT CONTACT PERSON: Ann Fowler, City of Renton / 1055 S Grady Way, Renton, WA 98057 / afowler@rentonwa.gov LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/knhndiq PERMITS/REVIEW REQUESTED: SEPA Environmental Review PROJECT DESCRIPTION: The applicant, the City of Renton Public Works Department, is requesting SEPA Environmental Review for the City of Renton 2021 Long Range Wastewater Management Plan. The subject plan will reviewed as a non-project action, as defined by Section 197-11-774 in the Washington Administrative Code. The plan primarily serves as an update to the City of Renton’s 2010 Long Range Wastewater Management Plan and was developed collaboratively by City staff and Carollo Engineers, Inc. (Carollo), including ADS Environmental Services LLC as part of the Carollo team. The plan addresses policies, criteria, assumptions, and recommendations regarding the Wastewater Management of the City’s planning area with consideration to population growth and increased demands on the sewer utility. The plan will be used as a guide in maintaining and improving the water system in the short-term over the next 10 years. It also provides a planning framework for the 20-year, long-term planning horizon. The primary purpose of this plan is to identify capacity deficiencies in the wastewater collection system, develop feasible alternatives to correct these deficiencies, and plan the infrastructure that will serve future development by addressing facility reliability, public health, groundwater and environmental protection, operation and maintenance, and financing issues. Maintaining a current Plan is required to meet the regulations of the Washington State Department of Health (DOH) and the requirements of the Washington State Growth Management Act. The plan also contains estimated timeframes, which are the intended framework for future funding decisions. The applicant submitted an Environmental (SEPA) Checklist with the application. DATE OF APPLICATION: March 31, 2021 NOTICE OF COMPLETE APPLICATION: June 1, 2021 Comments on the above application must be submitted in writing to Brittany Gillia, Assistant Planner; CED , – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on June 15, 2021. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Planner. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Brittany Gillia, Assistant Planner; Tel: (425) 430-7246; Email: bgillia@rentonwa.gov NOTICE