HomeMy WebLinkAboutNOA_Project_Acceptance_210601DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR21-000001 Long Range Wastewater Management Plan Environmental Review / LUA21-000116, ECF
NAME:
MAILING ADDRESS: CITY/STATE/ZIP:
EMAIL: ______ TELEPHONE NO.:
I prefer to receive project information and documents in hard copy via US mail
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: June 1, 2021
PROJECT NAME/NUMBER: PR21-000001 Long Range Wastewater Management Plan Environmental
Review / LUA21-000116, ECF
PROJECT LOCATION: City-Wide
APPLICANT/PROJECT CONTACT PERSON: Ann Fowler, City of Renton / 1055 S Grady Way, Renton,
WA 98057 / afowler@rentonwa.gov
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the
City of Renton Document Center website. See also
https://cutt.ly/knhndiq
PERMITS/REVIEW REQUESTED: SEPA Environmental Review
PROJECT DESCRIPTION: The applicant, the City of Renton Public Works Department, is requesting
SEPA Environmental Review for the City of Renton 2021 Long Range Wastewater Management Plan. The subject plan
will reviewed as a non-project action, as defined by Section 197-11-774 in the Washington Administrative Code. The
plan primarily serves as an update to the City of Renton’s 2010 Long Range Wastewater Management Plan and was
developed collaboratively by City staff and Carollo Engineers, Inc. (Carollo), including ADS Environmental Services LLC
as part of the Carollo team. The plan addresses policies, criteria, assumptions, and recommendations regarding the
Wastewater Management of the City’s planning area with consideration to population growth and increased demands
on the sewer utility. The plan will be used as a guide in maintaining and improving the water system in the short-term
over the next 10 years. It also provides a planning framework for the 20-year, long-term planning horizon.
The primary purpose of this plan is to identify capacity deficiencies in the wastewater collection system, develop
feasible alternatives to correct these deficiencies, and plan the infrastructure that will serve future development by
addressing facility reliability, public health, groundwater and environmental protection, operation and maintenance,
and financing issues. Maintaining a current Plan is required to meet the regulations of the Washington State
Department of Health (DOH) and the requirements of the Washington State Growth Management Act. The plan also
contains estimated timeframes, which are the intended framework for future funding decisions. The applicant
submitted an Environmental (SEPA) Checklist with the application.
DATE OF APPLICATION: March 31, 2021
NOTICE OF COMPLETE APPLICATION: June 1, 2021
Comments on the above application must be submitted in writing to Brittany Gillia, Assistant Planner; CED , – Planning
Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on June 15, 2021. If you have questions about this
proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Planner.
Anyone who submits written comments will automatically become a party of record and will be notified of any decision
on this project.
CONTACT PERSON: Brittany Gillia, Assistant Planner; Tel: (425) 430-7246; Email: bgillia@rentonwa.gov
NOTICE